-- phpMyAdmin SQL Dump
-- version 4.7.7
-- https://www.phpmyadmin.net/
--
-- Host: localhost:3306
-- Generation Time: Apr 10, 2018 at 01:59 AM
-- Server version: 10.1.31-MariaDB-cll-lve
-- PHP Version: 5.6.30

SET SQL_MODE = "NO_AUTO_VALUE_ON_ZERO";
SET AUTOCOMMIT = 0;
START TRANSACTION;
SET time_zone = "+00:00";


/*!40101 SET @OLD_CHARACTER_SET_CLIENT=@@CHARACTER_SET_CLIENT */;
/*!40101 SET @OLD_CHARACTER_SET_RESULTS=@@CHARACTER_SET_RESULTS */;
/*!40101 SET @OLD_COLLATION_CONNECTION=@@COLLATION_CONNECTION */;
/*!40101 SET NAMES utf8mb4 */;

--
-- Database: `bremisec_kanb946`
--

-- --------------------------------------------------------

--
-- Table structure for table `actions`
--

CREATE TABLE `actions` (
  `id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `event_name` varchar(50) NOT NULL,
  `action_name` varchar(255) DEFAULT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `action_has_params`
--

CREATE TABLE `action_has_params` (
  `id` int(11) NOT NULL,
  `action_id` int(11) NOT NULL,
  `name` varchar(50) NOT NULL,
  `value` varchar(50) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `columns`
--

CREATE TABLE `columns` (
  `id` int(11) NOT NULL,
  `title` varchar(255) NOT NULL,
  `position` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `task_limit` int(11) DEFAULT '0',
  `description` text,
  `hide_in_dashboard` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `columns`
--

INSERT INTO `columns` (`id`, `title`, `position`, `project_id`, `task_limit`, `description`, `hide_in_dashboard`) VALUES
(2, 'Pending', 1, 1, 0, 'Tasks that haven\'t been started yet', 0),
(3, 'Work in progress', 2, 1, 0, 'Tasks in Progress', 0),
(4, 'Done', 4, 1, 0, 'Completed Tasks (Leave for 1 Week then Close)\r\n\r\nIf closed you can search \"status:closed\"', 0),
(6, 'Pending', 2, 2, 0, 'Tasks that haven\'t been started', 0),
(7, 'Work in progress', 3, 2, 0, 'Tasks that are in progress', 0),
(8, 'Done', 4, 2, 0, 'Tasks that have been completed', 0),
(9, 'In Transit', 3, 1, 0, 'Tasks that are on a Plane, Vessel or Train.', 0),
(14, 'Pending', 1, 4, 0, '', 0),
(16, 'Work in progress', 3, 4, 0, '', 0),
(17, 'Done', 4, 4, 0, '', 0);

-- --------------------------------------------------------

--
-- Table structure for table `column_has_move_restrictions`
--

CREATE TABLE `column_has_move_restrictions` (
  `restriction_id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `role_id` int(11) NOT NULL,
  `src_column_id` int(11) NOT NULL,
  `dst_column_id` int(11) NOT NULL,
  `only_assigned` tinyint(1) DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `column_has_restrictions`
--

CREATE TABLE `column_has_restrictions` (
  `restriction_id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `role_id` int(11) NOT NULL,
  `column_id` int(11) NOT NULL,
  `rule` varchar(255) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `comments`
--

CREATE TABLE `comments` (
  `id` int(11) NOT NULL,
  `task_id` int(11) NOT NULL,
  `user_id` int(11) DEFAULT '0',
  `date_creation` bigint(20) DEFAULT NULL,
  `comment` text,
  `reference` varchar(50) DEFAULT '',
  `date_modification` bigint(20) DEFAULT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `comments`
--

INSERT INTO `comments` (`id`, `task_id`, `user_id`, `date_creation`, `comment`, `reference`, `date_modification`) VALUES
(1, 120, 9, 1520506279, 'Diese Aufgabe wurde per Mail an &quot;joerg.hirschfeld@rademacher.de&quot; mit dem Betreff &quot;Tester SW Update &quot; gesendet.', '', 1520506279),
(2, 119, 9, 1520588224, 'Diese Aufgabe wurde per Mail an &quot;johannes.tepasse@rademacher.de&quot; mit dem Betreff &quot;LBW PCB Software Update // Bitte am Montag transferieren&quot; gesendet.', '', 1520588224);

-- --------------------------------------------------------

--
-- Table structure for table `currencies`
--

CREATE TABLE `currencies` (
  `currency` char(3) NOT NULL,
  `rate` float DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `custom_filters`
--

CREATE TABLE `custom_filters` (
  `id` int(11) NOT NULL,
  `filter` varchar(100) NOT NULL,
  `project_id` int(11) NOT NULL,
  `user_id` int(11) NOT NULL,
  `name` varchar(100) NOT NULL,
  `is_shared` tinyint(1) DEFAULT '0',
  `append` tinyint(1) DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `groups`
--

CREATE TABLE `groups` (
  `id` int(11) NOT NULL,
  `external_id` varchar(255) DEFAULT '',
  `name` varchar(100) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `group_has_users`
--

CREATE TABLE `group_has_users` (
  `group_id` int(11) NOT NULL,
  `user_id` int(11) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `invites`
--

CREATE TABLE `invites` (
  `email` varchar(255) NOT NULL,
  `project_id` int(11) NOT NULL,
  `token` varchar(255) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `last_logins`
--

CREATE TABLE `last_logins` (
  `id` int(11) NOT NULL,
  `auth_type` varchar(25) DEFAULT NULL,
  `user_id` int(11) DEFAULT NULL,
  `ip` varchar(45) DEFAULT NULL,
  `user_agent` varchar(255) DEFAULT NULL,
  `date_creation` bigint(20) DEFAULT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `last_logins`
--

INSERT INTO `last_logins` (`id`, `auth_type`, `user_id`, `ip`, `user_agent`, `date_creation`) VALUES
(757, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:57.0) Gecko/20100101 Firefox/57.0', 1516801609),
(771, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:57.0) Gecko/20100101 Firefox/57.0', 1517216787),
(785, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:57.0) Gecko/20100101 Firefox/57.0', 1517389274),
(797, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', 1517471155),
(816, 'Database', 8, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.140 Safari/537.36', 1517825371),
(828, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', 1518074997),
(834, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.140 Safari/537.36', 1518102018),
(836, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 1518153968),
(844, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 1518412648),
(845, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 1518413873),
(846, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 1518418643),
(848, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.140 Safari/537.36', 1518420075),
(860, 'RememberMe', 8, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.167 Safari/537.36', 1518770487),
(862, 'RememberMe', 8, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.167 Safari/537.36', 1518785094),
(890, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1519963092),
(909, 'Database', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520351457),
(913, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520408665),
(917, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520412927),
(918, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520415430),
(919, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 1520419425),
(921, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 1520422807),
(925, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520437871),
(931, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520486311),
(935, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520502103),
(936, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520502424),
(937, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520503461),
(939, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520507436),
(948, 'Database', 11, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 1520589450),
(950, 'RememberMe', 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1520826610),
(953, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 1520857942),
(966, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 1521017688),
(967, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 1521018837),
(971, 'RememberMe', 6, '60.12.217.43', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1521032001),
(972, 'RememberMe', 6, '60.12.217.43', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1521033182),
(974, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 1521039834),
(980, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1521127987),
(990, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1521445894),
(991, 'RememberMe', 6, '180.162.73.112', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1521448776),
(992, 'RememberMe', 6, '180.162.73.112', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1521449372),
(996, 'RememberMe', 6, '180.108.153.183', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1521509766),
(998, 'RememberMe', 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1521531430),
(999, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 1521536357),
(1005, 'Database', 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 1521620811),
(1014, 'RememberMe', 6, '180.162.73.112', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1521787553),
(1018, 'Database', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522045314),
(1019, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1522049718),
(1020, 'Database', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522058582),
(1023, 'RememberMe', 6, '180.162.73.112', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1522113918),
(1024, 'Database', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522131559),
(1029, 'RememberMe', 6, '180.162.73.112', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1522208364),
(1031, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1522231081),
(1032, 'RememberMe', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522251348),
(1033, 'Database', 2, '46.245.219.150', 'Mozilla/5.0 (Windows NT 6.3; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1522253413),
(1035, 'Database', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522305930),
(1036, 'RememberMe', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522307290),
(1037, 'RememberMe', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522307948),
(1038, 'RememberMe', 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522316130),
(1040, 'Database', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522370801),
(1041, 'Database', 2, '185.22.140.73', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522400506),
(1042, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522647233),
(1043, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522666028),
(1044, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522726032),
(1045, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522752091),
(1046, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522776427),
(1047, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522793960),
(1048, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522801760),
(1049, 'RememberMe', 6, '180.162.73.112', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1522802380),
(1050, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1522841791),
(1051, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1522920337),
(1052, 'Database', 11, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1522994047),
(1053, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1522994096),
(1054, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1522998632),
(1055, 'RememberMe', 6, '180.162.73.112', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1523242577),
(1056, 'RememberMe', 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 1523243024),
(1057, 'RememberMe', 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 1523250948);

-- --------------------------------------------------------

--
-- Table structure for table `links`
--

CREATE TABLE `links` (
  `id` int(11) NOT NULL,
  `label` varchar(255) NOT NULL,
  `opposite_id` int(11) DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `links`
--

INSERT INTO `links` (`id`, `label`, `opposite_id`) VALUES
(1, 'relates to', 0),
(2, 'blocks', 3),
(3, 'is blocked by', 2),
(4, 'duplicates', 5),
(5, 'is duplicated by', 4),
(6, 'is a child of', 7),
(7, 'is a parent of', 6),
(8, 'targets milestone', 9),
(9, 'is a milestone of', 8),
(10, 'fixes', 11),
(11, 'is fixed by', 10);

-- --------------------------------------------------------

--
-- Table structure for table `password_reset`
--

CREATE TABLE `password_reset` (
  `token` varchar(80) NOT NULL,
  `user_id` int(11) NOT NULL,
  `date_expiration` int(11) NOT NULL,
  `date_creation` int(11) NOT NULL,
  `ip` varchar(45) NOT NULL,
  `user_agent` varchar(255) NOT NULL,
  `is_active` tinyint(1) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `password_reset`
--

INSERT INTO `password_reset` (`token`, `user_id`, `date_expiration`, `date_creation`, `ip`, `user_agent`, `is_active`) VALUES
('afe771d4aa34d5795bc4a785e0a1d0e72f45adcc2b7a503377ee33ee31c9', 6, 1513645604, 1513643804, '116.225.124.184', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1),
('c55996651774c1ed4ff48b70b77704932f0e1c07939952ce085f3329949f', 5, 1519803170, 1519801370, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1),
('c90fc3cce3587bbd90b69e19cc01e355af28c91b0b230a06fbdfedccd492', 6, 1513564297, 1513562497, '117.85.191.38', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1),
('dd83bb8792334a29f147efbb67d43217f7d1c7a73e5db6cfed76aa27efaa', 5, 1519803364, 1519801564, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 1),
('e8a8c80d7b87c57f0e3011c02924d6556a2ccded9fdb16761b5eaa3e4ff9', 6, 1511424247, 1511422447, '116.225.124.184', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', 1);

-- --------------------------------------------------------

--
-- Table structure for table `plugin_schema_versions`
--

CREATE TABLE `plugin_schema_versions` (
  `plugin` varchar(80) NOT NULL,
  `version` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `projects`
--

CREATE TABLE `projects` (
  `id` int(11) NOT NULL,
  `name` varchar(255) NOT NULL,
  `is_active` tinyint(4) DEFAULT '1',
  `token` varchar(255) DEFAULT NULL,
  `last_modified` bigint(20) DEFAULT NULL,
  `is_public` tinyint(1) DEFAULT '0',
  `is_private` tinyint(1) DEFAULT '0',
  `is_everybody_allowed` tinyint(1) DEFAULT '0',
  `description` text,
  `identifier` varchar(50) DEFAULT '',
  `start_date` varchar(10) DEFAULT '',
  `end_date` varchar(10) DEFAULT '',
  `owner_id` int(11) DEFAULT '0',
  `priority_default` int(11) DEFAULT '0',
  `priority_start` int(11) DEFAULT '0',
  `priority_end` int(11) DEFAULT '3',
  `email` varchar(255) DEFAULT NULL,
  `predefined_email_subjects` text
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `projects`
--

INSERT INTO `projects` (`id`, `name`, `is_active`, `token`, `last_modified`, `is_public`, `is_private`, `is_everybody_allowed`, `description`, `identifier`, `start_date`, `end_date`, `owner_id`, `priority_default`, `priority_start`, `priority_end`, `email`, `predefined_email_subjects`) VALUES
(1, 'Manufacturing (NPSR)', 1, '', 1523243130, 0, 0, 0, 'Tags:\r\n* LBW = LoCo Belt Winder Tasks\r\n* HP2 = HomePilot 2 Tasks\r\n* UBW-GB = Universal Belt Winder Sintered Gears (This can be updated after we move to other parts)\r\n\r\nI have Colour Coded Tasks:\r\n* Red = Top Priority\r\n* Orange = Mid Priority\r\n* Yellow = Normal\r\n* Green = QC Issue\r\n* Grey = Ongoing Monitor Topic\r\n', '', '', '', 1, 0, 0, 3, '', ''),
(2, 'Sourcing (NPSR)', 1, '', 1522802563, 0, 0, 0, '', '', '', '', 3, 0, 0, 3, '', ''),
(4, 'R&D', 1, '', 1522996008, 0, 0, 0, NULL, '', '', '', 1, 0, 0, 3, NULL, NULL);

-- --------------------------------------------------------

--
-- Table structure for table `project_activities`
--

CREATE TABLE `project_activities` (
  `id` int(11) NOT NULL,
  `date_creation` bigint(20) DEFAULT NULL,
  `event_name` varchar(50) NOT NULL,
  `creator_id` int(11) DEFAULT NULL,
  `project_id` int(11) DEFAULT NULL,
  `task_id` int(11) DEFAULT NULL,
  `data` text
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `project_activities`
--

INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1, 1498988735, 'task.create', 1, 1, 1, '{\"task_id\":1,\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n24.08.16 - we should receive the goods today\\r\\n07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n08.02.17 - we will start the mass production for the first 1K\\r\\n28.02.17 - mass production will be in cw10\\r\\n08.03.17 - How did the mass production go?\\r\\n15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n20.04.17 - all the devices were produced without any problems \\r\\n25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n23.05.17 - Manfred is collection all necessary information for a further order\\r\\n20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988735\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(2, 1498988796, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\"}}'),
(3, 1498988846, 'subtask.create', 1, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(4, 1498988871, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1498988871\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(5, 1498988874, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(6, 1498988876, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(7, 1498988897, 'subtask.create', 1, 1, 1, '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(8, 1498988921, 'subtask.create', 1, 1, 1, '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(9, 1498989271, 'task.create', 1, 1, 2, '{\"task_id\":2,\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989271\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(12, 1498989543, 'task.create', 1, 1, 5, '{\"task_id\":5,\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(13, 1498989723, 'task.create', 1, 1, 6, '{\"task_id\":6,\"task\":{\"id\":\"6\",\"title\":\"LBW Order #21\",\"description\":\"* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 22.05.17 - delay of max. 1-2 weeks  \\r\\n* 10.04.17 - Mail Ben: I had a call with Ralf this morning and because of the current production numbers and situation we have decided to do the following. 1080 Units RD45 will leave by vessel on the 20th and we will send out 360 units Air Freight (We Pay) at the end of the month to make up for this delay in sea freight. As for the further schedule I will let you know later this week.\\r\\n* 18.04.17 - 1600 x RD45 will leave with ETD 20.04.17 \\r\\n* 25.04.17 - we received the information that the ETD changed to 23.04.17\\r\\n* 03.05.17 - Air freight has left we are working on the next batch which is looking like it will hit the previous timeline.\\r\\n* 16.05.17 - Mail Ben: We managed to take care of most of the 60 User Guides, however sadly we are sending 1 box (20 Units) without User Guides. We will send you these 20 user guides with the next delivery as discussed. The box and the pallet have been clearly marked.\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - remaining quantity 3120 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to ETA 29.06.17\",\"date_creation\":\"1498989723\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989723\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989723\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(14, 1498989833, 'task.create', 1, 1, 7, '{\"task_id\":7,\"task\":{\"id\":\"7\",\"title\":\"Security Stock\",\"description\":\"* 01.03.17 - Jens has sent a new order for security stock 1400 pcs\\r\\n* 02.03.17 - Mail Ben: Regarding this delivery, the date is rather tight, we are currently looking into shipping this with Order #21, however this is still quite tight. Please give us till next week before we can confirm 100% on this. We don\\u2019t have stock of a lot of key components to handle the normal orders we and this one as well.\\r\\n* 16.03.17 - Mail Shinya: Just confirm and send to order with supplier one by one, they will catch up our time in this end of March or beginning of April, We will delivery 1400pcs together with LBW#21. Means ETA Rhede CW21\\/2017 (22.05.17)\\r\\n* 10.04.17 - Mail Jens: as mentioned last week in our Telco, I double checked the necessity of the each ordered 2oo pcs. safety stock of the international RD35\\/RD45. After internal double checking we do not need the security stocks of the international variants, due to this you\\u2019ll find appended our updated PO 4500030433 without the two positions of RD35\\/RD45int. The each 2 time of 200 pcs. I add to the national variants, so RD35 increased to 600pcs. and RD45 increased to 800pcs. Please send us your corresponding order comfirmation (PI)!\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - security stock - 1400 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to 29.06.17\",\"date_creation\":\"1498989833\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989833\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989833\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(15, 1498989954, 'task.create', 1, 1, 8, '{\"task_id\":8,\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989954\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(16, 1498989958, 'task.move.position', 1, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989954\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"9\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"9\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(17, 1498990023, 'task.create', 1, 1, 9, '{\"task_id\":9,\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498990023\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(18, 1498990120, 'task.create', 1, 1, 10, '{\"task_id\":10,\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498990120\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(19, 1499060242, 'task.create', 1, 1, 11, '{\"task_id\":11,\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060242\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(20, 1499060336, 'task.create', 1, 1, 12, '{\"task_id\":12,\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060336\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(21, 1499060388, 'task.create', 1, 1, 13, '{\"task_id\":13,\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(22, 1499060399, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060399\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\"}}'),
(23, 1499060495, 'task.create', 1, 1, 14, '{\"task_id\":14,\"task\":{\"id\":\"14\",\"title\":\"HP2 Order #11\",\"description\":\"* \\\"16.01.17 - we have send you a new order - Quantity 1K, 1st batch 500 pcs with ETA 02.05.17 (ETD Ende KW12) and 2nd batch with ETA 20.06.17 (ETD Ende KW19) . Please send us an order confirmation.\\r\\n* 17.01.17 - Shinya has sent the order confirmation\\r\\n* 08.03.17 - On track so far.\\r\\n* 29.03.17 - Mail Manfred: We plan with 160 pcs without packaging, power supply, foam or ethernet cable by air. Next 300 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 11.05.17. Next 200 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 17.05.17. The remaing quantity of #11 - 340 pcs - must be shipped on your side with ETD 28.04.17 - ETA 02.06.17\\r\\n* 06.04.17 - 160 pcs via DHL well received, further 144 via air freight with ETD 09.04.17, quantity 492 pcs via vessel ETD 09.04.17. Remaining quantity 251 pcs - best case cw24 ETA Rhede\\r\\n* 18.04.17 - 492 pcs with ETD 09.04.17 - ETA Rhede approx. 19.05.17\\r\\n* 23.05.17 - if everything goes well we will receive them this week\\r\\n* 31.05.17 - well received, further 149 pcs via LCL with ETD 11.06.17 means ETA 16.07.17 and remaining quantity 102 pcs with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 08.06.17 - Mail Shinya: 149 pcs HP2  have send out on time at 11th June. I will push IFB give to us B\\/L and send to you soon.\",\"date_creation\":\"1499060495\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060495\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060495\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(24, 1499060607, 'task.create', 1, 1, 15, '{\"task_id\":15,\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060607\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(25, 1499060678, 'task.create', 1, 1, 16, '{\"task_id\":16,\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060678\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(26, 1499060719, 'task.create', 1, 1, 17, '{\"task_id\":17,\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(27, 1499060791, 'task.create', 1, 1, 18, '{\"task_id\":18,\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060791\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(28, 1499060836, 'task.create', 1, 1, 19, '{\"task_id\":19,\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060836\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060836\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(29, 1499060901, 'task.create', 1, 1, 20, '{\"task_id\":20,\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060901\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(30, 1499060971, 'task.create', 1, 1, 21, '{\"task_id\":21,\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060971\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(31, 1499061048, 'task.create', 1, 1, 22, '{\"task_id\":22,\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061048\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(32, 1499061092, 'subtask.create', 1, 1, 2, '{\"subtask\":{\"id\":\"4\",\"title\":\"Receive Stock Plug Samples\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989271\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(33, 1499061100, 'subtask.create', 1, 1, 2, '{\"subtask\":{\"id\":\"5\",\"title\":\"Test and Measure Samples\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989271\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(34, 1499061110, 'subtask.create', 1, 1, 2, '{\"subtask\":{\"id\":\"6\",\"title\":\"Send Few Samples to YJ\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989271\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(35, 1499061118, 'subtask.create', 1, 1, 2, '{\"subtask\":{\"id\":\"7\",\"title\":\"Receive YJ Assembled and Test\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989271\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(36, 1499061129, 'subtask.create', 1, 1, 2, '{\"subtask\":{\"id\":\"8\",\"title\":\"Write Report for RDD QC\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498989271\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(37, 1499061238, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\"}}'),
(38, 1499061275, 'subtask.create', 1, 1, 12, '{\"subtask\":{\"id\":\"9\",\"title\":\"Receive Part Samples\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(39, 1499061292, 'subtask.create', 1, 1, 12, '{\"subtask\":{\"id\":\"10\",\"title\":\"Verify Dimensions + Function Test\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(40, 1499061304, 'subtask.create', 1, 1, 12, '{\"subtask\":{\"id\":\"11\",\"title\":\"Send Report to Germany (FFT+DIM)\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(41, 1499061312, 'subtask.create', 1, 1, 12, '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(42, 1499061317, 'subtask.create', 1, 1, 12, '{\"subtask\":{\"id\":\"13\",\"title\":\"Gain Release from RDD\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(43, 1499061354, 'subtask.create', 1, 1, 13, '{\"subtask\":{\"id\":\"14\",\"title\":\"Receive Samples from Carry\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"13\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(44, 1499061373, 'subtask.create', 1, 1, 13, '{\"subtask\":{\"id\":\"15\",\"title\":\"Verify Dimensions & Function\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"13\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(45, 1499061378, 'subtask.create', 1, 1, 13, '{\"subtask\":{\"id\":\"16\",\"title\":\"Send Report to Germany\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"13\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(46, 1499061390, 'subtask.create', 1, 1, 13, '{\"subtask\":{\"id\":\"17\",\"title\":\"Gain Release from Germany\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"13\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(47, 1499061945, 'task.assignee_change', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499061944\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"3\"}}'),
(51, 1499063928, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499063928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update.\"}}'),
(52, 1499063944, 'subtask.create', 1, 1, 5, '{\"subtask\":{\"id\":\"18\",\"title\":\"Shinya Book LCL Shipment #19 Rework\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499063928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(53, 1499064473, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499064473\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\"}}'),
(54, 1499066024, 'task.create', 1, 1, 24, '{\"task_id\":24,\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499066024\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(55, 1499067830, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"1\",\"name\":\"image002.jpg\",\"path\":\"tasks\\/1\\/34d2f2642d987281ddea186a3e849b20adf21402\",\"is_image\":\"1\",\"task_id\":\"1\",\"date\":\"1499067830\",\"user_id\":\"1\",\"size\":\"31345\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(56, 1499068804, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"1500595200\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499068804\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\",\"date_due\":1500595200}}'),
(57, 1499070051, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(58, 1499070052, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(59, 1499070054, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(60, 1499070056, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(61, 1499070057, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(62, 1499070060, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(63, 1499070085, 'task.update', 3, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499070085\",\"reference\":\"\",\"date_started\":\"1499070085\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"date_started\":1499070085}}'),
(64, 1499070121, 'task.update', 3, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n\\r\\nlallalaal\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499070121\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n\\r\\nlallalaal\"}}'),
(65, 1499070147, 'task.update', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499070147\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\"}}'),
(75, 1499072637, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499072637\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499070085\",\"reference\":\"\",\"date_started\":\"1499070085\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(76, 1499072640, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499070085\",\"reference\":\"\",\"date_started\":\"1499070085\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(77, 1499072721, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499072721\",\"reference\":\"\",\"date_started\":\"1499070060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\",\"date_started\":1499070060}}'),
(78, 1499072815, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"2\",\"name\":\"Micrometer Postage Slip.jpeg\",\"path\":\"tasks\\/1\\/99e7a51387716de038fb30d19667f3a7c37af796\",\"is_image\":\"1\",\"task_id\":\"1\",\"date\":\"1499072815\",\"user_id\":\"1\",\"size\":\"138927\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499072721\",\"reference\":\"\",\"date_started\":\"1499070060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(79, 1499074574, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499074574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\"}}'),
(80, 1499074625, 'subtask.create', 1, 1, 5, '{\"subtask\":{\"id\":\"19\",\"title\":\"Sent Rework Units\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499063928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(81, 1499129530, 'task.create', 1, 1, 25, '{\"task_id\":25,\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(82, 1499129554, 'subtask.create', 1, 1, 25, '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(83, 1499129562, 'subtask.create', 1, 1, 25, '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(84, 1499150300, 'task.move.column', 2, 1, 7, '{\"task_id\":\"7\",\"task\":{\"id\":\"7\",\"title\":\"Security Stock\",\"description\":\"* 01.03.17 - Jens has sent a new order for security stock 1400 pcs\\r\\n* 02.03.17 - Mail Ben: Regarding this delivery, the date is rather tight, we are currently looking into shipping this with Order #21, however this is still quite tight. Please give us till next week before we can confirm 100% on this. We don\\u2019t have stock of a lot of key components to handle the normal orders we and this one as well.\\r\\n* 16.03.17 - Mail Shinya: Just confirm and send to order with supplier one by one, they will catch up our time in this end of March or beginning of April, We will delivery 1400pcs together with LBW#21. Means ETA Rhede CW21\\/2017 (22.05.17)\\r\\n* 10.04.17 - Mail Jens: as mentioned last week in our Telco, I double checked the necessity of the each ordered 2oo pcs. safety stock of the international RD35\\/RD45. After internal double checking we do not need the security stocks of the international variants, due to this you\\u2019ll find appended our updated PO 4500030433 without the two positions of RD35\\/RD45int. The each 2 time of 200 pcs. I add to the national variants, so RD35 increased to 600pcs. and RD45 increased to 800pcs. Please send us your corresponding order comfirmation (PI)!\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - security stock - 1400 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to 29.06.17\",\"date_creation\":\"1498989833\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499150300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499150300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989833\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989833\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(85, 1499150322, 'task.move.column', 2, 1, 6, '{\"task_id\":\"6\",\"task\":{\"id\":\"6\",\"title\":\"LBW Order #21\",\"description\":\"* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 22.05.17 - delay of max. 1-2 weeks  \\r\\n* 10.04.17 - Mail Ben: I had a call with Ralf this morning and because of the current production numbers and situation we have decided to do the following. 1080 Units RD45 will leave by vessel on the 20th and we will send out 360 units Air Freight (We Pay) at the end of the month to make up for this delay in sea freight. As for the further schedule I will let you know later this week.\\r\\n* 18.04.17 - 1600 x RD45 will leave with ETD 20.04.17 \\r\\n* 25.04.17 - we received the information that the ETD changed to 23.04.17\\r\\n* 03.05.17 - Air freight has left we are working on the next batch which is looking like it will hit the previous timeline.\\r\\n* 16.05.17 - Mail Ben: We managed to take care of most of the 60 User Guides, however sadly we are sending 1 box (20 Units) without User Guides. We will send you these 20 user guides with the next delivery as discussed. The box and the pallet have been clearly marked.\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - remaining quantity 3120 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to ETA 29.06.17\",\"date_creation\":\"1498989723\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499150322\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499150322\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989723\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989723\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(86, 1499150360, 'subtask.update', 2, 1, 25, '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(87, 1499150361, 'subtask.update', 2, 1, 25, '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(88, 1499150362, 'subtask.update', 2, 1, 25, '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(89, 1499154688, 'comment.create', 2, 1, 13, '{\"comment\":{\"id\":\"2\",\"task_id\":\"13\",\"user_id\":\"2\",\"date_creation\":\"1499154688\",\"date_modification\":\"1499154688\",\"comment\":\"68i68oi7o7o\",\"reference\":\"\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"email\":\"Manfred.Kohlruss@rademacher.de\",\"avatar_path\":null},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(90, 1499154707, 'comment.delete', 2, 1, 13, '{\"comment\":{\"id\":\"2\",\"task_id\":\"13\",\"user_id\":\"2\",\"date_creation\":\"1499154688\",\"date_modification\":\"1499154688\",\"comment\":\"68i68oi7o7o\",\"reference\":\"\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"email\":\"Manfred.Kohlruss@rademacher.de\",\"avatar_path\":null},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(91, 1499154948, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499154948\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\"}}'),
(92, 1499155009, 'subtask.create', 2, 1, 2, '{\"subtask\":{\"id\":\"22\",\"title\":\"RD-CN needs 35K plugs from RD-D\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"4\",\"position\":\"6\",\"username\":\"Jens Kremer\",\"name\":\"Jens Kremer\",\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499154948\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(93, 1499155130, 'task.update', 2, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155130\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\"}}'),
(94, 1499155204, 'task.update', 2, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155203\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(95, 1499155243, 'task.update', 2, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155243\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(96, 1499155267, 'task.update', 2, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155267\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(97, 1499155286, 'task.update', 2, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155286\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(98, 1499155320, 'task.update', 2, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\\r\\n\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155320\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\\r\\n\"}}'),
(99, 1499155347, 'task.update', 2, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155347\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(100, 1499155574, 'task.update', 2, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(101, 1499155680, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155680\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\"}}'),
(102, 1499155989, 'task.update', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* \",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155989\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* \"}}'),
(103, 1499156064, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156064\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\"}}'),
(104, 1499156329, 'task.update', 2, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156329\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\"}}'),
(105, 1499156338, 'task.update', 2, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156338\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\"}}'),
(106, 1499156466, 'task.move.column', 2, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156466\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1499060971\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1499060971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(107, 1499156515, 'task.update', 2, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input manfred: \\\"on hold\\\"\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156515\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input manfred: \\\"on hold\\\"\"}}'),
(108, 1499156529, 'task.update', 2, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156529\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\"}}'),
(109, 1499177117, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499177117\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\"}}'),
(110, 1499177275, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499177275\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\"}}'),
(111, 1499177372, 'task.update', 1, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499177372\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(112, 1499235590, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499235590\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\"}}'),
(113, 1499252790, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499252790\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\",\"date_started\":1499934060}}'),
(114, 1499259217, 'task.update', 1, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499259217\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\"}}'),
(115, 1499259228, 'task.assignee_change', 1, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499259228\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(116, 1499323252, 'task.update', 2, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499323252\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\"}}'),
(117, 1499688758, 'task.update', 2, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499688758\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n\"}}'),
(118, 1499693165, 'task.update', 2, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499693164\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \"}}'),
(119, 1499695092, 'subtask.update', 1, 1, 25, '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499695092\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(120, 1499695096, 'subtask.update', 1, 1, 25, '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(121, 1499695144, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499695144\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\"}}'),
(122, 1499734558, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"1500595200\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499734558\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\"}}'),
(123, 1499734614, 'task.update', 1, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499734614\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Claims (RD-D Programming)\"}}'),
(124, 1499734621, 'task.create', 1, 1, 26, '{\"task_id\":26,\"task\":{\"id\":\"26\",\"title\":\"[DUPLICATE] HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499734621\",\"reference\":\"\",\"date_started\":null,\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(125, 1499734723, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499734723\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\",\"owner_id\":\"1\",\"date_started\":0}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(126, 1499734737, 'task.move.position', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499734723\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":13,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(127, 1499752927, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"4\",\"title\":\"Receive Stock Plug Samples\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499752927\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499235590\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(128, 1499752928, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"4\",\"title\":\"Receive Stock Plug Samples\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499235590\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(129, 1499752929, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"5\",\"title\":\"Test and Measure Samples\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499752929\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499235590\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(130, 1499752930, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"5\",\"title\":\"Test and Measure Samples\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499235590\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(131, 1499752941, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"5\",\"title\":\"Test and Measure Samples (PS)\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499235590\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(132, 1499753060, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753060\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\"}}'),
(133, 1499753510, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753510\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\"}}'),
(134, 1499753619, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753619\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\"}}'),
(135, 1499753659, 'subtask.create', 1, 1, 5, '{\"subtask\":{\"id\":\"23\",\"title\":\"Receive Document from Customs\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753619\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(136, 1499753684, 'task.file.create', 1, 1, 2, '{\"file\":{\"id\":\"3\",\"name\":\"M7238R-2-1(X) for sun sensor.pdf\",\"path\":\"tasks\\/2\\/12a64fb99dbed495646ac59301108bad7c04c1bd\",\"is_image\":\"0\",\"task_id\":\"2\",\"date\":\"1499753684\",\"user_id\":\"1\",\"size\":\"140939\"},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753060\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(137, 1499753685, 'task.file.create', 1, 1, 2, '{\"file\":{\"id\":\"4\",\"name\":\"M7239R-2-AB-0(2) for power supply.pdf\",\"path\":\"tasks\\/2\\/6e565dd0b102918e9c287521f164379f2b6c4fe4\",\"is_image\":\"0\",\"task_id\":\"2\",\"date\":\"1499753685\",\"user_id\":\"1\",\"size\":\"168281\"},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753060\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(138, 1499753686, 'task.file.create', 1, 1, 2, '{\"file\":{\"id\":\"5\",\"name\":\"Stock Analysis (Iss 1.0).pdf\",\"path\":\"tasks\\/2\\/e1262c4f2028b401df0c725ccc300c3a4cea71d0\",\"is_image\":\"0\",\"task_id\":\"2\",\"date\":\"1499753686\",\"user_id\":\"1\",\"size\":\"297751\"},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753060\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(139, 1499753778, 'task.update', 1, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\\r\\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499753777\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\\r\\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\",\"color_id\":\"grey\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(140, 1499754443, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754443\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(141, 1499754462, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754462\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"orange\"}}'),
(142, 1499754483, 'task.update', 1, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754483\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(143, 1499754494, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754494\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(144, 1499754517, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(145, 1499758031, 'task.create', 1, 1, 27, '{\"task_id\":27,\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(146, 1499758094, 'task.file.create', 1, 1, 27, '{\"file\":{\"id\":\"6\",\"name\":\"Logo-Adresse-WmD.PDF\",\"path\":\"tasks\\/27\\/050224ca929f1795d942618f515625e6e6f30729\",\"is_image\":\"0\",\"task_id\":\"27\",\"date\":\"1499758094\",\"user_id\":\"1\",\"size\":\"532221\"},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(147, 1499758102, 'task.file.create', 1, 1, 27, '{\"file\":{\"id\":\"7\",\"name\":\"17-07-10 Sonnensensoren RD 35 & 45.jpg\",\"path\":\"tasks\\/27\\/6211111b1d150fcedfc1de98f6b64f65a1919295\",\"is_image\":\"1\",\"task_id\":\"27\",\"date\":\"1499758102\",\"user_id\":\"1\",\"size\":\"161188\"},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(148, 1499758169, 'subtask.create', 1, 1, 27, '{\"subtask\":{\"id\":\"24\",\"title\":\"Get Price and Timeline from ZX\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(149, 1499760630, 'task.file.create', 1, 1, 27, '{\"file\":{\"id\":\"8\",\"name\":\"DSCN3250.jpg\",\"path\":\"tasks\\/27\\/41cd3f565f182d00c760a2347c2aab75fdbdac09\",\"is_image\":\"1\",\"task_id\":\"27\",\"date\":\"1499760630\",\"user_id\":\"1\",\"size\":\"4239155\"},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(150, 1499775320, 'task.update', 2, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499775320\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)\"}}'),
(151, 1499775369, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499775369\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\"}}'),
(152, 1499775915, 'task.update', 2, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499775915\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\"}}'),
(153, 1499846140, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"24\",\"title\":\"Get Price and Timeline from ZX\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499846140\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(154, 1499846141, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"24\",\"title\":\"Get Price and Timeline from ZX\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(155, 1499846157, 'subtask.create', 1, 1, 27, '{\"subtask\":{\"id\":\"25\",\"title\":\"Receive Labels from Supplier\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(156, 1499846166, 'subtask.create', 1, 1, 27, '{\"subtask\":{\"id\":\"26\",\"title\":\"Work out Assembly Increase Price\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(157, 1499846171, 'subtask.create', 1, 1, 27, '{\"subtask\":{\"id\":\"27\",\"title\":\"Send Samples to Germany\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499758031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(158, 1499846273, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499846273\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\"}}'),
(159, 1499846395, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499846395\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\"}}'),
(160, 1499846426, 'subtask.create', 1, 1, 1, '{\"subtask\":{\"id\":\"28\",\"title\":\"Martin\'s Reply to IQC of Chinese Gears\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"2\",\"position\":\"4\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499846395\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(161, 1499846483, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499846483\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\"}}'),
(162, 1499846674, 'subtask.update', 1, 1, 5, '{\"subtask\":{\"id\":\"23\",\"title\":\"Receive Document from Customs\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499846674\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(163, 1499846674, 'subtask.update', 1, 1, 5, '{\"subtask\":{\"id\":\"23\",\"title\":\"Receive Document from Customs\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(164, 1499848745, 'task.create', 1, 1, 28, '{\"task_id\":28,\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848745\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(165, 1499848780, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(166, 1499848798, 'subtask.create', 1, 1, 28, '{\"subtask\":{\"id\":\"29\",\"title\":\"Receive Drawings From Dieter\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(167, 1499848804, 'subtask.create', 1, 1, 28, '{\"subtask\":{\"id\":\"30\",\"title\":\"RX Quote for Stamp Update\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(168, 1499848815, 'subtask.create', 1, 1, 28, '{\"subtask\":{\"id\":\"31\",\"title\":\"Rework RD35\\/45 Covers\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(169, 1499848838, 'task.move.position', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":15,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(170, 1499848843, 'task.move.position', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(171, 1499848847, 'task.move.position', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(172, 1499848851, 'task.move.position', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499848780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(173, 1499868928, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499868928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\"}}'),
(174, 1499868942, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"6\",\"title\":\"Send Few Samples to YJ\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499868942\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499846483\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(175, 1499868943, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"6\",\"title\":\"Send Few Samples to YJ\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499846483\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(176, 1499869046, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n*** * 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.**\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499869046\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n*** * 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.**\"}}'),
(177, 1499869076, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* *** 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499869076\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* *** 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(178, 1499869096, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* ** 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.**\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499869096\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* ** 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.**\"}}'),
(179, 1499888371, 'task.update', 2, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888370\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(180, 1499888498, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888498\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \",\"color_id\":\"red\"}}'),
(181, 1499888638, 'task.update', 2, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888638\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(182, 1499888659, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888659\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(183, 1499888812, 'task.update', 2, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888812\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(184, 1499888915, 'task.update', 2, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888915\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(185, 1499888934, 'task.update', 2, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888934\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(186, 1499888966, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888966\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(187, 1499910453, 'subtask.update', 1, 1, 5, '{\"subtask\":{\"id\":\"18\",\"title\":\"Shinya Book LCL Shipment #19 Rework\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499910453\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(188, 1499910454, 'subtask.update', 1, 1, 5, '{\"subtask\":{\"id\":\"18\",\"title\":\"Shinya Book LCL Shipment #19 Rework\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(189, 1499910455, 'subtask.update', 1, 1, 5, '{\"subtask\":{\"id\":\"19\",\"title\":\"Sent Rework Units\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1499910455\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(190, 1499910456, 'subtask.update', 1, 1, 5, '{\"subtask\":{\"id\":\"19\",\"title\":\"Sent Rework Units\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"5\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499754517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(191, 1499910494, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499910494\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(192, 1499910521, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499910521\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\"}}'),
(193, 1499910583, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499910583\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\",\"owner_id\":\"2\"}}'),
(194, 1499910702, 'task.move.position', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888812\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":15,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(195, 1499910706, 'task.move.position', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888812\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(196, 1499910709, 'task.move.position', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888812\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(197, 1499910760, 'task.assignee_change', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499910760\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(198, 1499910780, 'task.close', 1, 1, 7, '{\"task_id\":\"7\",\"task\":{\"id\":\"7\",\"title\":\"Security Stock\",\"description\":\"* 01.03.17 - Jens has sent a new order for security stock 1400 pcs\\r\\n* 02.03.17 - Mail Ben: Regarding this delivery, the date is rather tight, we are currently looking into shipping this with Order #21, however this is still quite tight. Please give us till next week before we can confirm 100% on this. We don\\u2019t have stock of a lot of key components to handle the normal orders we and this one as well.\\r\\n* 16.03.17 - Mail Shinya: Just confirm and send to order with supplier one by one, they will catch up our time in this end of March or beginning of April, We will delivery 1400pcs together with LBW#21. Means ETA Rhede CW21\\/2017 (22.05.17)\\r\\n* 10.04.17 - Mail Jens: as mentioned last week in our Telco, I double checked the necessity of the each ordered 2oo pcs. safety stock of the international RD35\\/RD45. After internal double checking we do not need the security stocks of the international variants, due to this you\\u2019ll find appended our updated PO 4500030433 without the two positions of RD35\\/RD45int. The each 2 time of 200 pcs. I add to the national variants, so RD35 increased to 600pcs. and RD45 increased to 800pcs. Please send us your corresponding order comfirmation (PI)!\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - security stock - 1400 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to 29.06.17\",\"date_creation\":\"1498989833\",\"date_completed\":\"1499910780\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499910780\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499150300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(199, 1499910791, 'task.close', 1, 1, 6, '{\"task_id\":\"6\",\"task\":{\"id\":\"6\",\"title\":\"LBW Order #21\",\"description\":\"* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 22.05.17 - delay of max. 1-2 weeks  \\r\\n* 10.04.17 - Mail Ben: I had a call with Ralf this morning and because of the current production numbers and situation we have decided to do the following. 1080 Units RD45 will leave by vessel on the 20th and we will send out 360 units Air Freight (We Pay) at the end of the month to make up for this delay in sea freight. As for the further schedule I will let you know later this week.\\r\\n* 18.04.17 - 1600 x RD45 will leave with ETD 20.04.17 \\r\\n* 25.04.17 - we received the information that the ETD changed to 23.04.17\\r\\n* 03.05.17 - Air freight has left we are working on the next batch which is looking like it will hit the previous timeline.\\r\\n* 16.05.17 - Mail Ben: We managed to take care of most of the 60 User Guides, however sadly we are sending 1 box (20 Units) without User Guides. We will send you these 20 user guides with the next delivery as discussed. The box and the pallet have been clearly marked.\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - remaining quantity 3120 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to ETA 29.06.17\",\"date_creation\":\"1498989723\",\"date_completed\":\"1499910791\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499910791\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499150322\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(200, 1499918019, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499918019\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation.\"}}'),
(201, 1499918100, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499918100\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\"}}'),
(202, 1499928102, 'task.update', 2, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499928102\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(203, 1499930159, 'task.move.position', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888812\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(204, 1499930211, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n*13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499930211\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n*13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\"}}'),
(205, 1499930240, 'task.update', 2, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499930240\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \"}}'),
(206, 1499930280, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499930280\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(207, 1499930333, 'task.update', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499930333\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\"}}'),
(208, 1499930391, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499930391\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\"}}'),
(209, 1499930516, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499930516\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\"}}'),
(210, 1499934066, 'task.assignee_change', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499934066\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"4\"}}'),
(211, 1499937565, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499937565\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\"}}'),
(212, 1499942031, 'task.update', 2, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. Ben will forward the information to the supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499942031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. Ben will forward the information to the supplier.\"}}'),
(213, 1499942052, 'task.update', 2, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499942052\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\"}}'),
(214, 1500009341, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500009341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\"}}'),
(215, 1500009408, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500009408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\"}}'),
(216, 1500010319, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500010319\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed.\"}}'),
(217, 1500013401, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500013401\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(218, 1500272928, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500272928\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\"}}'),
(219, 1500273082, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500273082\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\"}}'),
(220, 1500297143, 'subtask.update', 1, 1, 28, '{\"subtask\":{\"id\":\"29\",\"title\":\"Receive Drawings From Dieter\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1500297143\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500009341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(221, 1500297146, 'subtask.update', 1, 1, 28, '{\"subtask\":{\"id\":\"29\",\"title\":\"Receive Drawings From Dieter\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500009341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(222, 1500329049, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500329049\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\"}}'),
(223, 1500345157, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500345157\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\"}}'),
(224, 1500390493, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500390493\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\"}}'),
(225, 1500427508, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1500427508\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500272928\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(226, 1500427510, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500272928\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(227, 1500427563, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500427562\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(228, 1500427578, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"9\",\"name\":\"314-F-00-029e (Iss 1.0).pdf\",\"path\":\"tasks\\/1\\/ec83a08a6dd8084ca03989cb1ac748adac7f7abb\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1500427578\",\"user_id\":\"1\",\"size\":\"271835\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500427562\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(229, 1500427579, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"10\",\"name\":\"314-Z-02-022j (Iss 1.0).pdf\",\"path\":\"tasks\\/1\\/50a8d0748a9c2fe87c6d4b4c20791c3c351f9672\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1500427579\",\"user_id\":\"1\",\"size\":\"226143\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500427562\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(230, 1500427579, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"11\",\"name\":\"375-F-00-004a (Iss 1.0).pdf\",\"path\":\"tasks\\/1\\/9291d5e631bd758a9df54af55ed547ad7524a687\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1500427579\",\"user_id\":\"1\",\"size\":\"275071\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500427562\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(231, 1500427580, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"12\",\"name\":\"375-Z-00-007 (Iss 1.0).pdf\",\"path\":\"tasks\\/1\\/ff8d9c65a17fe0dc8e29dfbc563298948d43e252\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1500427580\",\"user_id\":\"1\",\"size\":\"215277\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500427562\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(232, 1500442039, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500442039\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\"}}'),
(233, 1500521646, 'task.file.create', 1, 1, 27, '{\"file\":{\"id\":\"13\",\"name\":\"WechatIMG19.jpeg\",\"path\":\"tasks\\/27\\/377c117b2f9b80c8f5822a0c1788b71d07926aea\",\"is_image\":\"1\",\"task_id\":\"27\",\"date\":\"1500521646\",\"user_id\":\"1\",\"size\":\"98389\"},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500009408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(234, 1500521646, 'task.file.create', 1, 1, 27, '{\"file\":{\"id\":\"14\",\"name\":\"WechatIMG18.jpeg\",\"path\":\"tasks\\/27\\/997b4711864700e2eaad301fb7f167c74ff61812\",\"is_image\":\"1\",\"task_id\":\"27\",\"date\":\"1500521646\",\"user_id\":\"1\",\"size\":\"84261\"},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500009408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(235, 1500521720, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500521720\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \"}}'),
(236, 1500521770, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500521769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\"}}'),
(237, 1500521990, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500521990\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(238, 1500524593, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500524593\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\"}}'),
(239, 1500524601, 'task.move.column', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500524601\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1498989543\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(240, 1500524609, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500524609\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(241, 1500531358, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500531358\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\"}}'),
(242, 1500610789, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500610789\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\"}}'),
(243, 1500610814, 'task.file.create', 1, 1, 28, '{\"file\":{\"id\":\"15\",\"name\":\"RD45.ai\",\"path\":\"tasks\\/28\\/29d461791079c384262a5259d8706ac09abe005d\",\"is_image\":\"0\",\"task_id\":\"28\",\"date\":\"1500610814\",\"user_id\":\"1\",\"size\":\"1105117\"},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500610789\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(244, 1500610822, 'task.file.create', 1, 1, 28, '{\"file\":{\"id\":\"16\",\"name\":\"566-077.pdf\",\"path\":\"tasks\\/28\\/24d5222c802cc6f1e11030a136a7ca348353e4df\",\"is_image\":\"0\",\"task_id\":\"28\",\"date\":\"1500610822\",\"user_id\":\"1\",\"size\":\"58703\"},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500610789\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(245, 1500610911, 'task.update', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500610911\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\"}}'),
(246, 1500615613, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500615613\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\"}}'),
(247, 1500619078, 'task.update', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500619077\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\"}}'),
(248, 1500624878, 'task.assignee_change', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500624878\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(249, 1500625236, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500625236\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\"}}'),
(250, 1500625338, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500625338\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\"}}'),
(251, 1500874283, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"1500595200\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500874283\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n\"}}'),
(252, 1500874395, 'task.move.column', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500874395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500874395\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1498990023\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(253, 1500874456, 'task.update', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\\r\\n* 24.07.17 - These goods got on the vessel with no problems.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500874455\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500874395\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\\r\\n* 24.07.17 - These goods got on the vessel with no problems.\",\"color_id\":\"yellow\",\"owner_id\":\"2\"}}'),
(254, 1500875077, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500875077\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"date_due\":0}}'),
(255, 1500880790, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500880790\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n\"}}'),
(256, 1500885891, 'task.update', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500885891\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\"}}'),
(257, 1500885902, 'task.move.position', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500885891\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(258, 1500885905, 'task.move.position', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500885891\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(259, 1500885908, 'task.move.position', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500885891\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(260, 1500886512, 'task.file.create', 1, 1, 5, '{\"file\":{\"id\":\"17\",\"name\":\"SSSHHA7070088 (1).pdf\",\"path\":\"tasks\\/5\\/4f5cd7d26393e4943173d176084e0c6ebfb9f514\",\"is_image\":\"0\",\"task_id\":\"5\",\"date\":\"1500886512\",\"user_id\":\"1\",\"size\":\"75788\"},\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500625236\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(261, 1500886570, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500886570\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\"}}'),
(262, 1500887077, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500887077\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n\"}}'),
(263, 1500938487, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500938487\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n\"}}'),
(264, 1500959213, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500959213\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\"}}'),
(265, 1500965379, 'task.file.create', 1, 1, 5, '{\"file\":{\"id\":\"18\",\"name\":\"SSSHHA7070088.pdf\",\"path\":\"tasks\\/5\\/7ef3ad7bcf3ffc0a5720dd940b019b71ef8c9207\",\"is_image\":\"0\",\"task_id\":\"5\",\"date\":\"1500965379\",\"user_id\":\"1\",\"size\":\"174785\"},\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500886570\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(266, 1500965401, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500965401\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\"}}'),
(267, 1501027992, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501027992\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(268, 1501044962, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501044961\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\"}}'),
(269, 1501082842, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501082842\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\"}}'),
(270, 1501082858, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501082858\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\"}}'),
(271, 1501084063, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084063\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \"}}'),
(272, 1501084087, 'task.update', 2, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084087\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(273, 1501084102, 'task.update', 2, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084102\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(274, 1501084135, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084134\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(275, 1501113280, 'task.assignee_change', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501113280\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(276, 1501126302, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501126302\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\"}}'),
(277, 1501132723, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501132723\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\"}}'),
(278, 1501138949, 'task.move.column', 2, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501138949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501138949\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500524601\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(279, 1501139675, 'task.create', 1, 1, 29, '{\"task_id\":29,\"task\":{\"id\":\"29\",\"title\":\"200 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501139675\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(280, 1501139755, 'task.move.column', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501139755\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139755\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"9\",\"date_moved\":\"1501138949\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"9\",\"date_moved\":\"1501138949\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(281, 1501139801, 'task.update', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\\r\\n* 27.07.17 - I will leave this as In-Transit until they arrive in Germany if that\'s ok.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501139801\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139755\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\\r\\n* 27.07.17 - I will leave this as In-Transit until they arrive in Germany if that\'s ok.\"}}'),
(282, 1501145364, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145364\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\"}}'),
(283, 1501145380, 'task.file.create', 1, 1, 28, '{\"file\":{\"id\":\"19\",\"name\":\"RD45 Model Number Label Change.docx\",\"path\":\"tasks\\/28\\/a254301e93ec35ebdd7bb373837082419fb5b05e\",\"is_image\":\"0\",\"task_id\":\"28\",\"date\":\"1501145380\",\"user_id\":\"1\",\"size\":\"150670\"},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145364\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(284, 1501145415, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\"}}'),
(285, 1501146746, 'task.file.create', 1, 1, 27, '{\"file\":{\"id\":\"20\",\"name\":\"LBW RD35.45 Sun Sensor Change.docx\",\"path\":\"tasks\\/27\\/7f004c9189e544c070d8a88f8b75fda1e924676c\",\"is_image\":\"0\",\"task_id\":\"27\",\"date\":\"1501146746\",\"user_id\":\"1\",\"size\":\"311210\"},\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(286, 1501228684, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501228684\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\"}}'),
(287, 1501229057, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229057\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\"}}'),
(288, 1501229138, 'task.update', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\"}}'),
(289, 1501229154, 'task.move.position', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":14,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(290, 1501229158, 'task.move.position', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(291, 1501229163, 'task.move.position', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(292, 1501564382, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501564382\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\"}}'),
(293, 1501564388, 'task.move.column', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501564388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501564388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499129530\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(294, 1501564397, 'subtask.update', 1, 1, 25, '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1501564397\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501564388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501564388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(295, 1501564398, 'subtask.update', 1, 1, 25, '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501564388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501564388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(296, 1501564422, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"25\",\"title\":\"Receive Labels from Supplier\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1501564422\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(297, 1501564423, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"25\",\"title\":\"Receive Labels from Supplier\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(298, 1501564425, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"26\",\"title\":\"Work out Assembly Increase Price\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1501564425\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(299, 1501564426, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"26\",\"title\":\"Work out Assembly Increase Price\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(300, 1501564429, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"27\",\"title\":\"Send Samples to Germany\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1501564429\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(301, 1501564430, 'subtask.update', 1, 1, 27, '{\"subtask\":{\"id\":\"27\",\"title\":\"Send Samples to Germany\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"27\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501145415\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(302, 1501564480, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501564480\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\"}}'),
(303, 1501573595, 'task.update', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\\r\\n* 01.08.17 - Agreed on 7.94RMB. Shinya will send PI Tomorrow.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501573595\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\\r\\n* 01.08.17 - Agreed on 7.94RMB. Shinya will send PI Tomorrow.\"}}'),
(304, 1501573602, 'task.assignee_change', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\\r\\n* 01.08.17 - Agreed on 7.94RMB. Shinya will send PI Tomorrow.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501573602\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(305, 1501701753, 'task.update', 2, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed chnage request\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701753\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed chnage request\"}}'),
(306, 1501701790, 'task.update', 2, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701790\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(307, 1501701833, 'task.update', 2, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701833\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\"}}'),
(308, 1501701918, 'task.update', 2, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - current status of the label (sample \\/ picture) ? Price confirmed for the moment\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701918\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - current status of the label (sample \\/ picture) ? Price confirmed for the moment\"}}'),
(309, 1501701945, 'task.move.column', 2, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\\r\\n* 01.08.17 - Agreed on 7.94RMB. Shinya will send PI Tomorrow.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701945\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501701945\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499066024\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(310, 1501702036, 'task.update', 2, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702036\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\"}}'),
(311, 1501702055, 'task.update', 2, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702055\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\"}}'),
(312, 1501702341, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\"}}'),
(313, 1501702389, 'task.update', 2, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702389\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"orange\"}}'),
(314, 1501702491, 'task.move.column', 2, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501702491\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1501564388\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1501564388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(315, 1501702504, 'task.move.position', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229057\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(316, 1501702511, 'task.move.position', 2, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501702491\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501702491\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(317, 1501702647, 'task.update', 2, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702647\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\"}}'),
(318, 1501742939, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501742939\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\"}}'),
(319, 1501743026, 'task.move.column', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743026\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1501702491\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1501702491\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(320, 1501743044, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743044\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"LBW Relay Purchasing\",\"color_id\":\"grey\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(321, 1501743192, 'task.move.column', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743192\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743192\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1499758031\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(322, 1501743249, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n*03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743249\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743192\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n*03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\"}}'),
(323, 1501743254, 'task.move.column', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n*03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743254\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743254\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"2\",\"dst_column_id\":\"3\",\"date_moved\":\"1501743192\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"2\",\"dst_column_id\":\"3\",\"date_moved\":\"1501743192\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(324, 1501743588, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743588\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\"}}'),
(325, 1501743594, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(326, 1501743684, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n*03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743684\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743254\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(327, 1501743720, 'task.update', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743720\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\"}}'),
(328, 1501743734, 'task.move.position', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229057\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(329, 1501743839, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743839\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\"}}'),
(330, 1501743875, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743875\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(331, 1501743902, 'task.move.position', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(332, 1501743965, 'task.create', 1, 1, 30, '{\"task_id\":30,\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743965\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(333, 1501743969, 'task.move.position', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743965\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(334, 1501743979, 'task.move.position', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743965\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":8,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(335, 1501743983, 'task.move.position', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501743965\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(336, 1502153437, 'task.move.column', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n*03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502153437\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1502153437\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1501743254\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1501743254\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(337, 1502153465, 'task.update', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n* 03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\\r\\n* 08.08.17 - Prices sent. Task Closed.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502153465\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1502153437\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n* 03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\\r\\n* 08.08.17 - Prices sent. Task Closed.\"}}'),
(338, 1502153797, 'task.update', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502153797\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\"}}'),
(339, 1502253970, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502253970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\"}}'),
(340, 1502254037, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502254037\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\"}}'),
(341, 1502254097, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502254097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\"}}'),
(342, 1502700764, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"7\",\"title\":\"Receive YJ Assembled and Test\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1502700764\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502253970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(343, 1502700765, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"7\",\"title\":\"Receive YJ Assembled and Test\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502253970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(344, 1502700806, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502700806\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\"}}'),
(345, 1502700845, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502700845\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(346, 1502762277, 'task.update', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502762277\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\"}}'),
(347, 1502762301, 'task.update', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502762301\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\"}}'),
(348, 1502762354, 'task.move.column', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502762354\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1502762354\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1499060607\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(349, 1502762364, 'task.update', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502762364\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1502762354\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"yellow\",\"owner_id\":\"2\"}}'),
(350, 1502762510, 'task.close', 1, 1, 27, '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\\r\\n* 03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\\r\\n* 08.08.17 - Prices sent. Task Closed.\",\"date_creation\":\"1499758031\",\"date_completed\":\"1502762510\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502762510\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1502153437\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(351, 1502762524, 'task.close', 1, 1, 24, '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\\r\\n* 01.08.17 - Agreed on 7.94RMB. Shinya will send PI Tomorrow.\",\"date_creation\":\"1499066024\",\"date_completed\":\"1502762524\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502762524\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501701945\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(352, 1502771023, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502771023\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\"}}'),
(353, 1502889437, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502889437\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\"}}'),
(354, 1502935746, 'task.update', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502935746\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\",\"color_id\":\"yellow\"}}'),
(355, 1502935767, 'task.update', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502935767\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\"}}'),
(356, 1503296180, 'task.move.column', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503296179\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503296179\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1498990120\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(357, 1503296213, 'task.update', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\\r\\n* 21.08.17 - Goods got on the vessel without a problem. Set sail 20.08.17\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503296213\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503296179\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\\r\\n* 21.08.17 - Goods got on the vessel without a problem. Set sail 20.08.17\"}}'),
(358, 1503296226, 'task.move.column', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503296226\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503296226\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1501139675\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1501139675\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(359, 1503296251, 'task.update', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\\r\\n* 21.08.17 - Goods left with Order #24. Set Sail 20.08.17.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503296251\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503296226\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\\r\\n* 21.08.17 - Goods left with Order #24. Set Sail 20.08.17.\"}}'),
(360, 1503296644, 'task.update', 1, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\\r\\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\\r\\n* 21.08.17 - After Ralf\'s email regarding Dresden, I think we can close this?\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503296644\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\\r\\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\\r\\n* 21.08.17 - After Ralf\'s email regarding Dresden, I think we can close this?\"}}'),
(361, 1503297969, 'task.move.column', 1, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503297969\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503297969\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989954\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(362, 1503298002, 'task.update', 1, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\\r\\n* 21.08.17 - Checked with Jens and this as arrived and already been sent to Schellenberg.\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503298002\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503297969\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\\r\\n* 21.08.17 - Checked with Jens and this as arrived and already been sent to Schellenberg.\"}}'),
(363, 1503300208, 'task.move.column', 1, 1, 14, '{\"task_id\":\"14\",\"task\":{\"id\":\"14\",\"title\":\"HP2 Order #11\",\"description\":\"* \\\"16.01.17 - we have send you a new order - Quantity 1K, 1st batch 500 pcs with ETA 02.05.17 (ETD Ende KW12) and 2nd batch with ETA 20.06.17 (ETD Ende KW19) . Please send us an order confirmation.\\r\\n* 17.01.17 - Shinya has sent the order confirmation\\r\\n* 08.03.17 - On track so far.\\r\\n* 29.03.17 - Mail Manfred: We plan with 160 pcs without packaging, power supply, foam or ethernet cable by air. Next 300 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 11.05.17. Next 200 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 17.05.17. The remaing quantity of #11 - 340 pcs - must be shipped on your side with ETD 28.04.17 - ETA 02.06.17\\r\\n* 06.04.17 - 160 pcs via DHL well received, further 144 via air freight with ETD 09.04.17, quantity 492 pcs via vessel ETD 09.04.17. Remaining quantity 251 pcs - best case cw24 ETA Rhede\\r\\n* 18.04.17 - 492 pcs with ETD 09.04.17 - ETA Rhede approx. 19.05.17\\r\\n* 23.05.17 - if everything goes well we will receive them this week\\r\\n* 31.05.17 - well received, further 149 pcs via LCL with ETD 11.06.17 means ETA 16.07.17 and remaining quantity 102 pcs with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 08.06.17 - Mail Shinya: 149 pcs HP2  have send out on time at 11th June. I will push IFB give to us B\\/L and send to you soon.\",\"date_creation\":\"1499060495\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503300208\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503300208\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060495\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060495\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(364, 1503300228, 'task.update', 1, 1, 14, '{\"task_id\":\"14\",\"task\":{\"id\":\"14\",\"title\":\"HP2 Order #11\",\"description\":\"* \\\"16.01.17 - we have send you a new order - Quantity 1K, 1st batch 500 pcs with ETA 02.05.17 (ETD Ende KW12) and 2nd batch with ETA 20.06.17 (ETD Ende KW19) . Please send us an order confirmation.\\r\\n* 17.01.17 - Shinya has sent the order confirmation\\r\\n* 08.03.17 - On track so far.\\r\\n* 29.03.17 - Mail Manfred: We plan with 160 pcs without packaging, power supply, foam or ethernet cable by air. Next 300 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 11.05.17. Next 200 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 17.05.17. The remaing quantity of #11 - 340 pcs - must be shipped on your side with ETD 28.04.17 - ETA 02.06.17\\r\\n* 06.04.17 - 160 pcs via DHL well received, further 144 via air freight with ETD 09.04.17, quantity 492 pcs via vessel ETD 09.04.17. Remaining quantity 251 pcs - best case cw24 ETA Rhede\\r\\n* 18.04.17 - 492 pcs with ETD 09.04.17 - ETA Rhede approx. 19.05.17\\r\\n* 23.05.17 - if everything goes well we will receive them this week\\r\\n* 31.05.17 - well received, further 149 pcs via LCL with ETD 11.06.17 means ETA 16.07.17 and remaining quantity 102 pcs with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 08.06.17 - Mail Shinya: 149 pcs HP2  have send out on time at 11th June. I will push IFB give to us B\\/L and send to you soon.\\r\\n* 21.08.17 - HP2 Order #11 has also been fully received!\",\"date_creation\":\"1499060495\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503300228\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503300208\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* \\\"16.01.17 - we have send you a new order - Quantity 1K, 1st batch 500 pcs with ETA 02.05.17 (ETD Ende KW12) and 2nd batch with ETA 20.06.17 (ETD Ende KW19) . Please send us an order confirmation.\\r\\n* 17.01.17 - Shinya has sent the order confirmation\\r\\n* 08.03.17 - On track so far.\\r\\n* 29.03.17 - Mail Manfred: We plan with 160 pcs without packaging, power supply, foam or ethernet cable by air. Next 300 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 11.05.17. Next 200 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 17.05.17. The remaing quantity of #11 - 340 pcs - must be shipped on your side with ETD 28.04.17 - ETA 02.06.17\\r\\n* 06.04.17 - 160 pcs via DHL well received, further 144 via air freight with ETD 09.04.17, quantity 492 pcs via vessel ETD 09.04.17. Remaining quantity 251 pcs - best case cw24 ETA Rhede\\r\\n* 18.04.17 - 492 pcs with ETD 09.04.17 - ETA Rhede approx. 19.05.17\\r\\n* 23.05.17 - if everything goes well we will receive them this week\\r\\n* 31.05.17 - well received, further 149 pcs via LCL with ETD 11.06.17 means ETA 16.07.17 and remaining quantity 102 pcs with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 08.06.17 - Mail Shinya: 149 pcs HP2  have send out on time at 11th June. I will push IFB give to us B\\/L and send to you soon.\\r\\n* 21.08.17 - HP2 Order #11 has also been fully received!\"}}'),
(365, 1503363442, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503363442\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\"}}'),
(366, 1503390089, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503390089\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\"}}'),
(367, 1503452689, 'task.update', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503452689\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\"}}'),
(368, 1503452729, 'task.create', 1, 1, 31, '{\"task_id\":31,\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503452729\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(369, 1503452735, 'task.move.position', 1, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503452729\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(370, 1503452742, 'task.move.position', 1, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503452729\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(371, 1503452784, 'task.create', 1, 1, 32, '{\"task_id\":32,\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27?\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503452784\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(372, 1503452797, 'task.move.position', 1, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27?\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503452784\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(373, 1503455226, 'task.update', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503455226\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\"}}'),
(374, 1503463602, 'task.move.position', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1502254097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(375, 1503463605, 'task.move.position', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501126302\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(376, 1503501956, 'task.move.column', 2, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\\r\\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\\r\\n* 21.08.17 - After Ralf\'s email regarding Dresden, I think we can close this?\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503501955\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503501955\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"position\":6,\"src_column_id\":\"2\",\"dst_column_id\":\"4\",\"date_moved\":\"1499156466\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"2\",\"dst_column_id\":\"4\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(377, 1503502019, 'subtask.update', 2, 1, 1, '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503390089\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(378, 1503502020, 'subtask.update', 2, 1, 1, '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503390089\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(379, 1503502021, 'subtask.update', 2, 1, 1, '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503390089\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(380, 1503502097, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(381, 1503502259, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n23.08.17 - RD-D has payed the deposit\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502259\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n23.08.17 - RD-D has payed the deposit\"}}'),
(382, 1503502292, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502292\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\"}}'),
(383, 1503502318, 'task.update', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502318\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(384, 1503532231, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503532231\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\"}}'),
(385, 1503644873, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503644873\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\"}}'),
(386, 1503645736, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503645736\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(387, 1504063088, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063088\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\"}}'),
(388, 1504063101, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"8\",\"title\":\"Write Report for RDD QC\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1504063101\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063088\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(389, 1504063101, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"8\",\"title\":\"Write Report for RDD QC\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063088\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(390, 1504063102, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"8\",\"title\":\"Write Report for RDD QC\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063088\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(391, 1504063104, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"8\",\"title\":\"Write Report for RDD QC\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1504063104\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063088\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(392, 1504063105, 'subtask.update', 1, 1, 2, '{\"subtask\":{\"id\":\"8\",\"title\":\"Write Report for RDD QC\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063088\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(393, 1504063119, 'subtask.create', 1, 1, 2, '{\"subtask\":{\"id\":\"32\",\"title\":\"Quote Germany for CN Plugs\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"1\",\"position\":\"7\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063088\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(394, 1504063153, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063153\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(395, 1504063208, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063208\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\"}}'),
(396, 1504063321, 'task.close', 1, 1, 8, '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\\r\\n* 21.08.17 - Checked with Jens and this as arrived and already been sent to Schellenberg.\",\"date_creation\":\"1498989954\",\"date_completed\":\"1504063321\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063321\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503297969\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(397, 1504063345, 'task.close', 1, 1, 14, '{\"task_id\":\"14\",\"task\":{\"id\":\"14\",\"title\":\"HP2 Order #11\",\"description\":\"* \\\"16.01.17 - we have send you a new order - Quantity 1K, 1st batch 500 pcs with ETA 02.05.17 (ETD Ende KW12) and 2nd batch with ETA 20.06.17 (ETD Ende KW19) . Please send us an order confirmation.\\r\\n* 17.01.17 - Shinya has sent the order confirmation\\r\\n* 08.03.17 - On track so far.\\r\\n* 29.03.17 - Mail Manfred: We plan with 160 pcs without packaging, power supply, foam or ethernet cable by air. Next 300 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 11.05.17. Next 200 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 17.05.17. The remaing quantity of #11 - 340 pcs - must be shipped on your side with ETD 28.04.17 - ETA 02.06.17\\r\\n* 06.04.17 - 160 pcs via DHL well received, further 144 via air freight with ETD 09.04.17, quantity 492 pcs via vessel ETD 09.04.17. Remaining quantity 251 pcs - best case cw24 ETA Rhede\\r\\n* 18.04.17 - 492 pcs with ETD 09.04.17 - ETA Rhede approx. 19.05.17\\r\\n* 23.05.17 - if everything goes well we will receive them this week\\r\\n* 31.05.17 - well received, further 149 pcs via LCL with ETD 11.06.17 means ETA 16.07.17 and remaining quantity 102 pcs with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 08.06.17 - Mail Shinya: 149 pcs HP2  have send out on time at 11th June. I will push IFB give to us B\\/L and send to you soon.\\r\\n* 21.08.17 - HP2 Order #11 has also been fully received!\",\"date_creation\":\"1499060495\",\"date_completed\":\"1504063345\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063345\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503300208\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(398, 1504063353, 'task.close', 1, 1, 21, '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\\r\\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\\r\\n* 21.08.17 - After Ralf\'s email regarding Dresden, I think we can close this?\",\"date_creation\":\"1499060971\",\"date_completed\":\"1504063353\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504063353\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503501955\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(399, 1504065704, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504065704\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\"}}'),
(400, 1504077105, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504077105\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward.\"}}'),
(401, 1504078660, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"21\",\"name\":\"Gear Packaging.pdf\",\"path\":\"tasks\\/1\\/6e1c6c4d433198c20360280aef83e6c3b0de9377\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1504078660\",\"user_id\":\"1\",\"size\":\"869528\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504077105\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(402, 1504078683, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504078683\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\"}}'),
(403, 1504112070, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112070\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\"}}'),
(404, 1504112128, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112128\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\"}}'),
(405, 1504112236, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112236\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(406, 1504112259, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112259\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\"}}'),
(407, 1504112353, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27?\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112353\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27?\"}}'),
(408, 1504112500, 'task.move.column', 2, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\\r\\n* 27.07.17 - I will leave this as In-Transit until they arrive in Germany if that\'s ok.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112500\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504112500\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1501139755\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1501139755\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(409, 1504112534, 'task.move.column', 2, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\\r\\n* 24.07.17 - These goods got on the vessel with no problems.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504112534\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500874395\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500874395\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(410, 1504238019, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504238019\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\"}}'),
(411, 1504238028, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504238028\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(412, 1504253266, 'task.assignee_change', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\\r\\n* 21.08.17 - Goods got on the vessel without a problem. Set sail 20.08.17\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504253266\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503296179\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(413, 1504253274, 'task.assignee_change', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\\r\\n* 21.08.17 - Goods left with Order #24. Set Sail 20.08.17.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504253274\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503296226\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(414, 1504702873, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504702873\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\"}}'),
(415, 1504702930, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504702930\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\"}}'),
(416, 1504703340, 'task.update', 2, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504703340\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\"}}'),
(417, 1504703360, 'task.update', 2, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504703360\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(418, 1504703765, 'task.create', 2, 1, 33, '{\"task_id\":33,\"task\":{\"id\":\"33\",\"title\":\"LBW\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703765\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(419, 1504703788, 'task.update', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703788\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW - Claim RD45\",\"color_id\":\"green\"}}'),
(420, 1504703819, 'task.assignee_change', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(421, 1504703837, 'task.move.position', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(422, 1504703845, 'task.move.position', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(423, 1504703975, 'task.file.create', 2, 1, 33, '{\"file\":{\"id\":\"22\",\"name\":\"Screenshot aufgenommen 06\\/09\\/2017 15:19.png\",\"path\":\"tasks\\/33\\/fabf7ad33a5360155605799db0fdf3ea2c3df3ee\",\"is_image\":\"1\",\"task_id\":\"33\",\"date\":\"1504703975\",\"user_id\":\"2\",\"size\":\"1549263\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703899\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(424, 1504704011, 'task.file.create', 2, 1, 33, '{\"file\":{\"id\":\"23\",\"name\":\"Screenshot aufgenommen 06\\/09\\/2017 15:20.png\",\"path\":\"tasks\\/33\\/019a3c025104c0f503a3697536b62aa6951dd401\",\"is_image\":\"1\",\"task_id\":\"33\",\"date\":\"1504704011\",\"user_id\":\"2\",\"size\":\"1746478\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703899\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(425, 1504704186, 'task.update', 2, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504704186\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment\"}}'),
(426, 1504742808, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504742808\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\"}}'),
(427, 1504742940, 'task.update', 1, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504742940\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\"}}'),
(428, 1504752779, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1504752779\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504238028\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(429, 1504752781, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504238028\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(430, 1504752782, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"28\",\"title\":\"Martin\'s Reply to IQC of Chinese Gears\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"2\",\"position\":\"4\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"In progress\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504238028\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(431, 1504752783, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"28\",\"title\":\"Martin\'s Reply to IQC of Chinese Gears\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"2\",\"position\":\"4\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504238028\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(432, 1504771217, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504771216\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(433, 1504771280, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504771280\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\"}}'),
(434, 1504775991, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the chnage approval sheet to Andreas for release\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504775991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the chnage approval sheet to Andreas for release\"}}'),
(435, 1504776004, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504776004\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\"}}'),
(436, 1504776270, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504776270\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\"}}'),
(437, 1505117853, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505117853\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\"}}'),
(438, 1505275049, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505275049\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\"}}'),
(439, 1505275205, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505275205\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(440, 1505275301, 'task.file.create', 1, 1, 1, '{\"file\":{\"id\":\"24\",\"name\":\"150123_534_gears.xlsx\",\"path\":\"tasks\\/1\\/2714295f36ef9cfbb553b30520a521e4376dd266\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1505275301\",\"user_id\":\"1\",\"size\":\"11172\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505275049\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(441, 1505896503, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896503\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\"}}'),
(442, 1505896535, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896535\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\"}}'),
(443, 1505896604, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896604\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\"}}'),
(444, 1505896665, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896665\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\"}}'),
(445, 1505896714, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896714\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\"}}'),
(446, 1505896818, 'task.create', 1, 1, 34, '{\"task_id\":34,\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896818\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(447, 1505896823, 'task.move.position', 1, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896818\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(448, 1505896828, 'task.move.position', 1, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896818\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(449, 1505896941, 'task.move.position', 1, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1505896818\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(452, 1506040907, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506040907\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\",\"owner_id\":\"2\"}}'),
(453, 1506041021, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506041021\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\"}}'),
(461, 1506041412, 'task.update', 1, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506041412\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\",\"color_id\":\"yellow\"}}'),
(462, 1506041446, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506041446\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499734621\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(465, 1506041542, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506041542\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\"}}'),
(466, 1506042040, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 and purchase another 10k to 15k worth of relays in order to keep us secure.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506042040\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 and purchase another 10k to 15k worth of relays in order to keep us secure.\"}}'),
(467, 1506042124, 'task.create', 1, 1, 38, '{\"task_id\":38,\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506042124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(470, 1506302513, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506302513\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\"}}'),
(475, 1506668316, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506668316\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(476, 1506668376, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506668376\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17.\"}}'),
(477, 1506668398, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506668398\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\"}}'),
(478, 1506668485, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506668485\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\"}}'),
(479, 1506668614, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506668614\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\"}}'),
(480, 1506688211, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506688210\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\"}}'),
(481, 1506689557, 'task.update', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\"}}'),
(482, 1507515084, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507515084\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\"}}'),
(483, 1507560678, 'task.update', 2, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507560678\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\"}}'),
(484, 1507561894, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. Asap RD-D will send the requested samples.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561894\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. Asap RD-D will send the requested samples.\"}}'),
(485, 1507561921, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. and will send asap the requested samples.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561921\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. and will send asap the requested samples.\"}}'),
(486, 1507561928, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send asap the requested samples.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send asap the requested samples.\"}}'),
(487, 1507561944, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561944\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\"}}'),
(488, 1507561970, 'task.update', 2, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(489, 1507562029, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562029\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\"}}'),
(490, 1507562092, 'task.move.column', 2, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562092\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1502762354\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1502762354\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(491, 1507562109, 'task.move.column', 2, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\\r\\n* 21.08.17 - Goods got on the vessel without a problem. Set sail 20.08.17\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562109\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562109\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296179\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296179\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(492, 1507562126, 'task.move.column', 2, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\\r\\n* 21.08.17 - Goods left with Order #24. Set Sail 20.08.17.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562126\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562126\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296226\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296226\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(493, 1507562130, 'task.move.position', 2, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506668614\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(494, 1507595408, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\"}}'),
(495, 1507595473, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595473\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\"}}'),
(496, 1507595554, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred today regarding the 3rd shipment of the remaining HP2\'s from Order #13.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595554\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred today regarding the 3rd shipment of the remaining HP2\'s from Order #13.\"}}'),
(497, 1507595566, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595566\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\"}}'),
(498, 1507595640, 'task.update', 1, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595640\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\"}}'),
(499, 1507595730, 'task.update', 1, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595730\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(500, 1507595754, 'task.update', 1, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\\r\\n* 10.10.17 - I believe this is done?\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595754\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\\r\\n* 10.10.17 - I believe this is done?\"}}'),
(501, 1507595986, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595986\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\"}}'),
(502, 1507615682, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the poer supply stocko plug - sun sensor still OPEN\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507615682\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the poer supply stocko plug - sun sensor still OPEN\"}}'),
(503, 1507623903, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507623902\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n\"}}'),
(504, 1507885787, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods out in CW43.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507885787\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods out in CW43.\"}}'),
(505, 1507886034, 'task.move.column', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886034\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1498988735\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(506, 1507886055, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886055\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"color_id\":\"grey\",\"owner_id\":\"0\"}}'),
(507, 1507886161, 'task.create', 1, 1, 39, '{\"task_id\":39,\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(508, 1507886166, 'task.move.position', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(509, 1507886170, 'task.move.position', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(510, 1507886175, 'task.move.position', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(511, 1507886202, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(512, 1507886209, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"38\",\"title\":\"Receive Package from Germany\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(513, 1507886223, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"39\",\"title\":\"Receive Motors from Nichibo\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(514, 1507896385, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"40\",\"title\":\"Send Pricing to Manfred\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507886160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(515, 1508032593, 'subtask.create', 1, 1, 38, '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507595640\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(517, 1508143672, 'task.update', 6, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17-the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508143672\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17-the new samples are accept by Quality .\"}}'),
(518, 1508152037, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508152037\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(519, 1508196778, 'task.close', 1, 1, 5, '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\\r\\n* 27.07.17 - I will leave this as In-Transit until they arrive in Germany if that\'s ok.\",\"date_creation\":\"1498989543\",\"date_completed\":\"1508196778\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196778\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504112500\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(520, 1508196789, 'task.close', 1, 1, 9, '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\\r\\n* 24.07.17 - These goods got on the vessel with no problems.\",\"date_creation\":\"1498990023\",\"date_completed\":\"1508196789\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196789\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504112534\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(521, 1508196799, 'task.close', 1, 1, 15, '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":\"1508196799\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(522, 1508196810, 'task.close', 1, 1, 10, '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\\r\\n* 21.08.17 - Goods got on the vessel without a problem. Set sail 20.08.17\",\"date_creation\":\"1498990120\",\"date_completed\":\"1508196810\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196810\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562109\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(523, 1508196819, 'task.close', 1, 1, 29, '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\\r\\n* 21.08.17 - Goods left with Order #24. Set Sail 20.08.17.\",\"date_creation\":\"1501139675\",\"date_completed\":\"1508196819\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562126\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(524, 1508196843, 'task.update', 1, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196843\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\"}}'),
(525, 1508196870, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196870\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\"}}'),
(526, 1508196918, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196918\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(527, 1508196941, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196941\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality .\"}}'),
(528, 1508196947, 'task.move.column', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196947\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508196947\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060388\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(529, 1508196957, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508196957\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508196947\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(530, 1508221252, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens will send asap the updated order - new ETA Rhede cw02\\/2018 as DAP delivery. Furthermore the we must pay the 2nd half when we received the goods because of inventory stock reason. Please check.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508221252\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens will send asap the updated order - new ETA Rhede cw02\\/2018 as DAP delivery. Furthermore the we must pay the 2nd half when we received the goods because of inventory stock reason. Please check.\"}}'),
(533, 1508339434, 'task.update', 2, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\"}}'),
(534, 1508339541, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\\r\\n\\r\\n\\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339541\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\\r\\n\\r\\n\\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(535, 1508339566, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339566\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(536, 1508339675, 'task.update', 2, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\\r\\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   \",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339675\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\\r\\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   \"}}'),
(537, 1508339911, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the apyment when they receive the goods because of inventory stock reason. @Ben: Please check.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339911\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the apyment when they receive the goods because of inventory stock reason. @Ben: Please check.\"}}'),
(538, 1508340045, 'task.update', 2, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340045\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\"}}'),
(539, 1508340132, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check.\\r\\n\\r\\nIf you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340132\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check.\\r\\n\\r\\nIf you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(540, 1508340144, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340144\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(541, 1508340169, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n\\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340169\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n\\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(542, 1508340188, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n              ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340188\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n              ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(543, 1508340205, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340205\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(544, 1508340222, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340222\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(\\r\\n\"}}'),
(545, 1508340249, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340249\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(546, 1508340329, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* * 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340329\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* * 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(547, 1508340342, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340342\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(548, 1508340374, 'task.move.column', 2, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\\r\\n* 10.10.17 - I believe this is done?\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340374\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340374\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060901\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(549, 1508340536, 'task.create', 2, 1, 40, '{\"task_id\":40,\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508340536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(550, 1508340574, 'task.assignee_change', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508340574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(551, 1508340592, 'task.move.position', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508340574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(552, 1508481023, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508481023\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\"}}'),
(553, 1508540627, 'task.create', 1, 1, 41, '{\"task_id\":41,\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(554, 1508540632, 'task.move.position', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(555, 1508540646, 'task.move.position', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(556, 1508540646, 'task.move.position', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(557, 1508540649, 'task.move.position', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(558, 1508540740, 'task.file.create', 1, 1, 41, '{\"file\":{\"id\":\"25\",\"name\":\"566-013-\\u5f00\\u6a21\\u62a5\\u544a-20170929-1.ppt\",\"path\":\"tasks\\/41\\/4487c9004a7ca4af2e24f72460e36f9ff490674d\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1508540740\",\"user_id\":\"1\",\"size\":\"1071104\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(559, 1508540750, 'task.file.create', 1, 1, 41, '{\"file\":{\"id\":\"26\",\"name\":\"566-063-\\u5f00\\u6a21\\u62a5\\u544a-20170929-1.ppt\",\"path\":\"tasks\\/41\\/095f388aa2d0ca22bfe2227887b07d0422629819\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1508540750\",\"user_id\":\"1\",\"size\":\"1333248\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(560, 1508540778, 'task.file.create', 1, 1, 41, '{\"file\":{\"id\":\"27\",\"name\":\"RD35 Tool.xlsx\",\"path\":\"tasks\\/41\\/82b48182ca5d6996dce0a638fa8f96e1a15984a6\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1508540778\",\"user_id\":\"1\",\"size\":\"109292\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508540627\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(561, 1508541182, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508541182\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\"}}'),
(562, 1508541257, 'task.update', 1, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508541257\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060836\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\"}}'),
(563, 1508541771, 'task.update', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\\r\\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   \",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508541770\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(564, 1508545680, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the apyment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508545680\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the apyment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(565, 1508828894, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508828894\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\"}}'),
(566, 1508828913, 'task.move.column', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\\r\\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   \",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508828913\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508828913\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989271\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(567, 1508828973, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508828973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\"}}'),
(568, 1508829048, 'task.update', 1, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508829048\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\"}}'),
(569, 1509446403, 'task.create', 2, 1, 42, '{\"task_id\":42,\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509446403\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(570, 1509446459, 'task.assignee_change', 2, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509446459\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(571, 1509449439, 'task.update', 2, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509449439\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(572, 1509449471, 'task.update', 2, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a **change approval sheet** for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509449471\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a **change approval sheet** for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(573, 1509507911, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509507910\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\"}}'),
(574, 1509507923, 'task.file.create', 1, 1, 39, '{\"file\":{\"id\":\"28\",\"name\":\"UBW Gearbox Quote (Iss 2.0).pdf\",\"path\":\"tasks\\/39\\/8219d50f69c1627c19adc5409a2712275075967b\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1509507923\",\"user_id\":\"1\",\"size\":\"25712\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509507910\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(575, 1509507939, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"38\",\"title\":\"Receive Package from Germany\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1509507939\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509507910\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(576, 1509507940, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"38\",\"title\":\"Receive Package from Germany\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509507910\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(577, 1509507944, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"40\",\"title\":\"Send Pricing to Manfred\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1509507944\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509507910\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(578, 1509507945, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"40\",\"title\":\"Send Pricing to Manfred\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509507910\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(579, 1509507962, 'subtask.update', 1, 1, 28, '{\"subtask\":{\"id\":\"31\",\"title\":\"Rework RD35\\/45 Covers\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1509507962\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508541182\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(580, 1509507963, 'subtask.update', 1, 1, 28, '{\"subtask\":{\"id\":\"31\",\"title\":\"Rework RD35\\/45 Covers\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508541182\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(581, 1509508013, 'task.update', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509508013\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\"}}'),
(582, 1509508175, 'subtask.update', 1, 1, 28, '{\"subtask\":{\"id\":\"30\",\"title\":\"RX Quote for Stamp Update\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1509508175\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509508013\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(583, 1509508176, 'subtask.update', 1, 1, 28, '{\"subtask\":{\"id\":\"30\",\"title\":\"RX Quote for Stamp Update\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"28\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509508013\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(584, 1509508201, 'task.move.column', 1, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509508201\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509508201\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1505896818\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1505896818\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(585, 1509508339, 'task.update', 1, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\\r\\n* 01.11.17 - This has all been sent with Sally\'s goods Vessel Departure: 27.10.17.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509508339\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509508201\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\\r\\n* 01.11.17 - This has all been sent with Sally\'s goods Vessel Departure: 27.10.17.\"}}'),
(586, 1509520133, 'task.create', 3, 2, 43, '{\"task_id\":43,\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us\\r\\n                an updated quotation\\r\\n19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24,\\r\\n                tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17)\\r\\n                Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that \\r\\n                shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN \\r\\n                standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, \\r\\n                meanwhile supplier is doing the FSIR.\\r\\n13.09.17 - Henk has sent the FSIR to Berthold\\r\\n13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip.\\r\\n                So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework\\r\\n                some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while.\\r\\n                So please be patient, you\'ll get more info asap.\\r\\n11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520133\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520133\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(589, 1509520392, 'task.create', 3, 2, 45, '{\"task_id\":45,\"task\":{\"id\":\"45\",\"title\":\"project 672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the\\r\\n                order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem,\\r\\n                we will send you tomorrow the DFM.\\r\\n11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede.  \\r\\n                Could you please take this into account, when supplier will start the sampling?\\r\\n11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. \\r\\n                Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the\\r\\n                missing deforming angle.\\r\\n18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520392\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(590, 1509520408, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the\\r\\n                order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem,\\r\\n                we will send you tomorrow the DFM.\\r\\n11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede.  \\r\\n                Could you please take this into account, when supplier will start the sampling?\\r\\n11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. \\r\\n                Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the\\r\\n                missing deforming angle.\\r\\n18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"title\":\"672 - LED Dimmer\"}}'),
(591, 1509520540, 'task.create', 3, 2, 46, '{\"task_id\":46,\"task\":{\"id\":\"46\",\"title\":\"gearbox noise analysis\",\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the \\r\\n                gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a \\r\\n                complete assembled and tested unit to us ?\\r\\n18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor\\r\\n                they will contact their supplier and deliver the quotation in short term.\\r\\n23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level,\\r\\n                this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\",\"date_creation\":\"1509520540\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520540\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520540\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(592, 1509520674, 'task.create', 3, 2, 47, '{\"task_id\":47,\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ?\\r\\n                Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK.\\r\\n                Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer\\r\\n                to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed \\r\\n                afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting\\r\\n                for printing layout from Foresee.\\r\\n24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n28.10.17 - speechless high price of TA60 and S1 received from Foresee\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520674\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(593, 1509520776, 'task.create', 3, 2, 48, '{\"task_id\":48,\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main \\r\\n                license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the \\r\\n                timeline wherever possible.\\r\\n30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received\\r\\n                (now same pcb design for all GDOs).\\r\\n02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited\\r\\n               the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee\\r\\n               should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manula so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520776\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(594, 1509520879, 'task.create', 3, 2, 49, '{\"task_id\":49,\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the \\r\\n                different type of limit switch heads available for the WSEC series\\r\\n11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520879\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(595, 1509520959, 'task.create', 3, 2, 50, '{\"task_id\":50,\"task\":{\"id\":\"50\",\"title\":\"superrollo 5-channel hand transmitter w\\/ timer\",\"description\":\"24.03.17 - Mail Sally: DC104 series is including: DC104 DC105 DC168 DC169, from current standard offering, there is no 5-channel.\\r\\n                Dooya need to double check with product department next week.\\r\\n                DC104 and DC105>> with DISPLAY, without timer function\\r\\n                DC168(single-channel) and DC169(15-channel)>> with DISPLAY, with timer function\\r\\n                Instantly arranged sample for DC168 DC169 first, once we have feedback for the 5 channel, we will send you more info.\\r\\n                Price: DC168  RMB 27.50, DC169  RMB 28.00 \\r\\n30.03.17 - samples well received and forwarded to Ralf\\r\\n27.06.17 - in progress at our product management department\\r\\n30.08.17 - RD-D will send in a separate mail some questions - REACH and RoHS declaration etc.\\r\\n26.09.17 - Mail Sally: \\u00b7Remote control, due to the sales figure - DC168\\/DC169(with screen, with timer function) - NO plan to do any cerfitcation\\r\\n               DC104\\/DC105(no screen, no timer function) - will apply RED at the end of October. DC513\\/DC514(with screen, with timer function),\\r\\n               the one we saw during the visit in the electronics workshop display board - NO plan to do any cerfitcation, just FYI.\\r\\n04.10.17 - Mail Markus: Dear Sally, without certificates we will not be allowed to sell these products. The models DC104\\/DC105 has no timer \\r\\n               - we need a remote control with timer as an accessory. Can you please check again whether Dooya offers remote controls with\\r\\n                timer function and existing certificates?\\r\\n11.10.17 - the only one has both timer and certification(ongoing) is DC2705 (5 channels) approx 9USD. DC2703(single channel) \\r\\n                certification possible.\\r\\n30.10.17 - RED certification of  DC2705(5 channel) & DC2703(single channel) sent,waiting for Markus feedback\",\"date_creation\":\"1509520959\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509520959\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520959\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(596, 1509521002, 'task.create', 3, 2, 51, '{\"task_id\":51,\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request\\r\\n                base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n25.04.17 - further feedback from Ralf necessary\\r\\n27.06.17 - in progress at our product management department\\r\\n30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509521002\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(597, 1509521066, 'task.create', 3, 2, 52, '{\"task_id\":52,\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing \\r\\n                accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not \\r\\n                finding this issue earlier\\u2026\\r\\n22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing \\r\\n                accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch \\r\\n               with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026\\r\\n                We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the \\r\\n                bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high \\r\\n                voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you\\r\\n                a detailed reply.\\r\\n28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different \\r\\n                connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other \\r\\n                solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble\\r\\n                with that .zip file let me know.\\r\\n11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the \\r\\n                TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509521066\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(600, 1509521407, 'task.create', 3, 2, 55, '{\"task_id\":55,\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address.\\r\\n                The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product.\\r\\n                Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type,\\r\\n                but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also\\r\\n                can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of \\r\\n                DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63\\r\\n                The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of \\r\\n                \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our \\r\\n                Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture\\r\\n                below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed.\\r\\n                A simple wire as antenna is possible as well. Does this answer your question?\\r\\n13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question.\\r\\n                Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509521407\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(608, 1509556175, 'task.update', 2, 2, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us\\r\\n                an updated quotation\\r\\n19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24,\\r\\n                tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17)\\r\\n                Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that \\r\\n                shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN \\r\\n                standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, \\r\\n                meanwhile supplier is doing the FSIR.\\r\\n13.09.17 - Henk has sent the FSIR to Berthold\\r\\n13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip.\\r\\n                So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556175\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520133\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us\\r\\n                an updated quotation\\r\\n19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24,\\r\\n                tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17)\\r\\n                Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that \\r\\n                shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN \\r\\n                standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, \\r\\n                meanwhile supplier is doing the FSIR.\\r\\n13.09.17 - Henk has sent the FSIR to Berthold\\r\\n13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip.\\r\\n                So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\"}}'),
(609, 1509556251, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the\\r\\n                order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem,\\r\\n                we will send you tomorrow the DFM.\\r\\n11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede.  \\r\\n                Could you please take this into account, when supplier will start the sampling?\\r\\n11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556251\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the\\r\\n                order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem,\\r\\n                we will send you tomorrow the DFM.\\r\\n11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede.  \\r\\n                Could you please take this into account, when supplier will start the sampling?\\r\\n11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(610, 1509556349, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556349\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\"}}'),
(611, 1509556455, 'task.update', 2, 2, 46, '{\"task_id\":\"46\",\"task\":{\"id\":\"46\",\"title\":\"gearbox noise analysis\",\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n\\r\\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\\r\\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\\r\\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\",\"date_creation\":\"1509520540\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556455\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520540\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n\\r\\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\\r\\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\\r\\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\"}}'),
(612, 1509556590, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556590\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\"}}'),
(613, 1509556738, 'task.update', 2, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manula so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556738\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manula so then co-license could be issued.\"}}'),
(614, 1509556800, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\"}}'),
(615, 1509556934, 'task.update', 2, 2, 50, '{\"task_id\":\"50\",\"task\":{\"id\":\"50\",\"title\":\"superrollo 5-channel hand transmitter w\\/ timer\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: DC104 series is including: DC104 DC105 DC168 DC169, from current standard offering, there is no 5-channel. Dooya need to double check with product department next week. DC104 and DC105>> with DISPLAY, without timer function DC168(single-channel) and DC169(15-channel)>> with DISPLAY, with timer function Instantly arranged sample for DC168 DC169 first, once we have feedback for the 5 channel, we will send you more info.                Price: DC168  RMB 27.50, DC169  RMB 28.00 \\r\\n* 30.03.17 - samples well received and forwarded to Ralf\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will send in a separate mail some questions - REACH and RoHS declaration etc.\\r\\n* 26.09.17 - Mail Sally: \\u00b7Remote control, due to the sales figure - DC168\\/DC169(with screen, with timer function) - NO plan to do any cerfitcation DC104\\/DC105(no screen, no timer function) - will apply RED at the end of October. DC513\\/DC514(with screen, with timer function),             the one we saw during the visit in the electronics workshop display board - NO plan to do any cerfitcation, just FYI.\\r\\n* 04.10.17 - Mail Markus: Dear Sally, without certificates we will not be allowed to sell these products. The models DC104\\/DC105 has no timer - we need a remote control with timer as an accessory. Can you please check again whether Dooya offers remote controls with timer function and existing certificates?\\r\\n* 11.10.17 - the only one has both timer and certification(ongoing) is DC2705 (5 channels) approx 9USD. DC2703(single channel) certification possible.\\r\\n* 30.10.17 - RED certification of  DC2705(5 channel) & DC2703(single channel) sent,waiting for Markus feedback\",\"date_creation\":\"1509520959\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556934\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520959\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 24.03.17 - Mail Sally: DC104 series is including: DC104 DC105 DC168 DC169, from current standard offering, there is no 5-channel. Dooya need to double check with product department next week. DC104 and DC105>> with DISPLAY, without timer function DC168(single-channel) and DC169(15-channel)>> with DISPLAY, with timer function Instantly arranged sample for DC168 DC169 first, once we have feedback for the 5 channel, we will send you more info.                Price: DC168  RMB 27.50, DC169  RMB 28.00 \\r\\n* 30.03.17 - samples well received and forwarded to Ralf\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will send in a separate mail some questions - REACH and RoHS declaration etc.\\r\\n* 26.09.17 - Mail Sally: \\u00b7Remote control, due to the sales figure - DC168\\/DC169(with screen, with timer function) - NO plan to do any cerfitcation DC104\\/DC105(no screen, no timer function) - will apply RED at the end of October. DC513\\/DC514(with screen, with timer function),             the one we saw during the visit in the electronics workshop display board - NO plan to do any cerfitcation, just FYI.\\r\\n* 04.10.17 - Mail Markus: Dear Sally, without certificates we will not be allowed to sell these products. The models DC104\\/DC105 has no timer - we need a remote control with timer as an accessory. Can you please check again whether Dooya offers remote controls with timer function and existing certificates?\\r\\n* 11.10.17 - the only one has both timer and certification(ongoing) is DC2705 (5 channels) approx 9USD. DC2703(single channel) certification possible.\\r\\n* 30.10.17 - RED certification of  DC2705(5 channel) & DC2703(single channel) sent,waiting for Markus feedback\"}}'),
(616, 1509556979, 'task.update', 2, 2, 51, '{\"task_id\":\"51\",\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556979\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\"}}'),
(617, 1509557163, 'task.update', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509557163\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(632, 1509558240, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509558240\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\"}}'),
(633, 1509620409, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509620409\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\"}}'),
(634, 1509620426, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 first samples in week 46. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509620426\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"red\"}}'),
(635, 1509620981, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509620981\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\"}}'),
(636, 1509622240, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509622240\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\"}}'),
(637, 1509622536, 'task.create', 2, 2, 58, '{\"task_id\":58,\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509622536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(638, 1509622557, 'task.assignee_change', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509622557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"3\"}}'),
(639, 1509622669, 'task.file.create', 2, 2, 58, '{\"file\":{\"id\":\"29\",\"name\":\"QR_200001386_Housing_GGK 586-01-1_00.pdf\",\"path\":\"tasks\\/58\\/4fffb59c187ce2c873bf8a843e67ab480179eb97\",\"is_image\":\"0\",\"task_id\":\"58\",\"date\":\"1509622669\",\"user_id\":\"2\",\"size\":\"168719\"},\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509622626\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(640, 1509623364, 'task.update', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509623364\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n\\r\\n\"}}'),
(641, 1509696682, 'task.update', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509696682\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17.\"}}'),
(642, 1509696806, 'task.update', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509696806\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(643, 1509699651, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing \\r\\n                accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not \\r\\n                finding this issue earlier\\u2026\\r\\n22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing \\r\\n                accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch \\r\\n               with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026\\r\\n                We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the \\r\\n                bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high \\r\\n                voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you\\r\\n                a detailed reply.\\r\\n28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different \\r\\n                connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other \\r\\n                solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble\\r\\n                with that .zip file let me know.\\r\\n11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the \\r\\n                TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509699651\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing \\r\\n                accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not \\r\\n                finding this issue earlier\\u2026\\r\\n22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing \\r\\n                accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch \\r\\n               with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026\\r\\n                We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the \\r\\n                bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high \\r\\n                voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you\\r\\n                a detailed reply.\\r\\n28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different \\r\\n                connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other \\r\\n                solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble\\r\\n                with that .zip file let me know.\\r\\n11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the \\r\\n                TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n\"}}'),
(644, 1509699772, 'task.update', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509699772\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n\\r\\n\",\"color_id\":\"green\"}}'),
(645, 1509700441, 'task.update', 2, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509700441\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(646, 1509700496, 'task.update', 2, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - **Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.**\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509700496\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - **Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.**\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(647, 1509700527, 'task.update', 2, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509700527\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(648, 1509859523, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509859523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\"}}'),
(649, 1509859664, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"42\",\"title\":\"21\\/11\\/2017 Worm Samples Arrive\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509859523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(650, 1509859676, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"39\",\"title\":\"23\\/12\\/2017 Receive Motors from Nichibo\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509859523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(651, 1509859727, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"43\",\"title\":\"Motor Samples Testing Running in China\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"6\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509859523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(652, 1509859727, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"44\",\"title\":\"Motor Samples Sent to Germany\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"7\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509859523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(653, 1509859727, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"45\",\"title\":\"Motor Samples Testing Running in Germany\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"8\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509859523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(654, 1509864078, 'task.update', 1, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509864078\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n\\r\\n\"}}'),
(655, 1509937589, 'task.update', 1, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"6\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509937589\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(656, 1509937603, 'task.update', 1, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509937603\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(657, 1509937614, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509937614\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(658, 1509937688, 'task.create', 3, 2, 59, '{\"task_id\":59,\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509937688\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(659, 1509937691, 'task.update', 1, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - PCB-holder\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.18 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509937691\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520262\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"green\"}}'),
(660, 1509937702, 'task.update', 1, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509937702\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521307\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"green\"}}'),
(661, 1509937715, 'task.update', 1, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n\\r\\n\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509937715\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521559\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"green\"}}'),
(662, 1509937753, 'task.close', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":\"1509937753\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509937753\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508196947\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(663, 1509937761, 'task.close', 1, 1, 20, '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\\r\\n* 10.10.17 - I believe this is done?\",\"date_creation\":\"1499060901\",\"date_completed\":\"1509937761\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509937761\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340374\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(664, 1509937770, 'task.close', 1, 1, 2, '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\\r\\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   \",\"date_creation\":\"1498989271\",\"date_completed\":\"1509937770\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509937770\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508828913\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(665, 1509937831, 'task.assignee_change', 3, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509937831\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521307\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"6\"}}'),
(666, 1509937864, 'task.assignee_change', 3, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n\\r\\n\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509937864\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521559\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"6\"}}'),
(667, 1509937869, 'task.assignee_change', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509937869\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521771\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"6\"}}'),
(668, 1509952971, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509952971\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\"}}'),
(669, 1509953006, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"30\",\"name\":\"QR_200001327_TM09_HE3015_00.pdf\",\"path\":\"tasks\\/59\\/a02ac7acd0dafc6c12ae632cde9c3eb5a0470693\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1509953006\",\"user_id\":\"2\",\"size\":\"2085928\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509952993\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(670, 1509984069, 'task.update', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984069\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n\\r\\n\"}}'),
(671, 1509984116, 'task.update', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984116\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n\\r\\n\"}}'),
(672, 1509984170, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(673, 1510052856, 'task.update', 2, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. **Change approval sheet ???**\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510052856\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. **Change approval sheet ???**\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(674, 1510053391, 'task.update', 2, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510053391\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\"}}'),
(675, 1510120636, 'task.update', 3, 2, 46, '{\"task_id\":\"46\",\"task\":{\"id\":\"46\",\"title\":\"gearbox noise analysis\",\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n\\r\\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\\r\\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\\r\\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\\r\\n* 08.11.17 - Silent is not willing to give us the motor supplier info\",\"date_creation\":\"1509520540\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510120636\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520540\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n\\r\\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\\r\\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\\r\\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\\r\\n* 08.11.17 - Silent is not willing to give us the motor supplier info\"}}'),
(676, 1510125225, 'task.file.create', 2, 2, 58, '{\"file\":{\"id\":\"31\",\"name\":\"CAR-20171103-GGK586-01-1& GGK586-01-2-earth terminal damage.docx\",\"path\":\"tasks\\/58\\/6dacb7f461953225770accc976e7383fd706528c\",\"is_image\":\"0\",\"task_id\":\"58\",\"date\":\"1510125225\",\"user_id\":\"2\",\"size\":\"762570\"},\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509699820\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(677, 1510125329, 'task.file.create', 2, 2, 58, '{\"file\":{\"id\":\"32\",\"name\":\"CAR-20171103-GGK586-01-1& GGK586-01-2-earth terminal damage.pdf\",\"path\":\"tasks\\/58\\/015ee3f54c5496a43f887205c11fa4e4f736811c\",\"is_image\":\"0\",\"task_id\":\"58\",\"date\":\"1510125329\",\"user_id\":\"2\",\"size\":\"97015\"},\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509699820\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(678, 1510125393, 'task.update', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510125393\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n\"}}'),
(679, 1510126388, 'task.update', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\"}}'),
(680, 1510126395, 'task.assignee_change', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(681, 1510126405, 'task.file.create', 1, 1, 41, '{\"file\":{\"id\":\"33\",\"name\":\"566-013d-\\u5f00\\u6a21\\u62a5\\u544a-20171028.pptx\",\"path\":\"tasks\\/41\\/73f8f2db17362365050d8c0b082d6be398680bb7\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510126405\",\"user_id\":\"1\",\"size\":\"950827\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(682, 1510126409, 'task.file.create', 1, 1, 41, '{\"file\":{\"id\":\"34\",\"name\":\"566-063C-\\u5f00\\u6a21\\u62a5\\u544a-20171028.pptx\",\"path\":\"tasks\\/41\\/d167865aa95f924936bebd5cd0fbff8effb583a5\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510126409\",\"user_id\":\"1\",\"size\":\"1035413\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(683, 1510128922, 'task.file.create', 2, 2, 51, '{\"file\":{\"id\":\"35\",\"name\":\"DZ361-01(A-00).pdf\",\"path\":\"tasks\\/51\\/6af57d639c0df48e14c4185cd6726d845469793b\",\"is_image\":\"0\",\"task_id\":\"51\",\"date\":\"1510128921\",\"user_id\":\"2\",\"size\":\"402038\"},\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556979\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(684, 1510128922, 'task.file.create', 2, 2, 51, '{\"file\":{\"id\":\"36\",\"name\":\"DZ233(A-00).pdf\",\"path\":\"tasks\\/51\\/4efdfcabfc94e71addb82688f42074b7072efbaf\",\"is_image\":\"0\",\"task_id\":\"51\",\"date\":\"1510128922\",\"user_id\":\"2\",\"size\":\"312428\"},\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556979\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(685, 1510128922, 'task.file.create', 2, 2, 51, '{\"file\":{\"id\":\"37\",\"name\":\"DZ233-01(A-01).pdf\",\"path\":\"tasks\\/51\\/50a7747209ce030409afa394121f79196817952b\",\"is_image\":\"0\",\"task_id\":\"51\",\"date\":\"1510128922\",\"user_id\":\"2\",\"size\":\"356590\"},\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509556979\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(686, 1510130045, 'task.update', 2, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510130045\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(687, 1510132126, 'task.file.create', 2, 2, 58, '{\"file\":{\"id\":\"38\",\"name\":\"shipment packing picture.jpg\",\"path\":\"tasks\\/58\\/ae8b34fcfb8f9ec6a8d6d0e4ea41b39699b2b17d\",\"is_image\":\"1\",\"task_id\":\"58\",\"date\":\"1510132126\",\"user_id\":\"2\",\"size\":\"199455\"},\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510125393\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(688, 1510132126, 'task.file.create', 2, 2, 58, '{\"file\":{\"id\":\"39\",\"name\":\"old packing mechod.jpg\",\"path\":\"tasks\\/58\\/3fefee29b893525636a98ac4cc52a665af36388b\",\"is_image\":\"1\",\"task_id\":\"58\",\"date\":\"1510132126\",\"user_id\":\"2\",\"size\":\"73746\"},\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510125393\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(689, 1510132906, 'task.update', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132906\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n\\r\\n\\r\\n\"}}'),
(690, 1510132964, 'task.update', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\"}}'),
(691, 1510133064, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"40\",\"name\":\"Schematic Prints_Wind_DC116.pdf\",\"path\":\"tasks\\/55\\/5468ca07d9fa294dda53747ec661dafc8d7a6995\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133064\",\"user_id\":\"2\",\"size\":\"45035\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(692, 1510133064, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"41\",\"name\":\"DOE-17AU0836VTSPB-3.pdf\",\"path\":\"tasks\\/55\\/f44676ef52dcd6117de42d9d7b5ff27699c678b2\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133064\",\"user_id\":\"2\",\"size\":\"326844\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(693, 1510133064, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"42\",\"name\":\"DOE-17AU0836VTSPB-1.pdf\",\"path\":\"tasks\\/55\\/b9eebed159eda0dc9cca252ca9c781b7b21a395a\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133064\",\"user_id\":\"2\",\"size\":\"1208394\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(694, 1510133065, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"43\",\"name\":\"DOE-17AU0836VTSPB-2.pdf\",\"path\":\"tasks\\/55\\/2384aa532fcc9b1d0e52ec7b562a70725f50c529\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133065\",\"user_id\":\"2\",\"size\":\"1157680\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(695, 1510133065, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"44\",\"name\":\"DC116 CE-lVD.PDF\",\"path\":\"tasks\\/55\\/d0064da92f3e495e4a5e9eaf4b73df528f7c10e6\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133065\",\"user_id\":\"2\",\"size\":\"185024\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(696, 1510133065, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"45\",\"name\":\"eDC118\\u592a\\u9633\\u80fd\\u98ce\\u5149\\u611f\\u5e94\\u5668\\u8bf4\\u660e\\u4e66\\u5185\\u9875A-04.pdf\",\"path\":\"tasks\\/55\\/578d9036c9b4edb8e7ab28ccdfaa0a875ca15ae5\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133065\",\"user_id\":\"2\",\"size\":\"1050659\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(697, 1510133065, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"46\",\"name\":\"eDC118\\u592a\\u9633\\u80fd\\u98ce\\u5149\\u611f\\u5e94\\u5668\\u8bf4\\u660e\\u4e66A-04.pdf\",\"path\":\"tasks\\/55\\/4ebf140ac9b38b972a5702cd1d2cb5b7471b44e3\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133065\",\"user_id\":\"2\",\"size\":\"814199\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(698, 1510133065, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"47\",\"name\":\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\",\"path\":\"tasks\\/55\\/a969ee44b1406f93567ad4a60a135ee0db5e411d\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133065\",\"user_id\":\"2\",\"size\":\"496079\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(699, 1510133066, 'task.file.create', 2, 2, 55, '{\"file\":{\"id\":\"48\",\"name\":\"DC116W_User_Guide.pdf\",\"path\":\"tasks\\/55\\/0c5991a1c22fba253c024ed040ac245d30581ad2\",\"is_image\":\"0\",\"task_id\":\"55\",\"date\":\"1510133066\",\"user_id\":\"2\",\"size\":\"1189892\"},\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(700, 1510137991, 'task.create', 2, 1, 60, '{\"task_id\":60,\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(701, 1510137999, 'task.move.position', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(702, 1510138004, 'task.move.position', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(703, 1510138009, 'task.move.position', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(704, 1510139314, 'task.update', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\"}}'),
(705, 1510139326, 'task.file.create', 2, 1, 60, '{\"file\":{\"id\":\"49\",\"name\":\"534-122.pdf\",\"path\":\"tasks\\/60\\/55f8d7e982c1b8bc458892a943292558d8bc6abe\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510139326\",\"user_id\":\"2\",\"size\":\"298197\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(706, 1510139327, 'task.file.create', 2, 1, 60, '{\"file\":{\"id\":\"50\",\"name\":\"534-123.pdf\",\"path\":\"tasks\\/60\\/4ce76686716c027554ccc45d03b6152bd1b8bfeb\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510139327\",\"user_id\":\"2\",\"size\":\"310696\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(707, 1510146283, 'task.file.create', 2, 1, 60, '{\"file\":{\"id\":\"51\",\"name\":\"534-122.pdf\",\"path\":\"tasks\\/60\\/2401031dd2ee16fda65881524f5e78d2c345e132\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510146283\",\"user_id\":\"2\",\"size\":\"314048\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(708, 1510146283, 'task.file.create', 2, 1, 60, '{\"file\":{\"id\":\"52\",\"name\":\"534-123.pdf\",\"path\":\"tasks\\/60\\/cc6d56e6d694bc71d7534e481e66ec2f278cb50b\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510146283\",\"user_id\":\"2\",\"size\":\"322377\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(709, 1510171211, 'task.file.create', 2, 1, 41, '{\"file\":{\"id\":\"53\",\"name\":\"566-013d-\\u5f00\\u6a21\\u62a5\\u544a-20171028_Knl.pptx\",\"path\":\"tasks\\/41\\/62d6589315280f146b6dd763288ab94a219b4f3c\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510171211\",\"user_id\":\"2\",\"size\":\"1015146\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(710, 1510171211, 'task.file.create', 2, 1, 41, '{\"file\":{\"id\":\"54\",\"name\":\"566-063C-\\u5f00\\u6a21\\u62a5\\u544a-20171028_Knl.pptx\",\"path\":\"tasks\\/41\\/00c8c153b3091bad809029c3d63648fc0b762390\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510171211\",\"user_id\":\"2\",\"size\":\"1092746\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(711, 1510171339, 'task.update', 2, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510171339\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n\\r\\n\"}}'),
(712, 1510213476, 'task.create', 3, 2, 61, '{\"task_id\":61,\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213476\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(713, 1510213773, 'task.move.position', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213476\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":10,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(714, 1510213776, 'task.move.position', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213476\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(715, 1510213779, 'task.move.position', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213476\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(716, 1510213783, 'task.move.position', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213476\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":2,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(717, 1510213785, 'task.move.position', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213476\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(718, 1510213787, 'task.move.position', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509622240\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":2,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(719, 1510213794, 'task.move.column', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213794\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521771\"},\"project_id\":\"2\",\"position\":3,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521771\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(720, 1510213807, 'task.move.column', 3, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213807\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213807\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"position\":5,\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521307\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521307\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(721, 1510213809, 'task.move.column', 3, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n\\r\\n\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213809\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521559\"},\"project_id\":\"2\",\"position\":4,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521559\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(722, 1510213812, 'task.move.column', 3, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - PCB-holder\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.18 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213811\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509520262\"},\"project_id\":\"2\",\"position\":6,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509520262\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(723, 1510213814, 'task.move.column', 3, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510213814\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213814\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509622536\"},\"project_id\":\"2\",\"position\":7,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509622536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(724, 1510213823, 'task.move.position', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213794\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"6\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"6\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(725, 1510213826, 'task.move.position', 3, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"6\"},\"project_id\":\"2\",\"position\":2,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"6\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(726, 1510213844, 'task.move.position', 3, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n\\r\\n\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213809\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"6\"},\"project_id\":\"2\",\"position\":2,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"6\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(727, 1510213870, 'task.update', 3, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015 no function\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510213870\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213807\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"claim HM8015 no function\"}}'),
(728, 1510215518, 'task.update', 3, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n\\r\\n\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215518\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"orange\"}}'),
(729, 1510215626, 'task.move.column', 3, 2, 46, '{\"task_id\":\"46\",\"task\":{\"id\":\"46\",\"title\":\"gearbox noise analysis\",\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n\\r\\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\\r\\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\\r\\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\\r\\n* 08.11.17 - Silent is not willing to give us the motor supplier info\",\"date_creation\":\"1509520540\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215626\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215626\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509520540\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509520540\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(730, 1510215662, 'task.assignee_change', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(731, 1510215721, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215721\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"orange\"}}'),
(732, 1510215759, 'task.move.column', 3, 2, 53, '{\"task_id\":\"53\",\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215759\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1509521265\"},\"project_id\":\"2\",\"position\":2,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1509521265\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(733, 1510215782, 'task.assignee_change', 3, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - PCB-holder\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.18 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215782\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"2\"}}'),
(734, 1510215850, 'task.update', 3, 2, 53, '{\"task_id\":\"53\",\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215850\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"color_id\":\"blue\"}}'),
(735, 1510215868, 'task.update', 3, 2, 46, '{\"task_id\":\"46\",\"task\":{\"id\":\"46\",\"title\":\"gearbox noise analysis\",\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n\\r\\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\\r\\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\\r\\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\\r\\n* 08.11.17 - Silent is not willing to give us the motor supplier info\",\"date_creation\":\"1509520540\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215868\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215626\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"color_id\":\"grey\"}}'),
(736, 1510215886, 'task.update', 3, 2, 53, '{\"task_id\":\"53\",\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"dark_grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215886\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"color_id\":\"dark_grey\"}}'),
(737, 1510215901, 'task.update', 3, 2, 53, '{\"task_id\":\"53\",\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215901\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"color_id\":\"grey\"}}'),
(738, 1510216320, 'subtask.update', 3, 1, 12, '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(739, 1510216322, 'subtask.update', 3, 1, 12, '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(740, 1510216324, 'subtask.update', 3, 1, 12, '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(741, 1510216328, 'subtask.update', 3, 1, 12, '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(742, 1510216329, 'subtask.update', 3, 1, 12, '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(743, 1510216331, 'subtask.update', 3, 1, 12, '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(744, 1510219513, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510219513\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(745, 1510219542, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"55\",\"name\":\"124&45-3-50F-06D.xlsx\",\"path\":\"tasks\\/57\\/c4cfb0bdaabdf687f3b6e9e11a6d11b3f0daa39a\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510219542\",\"user_id\":\"2\",\"size\":\"12063\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510219513\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(746, 1510219701, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"56\",\"name\":\"Attached 1st gear planet test result _124&45-3-50F-06D.pdf\",\"path\":\"tasks\\/57\\/d68e6e6cae431b33e1cebb45f761f514906de3c8\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510219701\",\"user_id\":\"2\",\"size\":\"50660\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510219513\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(747, 1510221637, 'task.create', 2, 2, 62, '{\"task_id\":62,\"task\":{\"id\":\"62\",\"title\":\"2)\\tDC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n\\r\\n\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510221637\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(748, 1510221663, 'task.update', 2, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n\\r\\n\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510221663\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"title\":\"DC motor enquiry\",\"color_id\":\"blue\"}}'),
(749, 1510221717, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(750, 1510221726, 'subtask.update', 3, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(751, 1510221826, 'subtask.create', 3, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(752, 1510221829, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(753, 1510221833, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(754, 1510221838, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(755, 1510221884, 'subtask.create', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(756, 1510221896, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":\"1510221896\",\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(757, 1510221899, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(758, 1510221901, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(759, 1510221902, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":\"1510221902\",\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(760, 1510221905, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(761, 1510221907, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(763, 1510221948, 'subtask.delete', 3, 2, 48, '{\"subtask\":{\"id\":\"47\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(764, 1510222072, 'subtask.create', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(765, 1510222123, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":\"1510222123\",\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(766, 1510222259, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0.03\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.03\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(767, 1510222263, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0.03\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.03\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(768, 1510222265, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0.03\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":\"1510222265\",\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.03\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(769, 1510222284, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0.04\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(770, 1510222289, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0.04\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(771, 1510222290, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0.04\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":\"1510222290\",\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(772, 1510222303, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0.04\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(773, 1510222324, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0.04\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(774, 1510222854, 'task.update', 3, 2, 53, '{\"task_id\":\"53\",\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\"}}'),
(775, 1510222960, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"57\",\"name\":\"#9 salt spray test record.jpg\",\"path\":\"tasks\\/53\\/0d0ff1248e1ffdaf169163cc7aa0796c8d94a570\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222960\",\"user_id\":\"3\",\"size\":\"2566724\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(776, 1510222961, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"58\",\"name\":\"FM124\\u5ba2\\u8bc98D.xls\",\"path\":\"tasks\\/53\\/9896b32e22cf072b825a54b9f3c9fe98f38a9cf8\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510222961\",\"user_id\":\"3\",\"size\":\"35328\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(777, 1510222961, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"59\",\"name\":\"FM124\\u5ba2\\u8bc98D-E.xls\",\"path\":\"tasks\\/53\\/4aaee0b8081a54b40514a66aff5572d652849356\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510222961\",\"user_id\":\"3\",\"size\":\"47104\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(778, 1510222961, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"60\",\"name\":\"IP_533_HE1015_04.docx\",\"path\":\"tasks\\/53\\/89530be356c58bf0b9b3ec9cad330accf8e190f6\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510222961\",\"user_id\":\"3\",\"size\":\"83849\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(779, 1510222967, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"61\",\"name\":\"P1220121.JPG\",\"path\":\"tasks\\/53\\/6cbc9333cfc401d0092eb8418c7e374ebf8095e6\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222967\",\"user_id\":\"3\",\"size\":\"3758697\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(780, 1510222970, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"62\",\"name\":\"P1220122.JPG\",\"path\":\"tasks\\/53\\/166d6d87a9f12fdc2d8a5d065c4c7d6a77f3ce7c\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222970\",\"user_id\":\"3\",\"size\":\"2725833\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(781, 1510222974, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"63\",\"name\":\"P1220123.JPG\",\"path\":\"tasks\\/53\\/a056075a71b4909b7579088196bb359a456fcb95\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222974\",\"user_id\":\"3\",\"size\":\"3689144\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(782, 1510222977, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"64\",\"name\":\"P1220124.JPG\",\"path\":\"tasks\\/53\\/7d02d619a3c2c3b57ed3d016b11d56105b6ba33d\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222977\",\"user_id\":\"3\",\"size\":\"2653074\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(783, 1510222979, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"65\",\"name\":\"P1220125.JPG\",\"path\":\"tasks\\/53\\/283238981e71d9bb81c4c4f42ddc68bd9b63c4b9\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222979\",\"user_id\":\"3\",\"size\":\"1969450\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(784, 1510222981, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"66\",\"name\":\"P1220126.JPG\",\"path\":\"tasks\\/53\\/dabf68e5c4436992f351b39abc7b3829d935a020\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222981\",\"user_id\":\"3\",\"size\":\"1893862\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(785, 1510222983, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"67\",\"name\":\"P1220127.JPG\",\"path\":\"tasks\\/53\\/8242e363ea892ff4a7a2bc7e28f57f86990d762f\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222983\",\"user_id\":\"3\",\"size\":\"1758081\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(786, 1510222987, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"68\",\"name\":\"P1220128.JPG\",\"path\":\"tasks\\/53\\/1c77e1ee19f8f7b451a8d5036ddd741a0f6a05c5\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222987\",\"user_id\":\"3\",\"size\":\"3269569\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(787, 1510222990, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"69\",\"name\":\"P1220129.JPG\",\"path\":\"tasks\\/53\\/77069bd52e70531871d4f8f4f22db70c4d16e94c\",\"is_image\":\"1\",\"task_id\":\"53\",\"date\":\"1510222990\",\"user_id\":\"3\",\"size\":\"3307330\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(788, 1510222990, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"70\",\"name\":\"QR_200001309_TM09_HE1015_00.pdf\",\"path\":\"tasks\\/53\\/76f5ef258f7169f29cdba7babc37ef3fc66ccdb0\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510222990\",\"user_id\":\"3\",\"size\":\"103134\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(789, 1510222990, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"71\",\"name\":\"Rejection Report.PDF\",\"path\":\"tasks\\/53\\/f81d40c690bbbd0dc7b9aa6fb04469949a2de1b4\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510222990\",\"user_id\":\"3\",\"size\":\"25609\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(790, 1510223116, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"72\",\"name\":\"17-10-23_debit note_sample return delivery_order #5 u. #7_5000040411(1).pdf\",\"path\":\"tasks\\/53\\/586b048baf64d72d9764bf8763e47ae14cdc3e95\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223116\",\"user_id\":\"3\",\"size\":\"12167\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(791, 1510223116, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"73\",\"name\":\"17-10-23_debit note_sample return delivery_order #5 u. #7_5000040411(2).pdf\",\"path\":\"tasks\\/53\\/e4d93deaebe59446ce908f68f0e5a8ec86c2bc58\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223116\",\"user_id\":\"3\",\"size\":\"9471\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(792, 1510223117, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"74\",\"name\":\"170823_Belastung_E2017_39.pdf\",\"path\":\"tasks\\/53\\/9b32266ad1ba22b1d069541057e6d3c50f6ab79d\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223116\",\"user_id\":\"3\",\"size\":\"87409\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(793, 1510223117, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"75\",\"name\":\"FM124-\\u9500\\u9000\\u6263\\u6b3e-242-171025001-USD213 59.xlsx\",\"path\":\"tasks\\/53\\/725ff73a3cc6332d75d5f55de581925dbdb94656\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223117\",\"user_id\":\"3\",\"size\":\"27464\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(794, 1510223117, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"76\",\"name\":\"QR_200001326_TM09_HE0628_00.pdf\",\"path\":\"tasks\\/53\\/e6239dc671d1f3a2a59682e2abb66e613da74ee2\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223117\",\"user_id\":\"3\",\"size\":\"93175\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(795, 1510223117, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"77\",\"name\":\"QR_200001327_TM09_HE1015_00.pdf\",\"path\":\"tasks\\/53\\/d73547fa0a4f58dbf73b0c9754dac389ce690b8c\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223117\",\"user_id\":\"3\",\"size\":\"103451\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(796, 1510223118, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"78\",\"name\":\"QR_200001327_TM09_HE1015_01 final 1143pcs.pdf\",\"path\":\"tasks\\/53\\/c7c4848f92bd2b336a07dbecee531833509dd2f4\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223118\",\"user_id\":\"3\",\"size\":\"1021630\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(797, 1510223118, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"79\",\"name\":\"Rejection Report (1).PDF\",\"path\":\"tasks\\/53\\/ded93d258d2259cf4e8ce09c6fe451f8f8e6556d\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223118\",\"user_id\":\"3\",\"size\":\"25795\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(798, 1510223119, 'task.file.create', 3, 2, 53, '{\"file\":{\"id\":\"80\",\"name\":\"Rejection Report.PDF\",\"path\":\"tasks\\/53\\/a6b785338b9525306672380fd8ae5a22264845ff\",\"is_image\":\"0\",\"task_id\":\"53\",\"date\":\"1510223119\",\"user_id\":\"3\",\"size\":\"25665\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(799, 1510223212, 'task_internal_link.create_update', 3, 2, 59, '{\"task_link\":{\"id\":\"1\",\"opposite_task_id\":\"53\",\"task_id\":\"59\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(800, 1510223212, 'task_internal_link.create_update', 3, 2, 53, '{\"task_link\":{\"id\":\"2\",\"opposite_task_id\":\"59\",\"task_id\":\"53\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(801, 1510223282, 'task.update', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype. It is a zip file for which you need a password.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510223282\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype. It is a zip file for which you need a password.\"}}'),
(802, 1510223303, 'task_internal_link.delete', 3, 2, 59, '{\"task_link\":{\"id\":\"1\",\"opposite_task_id\":\"53\",\"task_id\":\"59\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(803, 1510223311, 'task_internal_link.create_update', 3, 2, 59, '{\"task_link\":{\"id\":\"3\",\"opposite_task_id\":\"53\",\"task_id\":\"59\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(804, 1510223311, 'task_internal_link.create_update', 3, 2, 53, '{\"task_link\":{\"id\":\"4\",\"opposite_task_id\":\"59\",\"task_id\":\"53\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(805, 1510223332, 'task_internal_link.delete', 3, 2, 59, '{\"task_link\":{\"id\":\"3\",\"opposite_task_id\":\"53\",\"task_id\":\"59\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(806, 1510223341, 'task_internal_link.create_update', 3, 2, 59, '{\"task_link\":{\"id\":\"5\",\"opposite_task_id\":\"53\",\"task_id\":\"59\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1509984170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(807, 1510223341, 'task_internal_link.create_update', 3, 2, 53, '{\"task_link\":{\"id\":\"6\",\"opposite_task_id\":\"59\",\"task_id\":\"53\",\"link_id\":\"1\",\"label\":\"relates to\",\"opposite_link_id\":\"0\"},\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510222854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(808, 1510225079, 'task.update', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510225079\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password.\"}}'),
(809, 1510225352, 'task.update', 2, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"_*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?_\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225352\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"_*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?_\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\"}}'),
(810, 1510225363, 'task.update', 2, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?_\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225363\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?_\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\"}}'),
(811, 1510225372, 'task.update', 2, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225372\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\"}}'),
(812, 1510225457, 'task.update', 2, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"_*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?___\\r\\n* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225457\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"_*09.11.2017 - Sally: Hi Jens,Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?___\\r\\n* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\"}}'),
(813, 1510225472, 'task.update', 2, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225472\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n*09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\"}}'),
(814, 1510225494, 'task.update', 2, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225494\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(815, 1510225620, 'task.update', 2, 2, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225620\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520133\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\"}}'),
(816, 1510225958, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510225958\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n\"}}'),
(817, 1510226766, 'task.update', 2, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510226766\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\"}}'),
(818, 1510247600, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247600\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\"}}'),
(819, 1510247817, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247817\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(820, 1510247828, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. \\r\\nCan we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247828\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. \\r\\nCan we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(821, 1510247846, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(822, 1510247858, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247858\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(823, 1510248012, 'task.create', 2, 1, 64, '{\"task_id\":64,\"task\":{\"id\":\"64\",\"title\":\"HP\",\"description\":\"\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248012\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(824, 1510248022, 'task.move.position', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP\",\"description\":\"\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248012\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(825, 1510248061, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248061\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 order #16 - 4500033946\",\"owner_id\":\"1\"}}'),
(826, 1510248160, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April, please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April, please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\",\"color_id\":\"red\"}}'),
(827, 1510248203, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248203\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\"}}'),
(828, 1510248338, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 09.11.17 - \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248338\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 09.11.17 - \",\"color_id\":\"red\"}}'),
(829, 1510248374, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248374\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Order #14 - 4500032237\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(830, 1510248520, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248520\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\"}}'),
(831, 1510248534, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(832, 1510248697, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \"}}'),
(833, 1510249626, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510249626\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\"}}'),
(834, 1510288858, 'task.update', 1, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 01.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510288858\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 01.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n\\r\\n\"}}'),
(835, 1510314228, 'task.update', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510314228\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \"}}'),
(836, 1510315396, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510315396\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n\"}}'),
(837, 1510317375, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* \\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510317375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* \\r\\n\\r\\n\"}}'),
(838, 1510317496, 'task.file.create', 2, 1, 17, '{\"file\":{\"id\":\"81\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/17\\/847a961bac969b8926c4c24cd4a9321f88ae2a2e\",\"is_image\":\"0\",\"task_id\":\"17\",\"date\":\"1510317496\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(839, 1510317515, 'task.file.create', 2, 1, 40, '{\"file\":{\"id\":\"82\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/40\\/f37db70b52cd6f1f7bfbf5c3628164bbfa83bba1\",\"is_image\":\"0\",\"task_id\":\"40\",\"date\":\"1510317515\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(840, 1510317529, 'task.file.create', 2, 1, 40, '{\"file\":{\"id\":\"83\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/40\\/edb31aaf0e3b1352a65d8725a7aa625ee7bd1d2b\",\"is_image\":\"0\",\"task_id\":\"40\",\"date\":\"1510317529\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(841, 1510317560, 'task.file.create', 2, 1, 64, '{\"file\":{\"id\":\"84\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/64\\/70768019f4694b774f13871cffa17b7aa1ed700a\",\"is_image\":\"0\",\"task_id\":\"64\",\"date\":\"1510317560\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* \\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510317375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(842, 1510492140, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"85\",\"name\":\"671-Z-00-100 a.pdf\",\"path\":\"tasks\\/52\\/45138f84af153404d4b6c77228023a2b5545456f\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1510492140\",\"user_id\":\"2\",\"size\":\"72765\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510315396\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(843, 1510492140, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"86\",\"name\":\"671-Z-00-101 a.pdf\",\"path\":\"tasks\\/52\\/0429ab39075f68f247f4f1e13ded1e6ff4ccfb98\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1510492140\",\"user_id\":\"2\",\"size\":\"81579\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510315396\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(844, 1510492140, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"87\",\"name\":\"671-Z-00-102 a.pdf\",\"path\":\"tasks\\/52\\/ca1f70f2fc64aafc293d21236e02c9b2d9055ca0\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1510492140\",\"user_id\":\"2\",\"size\":\"81122\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510315396\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(845, 1510532106, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510532106\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods.\"}}'),
(846, 1510532112, 'task.move.column', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510532112\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510532112\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499848745\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(847, 1510552401, 'task.file.create', 1, 1, 11, '{\"file\":{\"id\":\"88\",\"name\":\"RD452.mp4\",\"path\":\"tasks\\/11\\/42dda01e757244970b8f4dd72eb0aa3d460f7fb4\",\"is_image\":\"0\",\"task_id\":\"11\",\"date\":\"1510552401\",\"user_id\":\"1\",\"size\":\"846033\"},\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510532106\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(848, 1510552402, 'task.file.create', 1, 1, 11, '{\"file\":{\"id\":\"89\",\"name\":\"RD451.mp4\",\"path\":\"tasks\\/11\\/60ab6f319345e10e4e33a291dc7a0f8c3cb2689b\",\"is_image\":\"0\",\"task_id\":\"11\",\"date\":\"1510552402\",\"user_id\":\"1\",\"size\":\"846033\"},\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510532106\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(849, 1510564330, 'task.file.create', 3, 2, 62, '{\"file\":{\"id\":\"90\",\"name\":\"FL40RBL80-325V-3075A-20171109(if brushless, 170~200RMB each, approx.100KRMB tooling).pdf\",\"path\":\"tasks\\/62\\/4cf6214fd9c0dd9191fdc9c42d12d07baee3e334\",\"is_image\":\"0\",\"task_id\":\"62\",\"date\":\"1510564330\",\"user_id\":\"3\",\"size\":\"749021\"},\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n\\r\\n\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510221663\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(850, 1510564387, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n*13.11.17 - 1st mould sampling will be this Thursday 16 NOV\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510564387\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n*13.11.17 - 1st mould sampling will be this Thursday 16 NOV\"}}'),
(851, 1510564467, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n*13.11.17 - 1st mould sampling will be this Thursday 16 NOV\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510564467\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n*13.11.17 - 1st mould sampling will be this Thursday 16 NOV\"}}'),
(852, 1510564487, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510564487\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\"}}'),
(853, 1510577021, 'task.open', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510577021\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508196947\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(854, 1510577041, 'task.move.column', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510577041\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1508196947\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1508196947\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(855, 1510577137, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Drawings have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510577137\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Drawings have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\",\"color_id\":\"red\"}}'),
(856, 1510577169, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Drawings have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510577169\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"pink\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(857, 1510577234, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510577234\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\"}}'),
(858, 1510587769, 'task.update', 2, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\"}}'),
(859, 1510587794, 'task.file.create', 2, 1, 41, '{\"file\":{\"id\":\"91\",\"name\":\"566-013-1110.stp\",\"path\":\"tasks\\/41\\/abb28a5444fd1551c73ca2d93c8bc80c8d27db57\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587794\",\"user_id\":\"2\",\"size\":\"147159\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(860, 1510587795, 'task.file.create', 2, 1, 41, '{\"file\":{\"id\":\"92\",\"name\":\"566-013d-\\u5f00\\u6a21\\u62a5\\u544a-20171110.pptx\",\"path\":\"tasks\\/41\\/b98c3eb8429052f7ecf1f9b06aa0eef7faa90d28\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587795\",\"user_id\":\"2\",\"size\":\"825629\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(861, 1510587795, 'task.file.create', 2, 1, 41, '{\"file\":{\"id\":\"93\",\"name\":\"566-063C-\\u5f00\\u6a21\\u62a5\\u544a-20171110.pptx\",\"path\":\"tasks\\/41\\/42f6cb5efef666ca1190e4f5f63351f12d51c395\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587795\",\"user_id\":\"2\",\"size\":\"1050611\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(862, 1510587951, 'task.update', 2, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\"}}'),
(863, 1510587963, 'task.file.create', 2, 1, 41, '{\"file\":{\"id\":\"94\",\"name\":\"566-063C-\\u5f00\\u6a21\\u62a5\\u544a-20171113.pptx\",\"path\":\"tasks\\/41\\/1c66c8d294f1de3bef385440e16e172818fb3fc3\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587963\",\"user_id\":\"2\",\"size\":\"1081613\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(864, 1510587963, 'task.file.create', 2, 1, 41, '{\"file\":{\"id\":\"95\",\"name\":\"566-013e.pdf\",\"path\":\"tasks\\/41\\/24c7660ae193670a44279be9668b278d2e00de78\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587963\",\"user_id\":\"2\",\"size\":\"67768\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(865, 1510588070, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510588070\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\"}}'),
(866, 1510588086, 'task.file.create', 2, 1, 13, '{\"file\":{\"id\":\"96\",\"name\":\"566-002e.pdf\",\"path\":\"tasks\\/13\\/bff1f65adfb99ee85ef9648ff7d51f1e3b286754\",\"is_image\":\"0\",\"task_id\":\"13\",\"date\":\"1510588086\",\"user_id\":\"2\",\"size\":\"35566\"},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510588070\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(867, 1510588359, 'task.update', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510588359\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213814\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\"}}'),
(868, 1510588386, 'task.file.create', 2, 2, 58, '{\"file\":{\"id\":\"97\",\"name\":\"QR_200001386_Housing_GGK 586-01-1_01.pdf\",\"path\":\"tasks\\/58\\/b0bc44351071d18e5c6533cfb17659f64c5c3afe\",\"is_image\":\"0\",\"task_id\":\"58\",\"date\":\"1510588386\",\"user_id\":\"2\",\"size\":\"550799\"},\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510588359\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213814\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(869, 1510588403, 'task.move.column', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510588403\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510588403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213814\"},\"project_id\":\"2\",\"position\":12,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213814\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(870, 1510588415, 'task.update', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510588414\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510588403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"blue\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(871, 1510589975, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510589974\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n\\r\\n\"}}'),
(872, 1510590201, 'task.file.create', 2, 1, 28, '{\"file\":{\"id\":\"98\",\"name\":\"AW_PCAS_RD35.45 Cover Printing_00.pdf\",\"path\":\"tasks\\/28\\/5fafb3b93b1e40962475d71a5c86b76a1690c7ed\",\"is_image\":\"0\",\"task_id\":\"28\",\"date\":\"1510590201\",\"user_id\":\"2\",\"size\":\"158274\"},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510532112\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510532112\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(873, 1510590238, 'task.update', 2, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\\r\\n* 13.11.17 - Andreas has sent back the change approval sheet\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510590238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510532112\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\\r\\n* 13.11.17 - Andreas has sent back the change approval sheet\"}}'),
(874, 1510591085, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591085\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n\\r\\n\"}}'),
(875, 1510591095, 'task.file.create', 2, 2, 49, '{\"file\":{\"id\":\"99\",\"name\":\"WSSD40.jpg\",\"path\":\"tasks\\/49\\/7afaf8c5e9bdcf0976002cce76d4c650155f60fd\",\"is_image\":\"1\",\"task_id\":\"49\",\"date\":\"1510591095\",\"user_id\":\"2\",\"size\":\"115957\"},\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591085\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(876, 1510591248, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no.\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591248\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no.\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}'),
(877, 1510591272, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: H_i Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no.\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591272\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: H_i Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no.\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}'),
(878, 1510591314, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no.\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no.\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}'),
(879, 1510591324, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591324\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}'),
(880, 1510591336, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n\\r\\n\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591336\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n\\r\\n\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}'),
(881, 1510591349, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n\\r\\n\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510591349\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* \\r\\n\\r\\n\\r\\n*18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n\\r\\n\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}'),
(882, 1510647898, 'task.update', 3, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\\r\\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510647898\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510588403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\\r\\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(883, 1510657337, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657337\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\"}}'),
(884, 1510657353, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657353\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(885, 1510657447, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657447\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\"}}'),
(886, 1510657457, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657457\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(887, 1510676075, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510676075\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\"}}'),
(888, 1510676132, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"100\",\"name\":\"UBW testing information.msg\",\"path\":\"tasks\\/39\\/bebfcd37cf73d70a04e02d37669ef6f9b4a216d2\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1510676132\",\"user_id\":\"2\",\"size\":\"4001792\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510676075\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(889, 1510676604, 'task.update', 2, 2, 51, '{\"task_id\":\"51\",\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\\r\\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 \\u2013 drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\\r\\n\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510676604\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\\r\\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 \\u2013 drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\\r\\n\"}}'),
(890, 1510677704, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510677704\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n\\r\\n\\r\\n\"}}'),
(891, 1510677774, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"101\",\"name\":\"P1220128.JPG\",\"path\":\"tasks\\/59\\/ccacdcf25dfbcebf9a5c97e394fa7340f84a776f\",\"is_image\":\"1\",\"task_id\":\"59\",\"date\":\"1510677774\",\"user_id\":\"2\",\"size\":\"1776924\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510677704\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(892, 1510677775, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"102\",\"name\":\"tubular motor surface contaminate analysis.docx\",\"path\":\"tasks\\/59\\/35a4b2c76eb2434d56b4f5aa5737b096d0d5cda8\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1510677775\",\"user_id\":\"2\",\"size\":\"4366910\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510677704\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(912, 1510726261, 'task.create', 3, 2, 84, '{\"task_id\":84,\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busing and we need sufficient time for testing and evaluation. \\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510726261\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(913, 1510726370, 'task.update', 3, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busing and we need sufficient time for testing and evaluation. \\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510726370\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busing and we need sufficient time for testing and evaluation. \\r\\n \\r\\n\"}}'),
(914, 1510726436, 'task.update', 3, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the lastest TUV test report we\'ve already listed the new transformer as an option.\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510726436\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the lastest TUV test report we\'ve already listed the new transformer as an option.\\r\\n \\r\\n\"}}'),
(915, 1510726911, 'task.update', 3, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the lastest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF.\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510726911\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the lastest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF.\\r\\n \\r\\n\"}}'),
(916, 1510727011, 'task.file.create', 3, 2, 84, '{\"file\":{\"id\":\"103\",\"name\":\"SX5DF transformer.jpg\",\"path\":\"tasks\\/84\\/9bb725f6e8b9f02abf292a786aa442318c7bb1d1\",\"is_image\":\"1\",\"task_id\":\"84\",\"date\":\"1510727011\",\"user_id\":\"3\",\"size\":\"128604\"},\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the lastest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF.\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510726911\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(917, 1510727498, 'task.update', 3, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF.\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510727498\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF.\\r\\n \\r\\n\"}}'),
(918, 1510730799, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510730799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(919, 1510734227, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510734227\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\\r\\n\\r\\n\",\"color_id\":\"yellow\"}}'),
(920, 1510734248, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510734248\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\",\"color_id\":\"yellow\"}}'),
(921, 1510741428, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updates orders \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741428\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updates orders \\r\\n\\r\\n\\r\\n\"}}'),
(922, 1510741447, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741447\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\\r\\n\\r\\n\"}}'),
(923, 1510741472, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741472\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\"}}'),
(924, 1510741523, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\"}}'),
(925, 1510741534, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\\r\\n\\r\\n\"}}'),
(926, 1510742683, 'task.update', 2, 2, 51, '{\"task_id\":\"51\",\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\\r\\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 \\u2013 drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\\r\\n* 15.11.17 - Mail Sally: Noted, will send together with the TM20 gauge this week.\\r\\n\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510742683\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\\r\\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 \\u2013 drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\\r\\n* 15.11.17 - Mail Sally: Noted, will send together with the TM20 gauge this week.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(927, 1510743542, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510743542\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n\\r\\n\"}}'),
(928, 1510743575, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"104\",\"name\":\"Dooya_TechnicalAnnex_TM20_Ver171110.docx\",\"path\":\"tasks\\/52\\/998deba0d93e2c357ef31956849a039f41e63eb4\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1510743575\",\"user_id\":\"2\",\"size\":\"2645143\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510743542\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(929, 1510743618, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"105\",\"name\":\"drawing-671-Z-00-104a.pdf\",\"path\":\"tasks\\/52\\/597a99d3fa50aa5d29d71eb17ecc9d7931d204e9\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1510743618\",\"user_id\":\"2\",\"size\":\"28040\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510743542\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(930, 1510765015, 'task.update', 2, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510765015\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(931, 1510808247, 'task.create', 3, 2, 85, '{\"task_id\":85,\"task\":{\"id\":\"85\",\"title\":\"new baseplate material for SX5DF\",\"description\":\"* 14.11.17 - Sally: Same like for S1\\/S2\\/TA50\\/TA70, Foresee apply to change the chassis material of SX5DF as well, in order to bring down the cost.2pcs sample has sent out today. TNT tracking number 166186226\\r\\n* 14.11.17 - Andreas: atteched the PCAS SX5DF, approved\",\"date_creation\":\"1510808247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"0\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808247\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(932, 1510808286, 'task.file.create', 3, 2, 85, '{\"file\":{\"id\":\"106\",\"name\":\"AW_PCAS_SX5DF baseplate_00.pdf\",\"path\":\"tasks\\/85\\/986eb7be91b297e90440f031c465ac8dd6cdb079\",\"is_image\":\"0\",\"task_id\":\"85\",\"date\":\"1510808286\",\"user_id\":\"3\",\"size\":\"107073\"},\"task\":{\"id\":\"85\",\"title\":\"new baseplate material for SX5DF\",\"description\":\"* 14.11.17 - Sally: Same like for S1\\/S2\\/TA50\\/TA70, Foresee apply to change the chassis material of SX5DF as well, in order to bring down the cost.2pcs sample has sent out today. TNT tracking number 166186226\\r\\n* 14.11.17 - Andreas: atteched the PCAS SX5DF, approved\",\"date_creation\":\"1510808247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"0\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808247\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(933, 1510808418, 'task.create', 3, 2, 86, '{\"task_id\":86,\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808418\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808418\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(934, 1510808447, 'task.file.create', 3, 2, 86, '{\"file\":{\"id\":\"107\",\"name\":\"WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index(02).docx\",\"path\":\"tasks\\/86\\/ad713c593b28fa86fc9200e71b967c90619e4976\",\"is_image\":\"0\",\"task_id\":\"86\",\"date\":\"1510808447\",\"user_id\":\"3\",\"size\":\"146308\"},\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808418\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808418\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(935, 1510808535, 'task.create', 3, 2, 87, '{\"task_id\":87,\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808535\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808535\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(936, 1510808589, 'task.file.create', 3, 2, 87, '{\"file\":{\"id\":\"108\",\"name\":\"Foscam Quotation 20161025_Rademacher.pdf\",\"path\":\"tasks\\/87\\/280fadcacd2b9d301f253764288d843051fd7cdc\",\"is_image\":\"0\",\"task_id\":\"87\",\"date\":\"1510808589\",\"user_id\":\"3\",\"size\":\"126775\"},\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808535\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808535\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(937, 1510808590, 'task.file.create', 3, 2, 87, '{\"file\":{\"id\":\"109\",\"name\":\"Foscam Quotation 20171116_Rademacher.pdf\",\"path\":\"tasks\\/87\\/577897592abaffce53342402c682337c6504036a\",\"is_image\":\"0\",\"task_id\":\"87\",\"date\":\"1510808590\",\"user_id\":\"3\",\"size\":\"148298\"},\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808535\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808535\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(938, 1510808652, 'task.file.create', 3, 2, 87, '{\"file\":{\"id\":\"110\",\"name\":\"WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index(02).docx\",\"path\":\"tasks\\/87\\/32150e27089cb7d409214277eb9d3d51cd0cc579\",\"is_image\":\"0\",\"task_id\":\"87\",\"date\":\"1510808652\",\"user_id\":\"3\",\"size\":\"48365\"},\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808535\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808535\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(939, 1510808869, 'task.update', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808868\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\",\"color_id\":\"grey\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(940, 1510808880, 'task.move.column', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"4\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808880\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808880\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213476\"},\"project_id\":\"2\",\"position\":4,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213476\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(941, 1510808897, 'task.assignee_change', 3, 2, 85, '{\"task_id\":\"85\",\"task\":{\"id\":\"85\",\"title\":\"new baseplate material for SX5DF\",\"description\":\"* 14.11.17 - Sally: Same like for S1\\/S2\\/TA50\\/TA70, Foresee apply to change the chassis material of SX5DF as well, in order to bring down the cost.2pcs sample has sent out today. TNT tracking number 166186226\\r\\n* 14.11.17 - Andreas: atteched the PCAS SX5DF, approved\",\"date_creation\":\"1510808247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808897\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"owner_id\":\"3\"}}'),
(942, 1510808963, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808963\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\"}}'),
(943, 1510809148, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\"}}'),
(944, 1510809286, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510809286\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\"}}'),
(945, 1510809377, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510809377\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\"}}'),
(946, 1510809468, 'task.update', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510809468\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\"}}'),
(947, 1510809478, 'task.update', 1, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510809478\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\"}}'),
(948, 1510809513, 'task.file.create', 1, 1, 30, '{\"file\":{\"id\":\"111\",\"name\":\"image002.png\",\"path\":\"tasks\\/30\\/56051f7077f21cefa3ea5e4140d10cb322da9e28\",\"is_image\":\"1\",\"task_id\":\"30\",\"date\":\"1510809513\",\"user_id\":\"1\",\"size\":\"54832\"},\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510809468\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(949, 1510809531, 'task.file.create', 1, 1, 31, '{\"file\":{\"id\":\"112\",\"name\":\"image002.png\",\"path\":\"tasks\\/31\\/505e93dd2d1262fcbae510dc58f3f453c9d05006\",\"is_image\":\"1\",\"task_id\":\"31\",\"date\":\"1510809531\",\"user_id\":\"1\",\"size\":\"54832\"},\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510809478\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(950, 1510809594, 'task.update', 1, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"owner_id\":\"1\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(951, 1510812866, 'task.file.create', 3, 2, 59, '{\"file\":{\"id\":\"113\",\"name\":\"QR_200001327_TM09_HE3015_01.pdf\",\"path\":\"tasks\\/59\\/a1bb80558c88eba384bcab847062d5f2e1011791\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1510812866\",\"user_id\":\"3\",\"size\":\"132670\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510730799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(952, 1510812867, 'task.file.create', 3, 2, 59, '{\"file\":{\"id\":\"114\",\"name\":\"QR_200001397_TM10_HM2015_01.pdf\",\"path\":\"tasks\\/59\\/2c509ebdd310d485ef2d21d25991a684e845f51e\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1510812867\",\"user_id\":\"3\",\"size\":\"98765\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510730799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(953, 1510812867, 'task.file.create', 3, 2, 59, '{\"file\":{\"id\":\"115\",\"name\":\"QR_200001398_TM09_HE1017_01.pdf\",\"path\":\"tasks\\/59\\/fd90fb250e7b146ca5d084c1fee9778cd03c655c\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1510812867\",\"user_id\":\"3\",\"size\":\"122549\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510730799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(954, 1510816400, 'task.move.position', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510132964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":10,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(955, 1510817575, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510817575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n\"}}'),
(956, 1510817869, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510817869\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n\"}}'),
(957, 1510818017, 'task.move.column', 1, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510818017\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818017\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060836\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060836\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(958, 1510818124, 'task.move.column', 1, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510818124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1510818017\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1510818017\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(959, 1510818606, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510818606\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\"}}'),
(960, 1510818841, 'task.update', 1, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510818841\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\"}}'),
(961, 1510818852, 'task.update', 1, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510818852\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(962, 1510820216, 'subtask.update', 2, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":\"1510820216\",\"status_name\":\"In Bearbeitung\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(963, 1510820216, 'subtask.update', 2, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(964, 1510820218, 'subtask.update', 2, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510215662\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(965, 1510822780, 'task.file.create', 3, 2, 87, '{\"file\":{\"id\":\"116\",\"name\":\"FC2501P-Specification-2017.11.16.pdf\",\"path\":\"tasks\\/87\\/c3b6d6ed48e772171f2253a00c520cb517cc237a\",\"is_image\":\"0\",\"task_id\":\"87\",\"date\":\"1510822780\",\"user_id\":\"3\",\"size\":\"204639\"},\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510808535\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808535\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(966, 1510825645, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510825645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n\\r\\n\"}}'),
(967, 1510826188, 'task.create', 2, 2, 88, '{\"task_id\":88,\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. Please send us an offer for the following annual quantities: the cables according to drawing 752999904-08218 Revision C we need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter) per delivery 15K, 1.000 pieces  70000017  (2,00 meter)      one delivery, 3.000 pieces  70000018  (3,00 meter) one delivery , 2.000 pieces  70000019  (5,00 meter) one delivery. From the cable according to drawing SF-01+SF-85A WIRE: 12.000 pieces YNK 2M0 in three delivery\\u2019s.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510826188\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(968, 1510826204, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. Please send us an offer for the following annual quantities: the cables according to drawing 752999904-08218 Revision C we need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter) per delivery 15K, 1.000 pieces  70000017  (2,00 meter)      one delivery, 3.000 pieces  70000018  (3,00 meter) one delivery , 2.000 pieces  70000019  (5,00 meter) one delivery. From the cable according to drawing SF-01+SF-85A WIRE: 12.000 pieces YNK 2M0 in three delivery\\u2019s.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510826204\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. Please send us an offer for the following annual quantities: the cables according to drawing 752999904-08218 Revision C we need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter) per delivery 15K, 1.000 pieces  70000017  (2,00 meter)      one delivery, 3.000 pieces  70000018  (3,00 meter) one delivery , 2.000 pieces  70000019  (5,00 meter) one delivery. From the cable according to drawing SF-01+SF-85A WIRE: 12.000 pieces YNK 2M0 in three delivery\\u2019s.\\r\\n\\r\\n\\r\\n\"}}'),
(969, 1510826231, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"117\",\"name\":\"doc03643020171115160211.pdf\",\"path\":\"tasks\\/88\\/ba78388ec888aaa31e643444830dd2edb18101f5\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1510826231\",\"user_id\":\"2\",\"size\":\"1256804\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. Please send us an offer for the following annual quantities: the cables according to drawing 752999904-08218 Revision C we need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter) per delivery 15K, 1.000 pieces  70000017  (2,00 meter)      one delivery, 3.000 pieces  70000018  (3,00 meter) one delivery , 2.000 pieces  70000019  (5,00 meter) one delivery. From the cable according to drawing SF-01+SF-85A WIRE: 12.000 pieces YNK 2M0 in three delivery\\u2019s.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510826204\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(970, 1510826567, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"118\",\"name\":\"Wire Placement OK.JPG\",\"path\":\"tasks\\/52\\/b3dbd871245cae758867d03abeb24b55496ee1e9\",\"is_image\":\"1\",\"task_id\":\"52\",\"date\":\"1510826567\",\"user_id\":\"2\",\"size\":\"501031\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510825645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(971, 1510826567, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"119\",\"name\":\"Wire Placement wrong.jpg\",\"path\":\"tasks\\/52\\/dfae1ce32bc796909b5de7bfef7a36c68a089a37\",\"is_image\":\"1\",\"task_id\":\"52\",\"date\":\"1510826567\",\"user_id\":\"2\",\"size\":\"707126\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510825645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(972, 1510826671, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"120\",\"name\":\"Semi-finished products Motor moisture removal and Hall test.xlsx\",\"path\":\"tasks\\/52\\/66d8a965d8b79efb7fc66102b4f6593598cb1f9f\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1510826671\",\"user_id\":\"2\",\"size\":\"1296489\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510825645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(973, 1510827206, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510827206\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(974, 1510827366, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"121\",\"name\":\"QR_200001327_TM09_HE3015_01.pdf\",\"path\":\"tasks\\/59\\/9719f235f877612243b8313b11613d9b1fe36044\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1510827366\",\"user_id\":\"2\",\"size\":\"132670\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510827206\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(975, 1510827366, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"122\",\"name\":\"QR_200001397_TM10_HM2015_01.pdf\",\"path\":\"tasks\\/59\\/77607e9b11bd8df47abde65823f1b8cab2111487\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1510827366\",\"user_id\":\"2\",\"size\":\"98765\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510827206\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(976, 1510827366, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"123\",\"name\":\"QR_200001398_TM09_HE1017_01.pdf\",\"path\":\"tasks\\/59\\/a1b661a8e5a7bfdb2e909b3fca891509533f25ad\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1510827366\",\"user_id\":\"2\",\"size\":\"122549\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510827206\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(977, 1510827838, 'task.update', 2, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB**\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510827838\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB**\\r\\n \\r\\n\"}}'),
(978, 1510827863, 'task.update', 2, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510827863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n \\r\\n\"}}'),
(979, 1510830962, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510830962\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n*19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(980, 1510830982, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510830982\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n\\r\\n\\r\\n\"}}'),
(981, 1510831028, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510831028\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(982, 1510840649, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"124\",\"name\":\"product change_approval application(1st stage gear 30N40N50N).xlsx\",\"path\":\"tasks\\/57\\/bbc1751d3b5cb004b6ccd39f3af814c2bb7c351b\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510840649\",\"user_id\":\"2\",\"size\":\"377409\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510219513\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(983, 1510840687, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840687\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}'),
(984, 1510840739, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"125\",\"name\":\"45-3-50F-06A(A-02).pdf\",\"path\":\"tasks\\/57\\/eb47c7e43f1a52f0d2401b0517cd98be815e3001\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510840739\",\"user_id\":\"2\",\"size\":\"28118\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840687\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(985, 1510840739, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"126\",\"name\":\"New drawing of the 50Nm 1st stage Gear.pdf\",\"path\":\"tasks\\/57\\/7c1660dd212648cfd3de2d707087dc177c013c1b\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510840739\",\"user_id\":\"2\",\"size\":\"105229\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840687\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(986, 1510840846, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}'),
(987, 1510840888, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"127\",\"name\":\"45-3-50F-06D(A-00).pdf\",\"path\":\"tasks\\/57\\/6e3e8fd7882d41e54ae64b5adcf31334ac5cdb01\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510840888\",\"user_id\":\"2\",\"size\":\"1499280\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(988, 1510840889, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"128\",\"name\":\"product change_approval application(1st stage gear 30N40N50N)_update.xlsx\",\"path\":\"tasks\\/57\\/d7aede3e9e7187b5823877681ef668ad695bc7ca\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510840889\",\"user_id\":\"2\",\"size\":\"377393\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(989, 1510840936, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"129\",\"name\":\"1st stage gear  Common normal.jpg\",\"path\":\"tasks\\/57\\/6a1b89ef16d2047d9cada391ae7a67292b20b889\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1510840936\",\"user_id\":\"2\",\"size\":\"235715\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(990, 1510840936, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"130\",\"name\":\"1st stage gear tooth width.jpg\",\"path\":\"tasks\\/57\\/9ddc025db70a6d4e610a2c4508bf824feb94c59d\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1510840936\",\"user_id\":\"2\",\"size\":\"239613\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510840846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(991, 1510841057, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841057\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}'),
(992, 1510841163, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841163\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}'),
(993, 1510841177, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"131\",\"name\":\"45-3-50F-06A life cycle test report Dooya_20170811_finish.xlsx\",\"path\":\"tasks\\/57\\/0d452af44da25ee33c7b33697790fa7fd7bfe15f\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510841177\",\"user_id\":\"2\",\"size\":\"12787\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841163\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(994, 1510841177, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"132\",\"name\":\"124# 50Nm 1st stage planet optimised gear comparison.xlsx\",\"path\":\"tasks\\/57\\/8e29c3ae3b22769a13fd68f67e61ca60a76569af\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510841177\",\"user_id\":\"2\",\"size\":\"10676\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841163\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(995, 1510841424, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841424\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}'),
(996, 1510841607, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841607\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}'),
(997, 1510841701, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"133\",\"name\":\"500p AG2RAR4107.pdf\",\"path\":\"tasks\\/57\\/a67d1f709b8ffc5c81263902ac76dc81c8256b61\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510841701\",\"user_id\":\"2\",\"size\":\"21312\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841607\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(998, 1510841702, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"134\",\"name\":\"AGBQDTU103 AGBQDTU105.pdf\",\"path\":\"tasks\\/57\\/6193eae06a0ca25dde33f496b718557ad302051c\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510841702\",\"user_id\":\"2\",\"size\":\"60680\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841607\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(999, 1510841703, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"135\",\"name\":\"tubular motor surface mark.jpg\",\"path\":\"tasks\\/57\\/fd527882b5da7fdcd811eafde0fee712fa86685f\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1510841703\",\"user_id\":\"2\",\"size\":\"350035\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841607\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1000, 1510841796, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"136\",\"name\":\"173010.JPG\",\"path\":\"tasks\\/57\\/0bb4c638d2fefa94c352814f8033d26ff96561da\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1510841796\",\"user_id\":\"2\",\"size\":\"36020\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* 01.11.2017 - Henk: the 1st stage gear for 30Nm\\/40Nm\\/50Nm are Nylon and green ,the tooth width is 1.3mm\\u3002\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* \\r\\n* \\r\\n\\r\\n\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510841607\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1001, 1510842064, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510842064\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\"}}'),
(1002, 1510842102, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"137\",\"name\":\"124&45-3-50F-06D.xlsx\",\"path\":\"tasks\\/57\\/d404a65f153788fcef7200d2c5f248966955c41f\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1510842102\",\"user_id\":\"2\",\"size\":\"12063\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510842064\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1003, 1510842301, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"138\",\"name\":\"171110_test_record_1_stage_gear_fullfil_requirement.JPG\",\"path\":\"tasks\\/57\\/7787b83cd6f029be0c3cf42729acc04a28cd1415\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1510842301\",\"user_id\":\"2\",\"size\":\"158347\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510842064\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1004, 1510842365, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"139\",\"name\":\"171109_test_record_1_stage_gear_fullfil_requirement.JPG\",\"path\":\"tasks\\/57\\/3ab94e5e94b634f129c61f5203eafd6b0f9b7486\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1510842365\",\"user_id\":\"2\",\"size\":\"158347\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510842064\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1005, 1510842527, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510842527\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n\"}}'),
(1006, 1510848445, 'task.file.create', 2, 1, 1, '{\"file\":{\"id\":\"140\",\"name\":\"170913_price_sinter-gears.JPG\",\"path\":\"tasks\\/1\\/f7db8419a4166d1865553dfc831a69aa1950ae24\",\"is_image\":\"1\",\"task_id\":\"1\",\"date\":\"1510848445\",\"user_id\":\"2\",\"size\":\"57154\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(1007, 1510848735, 'task.file.create', 2, 1, 1, '{\"file\":{\"id\":\"141\",\"name\":\"Gear Packaging (Iss 2.0).pdf\",\"path\":\"tasks\\/1\\/5eeea27a084f1f27868bfd680e3180a65cf5977a\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1510848735\",\"user_id\":\"2\",\"size\":\"872312\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(1008, 1510893902, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510893902\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch.\"}}'),
(1009, 1510893936, 'task.file.create', 1, 1, 13, '{\"file\":{\"id\":\"142\",\"name\":\"566-002e Modification Sample Report.pdf\",\"path\":\"tasks\\/13\\/54ade88884923a67e1cb7ca2f566c288b76e9e61\",\"is_image\":\"0\",\"task_id\":\"13\",\"date\":\"1510893936\",\"user_id\":\"1\",\"size\":\"10247291\"},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510893902\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1010, 1510894048, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510894048\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\"}}'),
(1011, 1510894077, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510894077\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\"}}'),
(1012, 1510894221, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510894221\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n\"}}'),
(1013, 1510902988, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 . Manfred: we need a DDP delivery\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510902988\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 . Manfred: we need a DDP delivery\"}}'),
(1014, 1510903383, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510903383\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n\"}}'),
(1015, 1510903955, 'task.file.create', 2, 1, 13, '{\"file\":{\"id\":\"143\",\"name\":\"QIR-20171117-sample-Seitenteil -566 F 002 e.docx\",\"path\":\"tasks\\/13\\/8c8ef68565ad2b88142f0c342a433e622f98974f\",\"is_image\":\"0\",\"task_id\":\"13\",\"date\":\"1510903955\",\"user_id\":\"2\",\"size\":\"1483219\"},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510894077\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1016, 1510904669, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510904669\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\"}}'),
(1017, 1510904691, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510904691\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\"}}'),
(1018, 1510904770, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510904770\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\"}}'),
(1019, 1510905313, 'task.move.position', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. Please send us an offer for the following annual quantities: the cables according to drawing 752999904-08218 Revision C we need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter) per delivery 15K, 1.000 pieces  70000017  (2,00 meter)      one delivery, 3.000 pieces  70000018  (3,00 meter) one delivery , 2.000 pieces  70000019  (5,00 meter) one delivery. From the cable according to drawing SF-01+SF-85A WIRE: 12.000 pieces YNK 2M0 in three delivery\\u2019s.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510826204\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":11,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1020, 1510905315, 'task.move.position', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. Please send us an offer for the following annual quantities: the cables according to drawing 752999904-08218 Revision C we need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter) per delivery 15K, 1.000 pieces  70000017  (2,00 meter)      one delivery, 3.000 pieces  70000018  (3,00 meter) one delivery , 2.000 pieces  70000019  (5,00 meter) one delivery. From the cable according to drawing SF-01+SF-85A WIRE: 12.000 pieces YNK 2M0 in three delivery\\u2019s.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510826204\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":6,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1021, 1510905319, 'task.move.position', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. Please send us an offer for the following annual quantities: the cables according to drawing 752999904-08218 Revision C we need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter) per delivery 15K, 1.000 pieces  70000017  (2,00 meter)      one delivery, 3.000 pieces  70000018  (3,00 meter) one delivery , 2.000 pieces  70000019  (5,00 meter) one delivery. From the cable according to drawing SF-01+SF-85A WIRE: 12.000 pieces YNK 2M0 in three delivery\\u2019s.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510826204\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":2,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1022, 1510905341, 'task.file.create', 3, 2, 84, '{\"file\":{\"id\":\"144\",\"name\":\"product change approval application(SX5DF transformer 2017-11-17).docx\",\"path\":\"tasks\\/84\\/62323fed18dfc984595dd157e9a046d391ca7fe9\",\"is_image\":\"0\",\"task_id\":\"84\",\"date\":\"1510905341\",\"user_id\":\"3\",\"size\":\"372741\"},\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510827863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1023, 1510906172, 'task.update', 2, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\\r\\n\\r\\n\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510906172\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\\r\\n\\r\\n\\r\\n \\r\\n\"}}'),
(1024, 1510911648, 'task.update', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\\r\\n* 16.11.2017 - Sally: Please check if it is possible that we delay ETD of #2 to be 05 JAN, this way #2 should be calculated in 2018, so then we can maximum the bonus in 2018 and increase the possibility of reaching 120K?\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"4\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510911648\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808880\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\\r\\n* 16.11.2017 - Sally: Please check if it is possible that we delay ETD of #2 to be 05 JAN, this way #2 should be calculated in 2018, so then we can maximum the bonus in 2018 and increase the possibility of reaching 120K?\",\"color_id\":\"blue\"}}'),
(1025, 1510913680, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510913680\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n\"}}'),
(1026, 1510919848, 'task.create', 2, 2, 89, '{\"task_id\":89,\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510919848\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1027, 1510919864, 'task.update', 2, 2, 89, '{\"task_id\":\"89\",\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510919864\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\",\"owner_id\":\"6\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1028, 1510919881, 'task.file.create', 2, 2, 89, '{\"file\":{\"id\":\"145\",\"name\":\"QR_20001399_Unterteil HomeTimer_GGK 593-2-1_00.pdf\",\"path\":\"tasks\\/89\\/2b8de33212bf1e26fbf5ba2be5bb854328afdabe\",\"is_image\":\"0\",\"task_id\":\"89\",\"date\":\"1510919881\",\"user_id\":\"2\",\"size\":\"126473\"},\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510919864\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1029, 1511011021, 'task.update', 3, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 17.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511011021\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 17.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\"}}'),
(1030, 1511011042, 'task.file.create', 3, 2, 59, '{\"file\":{\"id\":\"146\",\"name\":\"QR_200001327_TM09_HE3015_02.pdf\",\"path\":\"tasks\\/59\\/c095f650e55f5980ecf3c01ee5e388be64d0de18\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1511011042\",\"user_id\":\"3\",\"size\":\"132945\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 17.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511011021\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1031, 1511011043, 'task.file.create', 3, 2, 59, '{\"file\":{\"id\":\"147\",\"name\":\"QR_200001397_TM10_HM2015_02.pdf\",\"path\":\"tasks\\/59\\/baa077161b2cb794f9156a15a8019bf804eded2f\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1511011043\",\"user_id\":\"3\",\"size\":\"99025\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 17.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511011021\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1032, 1511011043, 'task.file.create', 3, 2, 59, '{\"file\":{\"id\":\"148\",\"name\":\"QR_200001398_TM09_HE1017_02.pdf\",\"path\":\"tasks\\/59\\/d27a8bc590c0966649b106d1e4294d44becb5b3f\",\"is_image\":\"0\",\"task_id\":\"59\",\"date\":\"1511011043\",\"user_id\":\"3\",\"size\":\"124735\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 17.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511011021\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1033, 1511011119, 'task.update', 3, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\\r\\n* 16.11.2017 - Sally: Please check if it is possible that we delay ETD of #2 to be 05 JAN, this way #2 should be calculated in 2018, so then we can maximum the bonus in 2018 and increase the possibility of reaching 120K?\\r\\n* 17.11.2017 - Manfred:the ETD from Dooya factory must be between 1-3.01.2018 (so absolutely in 2018 \\u2013 necessary for the calculation of the bonus 2018), planned ETD (vessel set sail)  06.01.18 and ETA Rhede - five weeks later - means 09.02.18. Maybe you must try to get a fast vessel if the ETD is a few days later - to reach the ETA.\\r\\n* 18.11.2017 - Sally: Attached updated PI of #2 and #2acc, ETD 03 Jan 2018.\",\"date_creation\":\"1510213476\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"4\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511011119\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808880\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\\r\\n* 16.11.2017 - Sally: Please check if it is possible that we delay ETD of #2 to be 05 JAN, this way #2 should be calculated in 2018, so then we can maximum the bonus in 2018 and increase the possibility of reaching 120K?\\r\\n* 17.11.2017 - Manfred:the ETD from Dooya factory must be between 1-3.01.2018 (so absolutely in 2018 \\u2013 necessary for the calculation of the bonus 2018), planned ETD (vessel set sail)  06.01.18 and ETA Rhede - five weeks later - means 09.02.18. Maybe you must try to get a fast vessel if the ETD is a few days later - to reach the ETA.\\r\\n* 18.11.2017 - Sally: Attached updated PI of #2 and #2acc, ETD 03 Jan 2018.\",\"color_id\":\"grey\"}}'),
(1034, 1511011161, 'task.update', 3, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511011161\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\"}}'),
(1035, 1511086520, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511086520\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\"}}'),
(1036, 1511086628, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511086628\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n\"}}'),
(1037, 1511141138, 'task.file.create', 1, 1, 17, '{\"file\":{\"id\":\"149\",\"name\":\"Production Schedule (Iss 3.0).pdf\",\"path\":\"tasks\\/17\\/4cdb851d58591bb3d6f453fa41c7ae7b5ba2441d\",\"is_image\":\"0\",\"task_id\":\"17\",\"date\":\"1511141138\",\"user_id\":\"1\",\"size\":\"553543\"},\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510904770\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1038, 1511141173, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511141173\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\"}}'),
(1039, 1511154016, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511154016\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\"}}'),
(1040, 1511154145, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511154145\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\"}}'),
(1041, 1511236020, 'task.file.create', 3, 2, 57, '{\"file\":{\"id\":\"150\",\"name\":\"124&45-3-50F-06D 30Nm 40Nm 50Nm 1st stage planet optimised gear comparison.xlsx\",\"path\":\"tasks\\/57\\/f534dc48d4aa516ae5ac97fb55f0b9561145c129\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1511236020\",\"user_id\":\"3\",\"size\":\"15344\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1510842527\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1042, 1511248857, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511248857\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n\"}}'),
(1043, 1511248867, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"151\",\"name\":\"171121_comparison_1_stage_old_new_12445-3-50F-06D.pdf\",\"path\":\"tasks\\/57\\/1e2831e1bf4b543080085e699735e43a44f9c86c\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1511248867\",\"user_id\":\"2\",\"size\":\"51475\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511248857\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1044, 1511249032, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511249032\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\"}}'),
(1045, 1511257863, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511257863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\"}}'),
(1046, 1511257868, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"42\",\"title\":\"21\\/11\\/2017 Worm Samples Arrive\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1511257868\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511257863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1047, 1511257869, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"42\",\"title\":\"21\\/11\\/2017 Worm Samples Arrive\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"5\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511257863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1048, 1511264700, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511264700\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n\"}}'),
(1049, 1511264799, 'task.file.create', 2, 1, 38, '{\"file\":{\"id\":\"152\",\"name\":\"171121_GSM3_sample_Ben.pdf\",\"path\":\"tasks\\/38\\/7348e7c0e205459f0d839cc10fa6b4416ddcd834\",\"is_image\":\"0\",\"task_id\":\"38\",\"date\":\"1511264799\",\"user_id\":\"2\",\"size\":\"167873\"},\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511264700\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1050, 1511310666, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511310666\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\"}}'),
(1051, 1511329400, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511329400\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1052, 1511331106, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511331106\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\"}}'),
(1053, 1511331127, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"39\",\"title\":\"01\\/12\\/2017 Receive Motors from Nichibo\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511331106\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1054, 1511332109, 'task.close', 1, 1, 28, '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\\r\\n* 13.11.17 - Andreas has sent back the change approval sheet\",\"date_creation\":\"1499848745\",\"date_completed\":\"1511332109\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511332109\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510532112\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1055, 1511333314, 'task.update', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. \\r\\n\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n\\r\\n\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511333314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. \\r\\n\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n\\r\\n\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n\",\"color_id\":\"blue\"}}'),
(1056, 1511333435, 'task.update', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n\\r\\n\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511333435\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n\\r\\n\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n\"}}'),
(1057, 1511345404, 'task.update', 2, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .please help to confirm and advise.\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511345404\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .please help to confirm and advise.\\r\\n\"}}'),
(1058, 1511345415, 'task.file.create', 2, 1, 19, '{\"file\":{\"id\":\"153\",\"name\":\"IMG_0131.JPG\",\"path\":\"tasks\\/19\\/620831208d6e5f70735c048bc35fe93ad569c5c7\",\"is_image\":\"1\",\"task_id\":\"19\",\"date\":\"1511345415\",\"user_id\":\"2\",\"size\":\"185156\"},\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .please help to confirm and advise.\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511345404\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1059, 1511354378, 'task.update', 2, 2, 51, '{\"task_id\":\"51\",\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\\r\\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 \\u2013 drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\\r\\n* 15.11.17 - Mail Sally: Noted, will send together with the TM20 gauge this week.\\r\\n* 20.11.17 - RD-D has received 5 pcs samples, currentyl under investigation by a customer \\r\\n\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511354378\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\\r\\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 \\u2013 drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\\r\\n* 15.11.17 - Mail Sally: Noted, will send together with the TM20 gauge this week.\\r\\n* 20.11.17 - RD-D has received 5 pcs samples, currentyl under investigation by a customer \\r\\n\"}}'),
(1060, 1511357171, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511357171\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1061, 1511357186, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"154\",\"name\":\"Dooya_TechnicalAnnex_TM20_Ver171122.docx\",\"path\":\"tasks\\/52\\/66913448076dc080802771c3e0102b4471a49656\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1511357186\",\"user_id\":\"2\",\"size\":\"2644290\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511357171\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1062, 1511359246, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511359246\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n\"}}'),
(1063, 1511360391, 'task.create', 2, 1, 90, '{\"task_id\":90,\"task\":{\"id\":\"90\",\"title\":\"HP2\",\"description\":\"\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"21\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360391\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1064, 1511360400, 'task.move.position', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2\",\"description\":\"\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360391\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":13,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1065, 1511360543, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\"}}'),
(1066, 1511360556, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"155\",\"name\":\"neues_Firmenlogo_ab 15.01.18.pptx\",\"path\":\"tasks\\/90\\/e3227d5484a9e308aced7533fcda95074aac48fd\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1511360556\",\"user_id\":\"2\",\"size\":\"179952\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1067, 1511360556, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"156\",\"name\":\"HP2 TP-001C.PDF\",\"path\":\"tasks\\/90\\/36201ed391caa1e0dfb875d5125791f55bfbd1db\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1511360556\",\"user_id\":\"2\",\"size\":\"617305\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1068, 1511360667, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360667\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n\\r\\n\"}}'),
(1069, 1511409497, 'task.create', 3, 2, 91, '{\"task_id\":91,\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n1. Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default.\\r\\n2. Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511409497\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1070, 1511409542, 'task.update', 3, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n1. Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default.\\r\\n2. Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511409542\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n1. Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default.\\r\\n2. Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n\\r\\n\"}}'),
(1071, 1511409589, 'task.file.create', 3, 2, 91, '{\"file\":{\"id\":\"157\",\"name\":\"QR_200001403_Blende 6-fach Taster_GGK 663-1_00.pdf\",\"path\":\"tasks\\/91\\/9d02c680bdeb56552ddd9537e24d2b8079468c2c\",\"is_image\":\"0\",\"task_id\":\"91\",\"date\":\"1511409589\",\"user_id\":\"3\",\"size\":\"5830209\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n1. Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default.\\r\\n2. Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511409542\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1072, 1511409733, 'task.update', 3, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\\r\\n* 23.11.17 - Mail Andreas: Manfred will contact you!\\r\\n\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511409733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\\r\\n* 23.11.17 - Mail Andreas: Manfred will contact you!\\r\\n\\r\\n \\r\\n\"}}'),
(1073, 1511410030, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511410030\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1074, 1511503710, 'task.update', 6, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511503710\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\"}}'),
(1075, 1511504034, 'task.update', 6, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17-Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511504034\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17-Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\"}}'),
(1076, 1511505026, 'task.update', 6, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - PCB-holder\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511505026\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \"}}'),
(1077, 1511505229, 'task.update', 6, 2, 89, '{\"task_id\":\"89\",\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511505229\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n\\r\\n\"}}'),
(1078, 1511505317, 'task.update', 6, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n1. Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default.\\r\\n2. Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally,\\r\\nsorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511505317\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n1. Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default.\\r\\n2. Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally,\\r\\nsorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n\\r\\n\\r\\n\"}}'),
(1079, 1511505445, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"158\",\"name\":\"124&45-3-50F-06D.xlsx\",\"path\":\"tasks\\/57\\/268aba70c09a564ed02853522022e86198a9e8ca\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1511505445\",\"user_id\":\"6\",\"size\":\"15345\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511359092\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1080, 1511508830, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511508830\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\"}}'),
(1081, 1511510868, 'task.update', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. So we are looking at the beginning of next year for this first round of samples.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511510868\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. So we are looking at the beginning of next year for this first round of samples.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1082, 1511511368, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511511367\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\"}}'),
(1083, 1511511420, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511511420\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\"}}'),
(1084, 1511511482, 'task.update', 1, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511511482\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n\\r\\n\"}}'),
(1085, 1511511525, 'task.update', 1, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511511525\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\"}}'),
(1086, 1511512342, 'task.update', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511512342\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(1087, 1511515451, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511515451\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\"}}'),
(1088, 1511517232, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511517232\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n\\r\\n\\r\\n\",\"color_id\":\"red\"}}'),
(1089, 1511517297, 'task.file.create', 2, 1, 38, '{\"file\":{\"id\":\"159\",\"name\":\"5512\\u66f2\\u7ebf\\u56fe20171105.pdf\",\"path\":\"tasks\\/38\\/ab7c5c86ee591b4638a2fb248c4f589b1cb1a138\",\"is_image\":\"0\",\"task_id\":\"38\",\"date\":\"1511517297\",\"user_id\":\"2\",\"size\":\"833192\"},\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511511525\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1090, 1511517375, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\"}}'),
(1091, 1511517433, 'task.update', 2, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517433\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n\"}}'),
(1092, 1511518114, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"160\",\"name\":\"257462733834049025.jpg\",\"path\":\"tasks\\/45\\/093faf519da339c1a0d576bc441eab9fc65b678a\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1511518114\",\"user_id\":\"2\",\"size\":\"34291\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511410030\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1093, 1511518114, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"161\",\"name\":\"274342696789098558.jpg\",\"path\":\"tasks\\/45\\/0b5495690a22dad0bf4808747749b5cdd7f46adf\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1511518114\",\"user_id\":\"2\",\"size\":\"43559\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511410030\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1094, 1511518114, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"162\",\"name\":\"334171288943119100.jpg\",\"path\":\"tasks\\/45\\/70ae817c54f06daae36e873131283afd120862c5\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1511518114\",\"user_id\":\"2\",\"size\":\"34422\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511410030\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1095, 1511518114, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"163\",\"name\":\"473353424943209006.jpg\",\"path\":\"tasks\\/45\\/2a8078bb25a3f2f43ed1fbc892f009ce4a575ada\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1511518114\",\"user_id\":\"2\",\"size\":\"32988\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511410030\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1096, 1511518115, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"164\",\"name\":\"789481802402228384.jpg\",\"path\":\"tasks\\/45\\/1bc960f583eee83d616106f4ee1cd5ea60e2b95c\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1511518115\",\"user_id\":\"2\",\"size\":\"34799\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511410030\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1097, 1511518275, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st without surface texture to Jens next Monday\\r\\n* \",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511518275\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st without surface texture to Jens next Monday\\r\\n* \"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1098, 1511518429, 'task.update', 2, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511518429\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\"}}'),
(1099, 1511518537, 'task.move.column', 2, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511518536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1510808418\"},\"project_id\":\"2\",\"position\":8,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1510808418\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1100, 1511518541, 'task.move.column', 2, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511518541\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1511518536\"},\"project_id\":\"2\",\"position\":14,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1511518536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1101, 1511518543, 'task.move.column', 2, 2, 87, '{\"task_id\":\"87\",\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511518543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1510808535\"},\"project_id\":\"2\",\"position\":8,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1510808535\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1102, 1511519504, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* \",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511519504\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* \"}}'),
(1103, 1511617504, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived and testing will begin on Monday.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511617504\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived and testing will begin on Monday.\"}}'),
(1104, 1511617517, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok and testing will begin on Monday.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511617517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok and testing will begin on Monday.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1105, 1511617545, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511617545\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\"}}'),
(1106, 1511767501, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"165\",\"name\":\"671-Z-00-101 b.pdf\",\"path\":\"tasks\\/52\\/d3b2afb101a345d558d69bd640f41d22fa9894a0\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1511767500\",\"user_id\":\"2\",\"size\":\"82304\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511357171\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1107, 1511767717, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"166\",\"name\":\"E-JS-9-1#\\u5ba2\\u6237DM35\\u300145G\\u534a\\u6210\\u54c1\\u7535\\u673a\\u6392\\u6f6e\\u53ca\\u970d\\u5c14\\u6d4b\\u8bd5.pdf\",\"path\":\"tasks\\/52\\/c684362a70e4b4eacbdbbbc7ce9b21a111ae4f74\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1511767717\",\"user_id\":\"2\",\"size\":\"326594\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511357171\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1108, 1511768023, 'task.update', 2, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct? \\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed?\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor?\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511768023\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct? \\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed?\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor?\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1109, 1511768418, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511768418\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1110, 1511768623, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511768623\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n\"}}'),
(1111, 1511768631, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511768631\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(1112, 1511782595, 'task.update', 2, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511782595\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1113, 1511783064, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511783064\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\"}}'),
(1114, 1511790742, 'task.update', 2, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511790742\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n\\r\\n\"}}'),
(1115, 1511855395, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511855395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1116, 1511855468, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511855468\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\"}}'),
(1117, 1511855708, 'subtask.update', 3, 1, 38, '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1118, 1511855710, 'subtask.update', 3, 1, 38, '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1119, 1511855712, 'subtask.update', 3, 1, 38, '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1120, 1511915873, 'task.update', 1, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511915873\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n\"}}'),
(1121, 1511920073, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"39\",\"title\":\"01\\/12\\/2017 Receive Motors from Nichibo\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1511920073\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511515451\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1122, 1511920074, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"39\",\"title\":\"01\\/12\\/2017 Receive Motors from Nichibo\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511515451\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1123, 1511920110, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511920110\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\"}}'),
(1124, 1511920170, 'task.file.create', 1, 1, 39, '{\"file\":{\"id\":\"167\",\"name\":\"Internal Packaging.jpeg\",\"path\":\"tasks\\/39\\/12efc3819b07f8c7bb742b4dfbfb4b0cd5a76bb9\",\"is_image\":\"1\",\"task_id\":\"39\",\"date\":\"1511920170\",\"user_id\":\"1\",\"size\":\"182462\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511920110\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1125, 1511939384, 'task.file.create', 2, 1, 33, '{\"file\":{\"id\":\"168\",\"name\":\"ReqSpec_LowCost Beltwinder_Ver12_111017.pdf\",\"path\":\"tasks\\/33\\/85137b8a414a4c470ccb5da22199305ac17a5ede\",\"is_image\":\"0\",\"task_id\":\"33\",\"date\":\"1511939384\",\"user_id\":\"2\",\"size\":\"1899309\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1126, 1511939680, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511939680\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n\"}}'),
(1127, 1511942380, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\"}}'),
(1128, 1511950115, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511518429\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1129, 1511950116, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"46\",\"title\":\"update TA60 user manual according to TUV request\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"48\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511518429\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1130, 1511950176, 'task.update', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n*29.11.17 - Johnson: co-license will be ready next week\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511950175\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n*29.11.17 - Johnson: co-license will be ready next week\"}}'),
(1131, 1511969345, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969345\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n\\r\\n\\r\\n\"}}'),
(1132, 1511969462, 'task.update', 2, 2, 87, '{\"task_id\":\"87\",\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n* 29.11.17 - Manfred: currently set \\\"on hold\\\" because we can again order a quantity of 600 pcs of the \\\"old 1.3 MP version with \\\"old\\\" chip\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969462\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n* 29.11.17 - Manfred: currently set \\\"on hold\\\" because we can again order a quantity of 600 pcs of the \\\"old 1.3 MP version with \\\"old\\\" chip\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1133, 1511969476, 'task.update', 2, 2, 87, '{\"task_id\":\"87\",\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n* 29.11.17 - Manfred: currently set this topic \\\"on hold\\\" because we can again order a quantity of 600 pcs of the \\\"old 1.3 MP version with \\\"old\\\" chip\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969475\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n* 29.11.17 - Manfred: currently set this topic \\\"on hold\\\" because we can again order a quantity of 600 pcs of the \\\"old 1.3 MP version with \\\"old\\\" chip\\r\\n\\r\\n\"}}'),
(1134, 1511969503, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969503\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\"}}'),
(1135, 1511969665, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson,\\r\\n\\r\\nAs briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\n\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\n\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969665\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson,\\r\\n\\r\\nAs briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\n\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\n\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\"}}'),
(1136, 1511969677, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\n\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\n\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969677\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\n\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\n\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\"}}'),
(1137, 1511969693, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969693\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\"}}'),
(1138, 1511969712, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969712\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1139, 1511969726, 'task.file.create', 2, 2, 47, '{\"file\":{\"id\":\"169\",\"name\":\"Quotation 2017-11-24.xlsx\",\"path\":\"tasks\\/47\\/58dd1116379fc5b79aa5dc45d3e3f8a9ec48d3f0\",\"is_image\":\"0\",\"task_id\":\"47\",\"date\":\"1511969726\",\"user_id\":\"2\",\"size\":\"14017\"},\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969712\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1140, 1511969786, 'task.update', 2, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\"}}'),
(1141, 1511969856, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"170\",\"name\":\"Dooya_TechnicalAnnex_TM20_Ver171123.docx\",\"path\":\"tasks\\/52\\/ca2c2fad9af98701def6eb1d753d0b5f5b8f0be6\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1511969856\",\"user_id\":\"2\",\"size\":\"2649863\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511357171\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1142, 1511969962, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969962\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1143, 1511970155, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 29.11.17 - Mail Sally: Hi Jorg, Dooya technical department had meeting fully discussed about your update on the text in technical annex regarding the heat protection test, their conclusion is everything on the TM20 annex should stay same as TM09 except add the sensor test, no change is accepted. :-( Please advise. Attached signed copy (TM20.pdf) (only adding the same text as same as the TM09 annex on 6.1.1, no change)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511970155\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 29.11.17 - Mail Sally: Hi Jorg, Dooya technical department had meeting fully discussed about your update on the text in technical annex regarding the heat protection test, their conclusion is everything on the TM20 annex should stay same as TM09 except add the sensor test, no change is accepted. :-( Please advise. Attached signed copy (TM20.pdf) (only adding the same text as same as the TM09 annex on 6.1.1, no change)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1144, 1511970165, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"171\",\"name\":\"TM20.pdf\",\"path\":\"tasks\\/52\\/7f9a3f8622f8cf42e5de462866cf3342bcb42bea\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1511970165\",\"user_id\":\"2\",\"size\":\"8962887\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 29.11.17 - Mail Sally: Hi Jorg, Dooya technical department had meeting fully discussed about your update on the text in technical annex regarding the heat protection test, their conclusion is everything on the TM20 annex should stay same as TM09 except add the sensor test, no change is accepted. :-( Please advise. Attached signed copy (TM20.pdf) (only adding the same text as same as the TM09 annex on 6.1.1, no change)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511970155\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1145, 1511973428, 'task.update', 2, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511973428\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n\\r\\n\\r\\n\"}}'),
(1146, 1511973437, 'task.move.column', 2, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511973437\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511973437\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1510818124\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1147, 1511973609, 'task.update', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511973609\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1148, 1511973625, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"172\",\"name\":\"IMG_0394.JPG\",\"path\":\"tasks\\/59\\/1c98b59c2c3ad6ede4b1be4fbbdb093375ef4ac4\",\"is_image\":\"1\",\"task_id\":\"59\",\"date\":\"1511973625\",\"user_id\":\"2\",\"size\":\"856343\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511973609\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1149, 1511973626, 'task.file.create', 2, 2, 59, '{\"file\":{\"id\":\"173\",\"name\":\"tube surface.JPG\",\"path\":\"tasks\\/59\\/bdd8bbafcd3b7b8a36616a36b7c319c232919d59\",\"is_image\":\"1\",\"task_id\":\"59\",\"date\":\"1511973626\",\"user_id\":\"2\",\"size\":\"755251\"},\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511973609\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1150, 1512041227, 'task.update', 2, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512041227\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1151, 1512042865, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512042865\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n\"}}'),
(1152, 1512118166, 'subtask.update', 2, 1, 39, '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1153, 1512118166, 'subtask.update', 2, 1, 39, '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1154, 1512118168, 'subtask.update', 2, 1, 39, '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1155, 1512210650, 'task.create', 3, 2, 92, '{\"task_id\":92,\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512210650\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1156, 1512210703, 'task.file.create', 3, 2, 92, '{\"file\":{\"id\":\"174\",\"name\":\"fitting with motor head.docx\",\"path\":\"tasks\\/92\\/b6351c4ee29691652fb030f7173643cd718e2f9b\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1512210703\",\"user_id\":\"3\",\"size\":\"2398115\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512210650\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1157, 1512210704, 'task.file.create', 3, 2, 92, '{\"file\":{\"id\":\"175\",\"name\":\"RE Inspection records of the parts GGK 539-096  GGK 539-07 from Carry ... (62.4 KB).msg\",\"path\":\"tasks\\/92\\/721c3764f617d027fa69eb67e0e96709600f40b4\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1512210704\",\"user_id\":\"3\",\"size\":\"63488\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512210650\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1158, 1512210989, 'task.file.create', 3, 2, 92, '{\"file\":{\"id\":\"176\",\"name\":\"spring dimension 43.5 follow drawing ,shaking and noise.MOV\",\"path\":\"tasks\\/92\\/d423c061a4a7ee53e0e42e47d88d04150b38a504\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1512210989\",\"user_id\":\"3\",\"size\":\"48468652\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512210650\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1159, 1512211038, 'task.file.create', 3, 2, 92, '{\"file\":{\"id\":\"177\",\"name\":\"spring dimension is 42.1mm~42.9mm, noshaking and noise.MOV\",\"path\":\"tasks\\/92\\/91853162c8fabb134313c6eb34b5c3c31993046c\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1512211038\",\"user_id\":\"3\",\"size\":\"11949996\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512210650\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1160, 1512211205, 'task.file.create', 3, 2, 92, '{\"file\":{\"id\":\"178\",\"name\":\"proposal pos3 of 539-096d.pdf\",\"path\":\"tasks\\/92\\/6eecf7df3a26d417cbc26923b68a35d636e9d10d\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1512211205\",\"user_id\":\"3\",\"size\":\"995500\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512210650\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1161, 1512212302, 'task.update', 3, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual dimension 42,5 +\\/- 0,5 generate better functionality, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512212302\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual dimension 42,5 +\\/- 0,5 generate better functionality, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n\"}}'),
(1162, 1512212349, 'task.update', 3, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual dimension 42,5 +\\/- 0,5 generate better functionality, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our proposed dimension for Pos,3 is  42,5 +\\/- 0,5. Please consider.\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512212349\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual dimension 42,5 +\\/- 0,5 generate better functionality, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our proposed dimension for Pos,3 is  42,5 +\\/- 0,5. Please consider.\\r\\n\\r\\n\"}}'),
(1163, 1512212408, 'task.update', 3, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual dime**nsion 42,5 +\\/- 0,5 generate better functionality, pl**ease help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.\\r\\n*** 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512212408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual dime**nsion 42,5 +\\/- 0,5 generate better functionality, pl**ease help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.\\r\\n*** 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1164, 1512212511, 'task.update', 3, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512212511\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n\\r\\n\"}}'),
(1165, 1512213701, 'task.update', 3, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512213701\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\"}}'),
(1166, 1512353007, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353007\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n\"}}'),
(1167, 1512353059, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353059\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\"}}'),
(1168, 1512353134, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353134\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1169, 1512353158, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via LCL.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353158\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via LCL.\"}}'),
(1170, 1512353169, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"FHP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353169\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"FHP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\"}}'),
(1171, 1512353195, 'task.move.column', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353195\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512353195\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"2\",\"dst_column_id\":\"4\",\"date_moved\":\"1507886034\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"2\",\"dst_column_id\":\"4\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1172, 1512353218, 'task.update', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 04.12.17 - This I feel can be closed as we are currently planning for the whole UBW Gearbox Assembly.\\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353218\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512353195\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 04.12.17 - This I feel can be closed as we are currently planning for the whole UBW Gearbox Assembly.\\r\\n\"}}'),
(1173, 1512375539, 'task.update', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512375539\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1174, 1512384679, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"FHP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512384679\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n\"}}'),
(1175, 1512397952, 'task.update', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512397952\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n\"}}'),
(1176, 1512401138, 'task.update', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - PCB-holder\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512401138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\"}}'),
(1177, 1512401694, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512401694\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n\\r\\n\"}}'),
(1178, 1512460426, 'task.update', 2, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512460426\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1179, 1512462297, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512462297\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Order #14 - 4500032237\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1180, 1512462362, 'task.update', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512462362\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n\\r\\n\"}}'),
(1181, 1512462667, 'task.update', 3, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n\\r\\n* 04.12.17 - \\u2022Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512462667\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n\\r\\n* 04.12.17 - \\u2022Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\"}}'),
(1182, 1512483307, 'task.update', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512483307\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"GGK 533-1 - claim - Motorhead\"}}'),
(1183, 1512483328, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512483328\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(1184, 1512483395, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512483395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1185, 1512483419, 'task.file.create', 2, 2, 91, '{\"file\":{\"id\":\"179\",\"name\":\"QR_200001403_Blende 6-fach Taster_GGK 663-1_01.pdf\",\"path\":\"tasks\\/91\\/73251bc276a07b71dd817468a188a5fd0b56bc0b\",\"is_image\":\"0\",\"task_id\":\"91\",\"date\":\"1512483419\",\"user_id\":\"2\",\"size\":\"94748\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512483395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1186, 1512544914, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512544914\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1187, 1512545232, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512545232\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\\r\\n\"}}'),
(1188, 1512545237, 'task.move.column', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512545237\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512545237\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1499060242\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1189, 1512545245, 'task.update', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512545245\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512545237\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(1190, 1512545254, 'task.move.column', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512545254\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512545254\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060678\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1191, 1512545295, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512545295\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\\r\\n\\r\\n\"}}'),
(1192, 1512545300, 'task.move.column', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512545300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512545300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1499060719\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1193, 1512545313, 'task.update', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512545313\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512545300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"yellow\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1194, 1512566978, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 04.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic. * 04.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512566978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 04.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic. * 04.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1195, 1512567021, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 04.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.     * 04.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512567021\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 04.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.     * 04.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1196, 1512567048, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 04.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               * 04.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512567048\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 04.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               * 04.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1197, 1512567096, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512567096\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1198, 1512595668, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512595668\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\"}}'),
(1199, 1512595696, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512595696\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\"}}'),
(1200, 1512628023, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0.04\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":\"1512628023\",\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1201, 1512628024, 'subtask.update', 3, 2, 48, '{\"subtask\":{\"id\":\"48\",\"title\":\"obtain GDO co-license\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0.04\",\"task_id\":\"48\",\"user_id\":\"3\",\"position\":\"2\",\"username\":\"Sally Zhang\",\"name\":\"Sally Zhang\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511969786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1202, 1512628058, 'task.update', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512628058\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\"}}'),
(1203, 1512628794, 'task.file.create', 3, 2, 91, '{\"file\":{\"id\":\"180\",\"name\":\"CAR-20171208- GGK 633-1-color not conform to RAL9003.docx\",\"path\":\"tasks\\/91\\/518243e9c8367d9e9d56f9de0420706252953bda\",\"is_image\":\"0\",\"task_id\":\"91\",\"date\":\"1512628794\",\"user_id\":\"3\",\"size\":\"1769120\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512544914\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1204, 1512629029, 'task.update', 3, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\\r\\n* 07.12.17 - Mail Ralf: Ok, noted. For the time being there are no further action items on this matter at your end.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512629029\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\\r\\n* 07.12.17 - Mail Ralf: Ok, noted. For the time being there are no further action items on this matter at your end.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1205, 1512629085, 'task.move.column', 3, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\\r\\n* 07.12.17 - Mail Ralf: Ok, noted. For the time being there are no further action items on this matter at your end.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512629085\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629085\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1510221637\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1510221637\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1206, 1512629104, 'task.update', 3, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\\r\\n* 07.12.17 - Mail Ralf: Ok, noted. For the time being there are no further action items on this matter at your end.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512629104\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629085\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"color_id\":\"grey\"}}'),
(1207, 1512629151, 'task.move.column', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629151\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509520776\"},\"project_id\":\"2\",\"position\":6,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509520776\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1208, 1512629168, 'task.update', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629168\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"color_id\":\"grey\"}}'),
(1209, 1512629192, 'task.move.column', 3, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\\r\\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512629192\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629192\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1510588403\"},\"project_id\":\"2\",\"position\":10,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1510588403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1210, 1512629764, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 samples and material properities sheet for your reference.\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629764\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 samples and material properities sheet for your reference.\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\"}}'),
(1211, 1512629785, 'task.file.create', 3, 2, 45, '{\"file\":{\"id\":\"181\",\"name\":\"drawing-672-F-00-001b.pdf\",\"path\":\"tasks\\/45\\/435d1a4ba48bdd35f7c1a25b1d64a38424ba819a\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1512629785\",\"user_id\":\"3\",\"size\":\"84795\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 samples and material properities sheet for your reference.\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629764\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1212, 1512629785, 'task.file.create', 3, 2, 45, '{\"file\":{\"id\":\"182\",\"name\":\"drawing-672-F-00-002b.pdf\",\"path\":\"tasks\\/45\\/f2fc245088da361fee0808e9d7bb6482b402e90b\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1512629785\",\"user_id\":\"3\",\"size\":\"97714\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 samples and material properities sheet for your reference.\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629764\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1213, 1512629786, 'task.file.create', 3, 2, 45, '{\"file\":{\"id\":\"183\",\"name\":\"FSIR for 672-F-00-001 b.xlsx\",\"path\":\"tasks\\/45\\/629873039ed14fdb4b9d32e47018d41592b883b7\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1512629786\",\"user_id\":\"3\",\"size\":\"21735\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 samples and material properities sheet for your reference.\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629764\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1214, 1512629786, 'task.file.create', 3, 2, 45, '{\"file\":{\"id\":\"184\",\"name\":\"FSIR for 672-F-00-002 b.xlsx\",\"path\":\"tasks\\/45\\/b9a32f6e5843376bbba08c94cffac95452d6dd76\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1512629786\",\"user_id\":\"3\",\"size\":\"24507\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 samples and material properities sheet for your reference.\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629764\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1215, 1512629798, 'task.file.create', 3, 2, 45, '{\"file\":{\"id\":\"185\",\"name\":\"Material properities  sheet -Sabic PC 945 NC.pdf\",\"path\":\"tasks\\/45\\/70b6958d8a9c26d8543b30e70bd32d866386ef8b\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1512629798\",\"user_id\":\"3\",\"size\":\"16341\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 samples and material properities sheet for your reference.\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629764\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1216, 1512629868, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512629868\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n\\r\\n\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n\\r\\n\"}}'),
(1217, 1512632652, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512632652\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n\\r\\n\"}}'),
(1218, 1512634655, 'task.create', 2, 1, 93, '{\"task_id\":93,\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634655\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1219, 1512634664, 'task.move.position', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634655\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1220, 1512634739, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\"}}'),
(1221, 1512634764, 'task.file.create', 2, 1, 93, '{\"file\":{\"id\":\"186\",\"name\":\"20171206_163914_resized_1.jpg\",\"path\":\"tasks\\/93\\/932f585527f75237d60fc09afe1c2dab4bea7cc3\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1512634764\",\"user_id\":\"2\",\"size\":\"368088\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1222, 1512634764, 'task.file.create', 2, 1, 93, '{\"file\":{\"id\":\"187\",\"name\":\"20171206_163920_resized_1.jpg\",\"path\":\"tasks\\/93\\/be5a2720d6436fc5c6a1470f72552837ab8a4db3\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1512634764\",\"user_id\":\"2\",\"size\":\"285148\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1223, 1512634764, 'task.file.create', 2, 1, 93, '{\"file\":{\"id\":\"188\",\"name\":\"20171206_163930_resized_1.jpg\",\"path\":\"tasks\\/93\\/5590b3382e4c6671187060c418d26f92038617d0\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1512634764\",\"user_id\":\"2\",\"size\":\"389565\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1224, 1512634786, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(1225, 1512643014, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512643014\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n\\r\\n\"}}'),
(1226, 1512643247, 'task.create', 2, 2, 94, '{\"task_id\":94,\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512643247\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1227, 1512643262, 'task.update', 2, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512643262\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(1228, 1512643315, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"189\",\"name\":\"QR_200001416_TM09_HE1015_00.pdf\",\"path\":\"tasks\\/94\\/d424a61aaa4d0c15921505c76294b1cf2f3120a4\",\"is_image\":\"0\",\"task_id\":\"94\",\"date\":\"1512643315\",\"user_id\":\"2\",\"size\":\"296303\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512643262\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1229, 1512643316, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"190\",\"name\":\"\\u5fae\\u4fe1\\u56fe\\u7247_20171207181247.png\",\"path\":\"tasks\\/94\\/fa487e8cb28d69f83d3e77b11e039c52b638d805\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1512643316\",\"user_id\":\"2\",\"size\":\"222497\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512643262\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1230, 1512643316, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"191\",\"name\":\"\\u5fae\\u4fe1\\u56fe\\u7247_20171207181015.png\",\"path\":\"tasks\\/94\\/c4f6411106f9a5c9aacca131f565e91fce4479a5\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1512643316\",\"user_id\":\"2\",\"size\":\"20753\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512643262\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1231, 1512644623, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512644623\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1232, 1512644634, 'task.file.create', 2, 2, 91, '{\"file\":{\"id\":\"192\",\"name\":\"CAR-20171208- GGK 633-1-color not conform to RAL9003.docx\",\"path\":\"tasks\\/91\\/688e746f6605458dc1784e9e88dd284060f584bd\",\"is_image\":\"0\",\"task_id\":\"91\",\"date\":\"1512644634\",\"user_id\":\"2\",\"size\":\"1769120\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512644623\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1233, 1512650140, 'task.move.position', 2, 2, 89, '{\"task_id\":\"89\",\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511505229\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"6\"},\"project_id\":\"2\",\"position\":7,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"6\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1234, 1512677863, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 07.12.17 - Mail Manfred: Dear Berthold, do you already have a result regarding the sheetmetall parts (5 pcs) which Henk has sent to us ?\\r\\n\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512677863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 07.12.17 - Mail Manfred: Dear Berthold, do you already have a result regarding the sheetmetall parts (5 pcs) which Henk has sent to us ?\\r\\n\\r\\n\"}}'),
(1235, 1512677897, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with **ETD 05.18** - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512677897\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with **ETD 05.18** - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\"}}'),
(1236, 1512677914, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512677914\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\"}}'),
(1237, 1512678022, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512678022\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\"}}'),
(1238, 1512678047, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want **(ETD approx. 06.02.18 (cw6)**\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512678047\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want **(ETD approx. 06.02.18 (cw6)**\"}}'),
(1239, 1512679122, 'task.update', 2, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512679122\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1240, 1512699810, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512699810\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n\\r\\n\\r\\n\"}}'),
(1241, 1512701729, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512701729\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n\"}}'),
(1242, 1512701733, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":\"1512701733\",\"status_name\":\"In progress\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512701729\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1243, 1512701734, 'subtask.update', 1, 1, 39, '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512701729\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1244, 1512711653, 'task.update', 1, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Packaging supplier just came and quoted. We got 3.10RMB for the lower packaging so with the foam the total price is 7.40RMB (Lower Box + Foam). Samples will be ready on Wednesday\\/Thursday next week.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512711653\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Packaging supplier just came and quoted. We got 3.10RMB for the lower packaging so with the foam the total price is 7.40RMB (Lower Box + Foam). Samples will be ready on Wednesday\\/Thursday next week.\\r\\n\\r\\n\"}}'),
(1245, 1512721120, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512721120\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n\"}}'),
(1246, 1512721155, 'task.update', 6, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Andreas: will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512721155\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Andreas: will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1247, 1512721182, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512721182\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\"}}'),
(1248, 1512721189, 'task.update', 6, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512721189\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n\"}}'),
(1249, 1512721300, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n*08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512721300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n*08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n\"}}'),
(1250, 1512721901, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512721901\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\"}}'),
(1251, 1512721966, 'task.update', 6, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015 no function\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n*08.12.17-Henk : this can closed ,approved by Andreas\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512721966\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213807\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n*08.12.17-Henk : this can closed ,approved by Andreas\\r\\n\"}}'),
(1252, 1512721996, 'task.update', 6, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015 no function\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n* 08.12.17-Henk : this can closed ,approved by Andreas\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512721996\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213807\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n* 08.12.17-Henk : this can closed ,approved by Andreas\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1253, 1512722025, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512722025\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n\"}}'),
(1254, 1512722074, 'task.update', 6, 2, 89, '{\"task_id\":\"89\",\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n* 08.12.17-Henk :this can closed ,approved by Andreas\\r\\n\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512722074\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n* 08.12.17-Henk :this can closed ,approved by Andreas\\r\\n\\r\\n\"}}'),
(1255, 1512722140, 'task.update', 2, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 27.11.17 - Mail Berthold: Thanks for the info, noted. Do we need to change the drawings to fit the new measures, or do they fix the next parts to fit the drawing?\\r\\n* 27.11.17 - Mail Ben: I would personally leave everything alone for the moment with the drawings and just consider the current situation a \\u201cconcession\\u201d for the moment (based on your and Andreas\\u2019s measurements too). Once we have received 2 more orders from Carry we can see where their measurements stand on a longer timeline then we can considering locking in the drawings to this. Hope thats ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512722140\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 27.11.17 - Mail Berthold: Thanks for the info, noted. Do we need to change the drawings to fit the new measures, or do they fix the next parts to fit the drawing?\\r\\n* 27.11.17 - Mail Ben: I would personally leave everything alone for the moment with the drawings and just consider the current situation a \\u201cconcession\\u201d for the moment (based on your and Andreas\\u2019s measurements too). Once we have received 2 more orders from Carry we can see where their measurements stand on a longer timeline then we can considering locking in the drawings to this. Hope thats ok.\\r\\n\\r\\n\\r\\n\"}}'),
(1256, 1512722361, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512722361\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1257, 1512723148, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512723148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n\\r\\n\"}}'),
(1258, 1512726991, 'task.update', 3, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015 no function\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n* 08.12.17-Henk : this can closed ,approved by Andreas\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512726991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213807\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"grey\"}}'),
(1259, 1512726999, 'task.update', 3, 2, 89, '{\"task_id\":\"89\",\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n* 08.12.17-Henk :this can closed ,approved by Andreas\\r\\n\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512726999\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"grey\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1260, 1512727089, 'task.move.column', 3, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015 no function\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n* 08.12.17-Henk : this can closed ,approved by Andreas\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512727089\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512727089\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213807\"},\"project_id\":\"2\",\"position\":7,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213807\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1261, 1512727092, 'task.move.column', 3, 2, 89, '{\"task_id\":\"89\",\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n* 08.12.17-Henk :this can closed ,approved by Andreas\\r\\n\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512727092\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512727092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510919848\"},\"project_id\":\"2\",\"position\":8,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510919848\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1262, 1512727378, 'task.update', 3, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512727378\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\",\"color_id\":\"blue\"}}'),
(1263, 1512727762, 'task.update', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n*08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512727762\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n*08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\",\"owner_id\":\"3\"}}'),
(1264, 1512727785, 'task.file.create', 3, 2, 86, '{\"file\":{\"id\":\"193\",\"name\":\"WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index(02)_update.docx\",\"path\":\"tasks\\/86\\/b5491d95be92a7d72d08c875446ae5fbb95ae471\",\"is_image\":\"0\",\"task_id\":\"86\",\"date\":\"1512727785\",\"user_id\":\"3\",\"size\":\"146239\"},\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n*08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512727762\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1265, 1512729536, 'task.update', 3, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 08.12.17 - Replacement batch will be ready next Tuesday 12 Dec\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512729536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 08.12.17 - Replacement batch will be ready next Tuesday 12 Dec\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1266, 1512729546, 'task.update', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n*08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512729545\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n*08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\"}}'),
(1267, 1512729563, 'task.update', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512729563\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\"}}'),
(1268, 1512736266, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512736266\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1269, 1512736713, 'task.update', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512736713\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\"}}'),
(1270, 1512736827, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"194\",\"name\":\"124 TM20 HAL&NTC test document_V4.docx\",\"path\":\"tasks\\/52\\/45d2c9269ecbafa28232c4cdd43023b8184f84bf\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1512736827\",\"user_id\":\"2\",\"size\":\"377324\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 29.11.17 - Mail Sally: Hi Jorg, Dooya technical department had meeting fully discussed about your update on the text in technical annex regarding the heat protection test, their conclusion is everything on the TM20 annex should stay same as TM09 except add the sensor test, no change is accepted. :-( Please advise. Attached signed copy (TM20.pdf) (only adding the same text as same as the TM09 annex on 6.1.1, no change)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511970155\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1271, 1512972406, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512972406\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\"}}'),
(1272, 1513060235, 'task.update', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513060235\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\"}}'),
(1273, 1513064887, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\"}}'),
(1274, 1513074677, 'task.create', 3, 2, 95, '{\"task_id\":95,\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- - Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074677\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1275, 1513074708, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"195\",\"name\":\"New_SPECIFICATIONS_20170802.pdf\",\"path\":\"tasks\\/95\\/c172c6e0bfa0c1ae51c602104594fa07dd39b0d4\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513074708\",\"user_id\":\"3\",\"size\":\"806294\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- - Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074677\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1276, 1513074710, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"196\",\"name\":\"Old-specifications_SMD_V2.0.pdf\",\"path\":\"tasks\\/95\\/dca27da9d2f2d91618ba813aac5979ba33f1838b\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513074710\",\"user_id\":\"3\",\"size\":\"585117\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- - Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074677\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1277, 1513074710, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"197\",\"name\":\"WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index_Camera WIFI module_20171207.docx\",\"path\":\"tasks\\/95\\/0440f1ec2c39ca2bcd9c67b1986ce915f4bb8ab2\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513074710\",\"user_id\":\"3\",\"size\":\"57332\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- - Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074677\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1278, 1513074729, 'task.update', 3, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n               * Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074729\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n               * Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1279, 1513074759, 'task.update', 3, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n * Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074759\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n * Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\"}}'),
(1280, 1513074971, 'task.create', 3, 2, 96, '{\"task_id\":96,\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074971\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1281, 1513075085, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"198\",\"name\":\"533-123k.pdf\",\"path\":\"tasks\\/96\\/4758a6ba6c54fd4d6f17fb3605d3fcd336293015\",\"is_image\":\"0\",\"task_id\":\"96\",\"date\":\"1513075085\",\"user_id\":\"3\",\"size\":\"93963\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074971\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1282, 1513079427, 'task.file.create', 3, 2, 86, '{\"file\":{\"id\":\"199\",\"name\":\"AW_PCAS_ LFI 534-3 Power Supply.pdf\",\"path\":\"tasks\\/86\\/abb91c62229e0035114b68a2418e0cf9bbfd4380\",\"is_image\":\"0\",\"task_id\":\"86\",\"date\":\"1513079427\",\"user_id\":\"3\",\"size\":\"135067\"},\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512729563\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1283, 1513079486, 'task.update', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513079486\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n\\r\\n\",\"color_id\":\"grey\"}}'),
(1284, 1513079501, 'task.move.column', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513079501\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513079501\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1511518541\"},\"project_id\":\"2\",\"position\":9,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1511518541\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1285, 1513079740, 'task.file.create', 3, 2, 86, '{\"file\":{\"id\":\"200\",\"name\":\"AW_PCAS_ LFI 534-3 Power Supply.pdf\",\"path\":\"tasks\\/86\\/3296830771d336d29af1447870437341701f06b9\",\"is_image\":\"0\",\"task_id\":\"86\",\"date\":\"1513079740\",\"user_id\":\"3\",\"size\":\"78393\"},\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513079501\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513079501\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1286, 1513079953, 'task.update', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n* - LBW start from #28\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513079953\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513079501\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n* - LBW start from #28\\r\\n\\r\\n\\r\\n\"}}'),
(1287, 1513080016, 'task.update', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n*  - LBW start from #28\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513080016\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513079501\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n*  - LBW start from #28\\r\\n\\r\\n\\r\\n\"}}'),
(1288, 1513080029, 'task.update', 3, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n*LBW start from #28\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513080029\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513079501\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n*LBW start from #28\\r\\n\\r\\n\\r\\n\"}}'),
(1289, 1513167219, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513167219\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\"}}'),
(1290, 1513167448, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513167448\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\"}}'),
(1291, 1513229965, 'task.file.create', 3, 2, 91, '{\"file\":{\"id\":\"201\",\"name\":\"compare with RAL9003 color card.JPG\",\"path\":\"tasks\\/91\\/7b321951942d9b1f795a1e3506fa903d7c925830\",\"is_image\":\"1\",\"task_id\":\"91\",\"date\":\"1513229965\",\"user_id\":\"3\",\"size\":\"711728\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 08.12.17 - Replacement batch will be ready next Tuesday 12 Dec\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512729536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1292, 1513229968, 'task.file.create', 3, 2, 91, '{\"file\":{\"id\":\"202\",\"name\":\"IR-GGK663-1.xlsx\",\"path\":\"tasks\\/91\\/beba0e6933e84c0cf22bed32c95db716cece0e86\",\"is_image\":\"0\",\"task_id\":\"91\",\"date\":\"1513229968\",\"user_id\":\"3\",\"size\":\"483175\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 08.12.17 - Replacement batch will be ready next Tuesday 12 Dec\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1512729536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1293, 1513230082, 'task.update', 3, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513230082\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"color_id\":\"blue\"}}'),
(1294, 1513230161, 'task.file.create', 3, 2, 91, '{\"file\":{\"id\":\"203\",\"name\":\"replacement 663-1 compare with RAL9003 color card.JPG\",\"path\":\"tasks\\/91\\/01b784e6d2eb5e56b1fb71119613dbdb63774fa7\",\"is_image\":\"1\",\"task_id\":\"91\",\"date\":\"1513230161\",\"user_id\":\"3\",\"size\":\"711728\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513230082\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1295, 1513230205, 'task.file.create', 3, 2, 91, '{\"file\":{\"id\":\"204\",\"name\":\"IR-GGK663-1(replacement).xlsx\",\"path\":\"tasks\\/91\\/85d371ce5f7a1a188541d3d864c07077db8a113b\",\"is_image\":\"0\",\"task_id\":\"91\",\"date\":\"1513230205\",\"user_id\":\"3\",\"size\":\"483175\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513230082\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1296, 1513231462, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"205\",\"name\":\"NEW WIFI module RED certs.rar\",\"path\":\"tasks\\/95\\/277b5e2d8bf87f08eeda62420ae90f186f806968\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513231462\",\"user_id\":\"3\",\"size\":\"7071383\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n * Peter: It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513074759\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1297, 1513235669, 'task.update', 1, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513235669\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n\\r\\n\"}}'),
(1298, 1513235787, 'task.file.create', 1, 1, 93, '{\"file\":{\"id\":\"206\",\"name\":\"Overview.jpg\",\"path\":\"tasks\\/93\\/a06068542dd5e317bf7616d417dc30c9fb484b9f\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1513235787\",\"user_id\":\"1\",\"size\":\"526931\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513235669\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1299, 1513235791, 'task.file.create', 1, 1, 93, '{\"file\":{\"id\":\"207\",\"name\":\"Edge Tearing.jpg\",\"path\":\"tasks\\/93\\/1887ae0617da5843de58a861c5c8f0614b13c63a\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1513235791\",\"user_id\":\"1\",\"size\":\"58079\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513235669\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1300, 1513235796, 'task.file.create', 1, 1, 93, '{\"file\":{\"id\":\"208\",\"name\":\"Corner Problem 2.jpg\",\"path\":\"tasks\\/93\\/b80d782b77fe52c8ce822da20670479ed4a5a337\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1513235796\",\"user_id\":\"1\",\"size\":\"75685\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513235669\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1301, 1513235800, 'task.file.create', 1, 1, 93, '{\"file\":{\"id\":\"209\",\"name\":\"Corner Problem.jpg\",\"path\":\"tasks\\/93\\/06b4c5ff9b53b59c03b1b0e853f64fff081ea79c\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1513235800\",\"user_id\":\"1\",\"size\":\"60766\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513235669\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1302, 1513235866, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513235866\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\"}}'),
(1303, 1513263714, 'task.update', 2, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n * 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513263714\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n * 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1304, 1513263736, 'task.update', 2, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513263736\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\"}}'),
(1305, 1513268259, 'task.file.create', 2, 2, 52, '{\"file\":{\"id\":\"210\",\"name\":\"TM20.pdf\",\"path\":\"tasks\\/52\\/b5dd26ed0603d165390ddabdadca6f80092266bf\",\"is_image\":\"0\",\"task_id\":\"52\",\"date\":\"1513268259\",\"user_id\":\"2\",\"size\":\"9048918\"},\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 29.11.17 - Mail Sally: Hi Jorg, Dooya technical department had meeting fully discussed about your update on the text in technical annex regarding the heat protection test, their conclusion is everything on the TM20 annex should stay same as TM09 except add the sensor test, no change is accepted. :-( Please advise. Attached signed copy (TM20.pdf) (only adding the same text as same as the TM09 annex on 6.1.1, no change)\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511970155\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1306, 1513268405, 'task.update', 2, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 29.11.17 - Mail Sally: Hi Jorg, Dooya technical department had meeting fully discussed about your update on the text in technical annex regarding the heat protection test, their conclusion is everything on the TM20 annex should stay same as TM09 except add the sensor test, no change is accepted. :-( Please advise. Attached signed copy (TM20.pdf) (only adding the same text as same as the TM09 annex on 6.1.1, no change)\\r\\n* 14.12.17 - Mail Sally: Hi Jorg, Attached TM20 Technical Annex signed back by Dooya.  \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513268405\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 29.11.17 - Mail Sally: Hi Jorg, Dooya technical department had meeting fully discussed about your update on the text in technical annex regarding the heat protection test, their conclusion is everything on the TM20 annex should stay same as TM09 except add the sensor test, no change is accepted. :-( Please advise. Attached signed copy (TM20.pdf) (only adding the same text as same as the TM09 annex on 6.1.1, no change)\\r\\n* 14.12.17 - Mail Sally: Hi Jorg, Attached TM20 Technical Annex signed back by Dooya.  \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1307, 1513299372, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513299372\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n\\r\\n\"}}'),
(1308, 1513315085, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"211\",\"name\":\"FC2501P full device with new WIFI module thermal shock test report_CN.pdf\",\"path\":\"tasks\\/95\\/9db4bc3764dc2252df43e419bf5b4a92ed372538\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513315085\",\"user_id\":\"3\",\"size\":\"481314\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513263736\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1309, 1513315086, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"212\",\"name\":\"MPE(\\u56fa\\u5b9a\\u5f0f).pdf\",\"path\":\"tasks\\/95\\/820d0a19e4e52a2b8a8d84eecddddb5e72c58229\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513315086\",\"user_id\":\"3\",\"size\":\"86753\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513263736\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1310, 1513315190, 'task.update', 3, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 14.12.17 - Mail Sally: Hi Jorg, Attached TM20 Technical Annex signed back by Dooya.  \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513315190\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 14.12.17 - Mail Sally: Hi Jorg, Attached TM20 Technical Annex signed back by Dooya.  \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1311, 1513319545, 'task.update', 1, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time.\\r\\nThis timeline is based on no major modifications required to the PCB.\\r\\nThe cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option.\\r\\nIf we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513319545\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time.\\r\\nThis timeline is based on no major modifications required to the PCB.\\r\\nThe cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option.\\r\\nIf we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\n\\r\\n\"}}'),
(1312, 1513320081, 'task.file.create', 3, 2, 94, '{\"file\":{\"id\":\"213\",\"name\":\"QR_200001416_TM09_HE1015_01.pdf\",\"path\":\"tasks\\/94\\/66b7c97582f9b01555f68da21348126af2eee1dc\",\"is_image\":\"0\",\"task_id\":\"94\",\"date\":\"1513320081\",\"user_id\":\"3\",\"size\":\"71569\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513299372\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1313, 1513320585, 'task.file.create', 1, 1, 60, '{\"file\":{\"id\":\"214\",\"name\":\"St\\u0081ckliste SAPSt\\u0081-PLS 534-1-2_cost (Iss 1.0).xlsx\",\"path\":\"tasks\\/60\\/dd811e9889456d8ed2820de13e1f425e5f498c16\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513320585\",\"user_id\":\"1\",\"size\":\"15275\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1314, 1513320605, 'task.file.create', 1, 1, 60, '{\"file\":{\"id\":\"215\",\"name\":\"(substitution for 653 105 131 822 von Wu\\u0308rth)A127C-340xx03S-x01.pdf\",\"path\":\"tasks\\/60\\/331b7214909210dbef55a1168afb6256108a598c\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513320605\",\"user_id\":\"1\",\"size\":\"256088\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1315, 1513323671, 'task.file.create', 1, 1, 60, '{\"file\":{\"id\":\"216\",\"name\":\"(substitution for 653 105 131 822 von Wu\\u0308rth)A127C-340xx03S-x01.pdf\",\"path\":\"tasks\\/60\\/bc27ecc00f7478d43d8fa2e362be6a033b284c82\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513323671\",\"user_id\":\"1\",\"size\":\"256088\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1316, 1513323749, 'task.file.create', 1, 1, 60, '{\"file\":{\"id\":\"217\",\"name\":\"(substitution)PX-220UF-35V-8X11.5.pdf\",\"path\":\"tasks\\/60\\/fcd1242beb9815251de550c777cce655c933d266\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513323749\",\"user_id\":\"1\",\"size\":\"598840\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1317, 1513327305, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513327305\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\"}}'),
(1318, 1513329437, 'task.update', 6, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears,so this can be closed .\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513329437\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears,so this can be closed .\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1319, 1513340326, 'task.create', 2, 1, 97, '{\"task_id\":97,\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1320, 1513340336, 'task.move.position', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1321, 1513340355, 'task.move.position', 2, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time.\\r\\nThis timeline is based on no major modifications required to the PCB.\\r\\nThe cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option.\\r\\nIf we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513319545\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1322, 1513340369, 'task.move.position', 2, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512679122\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1323, 1513340374, 'task.move.position', 2, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512679122\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1324, 1513340379, 'task.move.position', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17-Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511504034\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":8,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1325, 1513340434, 'task.move.position', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512736713\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1326, 1513340437, 'task.move.position', 2, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512736713\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1327, 1513340453, 'task.move.position', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1328, 1513340458, 'task.move.position', 2, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509937603\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":17,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1329, 1513340459, 'task.move.position', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512397952\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":18,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1330, 1513340500, 'task.file.create', 2, 1, 97, '{\"file\":{\"id\":\"218\",\"name\":\"(New proposal 2018)emmc_4gb_8gb_ps8225_v50_wt.pdf\",\"path\":\"tasks\\/97\\/b4de8e5f1afd21c599324c5fa319df0e7e66009d\",\"is_image\":\"0\",\"task_id\":\"97\",\"date\":\"1513340500\",\"user_id\":\"2\",\"size\":\"428515\"},\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1331, 1513340500, 'task.file.create', 2, 1, 97, '{\"file\":{\"id\":\"219\",\"name\":\"(current)emmc_ps8210_v451_80s_153b_wt.pdf\",\"path\":\"tasks\\/97\\/59fd883d9041b881dd9421215d25b02f2a9949fa\",\"is_image\":\"0\",\"task_id\":\"97\",\"date\":\"1513340500\",\"user_id\":\"2\",\"size\":\"510770\"},\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1332, 1513340608, 'task.create', 2, 2, 98, '{\"task_id\":98,\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340608\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1333, 1513340709, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340709\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n\",\"color_id\":\"blue\",\"owner_id\":\"3\"}}'),
(1334, 1513340727, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340727\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n\"}}'),
(1335, 1513340737, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340737\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n\"}}'),
(1336, 1513340775, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: 1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340775\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: 1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\"}}'),
(1337, 1513340819, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\"}}'),
(1338, 1513340943, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"220\",\"name\":\"foil too tight and too many layer of foil.jpg\",\"path\":\"tasks\\/98\\/1a18b17b3973f87937207885e8dd5c07f94feb84\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513340943\",\"user_id\":\"2\",\"size\":\"122008\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1339, 1513340943, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"221\",\"name\":\"no damage on S2 carton.jpg\",\"path\":\"tasks\\/98\\/486b33a8b794004e5e8aef5ce8e010b22085a93e\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513340943\",\"user_id\":\"2\",\"size\":\"153531\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1340, 1513340943, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"222\",\"name\":\"S2 carton shape is better.jpg\",\"path\":\"tasks\\/98\\/2cb24c67e98d9821c38fd71ff5c71303a2ecce7e\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513340943\",\"user_id\":\"2\",\"size\":\"105233\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1341, 1513340943, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"223\",\"name\":\"some SX5 carton deformation.jpg\",\"path\":\"tasks\\/98\\/c9b323eb45d96cbfa8ff99d0ace6d80f86d6dd23\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513340943\",\"user_id\":\"2\",\"size\":\"95137\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1342, 1513340944, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"224\",\"name\":\"some SX5 carton deformation2.jpg\",\"path\":\"tasks\\/98\\/94e7680fd7f352443bec0d9b11e82c43a6eda903\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513340944\",\"user_id\":\"2\",\"size\":\"96107\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1343, 1513340944, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"225\",\"name\":\"some SX5 carton deformation3.jpg\",\"path\":\"tasks\\/98\\/9a9ab9c324438aa501000fa95808795ee3c64e4e\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513340944\",\"user_id\":\"2\",\"size\":\"147065\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1344, 1513341126, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513341126\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n\\r\\n\"}}'),
(1345, 1513341158, 'task.move.position', 2, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\\r\\n* 23.11.17 - Mail Andreas: Manfred will contact you!\\r\\n\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511409733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1346, 1513341164, 'task.move.position', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513341126\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":6,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1347, 1513341179, 'task.move.position', 2, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513263736\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1348, 1513341181, 'task.move.position', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513167448\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1349, 1513341185, 'task.move.position', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513167448\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":4,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1350, 1513341186, 'task.move.position', 2, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513263736\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1351, 1513342498, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513342498\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n\"}}'),
(1352, 1513342640, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513342640\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1353, 1513342679, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513342679\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\"}}'),
(1354, 1513537040, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513537040\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\"}}'),
(1355, 1513571247, 'task.file.create', 3, 1, 60, '{\"file\":{\"id\":\"226\",\"name\":\"(substitution)YXJ-330UF-35V-10X12.5.pdf\",\"path\":\"tasks\\/60\\/781b8a37f5659e30ba0417c5fd3c5e59ec48cc87\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513571247\",\"user_id\":\"3\",\"size\":\"268517\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1356, 1513572015, 'task.update', 3, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears,so this can be closed .\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513572014\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"grey\"}}'),
(1357, 1513572033, 'task.move.column', 3, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears,so this can be closed .\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513572033\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513572033\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213809\"},\"project_id\":\"2\",\"position\":9,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213809\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1358, 1513572038, 'task.move.position', 3, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears,so this can be closed .\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513572033\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513572033\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"8\",\"dst_column_id\":\"8\"},\"project_id\":\"2\",\"position\":10,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"8\",\"dst_column_id\":\"8\",\"date_moved\":\"1513572033\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1359, 1513577760, 'task.file.create', 3, 2, 98, '{\"file\":{\"id\":\"227\",\"name\":\"768190152001950604.jpg\",\"path\":\"tasks\\/98\\/a9232ed6f230f8a2add197003872ce53dd3a3d95\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513577760\",\"user_id\":\"3\",\"size\":\"2472041\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513537040\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1360, 1513577767, 'task.file.create', 3, 2, 98, '{\"file\":{\"id\":\"228\",\"name\":\"774787735801221762.jpg\",\"path\":\"tasks\\/98\\/53762a5e3f3fff001e68d72a065ed33ae34e316d\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513577767\",\"user_id\":\"3\",\"size\":\"2483635\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513537040\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1361, 1513577813, 'task.update', 3, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 16.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.\\r\\n2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\nSally: confirmed.\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513577813\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 16.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.\\r\\n2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\nSally: confirmed.\\r\\n\"}}'),
(1362, 1513577831, 'task.update', 3, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* Sally: confirmed.\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513577831\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* Sally: confirmed.\\r\\n\"}}'),
(1363, 1513582837, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513582837\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n\"}}'),
(1364, 1513582852, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"229\",\"name\":\"768190152001950604.jpg\",\"path\":\"tasks\\/98\\/2c7b9db8e892ad869004e76739e965516ea2e06b\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513582852\",\"user_id\":\"2\",\"size\":\"2472041\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513582837\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1365, 1513582853, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"230\",\"name\":\"774787735801221762.jpg\",\"path\":\"tasks\\/98\\/13122d4ed7305f71b149b388770c645fe5e79355\",\"is_image\":\"1\",\"task_id\":\"98\",\"date\":\"1513582853\",\"user_id\":\"2\",\"size\":\"2483635\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513582837\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1366, 1513595786, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513595786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1367, 1513602564, 'task.assignee_change', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513602564\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1368, 1513608514, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513608514\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1369, 1513611310, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513611310\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\"}}'),
(1370, 1513667649, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513667649\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n\"}}'),
(1371, 1513667692, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"231\",\"name\":\"314-143.pdf\",\"path\":\"tasks\\/88\\/04c525e76f7fd6c0a25e0ac73cf7bb9973075b9f\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1513667692\",\"user_id\":\"2\",\"size\":\"260260\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513667649\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1372, 1513667692, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"232\",\"name\":\"387-065a.pdf\",\"path\":\"tasks\\/88\\/36212542e78a7cbbc785b9f0e20deef4cf4e25cd\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1513667692\",\"user_id\":\"2\",\"size\":\"83183\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513667649\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1373, 1513667692, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"233\",\"name\":\"doc03643020171115160211.pdf\",\"path\":\"tasks\\/88\\/6f67d2b5889fcbc54614dd1df009801a2305af4d\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1513667692\",\"user_id\":\"2\",\"size\":\"1256804\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513667649\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1374, 1513667692, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"234\",\"name\":\"YNK_2M0-1_TTL-Network.pdf\",\"path\":\"tasks\\/88\\/744faacc09bee63fc2f8510afb6aab5b400e0505\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1513667692\",\"user_id\":\"2\",\"size\":\"390593\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513667649\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1375, 1513667799, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nI will update you regarding the timeline as soon as I know more.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513667799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nI will update you regarding the timeline as soon as I know more.\\r\\n\\r\\n\\r\\n\"}}'),
(1376, 1513668095, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January.* \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513668095\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January.* \\r\\n\\r\\n\\r\\n\"}}'),
(1377, 1513668104, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513668104\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1378, 1513670964, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to\\r\\n-\\tGet Detailed documentation for any change made on bootloader and kernel\\r\\n-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project\\r\\n-\\tmake additional validation in the new sw architecture \\r\\n-\\tinvolve our partners for the old and new architecture (Sigma and emlix)\\r\\n-\\tincrease the number of test devices to at least 20 pcs.\\r\\nAs all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513670964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to\\r\\n-\\tGet Detailed documentation for any change made on bootloader and kernel\\r\\n-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project\\r\\n-\\tmake additional validation in the new sw architecture \\r\\n-\\tinvolve our partners for the old and new architecture (Sigma and emlix)\\r\\n-\\tincrease the number of test devices to at least 20 pcs.\\r\\nAs all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1379, 1513671027, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513671027\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1380, 1513671086, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513671086\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1381, 1513671125, 'task.update', 6, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears and beyond 10000 cycle,so this can be closed .\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513671125\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513572033\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears and beyond 10000 cycle,so this can be closed .\"}}'),
(1382, 1513671139, 'task.update', 6, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears and beyond 10000 cycles,so this can be closed .\",\"date_creation\":\"1509521559\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513671139\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513572033\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears and beyond 10000 cycles,so this can be closed .\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1383, 1513671274, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513671274\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n\\r\\n\\r\\n\"}}'),
(1384, 1513673093, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"235\",\"name\":\"FC2501P full device reliability test report with new WIFI module_add EN.pdf\",\"path\":\"tasks\\/95\\/e0d7ca6c58a4c0d0360034d46e537323b64d9994\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513673093\",\"user_id\":\"3\",\"size\":\"1163905\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513263736\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1385, 1513673127, 'task.update', 3, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513673127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\"}}'),
(1386, 1513673548, 'task.file.create', 2, 2, 95, '{\"file\":{\"id\":\"236\",\"name\":\"CCISE170400101 EN 301489-1,17.pdf\",\"path\":\"tasks\\/95\\/4b669691674c744dbc6e39db2357b7ce20f5dad8\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513673548\",\"user_id\":\"2\",\"size\":\"2305616\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513673127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1387, 1513673549, 'task.file.create', 2, 2, 95, '{\"file\":{\"id\":\"237\",\"name\":\"CCISE170400102 EN 300328(RED) 2.4GWIFI.pdf\",\"path\":\"tasks\\/95\\/94772fe2fb9ad0bf758bd6a9a4b2d2f96fc178ad\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513673549\",\"user_id\":\"2\",\"size\":\"2999378\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513673127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1388, 1513673549, 'task.file.create', 2, 2, 95, '{\"file\":{\"id\":\"238\",\"name\":\"CCISE170400103 EN 62311.pdf\",\"path\":\"tasks\\/95\\/6594bb6c4c8885d56c399cfa359043594528f55e\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513673549\",\"user_id\":\"2\",\"size\":\"380785\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513673127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1389, 1513673549, 'task.file.create', 2, 2, 95, '{\"file\":{\"id\":\"239\",\"name\":\"FC2501P full device reliability test report with new WIFI module_add EN.pdf\",\"path\":\"tasks\\/95\\/d4c2ead96f0f397fe10802af557ab26b62fd7b54\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513673549\",\"user_id\":\"2\",\"size\":\"1163905\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513673127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1390, 1513673549, 'task.file.create', 2, 2, 95, '{\"file\":{\"id\":\"240\",\"name\":\"FC2501P full device with new WIFI module thermal shock test report_CN.pdf\",\"path\":\"tasks\\/95\\/ffb0f32f6d50f4270ca0a7acab8d4d224eef39a0\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513673549\",\"user_id\":\"2\",\"size\":\"481314\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513673127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1391, 1513673550, 'task.file.create', 2, 2, 95, '{\"file\":{\"id\":\"241\",\"name\":\"MPE(\\u56fa\\u5b9a\\u5f0f).pdf\",\"path\":\"tasks\\/95\\/5ef6c9881cd5b4414dd87ace631f8f292c2d0f11\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1513673550\",\"user_id\":\"2\",\"size\":\"86753\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513673127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1392, 1513673878, 'task.update', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment ?\\r\\n\\r\\n\\r\\n\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513673878\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment ?\\r\\n\\r\\n\\r\\n\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n\\r\\n\"}}'),
(1393, 1513673916, 'task.update', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513673916\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1394, 1513676685, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513676685\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1395, 1513676728, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513676728\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1396, 1513695365, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 19.12.17 - RD-D will send samples asap - tracking number ?\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513695365\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 19.12.17 - RD-D will send samples asap - tracking number ?\"}}'),
(1397, 1513697710, 'task.update', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details.\\r\\n\\r\\nLatest on Thursday we will send you further information regarding the target prices.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513697710\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details.\\r\\n\\r\\nLatest on Thursday we will send you further information regarding the target prices.\\r\\n\"}}'),
(1398, 1513697733, 'task.update', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513697733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n\"}}'),
(1399, 1513697761, 'task.file.create', 2, 1, 60, '{\"file\":{\"id\":\"242\",\"name\":\"171219_BOM_UBW_SX-MHI.XLSX\",\"path\":\"tasks\\/60\\/d2fd1cb3495550d9e519f30e531ac4f7985db788\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513697761\",\"user_id\":\"2\",\"size\":\"37879\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513697733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1400, 1513699678, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"243\",\"name\":\"UBW Gearbox Quote (Iss 2.0).pdf\",\"path\":\"tasks\\/39\\/34d05958830173b30b1f8b019d6c05eda2ae75f8\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1513699678\",\"user_id\":\"2\",\"size\":\"25712\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513611310\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1401, 1513745974, 'task.update', 1, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513745974\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1402, 1513746036, 'task.update', 1, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\\r\\n* 20.12.17 - Peter has asked me to hold. If we can secure the relays for the next year then there is no need to do this.\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513746036\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\\r\\n* 20.12.17 - Peter has asked me to hold. If we can secure the relays for the next year then there is no need to do this.\"}}'),
(1403, 1513748367, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"244\",\"name\":\"new.jpg\",\"path\":\"tasks\\/96\\/18eee412bea8a04ac8289b1532a1c8a075def4a4\",\"is_image\":\"1\",\"task_id\":\"96\",\"date\":\"1513748367\",\"user_id\":\"3\",\"size\":\"142193\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513167448\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1404, 1513748367, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"245\",\"name\":\"old(now using).jpg\",\"path\":\"tasks\\/96\\/cf07003b5a106cccd3bfb8b1f49c441ffad64cf4\",\"is_image\":\"1\",\"task_id\":\"96\",\"date\":\"1513748367\",\"user_id\":\"3\",\"size\":\"159195\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513167448\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1405, 1513748395, 'task.update', 3, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513748395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n\"}}'),
(1406, 1513754124, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\"}}'),
(1407, 1513756348, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"246\",\"name\":\"IMG_3086.jpg\",\"path\":\"tasks\\/96\\/61c80cb331d5c96a668aca76b0bf7a194d87d165\",\"is_image\":\"1\",\"task_id\":\"96\",\"date\":\"1513756348\",\"user_id\":\"3\",\"size\":\"1948034\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513748395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1408, 1513757885, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer.\\r\\n\\r\\nWe need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n- Mail Berthold: \\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513757885\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer.\\r\\n\\r\\nWe need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n- Mail Berthold: \\r\\n\"}}'),
(1409, 1513757908, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513757907\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \"}}'),
(1410, 1513757999, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513757999\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n\"}}'),
(1411, 1513778833, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 19.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513778833\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 19.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\"}}'),
(1412, 1513825594, 'task.update', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513825594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1413, 1513844125, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513844125\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1414, 1513845200, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513845200\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\"}}'),
(1415, 1513845826, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513845826\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \"}}'),
(1416, 1513858445, 'task.update', 1, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513858444\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n\\r\\n\\r\\n\"}}'),
(1417, 1513869300, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513869300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n\\r\\n\\r\\n\"}}'),
(1418, 1513922640, 'task.update', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513922640\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1419, 1513949109, 'task.update', 5, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513949109\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\",\"owner_id\":\"5\"}}'),
(1420, 1513949602, 'task.update', 5, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513949602\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\",\"owner_id\":\"5\"}}'),
(1421, 1513949762, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513949762\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(1422, 1513950009, 'task.update', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513950009\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n\\r\\n\\r\\n\",\"owner_id\":\"6\"}}'),
(1423, 1513950530, 'task.create', 5, 2, 99, '{\"task_id\":99,\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"* 22.12.2017 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1513950530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1424, 1513950843, 'task.create', 5, 1, 100, '{\"task_id\":100,\"task\":{\"id\":\"100\",\"title\":\"Life cycle test reck\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1513950843\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1425, 1513950909, 'task.update', 5, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1513950909\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"Life cycle test rack\"}}'),
(1426, 1514366992, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"247\",\"name\":\"MaterialData_14526 ZAMAK 5(old).pdf\",\"path\":\"tasks\\/96\\/b08befedc2233bcc68d4ac9815ca862d7bbb896f\",\"is_image\":\"0\",\"task_id\":\"96\",\"date\":\"1514366992\",\"user_id\":\"3\",\"size\":\"342444\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513757999\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1427, 1514366992, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"248\",\"name\":\"MaterialData_14528 ZAMAK 2(new).pdf\",\"path\":\"tasks\\/96\\/5874e1feaa060a8cf35083883beb8d709d681024\",\"is_image\":\"0\",\"task_id\":\"96\",\"date\":\"1514366992\",\"user_id\":\"3\",\"size\":\"317035\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513757999\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1428, 1514366993, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"249\",\"name\":\"ZAMAK 2(new).jpg\",\"path\":\"tasks\\/96\\/92bb037e3773d874508983893b81f4b7481ae3b4\",\"is_image\":\"1\",\"task_id\":\"96\",\"date\":\"1514366993\",\"user_id\":\"3\",\"size\":\"142193\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513757999\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1429, 1514366993, 'task.file.create', 3, 2, 96, '{\"file\":{\"id\":\"250\",\"name\":\"ZAMAK 5(old,now using).jpg\",\"path\":\"tasks\\/96\\/b17fc7fb1ae49233185115067277e6046b7227ef\",\"is_image\":\"1\",\"task_id\":\"96\",\"date\":\"1514366993\",\"user_id\":\"3\",\"size\":\"159195\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1513757999\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1430, 1514367020, 'task.update', 3, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak #2, #3, #5, #7. #2 is the one with best mechanical property.\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514367020\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak #2, #3, #5, #7. #2 is the one with best mechanical property.\\r\\n\\r\\n\"}}'),
(1431, 1514367041, 'task.update', 3, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514367041\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n\\r\\n\"}}'),
(1432, 1514438764, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors before calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514438764\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors before calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1433, 1514439307, 'task.update', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514439307\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1434, 1514541378, 'task.update', 3, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514541378\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1435, 1514863928, 'task.update', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514863928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n\"}}'),
(1436, 1514863970, 'task.file.create', 3, 2, 48, '{\"file\":{\"id\":\"251\",\"name\":\"product change_approval application(PCB of S1S2TA60,SX5DF 2017-8-10).jpg\",\"path\":\"tasks\\/48\\/d692c2e4ccc28cb2d82366df0f538ba49147c12e\",\"is_image\":\"1\",\"task_id\":\"48\",\"date\":\"1514863970\",\"user_id\":\"3\",\"size\":\"1362314\"},\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514863928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1437, 1514863971, 'task.file.create', 3, 2, 48, '{\"file\":{\"id\":\"252\",\"name\":\"product change_approval application(PCB WIFI removal 2017-10-16)_signed.jpg\",\"path\":\"tasks\\/48\\/6261d76c5743fa2ec43676aac618d9eeef3d0057\",\"is_image\":\"1\",\"task_id\":\"48\",\"date\":\"1514863971\",\"user_id\":\"3\",\"size\":\"1130909\"},\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n\",\"date_creation\":\"1509520776\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514863928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1438, 1514873052, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark are less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514873052\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark are less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1439, 1514873186, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514873186\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\"}}'),
(1440, 1514873304, 'subtask.update', 5, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":\"1514873304\",\"status_name\":\"In Bearbeitung\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1441, 1514873307, 'subtask.update', 5, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1442, 1514873308, 'subtask.update', 5, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1443, 1514876855, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514876854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number.\"}}'),
(1444, 1514876881, 'subtask.create', 1, 1, 39, '{\"subtask\":{\"id\":\"49\",\"title\":\"Change LBW Worm Drawing for Nichibo\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"2\",\"position\":\"9\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514876854\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1445, 1514876942, 'task.update', 1, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n* 02.01.18 - The fixing of the white marks on the RDD Logo on the HP2 has resulted in 2,000RMB in Lapping Costs.\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514876942\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511973437\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n* 02.01.18 - The fixing of the white marks on the RDD Logo on the HP2 has resulted in 2,000RMB in Lapping Costs.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1446, 1514877031, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514877031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \"}}'),
(1447, 1514877096, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514877096\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\"}}'),
(1448, 1514877125, 'subtask.create', 1, 1, 60, '{\"subtask\":{\"id\":\"50\",\"title\":\"Plastic Parts Tooling Information\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"60\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514877096\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1449, 1514877125, 'subtask.create', 1, 1, 60, '{\"subtask\":{\"id\":\"51\",\"title\":\"Label Photos\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"60\",\"user_id\":\"2\",\"position\":\"2\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"Todo\",\"is_timer_started\":false},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514877096\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1450, 1514877331, 'task.update', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514877331\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\\r\\n\\r\\n\"}}'),
(1451, 1514877491, 'task.update', 1, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514877491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\"}}'),
(1452, 1514877653, 'task.file.create', 1, 1, 100, '{\"file\":{\"id\":\"253\",\"name\":\"Screenshot taken 02\\/01\\/2018 07:20.png\",\"path\":\"tasks\\/100\\/2b966ee404fb669a55ba318416c846372995be8a\",\"is_image\":\"1\",\"task_id\":\"100\",\"date\":\"1514877653\",\"user_id\":\"1\",\"size\":\"1350263\"},\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514877491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1453, 1514877684, 'task.file.create', 1, 1, 100, '{\"file\":{\"id\":\"254\",\"name\":\"Screenshot taken 02\\/01\\/2018 07:21.png\",\"path\":\"tasks\\/100\\/a21a8498014e37f2c4bd13ec4a32ed027aaaec67\",\"is_image\":\"1\",\"task_id\":\"100\",\"date\":\"1514877684\",\"user_id\":\"1\",\"size\":\"1249087\"},\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514877491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1454, 1514877910, 'subtask.update', 1, 1, 1, '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"1.81\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Done\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 04.12.17 - This I feel can be closed as we are currently planning for the whole UBW Gearbox Assembly.\\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512353218\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512353195\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1455, 1514883904, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. **\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514883904\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. **\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1456, 1514883929, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514883929\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1457, 1514883970, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it buy increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514883970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it buy increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1458, 1514892373, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise   \\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514892373\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise   \\r\\n\\r\\n\"}}'),
(1459, 1514892446, 'task.file.create', 5, 2, 92, '{\"file\":{\"id\":\"255\",\"name\":\"springimension iO_ mounting iO.MOV\",\"path\":\"tasks\\/92\\/4a8882bca13eb30402bcb6d674fe24c2c3be0820\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1514892446\",\"user_id\":\"5\",\"size\":\"56588411\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise   \\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514892393\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1460, 1514892533, 'task.file.create', 5, 2, 92, '{\"file\":{\"id\":\"256\",\"name\":\"springdimension niO_ mounting niO.MOV\",\"path\":\"tasks\\/92\\/4d51273dd687da8b635f8acdfe302aa395a5cf07\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1514892533\",\"user_id\":\"5\",\"size\":\"34010119\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise   \\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514892393\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1461, 1514893488, 'task.update', 3, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514893488\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1462, 1514895262, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514895261\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\"}}'),
(1463, 1514895781, 'task.update', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514895781\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\"}}'),
(1464, 1514905136, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514905136\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1465, 1514905165, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514905165\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n\\r\\n\\r\\n\"}}'),
(1466, 1514906309, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514906309\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n\\r\\n\\r\\n\"}}'),
(1467, 1514906554, 'task.file.create', 5, 2, 94, '{\"file\":{\"id\":\"257\",\"name\":\"20171215_084252.mp4\",\"path\":\"tasks\\/94\\/2bd7875801253582bca97619ec5c79c2b61fce0d\",\"is_image\":\"0\",\"task_id\":\"94\",\"date\":\"1514906554\",\"user_id\":\"5\",\"size\":\"41159022\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514440465\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1468, 1514906560, 'task.file.create', 5, 2, 94, '{\"file\":{\"id\":\"258\",\"name\":\"20171215_084537.mp4\",\"path\":\"tasks\\/94\\/5390832d0943f337cefba1a6dd5d223608fde980\",\"is_image\":\"0\",\"task_id\":\"94\",\"date\":\"1514906560\",\"user_id\":\"5\",\"size\":\"18532564\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514440465\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1469, 1514906852, 'task.update', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - motor has not enough power\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514906852\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1470, 1514908263, 'task.update', 5, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514908263\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1471, 1514946569, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514946569\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1472, 1514947199, 'task.file.create', 6, 2, 92, '{\"file\":{\"id\":\"259\",\"name\":\"Drawing 539-096d-spring washer.jpg\",\"path\":\"tasks\\/92\\/02456e5d347c6136c7818c24a861351d5255a147\",\"is_image\":\"1\",\"task_id\":\"92\",\"date\":\"1514947199\",\"user_id\":\"6\",\"size\":\"756294\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514946569\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1473, 1514979127, 'task.update', 3, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514979127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\"}}'),
(1474, 1514979140, 'task.update', 3, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514979140\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"grey\"}}'),
(1475, 1514979237, 'task.file.create', 3, 2, 95, '{\"file\":{\"id\":\"260\",\"name\":\"AW_PCAS_659_660_Camera WIFI module_20180103_signed.pdf\",\"path\":\"tasks\\/95\\/043a0d4e9f4a94571a73b9f7a555f11c3d155f59\",\"is_image\":\"0\",\"task_id\":\"95\",\"date\":\"1514979237\",\"user_id\":\"3\",\"size\":\"725298\"},\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514979140\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1476, 1514979252, 'task.move.column', 3, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514979252\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1514979252\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1513074677\"},\"project_id\":\"2\",\"position\":10,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1513074677\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1477, 1514979254, 'task.move.position', 3, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514979252\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1514979252\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"8\",\"dst_column_id\":\"8\"},\"project_id\":\"2\",\"position\":11,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"8\",\"dst_column_id\":\"8\",\"date_moved\":\"1514979252\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1478, 1514979834, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514979834\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n\\r\\n\\r\\n\"}}'),
(1479, 1514981693, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.17 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb (ETD ?)\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514981693\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.17 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb (ETD ?)\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1480, 1514981695, 'task.update', 3, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n\\r\\n* 03.01.17 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514981695\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n\\r\\n* 03.01.17 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n\\r\\n\\r\\n\"}}'),
(1481, 1514982315, 'task.update', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514982315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\"}}'),
(1482, 1514987275, 'subtask.update', 5, 1, 33, '{\"subtask\":{\"id\":\"34\",\"title\":\"2 Ok and 2 NOK Samples from DE\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"2\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":\"1514987275\",\"status_name\":\"In Bearbeitung\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1483, 1514987278, 'subtask.update', 5, 1, 33, '{\"subtask\":{\"id\":\"34\",\"title\":\"2 Ok and 2 NOK Samples from DE\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"2\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1484, 1514987280, 'subtask.update', 5, 1, 33, '{\"subtask\":{\"id\":\"34\",\"title\":\"2 Ok and 2 NOK Samples from DE\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"2\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1485, 1514987683, 'task.update', 5, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  \\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514987683\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  \\r\\n\"}}'),
(1486, 1514987799, 'task.update', 5, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 -Andreas : we do not understand the reason for the change request; Mail from Berthold \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514987799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 -Andreas : we do not understand the reason for the change request; Mail from Berthold \"}}'),
(1487, 1514987824, 'task.assignee_change', 5, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 -Andreas : we do not understand the reason for the change request; Mail from Berthold \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514987824\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(1488, 1514989032, 'task.update', 5, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989032\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery\",\"owner_id\":\"5\"}}'),
(1489, 1514989076, 'task.file.create', 5, 1, 33, '{\"file\":{\"id\":\"261\",\"name\":\"Test\\u00fcbersicht RD45 2017.JPG\",\"path\":\"tasks\\/33\\/310091fd56b03024a3679af7fff515e26f6cc4e3\",\"is_image\":\"1\",\"task_id\":\"33\",\"date\":\"1514989076\",\"user_id\":\"5\",\"size\":\"131552\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989032\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1490, 1514989355, 'task.update', 5, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514989355\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"Life cycle test rack LBW\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1491, 1514989366, 'task.create', 5, 1, 101, '{\"task_id\":101,\"task\":{\"id\":\"101\",\"title\":\"[DUPLIKAT] Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514989366\",\"reference\":\"\",\"date_started\":null,\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1492, 1514989402, 'task.update', 5, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514989402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"Life cycle test rack turbular motors\",\"date_started\":0}}'),
(1493, 1514989523, 'task.update', 5, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #15\\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514989523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #15\\r\\n\"}}'),
(1494, 1514989581, 'task.update', 5, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #14\\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514989581\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #14\\r\\n\"}}'),
(1495, 1514989643, 'task.update', 5, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\"}}'),
(1496, 1514990365, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514990365\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n\\r\\n\\r\\n\\r\\n\",\"owner_id\":\"5\"}}'),
(1497, 1514991149, 'task.update', 5, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514991149\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(1498, 1514994219, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.17 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514994219\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.17 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.17 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1499, 1514994289, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514994289\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n\\r\\n\\r\\n\"}}'),
(1500, 1515034155, 'task.update', 1, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515034155\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\"}}'),
(1501, 1515034217, 'task.update', 1, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"*04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515034216\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"*04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\"}}'),
(1502, 1515034237, 'task.update', 1, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515034237\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\"}}'),
(1503, 1515034260, 'task.move.column', 1, 1, 13, '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 27.11.17 - Mail Berthold: Thanks for the info, noted. Do we need to change the drawings to fit the new measures, or do they fix the next parts to fit the drawing?\\r\\n* 27.11.17 - Mail Ben: I would personally leave everything alone for the moment with the drawings and just consider the current situation a \\u201cconcession\\u201d for the moment (based on your and Andreas\\u2019s measurements too). Once we have received 2 more orders from Carry we can see where their measurements stand on a longer timeline then we can considering locking in the drawings to this. Hope thats ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515034259\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515034259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1510577041\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1504, 1515060259, 'task.create', 3, 2, 102, '{\"task_id\":102,\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515060259\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1505, 1515060612, 'task.update', 3, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 3K NOK.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515060612\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 3K NOK.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\"}}'),
(1506, 1515060638, 'task.update', 3, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 3K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515060638\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 3K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\"}}'),
(1507, 1515061357, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515061357\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n\\r\\n\\r\\n\"}}'),
(1508, 1515061717, 'task.assignee_change', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 3K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515061717\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1509, 1515061737, 'task.assignee_change', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515061737\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1510, 1515061757, 'task.assignee_change', 2, 2, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515061757\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520133\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1511, 1515061901, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 04.01.18 - Mail Johnson: Concerning about the pricing of TA60, I communicated with our financial department, but they feedbacked that RMB 398 is the lowest price we can offer at present.\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515061901\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 04.01.18 - Mail Johnson: Concerning about the pricing of TA60, I communicated with our financial department, but they feedbacked that RMB 398 is the lowest price we can offer at present.\\r\\n\"}}'),
(1512, 1515063130, 'task.update', 3, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"* 04.01.2018 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n\\r\\n* 22.12.2017 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515063130\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 04.01.2018 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n\\r\\n* 22.12.2017 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1513, 1515063169, 'task.assignee_change', 3, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"* 04.01.2018 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n\\r\\n* 22.12.2017 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515063169\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1514, 1515114889, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515114889\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1515, 1515114917, 'task.assignee_change', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515114917\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1516, 1515115185, 'task.assignee_change', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515115185\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"6\"}}'),
(1517, 1515115555, 'task.assignee_change', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515115555\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1518, 1515118606, 'task.update', 6, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515118606\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1519, 1515119134, 'subtask.update', 6, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1520, 1515119135, 'subtask.update', 6, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1521, 1515119136, 'subtask.update', 6, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1522, 1515119136, 'subtask.update', 6, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1523, 1515119137, 'subtask.update', 6, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1524, 1515119138, 'subtask.update', 6, 1, 33, '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1525, 1515137184, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"\\r\\n* 05.01.17 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.2018 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.2017 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515137184\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 05.01.17 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.2018 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.2017 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1526, 1515137201, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515137201\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1527, 1515137273, 'task.update', 2, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515137273\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"owner_id\":\"3\"}}'),
(1528, 1515137293, 'task.file.create', 2, 2, 102, '{\"file\":{\"id\":\"262\",\"name\":\"IP_533_GGK 533-16_02.docx\",\"path\":\"tasks\\/102\\/9dfa85f03c442a4490ee0ef5ba2c672a095d9220\",\"is_image\":\"0\",\"task_id\":\"102\",\"date\":\"1515137293\",\"user_id\":\"2\",\"size\":\"113039\"},\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515137273\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1529, 1515138916, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515138916\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1530, 1515139144, 'task.assignee_change', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139144\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1531, 1515139206, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139206\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n\"}}'),
(1532, 1515139327, 'task.assignee_change', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139327\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1533, 1515139344, 'task.assignee_change', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139344\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"3\"}}'),
(1534, 1515139361, 'task.assignee_change', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139361\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(1535, 1515149180, 'task.update', 2, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515149180\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\"}}'),
(1536, 1515149200, 'task.assignee_change', 2, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515149200\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"6\"}}'),
(1537, 1515149289, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515149289\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1538, 1515149944, 'task.update', 2, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515149944\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\"}}'),
(1539, 1515157494, 'task.update', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515157494\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\"}}'),
(1540, 1515157738, 'task.file.create', 2, 2, 44, '{\"file\":{\"id\":\"263\",\"name\":\"533-011g.pdf\",\"path\":\"tasks\\/44\\/63719273f27c969d1201cce72b04a3e298e5f729\",\"is_image\":\"0\",\"task_id\":\"44\",\"date\":\"1515157738\",\"user_id\":\"2\",\"size\":\"162639\"},\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515157494\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1541, 1515157756, 'task.file.create', 2, 2, 44, '{\"file\":{\"id\":\"264\",\"name\":\"QH_20171017_Platinenhalter 533 zu gro\\u00df.pdf\",\"path\":\"tasks\\/44\\/cd2592ee4fabfbace7e48a63c59626b793b8aa38\",\"is_image\":\"0\",\"task_id\":\"44\",\"date\":\"1515157756\",\"user_id\":\"2\",\"size\":\"116648\"},\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515157494\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1542, 1515157757, 'task.file.create', 2, 2, 44, '{\"file\":{\"id\":\"265\",\"name\":\"IR-GGK 533-1.xlsx\",\"path\":\"tasks\\/44\\/ab82cdd51a1701dba0c777dcdf1b81c3d68683eb\",\"is_image\":\"0\",\"task_id\":\"44\",\"date\":\"1515157757\",\"user_id\":\"2\",\"size\":\"525048\"},\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515157494\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1543, 1515375370, 'task.update', 1, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515375370\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1544, 1515396828, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515396828\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n\"}}'),
(1545, 1515396854, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"266\",\"name\":\"534-124.pdf\",\"path\":\"tasks\\/39\\/7b5001a098810df12fc1bd47df6f0d54e820b4f5\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1515396854\",\"user_id\":\"2\",\"size\":\"55543\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515396828\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1546, 1515399575, 'task.update', 6, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515399575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\"}}'),
(1547, 1515399636, 'task.file.create', 6, 1, 12, '{\"file\":{\"id\":\"267\",\"name\":\"QIR-20180108-sample-Case Upper Part.doc\",\"path\":\"tasks\\/12\\/81d98bd86e68430195d48f8160b54ff1532ef053\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1515399636\",\"user_id\":\"6\",\"size\":\"5485568\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515399575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1548, 1515399666, 'task.file.create', 6, 1, 12, '{\"file\":{\"id\":\"268\",\"name\":\"QIR-20180108-sample-Case Bottom Part.doc\",\"path\":\"tasks\\/12\\/41e7160b872f41f002b563dd1e217556adbe9d2a\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1515399666\",\"user_id\":\"6\",\"size\":\"8096256\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515399575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1549, 1515417141, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515417141\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1550, 1515417236, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"269\",\"name\":\"FSR for 672-F-00-001 b_Eller_080117.xlsx\",\"path\":\"tasks\\/45\\/954ba26bc401eb41a5d605250f7027319b8fef42\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1515417236\",\"user_id\":\"2\",\"size\":\"22292\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515417141\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1551, 1515417236, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"270\",\"name\":\"FSR for 672-F-00-002 b_Eller_080118.xlsx\",\"path\":\"tasks\\/45\\/d975580ca77192ceebc5d19bb32aa1c223ed46ad\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1515417236\",\"user_id\":\"2\",\"size\":\"23194\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515417141\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1552, 1515417237, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"271\",\"name\":\"DSCN3550.JPG\",\"path\":\"tasks\\/45\\/a0c4e9cc8e7931c6785f62180d3e633da0359309\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1515417237\",\"user_id\":\"2\",\"size\":\"1923747\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515417141\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1553, 1515417238, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"272\",\"name\":\"DSCN3549.JPG\",\"path\":\"tasks\\/45\\/985aea376bd2dc8b321e329d377ea4c9ad0aa1d1\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1515417238\",\"user_id\":\"2\",\"size\":\"1881958\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515417141\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1554, 1515417300, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"273\",\"name\":\"FSR for 672-F-00-002 b_Eller_080118.xlsx\",\"path\":\"tasks\\/45\\/031290b1d0b1d8500bc74c862b3193d22584e551\",\"is_image\":\"0\",\"task_id\":\"45\",\"date\":\"1515417300\",\"user_id\":\"2\",\"size\":\"23194\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515417141\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1555, 1515417326, 'task.assignee_change', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515417326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"6\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1556, 1515477172, 'task.update', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\\r\\n* 09.01.18 - The first trial of the RD35 tooling has been done. There are several problems with Burrs and Flashing. They will repair the tool and do another trial on 25.01.18.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515477172\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\\r\\n* 09.01.18 - The first trial of the RD35 tooling has been done. There are several problems with Burrs and Flashing. They will repair the tool and do another trial on 25.01.18.\\r\\n\\r\\n\"}}'),
(1557, 1515477725, 'task.file.create', 1, 1, 41, '{\"file\":{\"id\":\"274\",\"name\":\"\\u6a21\\u5177\\u4fee\\u6a21\\u65b9\\u6848.ppt\",\"path\":\"tasks\\/41\\/fa52b3129d9c6a06a02ac0f3772076f31faef311\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1515477725\",\"user_id\":\"1\",\"size\":\"1480192\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\\r\\n* 09.01.18 - The first trial of the RD35 tooling has been done. There are several problems with Burrs and Flashing. They will repair the tool and do another trial on 25.01.18.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515477172\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1558, 1515479840, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515479840\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\"}}'),
(1559, 1515485276, 'task.update', 6, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515485276\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \"}}'),
(1560, 1515486173, 'task.update', 6, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 09.01.18-Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230.\\r\\nDear Martin:\\r\\nPlease help to updated the IP for GGK533-16 packing information.\\r\\nWe will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515486173\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.01.18-Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230.\\r\\nDear Martin:\\r\\nPlease help to updated the IP for GGK533-16 packing information.\\r\\nWe will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\"}}'),
(1561, 1515487803, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515487802\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1562, 1515498973, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515498973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n\"}}'),
(1563, 1515499253, 'task.assignee_change', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515499253\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1564, 1515504221, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have updated the order to: 300 x HP2 black \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515504221\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have updated the order to: 300 x HP2 black \"}}'),
(1565, 1515504402, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw11\\/18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD cw15\\/18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515504402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw11\\/18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD cw15\\/18)\\r\\n\"}}'),
(1566, 1515506591, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506591\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\"}}'),
(1567, 1515506964, 'task.create', 2, 1, 103, '{\"task_id\":103,\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1568, 1515506970, 'task.move.position', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1569, 1515507008, 'task.update', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments!\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515507007\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments!\\r\\n\"}}'),
(1570, 1515507138, 'task.update', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515507138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\"}}'),
(1571, 1515507199, 'task.file.create', 2, 1, 103, '{\"file\":{\"id\":\"275\",\"name\":\"18-01-08_order_4500034742_MHI(HP2 order #17).pdf\",\"path\":\"tasks\\/103\\/2a0e3ef47f2f88ebfc6a305d95a4de3e7c941ee1\",\"is_image\":\"0\",\"task_id\":\"103\",\"date\":\"1515507199\",\"user_id\":\"2\",\"size\":\"14435\"},\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515507138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1572, 1515507218, 'task.file.create', 2, 1, 64, '{\"file\":{\"id\":\"276\",\"name\":\"17-11-09_order_4500033946_MHI(HP2 order #16)_update1.pdf\",\"path\":\"tasks\\/64\\/628c596e9bdaae873a33e91ffc2821cc0ab32792\",\"is_image\":\"0\",\"task_id\":\"64\",\"date\":\"1515507218\",\"user_id\":\"2\",\"size\":\"14321\"},\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw11\\/18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD cw15\\/18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515504402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1573, 1515507243, 'task.file.create', 2, 1, 40, '{\"file\":{\"id\":\"277\",\"name\":\"17-10-18_order_4500033639_MHI(HP2 order #15)_update1.pdf\",\"path\":\"tasks\\/40\\/4f873052a48536a18023766a4ec6a81708626582\",\"is_image\":\"0\",\"task_id\":\"40\",\"date\":\"1515507243\",\"user_id\":\"2\",\"size\":\"14490\"},\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506591\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1574, 1515513164, 'task.update', 2, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515513164\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\"}}'),
(1575, 1515513171, 'task.assignee_change', 2, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515513171\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1576, 1515545231, 'task.update', 1, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515545231\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n\\r\\n\\r\\n\"}}'),
(1577, 1515551630, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515551630\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\"}}'),
(1578, 1515574126, 'task.update', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515574126\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\"}}'),
(1579, 1515575438, 'task.update', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515575438\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\"}}'),
(1580, 1515594924, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515594924\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n\\r\\n\\r\\n\"}}'),
(1581, 1515594937, 'task.file.create', 2, 1, 93, '{\"file\":{\"id\":\"278\",\"name\":\"180110_HP2_white_lower_packaging.JPG\",\"path\":\"tasks\\/93\\/ef3b02d0ecf2238311b89d1191f673d3adb373ce\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1515594937\",\"user_id\":\"2\",\"size\":\"100645\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515594924\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1582, 1515655125, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D reprot, but they will improve the production process from below aspectes:\\r\\n1.extend the oil immersion time to 60mins and shake each 10 minutes,keep the PH is 11-13( previous the immersion time is 45mins)\\r\\n2.keep the rust clean immersion time to 30mins and shake each 10 minutes,make the PH is 1-3,check for rust stain be clean or not before go to next process \\r\\n3.increase the backing temperture to 195degree after powder coating  \\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515655125\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D reprot, but they will improve the production process from below aspectes:\\r\\n1.extend the oil immersion time to 60mins and shake each 10 minutes,keep the PH is 11-13( previous the immersion time is 45mins)\\r\\n2.keep the rust clean immersion time to 30mins and shake each 10 minutes,make the PH is 1-3,check for rust stain be clean or not before go to next process \\r\\n3.increase the backing temperture to 195degree after powder coating  \\r\\n \"}}'),
(1583, 1515656959, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n\\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515656959\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n\\r\\n \"}}'),
(1584, 1515748341, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1585, 1515748410, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"279\",\"name\":\"bildmarkekreis_sw_pos.eps\",\"path\":\"tasks\\/90\\/715733817bdf25021cb1b4a5c5fab2d1846c13db\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748410\",\"user_id\":\"2\",\"size\":\"2916338\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1586, 1515748411, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"280\",\"name\":\"HomePilot_Verpackung_2018_ctpX4.pdf\",\"path\":\"tasks\\/90\\/640e748f3b7629bf030a40b23dd9c4648dc533ea\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748411\",\"user_id\":\"2\",\"size\":\"446603\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1587, 1515748411, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"281\",\"name\":\"HomePilot_Verpackung_2018_illustrator_CC.AI\",\"path\":\"tasks\\/90\\/f52d9a2778c1a69fed0d396d2d7f5a40e7001e15\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748411\",\"user_id\":\"2\",\"size\":\"135181\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1588, 1515748411, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"282\",\"name\":\"Logo HomePilot.jpg\",\"path\":\"tasks\\/90\\/35842e3f78b6d0508ea4f21f8e439905ca30c474\",\"is_image\":\"1\",\"task_id\":\"90\",\"date\":\"1515748411\",\"user_id\":\"2\",\"size\":\"472628\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1589, 1515748412, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"283\",\"name\":\"Logo schwarz  Druck s_w 1.eps\",\"path\":\"tasks\\/90\\/a1ae55ec59755e5307505fb335479441819a3c2d\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748412\",\"user_id\":\"2\",\"size\":\"1972106\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1590, 1515748934, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748934\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1591, 1515756749, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515756749\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SF-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices mentioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the information, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \"}}'),
(1592, 1515855479, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515855479\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n\\r\\n\\r\\n\"}}'),
(1593, 1515855875, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515855875\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\"}}'),
(1594, 1515856133, 'subtask.update', 6, 1, 38, '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1595, 1515856136, 'subtask.update', 6, 1, 38, '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1596, 1515856136, 'subtask.update', 6, 1, 38, '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1597, 1515856214, 'subtask.update', 6, 1, 25, '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(1598, 1515856216, 'subtask.update', 6, 1, 25, '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(1599, 1515856216, 'subtask.update', 6, 1, 25, '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(1600, 1515856218, 'subtask.update', 6, 1, 25, '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(1601, 1515856809, 'task.update', 2, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515856809\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\"}}'),
(1602, 1515924883, 'task.update', 5, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515924883\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n\"}}'),
(1603, 1515925106, 'task.update', 5, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515925106\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1604, 1515925437, 'task.update', 5, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515925437\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n \"}}'),
(1605, 1515925868, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515925868\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1606, 1515926053, 'task.update', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ?\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515926053\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ?\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"owner_id\":\"6\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1607, 1515994368, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(1608, 1515994419, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"284\",\"name\":\"1st stage gear life cycly test record  for 30Nm and 40 Nm.xlsx\",\"path\":\"tasks\\/57\\/050869d250499fb97ca44b33684a4f617b7642f9\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1515994419\",\"user_id\":\"6\",\"size\":\"18841\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1609, 1515994515, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"285\",\"name\":\"30N(1).jpg\",\"path\":\"tasks\\/57\\/9ed403ec4cf3a3024dd631d54d12729e00621469\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1515994515\",\"user_id\":\"6\",\"size\":\"33465\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1610, 1515994525, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"286\",\"name\":\"30N(2).jpg\",\"path\":\"tasks\\/57\\/3533a413bddbc66fab721d28d5113199f151baf5\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1515994525\",\"user_id\":\"6\",\"size\":\"33962\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1611, 1515994535, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"287\",\"name\":\"30N(3).jpg\",\"path\":\"tasks\\/57\\/7057e6d2d4cc9972364c27101b0d3069c721ab57\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1515994535\",\"user_id\":\"6\",\"size\":\"28321\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1612, 1515994553, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"288\",\"name\":\"40N(1).jpg\",\"path\":\"tasks\\/57\\/37b27fc358719d225afa8708a6888a1a6e5ad39c\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1515994553\",\"user_id\":\"6\",\"size\":\"30803\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1613, 1515994563, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"289\",\"name\":\"40N(2).jpg\",\"path\":\"tasks\\/57\\/a1660f82c65a17e1eb569906cf51f783c31b210f\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1515994563\",\"user_id\":\"6\",\"size\":\"35128\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm life cycle test are finished ,the result are good (beyond 10000times), 2pcs of 3 1st stage gear for 40Nm life cycle test are finished ,the result are good (beyond 10000times),remain 1pcs still going on test ,because the bearing and steel wire broken ,make have the result later than others .\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1614, 1515994873, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm and 2pcs for 40Nm life cycle test are finished ,the results are beyond 10000 times and the all 1st gear no broken .still 1pcs for 40Nm the test is  going on ,because the bearing and steel wire broken during testing ,make the result later than others .please see attached test record and the 1st gear status.\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994873\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm and 2pcs for 40Nm life cycle test are finished ,the results are beyond 10000 times and the all 1st gear no broken .still 1pcs for 40Nm the test is  going on ,because the bearing and steel wire broken during testing ,make the result later than others .please see attached test record and the 1st gear status.\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(1615, 1515994897, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm and 2pcs for 40Nm life cycle test are finished ,the results are beyond 10000 times and all 1st gear no broken .still 1pcs for 40Nm the test is  going on ,because the bearing and steel wire broken during testing ,make the result later than others .please see attached test record and the 1st gear status.\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515994897\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.01.17-Henk: 3pcs 1st stage gear for 30Nm and 2pcs for 40Nm life cycle test are finished ,the results are beyond 10000 times and all 1st gear no broken .still 1pcs for 40Nm the test is  going on ,because the bearing and steel wire broken during testing ,make the result later than others .please see attached test record and the 1st gear status.\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(1616, 1515996513, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk mail: \\r\\nDear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515996513\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.01.17-Henk mail: \\r\\nDear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(1617, 1515996629, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk mail: \\r\\nDear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515996629\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.01.17-Henk mail: \\r\\nDear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1618, 1515996636, 'task.assignee_change', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.17-Henk mail: \\r\\nDear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515996636\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"6\"}}'),
(1619, 1515996711, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18\\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515996711\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18\\r\\n \"}}'),
(1620, 1515996732, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 15.01.18-Henk mail: \\r\\nDear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515996732\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.01.18-Henk mail: \\r\\nDear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1621, 1515999116, 'task.update', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18 \\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1515999116\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18 \\r\\n \"}}'),
(1622, 1515999663, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the life test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515999663\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the life test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1623, 1515999704, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515999704\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1624, 1516018171, 'task.update', 2, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 04.01.18 - Mail Johnson: Concerning about the pricing of TA60, I communicated with our financial department, but they feedbacked that RMB 398 is the lowest price we can offer at present.\\r\\n* 15.01.18 - Ralf has sent a separate mail to James and Queenie where he again asked for a better price  .... \\\" So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516018171\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 04.01.18 - Mail Johnson: Concerning about the pricing of TA60, I communicated with our financial department, but they feedbacked that RMB 398 is the lowest price we can offer at present.\\r\\n* 15.01.18 - Ralf has sent a separate mail to James and Queenie where he again asked for a better price  .... \\\" So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n\"}}'),
(1625, 1516023127, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor - WISTAR\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\\r\\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516023127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"title\":\"Electronic Limit Switch Head Tubular Motor - WISTAR\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\\r\\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1626, 1516063755, 'task.update', 6, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516063755\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n\\r\\n\"}}'),
(1627, 1516064118, 'task.file.create', 6, 2, 102, '{\"file\":{\"id\":\"290\",\"name\":\"GGK533-16 packing pictures (1).JPG\",\"path\":\"tasks\\/102\\/977a867206892f4eb5e4d9f65320e0eb652b52f7\",\"is_image\":\"1\",\"task_id\":\"102\",\"date\":\"1516064118\",\"user_id\":\"6\",\"size\":\"731559\"},\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516063755\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1628, 1516064130, 'task.file.create', 6, 2, 102, '{\"file\":{\"id\":\"291\",\"name\":\"GGK533-16 packing pictures (2).JPG\",\"path\":\"tasks\\/102\\/88ed2eeb485c51a7e09cb85ca30eaa617ca9a7e3\",\"is_image\":\"1\",\"task_id\":\"102\",\"date\":\"1516064130\",\"user_id\":\"6\",\"size\":\"772743\"},\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516063755\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1629, 1516064142, 'task.file.create', 6, 2, 102, '{\"file\":{\"id\":\"292\",\"name\":\"GGK533-16 packing pictures (3).JPG\",\"path\":\"tasks\\/102\\/fdcf62c564ae29044f076e4cdaa3edb102abf018\",\"is_image\":\"1\",\"task_id\":\"102\",\"date\":\"1516064142\",\"user_id\":\"6\",\"size\":\"823161\"},\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516063755\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1630, 1516064850, 'task.file.create', 6, 2, 102, '{\"file\":{\"id\":\"293\",\"name\":\"GGK533-16 packing pictures (4).JPG\",\"path\":\"tasks\\/102\\/3a18f20163a5c1e5f61d70b99b923e0cc0cb7f3a\",\"is_image\":\"1\",\"task_id\":\"102\",\"date\":\"1516064850\",\"user_id\":\"6\",\"size\":\"762449\"},\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"\\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516063755\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1631, 1516086625, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1632, 1516086659, 'task.file.create', 2, 1, 93, '{\"file\":{\"id\":\"294\",\"name\":\"#shpt-18-004  DHL Rhede.xlsx\",\"path\":\"tasks\\/93\\/49dabc40493bbac6259ac41b4e918d00f1878d8e\",\"is_image\":\"0\",\"task_id\":\"93\",\"date\":\"1516086659\",\"user_id\":\"2\",\"size\":\"23674\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1633, 1516086659, 'task.file.create', 2, 1, 93, '{\"file\":{\"id\":\"295\",\"name\":\"PI-RD18402.pdf\",\"path\":\"tasks\\/93\\/ea6f472e03e75257e16bf87ea3ba02ade89101b9\",\"is_image\":\"0\",\"task_id\":\"93\",\"date\":\"1516086659\",\"user_id\":\"2\",\"size\":\"169371\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1634, 1516086660, 'task.file.create', 2, 1, 93, '{\"file\":{\"id\":\"296\",\"name\":\"\\u5fae\\u4fe1\\u56fe\\u7247_20180116.jpg\",\"path\":\"tasks\\/93\\/31a60c06286697de796d15325926d766fcf96a6c\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1516086660\",\"user_id\":\"2\",\"size\":\"613267\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1635, 1516086822, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086822\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\"}}'),
(1636, 1516087097, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516087097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1637, 1516087191, 'task.update', 6, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\"}}'),
(1638, 1516087242, 'task.update', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087242\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n\\r\\n\\r\\n\"}}'),
(1639, 1516087267, 'task.file.create', 6, 1, 12, '{\"file\":{\"id\":\"297\",\"name\":\"QIR-20180116-sample-Case Bottom Part.doc\",\"path\":\"tasks\\/12\\/56bd9d2c4576482f7219290e1854b59413f371d0\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1516087267\",\"user_id\":\"6\",\"size\":\"8096768\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1640, 1516087300, 'task.file.create', 6, 1, 12, '{\"file\":{\"id\":\"298\",\"name\":\"QIR-20180116-sample-upper Bottom Part.doc\",\"path\":\"tasks\\/12\\/eb4ac90d819af7f23537b3c31bcb807cff5f3829\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1516087300\",\"user_id\":\"6\",\"size\":\"4813824\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1641, 1516087357, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* * 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087356\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* * 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\"}}'),
(1642, 1516087368, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\"}}'),
(1643, 1516087441, 'task.update', 6, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087441\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n\"}}'),
(1644, 1516091148, 'task.update', 1, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516091148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n\\r\\n\\r\\n\"}}'),
(1645, 1516091294, 'task.file.create', 1, 1, 93, '{\"file\":{\"id\":\"299\",\"name\":\"Packaging Folding Process.mp4\",\"path\":\"tasks\\/93\\/3d813dbbdf7854d7261929b2a2b4b26a266a4ecf\",\"is_image\":\"0\",\"task_id\":\"93\",\"date\":\"1516091294\",\"user_id\":\"1\",\"size\":\"15052153\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516091148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1646, 1516093806, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516093806\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1647, 1516103669, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516103669\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"owner_id\":\"6\"}}'),
(1648, 1516115918, 'task.create', 2, 2, 104, '{\"task_id\":104,\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516115917\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1649, 1516115985, 'task.update', 2, 2, 104, '{\"task_id\":\"104\",\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516115985\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n\"}}'),
(1650, 1516192006, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: Taat means me have to wait until end of January with our decision.\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516192006\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: Taat means me have to wait until end of January with our decision.\\r\\n\"}}'),
(1651, 1516192022, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. **Comment Manfred: That means me have to wait until end of January with our decision.**\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516192022\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. **Comment Manfred: That means me have to wait until end of January with our decision.**\\r\\n\"}}'),
(1652, 1516232922, 'task.move.column', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516232922\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516232922\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1510137991\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1653, 1516262313, 'task.update', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor - WISTAR\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\\r\\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \\r\\n* 18.01.18 - Mail Sally: Dear Ralf, That would be fine. Cindy - Sales director, Sarah whom you\'ve met in hangzhou - Sales for Germany & Poland, Mr. Wan - Electronics Engineer. **They will go to meet you on March the 2nd at 10am at Rademacher booth.**\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516262313\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\\r\\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \\r\\n* 18.01.18 - Mail Sally: Dear Ralf, That would be fine. Cindy - Sales director, Sarah whom you\'ve met in hangzhou - Sales for Germany & Poland, Mr. Wan - Electronics Engineer. **They will go to meet you on March the 2nd at 10am at Rademacher booth.**\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1654, 1516274686, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516274686\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1655, 1516275333, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516275333\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1656, 1516343190, 'task.update', 3, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516343190\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\"}}'),
(1657, 1516343529, 'task.update', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, please help to send back another 2pcs NOK as discussed, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516343529\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, please help to send back another 2pcs NOK as discussed, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1658, 1516343556, 'task.update', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, please help to send back a**nother 2pcs NOK as discussed, and Henk will arrange Do**oya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516343556\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, please help to send back a**nother 2pcs NOK as discussed, and Henk will arrange Do**oya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1659, 1516343597, 'task.update', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516343597\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1660, 1516343608, 'task.assignee_change', 3, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516343608\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1661, 1516344219, 'task.update', 3, 2, 104, '{\"task_id\":\"104\",\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516344219\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n\",\"owner_id\":\"2\"}}'),
(1662, 1516345943, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516345943\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1663, 1516345962, 'task.file.create', 2, 2, 96, '{\"file\":{\"id\":\"300\",\"name\":\"IR-GGK533-51-2.xlsx\",\"path\":\"tasks\\/96\\/a12eae6894cf00952fc93189935fbb90f1682bf4\",\"is_image\":\"0\",\"task_id\":\"96\",\"date\":\"1516345962\",\"user_id\":\"2\",\"size\":\"506646\"},\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516345943\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1664, 1516348573, 'task.update', 2, 2, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.** Waybill 2836747104**\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516348573\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.** Waybill 2836747104**\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1665, 1516349329, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516349329\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1666, 1516349425, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516349425\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1667, 1516349450, 'task.assignee_change', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516349450\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1668, 1516349462, 'task.assignee_change', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18 \\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516349462\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1669, 1516349898, 'task.update', 6, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516349898\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n\\r\\n\"}}'),
(1670, 1516428717, 'task.create', 5, 2, 105, '{\"task_id\":105,\"task\":{\"id\":\"105\",\"title\":\"TM20 - HS XXXX - prototypes\",\"description\":\"* 2018.01.20 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 2018.01.19 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 2018.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 2017.12 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 2017.12 : 50 of each type send to RDM-G\",\"date_creation\":\"1516428717\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1516428717\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516428717\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1671, 1516430113, 'task.update', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516430113\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"priority\":2}}'),
(1672, 1516430197, 'task.update', 5, 2, 105, '{\"task_id\":\"105\",\"task\":{\"id\":\"105\",\"title\":\"TM20 - HS XXXX - prototypes\",\"description\":\"* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\",\"date_creation\":\"1516428717\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1516430197\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516428717\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1673, 1516583832, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516583832\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1674, 1516583951, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516583951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1675, 1516583991, 'task.file.create', 6, 2, 92, '{\"file\":{\"id\":\"301\",\"name\":\"223-443 d.pdf\",\"path\":\"tasks\\/92\\/44f301abd05a00ec2089f89c7f1302e3dcb77fc8\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1516583991\",\"user_id\":\"6\",\"size\":\"82493\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516583951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1676, 1516608294, 'task.update', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516608294\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(1677, 1516608319, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"302\",\"name\":\"40N (3).jpg\",\"path\":\"tasks\\/57\\/19ba43cbaf931070feded634dbc85432bc1fd14d\",\"is_image\":\"1\",\"task_id\":\"57\",\"date\":\"1516608319\",\"user_id\":\"6\",\"size\":\"35109\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516608294\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1678, 1516608333, 'task.file.create', 6, 2, 57, '{\"file\":{\"id\":\"303\",\"name\":\"1st stage gear life cycly test record  for 30Nm and 40 Nm 2018.1.22.xlsx\",\"path\":\"tasks\\/57\\/94c101f794215b355a37a8aba1e500f4ae008b7d\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1516608333\",\"user_id\":\"6\",\"size\":\"19247\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516608294\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1679, 1516608414, 'task.assignee_change', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516608414\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1680, 1516608493, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 22.01.18-Henk: so we can close this topic ?\\r\\n* 20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516608493\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.01.18-Henk: so we can close this topic ?\\r\\n* 20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1681, 1516638274, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516638274\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"owner_id\":\"1\",\"priority\":3}}'),
(1682, 1516638943, 'task.update', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooby for more information how it can be ? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516638943\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooby for more information how it can be ? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1683, 1516639034, 'task.update', 5, 2, 105, '{\"task_id\":\"105\",\"task\":{\"id\":\"105\",\"title\":\"TM20 - HS XXXX - prototypes\",\"description\":\"* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\",\"date_creation\":\"1516428717\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1516639034\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516428717\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\",\"owner_id\":\"6\"}}'),
(1684, 1516639097, 'task.update', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516639097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1685, 1516639239, 'task.update', 5, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516639239\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"owner_id\":\"0\",\"priority\":0}}'),
(1686, 1516639530, 'task.update', 5, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18\\r\\n*22.01.18 Andreas: Okay ; We will see; please tell dooya, if their will be a problem with the survace  of the tube we will send them back! We can close this point\\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516639530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18\\r\\n*22.01.18 Andreas: Okay ; We will see; please tell dooya, if their will be a problem with the survace  of the tube we will send them back! We can close this point\\r\\n \",\"owner_id\":\"0\",\"priority\":0}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1687, 1516639546, 'task.update', 5, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18\\r\\n* 22.01.18 Andreas: Okay ; We will see; please tell dooya, if their will be a problem with the survace  of the tube we will send them back! We can close this point\\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516639546\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18\\r\\n* 22.01.18 Andreas: Okay ; We will see; please tell dooya, if their will be a problem with the survace  of the tube we will send them back! We can close this point\\r\\n \"}}'),
(1688, 1516639619, 'task.assignee_change', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516639619\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"6\"}}'),
(1689, 1516668907, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516668907\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\"}}'),
(1690, 1516668965, 'task.update', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516668965\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. \\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1691, 1516668975, 'task.update', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516668975\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\"}}'),
(1692, 1516669046, 'task.update', 1, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516669046\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\"}}'),
(1693, 1516669136, 'task.create', 1, 1, 106, '{\"task_id\":106,\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516669136\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1694, 1516669216, 'task.create', 1, 1, 107, '{\"task_id\":107,\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516669216\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1695, 1516699279, 'task.move.column', 6, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"0\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516699279\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516699279\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213794\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1510213794\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1696, 1516699303, 'task.move.column', 6, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18\\r\\n* 22.01.18 Andreas: Okay ; We will see; please tell dooya, if their will be a problem with the survace  of the tube we will send them back! We can close this point\\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"0\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516699303\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516699303\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1509937688\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1509937688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1697, 1516699549, 'task.update', 6, 2, 105, '{\"task_id\":\"105\",\"task\":{\"id\":\"105\",\"title\":\"TM20 - HS XXXX - prototypes\",\"description\":\"* 23.01.18-Henk Mail:Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\n\\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n\\r\\n* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\",\"date_creation\":\"1516428717\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1516699549\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516428717\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18-Henk Mail:Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\n\\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n\\r\\n* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1698, 1516699618, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516699618\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1699, 1516699632, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516699632\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1700, 1516699733, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516699733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1701, 1516700491, 'task.update', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516700491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\"}}'),
(1702, 1516700540, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516700540\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1703, 1516700551, 'task.move.column', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516700551\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700551\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509520392\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509520392\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1704, 1516700838, 'task.create', 2, 2, 108, '{\"task_id\":108,\"task\":{\"id\":\"108\",\"title\":\"mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516700838\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1705, 1516700869, 'task.file.create', 2, 2, 108, '{\"file\":{\"id\":\"304\",\"name\":\"P1230408.JPG\",\"path\":\"tasks\\/108\\/752d24f204e40dda4801385dff7ca8154afc5691\",\"is_image\":\"1\",\"task_id\":\"108\",\"date\":\"1516700869\",\"user_id\":\"2\",\"size\":\"3646058\"},\"task\":{\"id\":\"108\",\"title\":\"mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516700838\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1706, 1516700925, 'task.update', 2, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516700925\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\"}}'),
(1707, 1516710973, 'task.create', 2, 1, 109, '{\"task_id\":109,\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"21\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1708, 1516710982, 'task.move.position', 2, 1, 109, '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":13,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1709, 1516710990, 'task.move.position', 2, 1, 109, '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1710, 1516711002, 'task.move.position', 2, 1, 109, '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1711, 1516723947, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516723947\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\"}}'),
(1712, 1516723990, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516723990\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\"}}'),
(1713, 1516724060, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516724060\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n\"}}'),
(1714, 1516764630, 'task.assignee_change', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1516764630\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1715, 1516784150, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516784150\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\\r\\n\"}}'),
(1716, 1516796408, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n\"}}'),
(1717, 1516796469, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"305\",\"name\":\"VDE wire.pdf\",\"path\":\"tasks\\/88\\/2024185dcc2838a485da1895c10408ae07ada3c2\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1516796469\",\"user_id\":\"2\",\"size\":\"1475587\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1718, 1516796469, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"306\",\"name\":\"specification sheet (plug + wire + end plug)_EN.pdf\",\"path\":\"tasks\\/88\\/11d524c30369a0c8b17e61a8429e6f87717b688d\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1516796469\",\"user_id\":\"2\",\"size\":\"506310\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1719, 1516796470, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"307\",\"name\":\"VDE-D01(plug).pdf\",\"path\":\"tasks\\/88\\/5ff643a4455ca61f48c6a47d8f592edcabebca62\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1516796470\",\"user_id\":\"2\",\"size\":\"719455\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1720, 1516796470, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"308\",\"name\":\"specification sheet (plug + wire)_EN.pdf\",\"path\":\"tasks\\/88\\/3060aa4ff92cee57d2e39fdc35a154579a0f453f\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1516796470\",\"user_id\":\"2\",\"size\":\"501283\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1721, 1516796470, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"309\",\"name\":\"VDE-QT8(end plug).PDF\",\"path\":\"tasks\\/88\\/e269fbc31d9c88c015da0683062ac36c011c5a33\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1516796470\",\"user_id\":\"2\",\"size\":\"915536\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796408\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1722, 1516796543, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n\\r\\n\\r\\n\"}}'),
(1723, 1516796561, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796561\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1724, 1516796871, 'task.update', 2, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796871\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516232922\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n\"}}'),
(1725, 1516796940, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - manfred has sent the target price with some further information of the comparison which he has sent\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516796940\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - manfred has sent the target price with some further information of the comparison which he has sent\"}}'),
(1726, 1516796960, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - Manfred has sent the target price with some further information of the comparison which he has sent\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516796960\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - Manfred has sent the target price with some further information of the comparison which he has sent\"}}'),
(1727, 1516797000, 'task.update', 2, 1, 109, '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516797000\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\"}}'),
(1728, 1516797092, 'task.move.column', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516797092\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1512634655\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1729, 1516797196, 'task.move.column', 2, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516797196\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797196\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545237\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545237\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1730, 1516797211, 'task.move.column', 2, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516797211\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797211\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545300\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1731, 1516797218, 'task.move.column', 2, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\\r\\n* 01.11.17 - This has all been sent with Sally\'s goods Vessel Departure: 27.10.17.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516797218\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797218\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1509508201\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1509508201\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1732, 1516797336, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n* 24.01.18 - Mail Sally: Attached change approval for the carton box shape of SX5DF. I\'ve sent the new layout 20180124 via Skype to you. Please check and confirm. New carton shape should start from the upcoming #5\\/2018. The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516797336\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n* 24.01.18 - Mail Sally: Attached change approval for the carton box shape of SX5DF. I\'ve sent the new layout 20180124 via Skype to you. Please check and confirm. New carton shape should start from the upcoming #5\\/2018. The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.\\r\\n\\r\\n\\r\\n\"}}'),
(1733, 1516800660, 'task.update', 2, 2, 104, '{\"task_id\":\"104\",\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516800660\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n\"}}'),
(1734, 1516867066, 'task.update', 1, 1, 22, '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n* 25.01.18 - Guangyue has been busy recently but now he has time, so after Spring Festival I will push him on this and we should have samples early March.\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516867066\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n* 25.01.18 - Guangyue has been busy recently but now he has time, so after Spring Festival I will push him on this and we should have samples early March.\\r\\n\\r\\n\"}}'),
(1735, 1516871268, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516871267\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n\\r\\n\"}}'),
(1736, 1516888182, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516888182\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n\\r\\n\\r\\n\",\"color_id\":\"red\"}}'),
(1737, 1517227953, 'task.create', 2, 2, 110, '{\"task_id\":110,\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517227953\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517227953\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1738, 1517228074, 'task.file.create', 2, 2, 110, '{\"file\":{\"id\":\"310\",\"name\":\"QR_200001452_RolloPort SX5_45059061_00.pdf\",\"path\":\"tasks\\/110\\/380bd798b0c3a757f3b9c3881b9e4372ddf920b6\",\"is_image\":\"0\",\"task_id\":\"110\",\"date\":\"1517228074\",\"user_id\":\"2\",\"size\":\"913774\"},\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517227977\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517227953\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1739, 1517297311, 'task.create', 2, 2, 111, '{\"task_id\":111,\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517297311\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1740, 1517297356, 'task.file.create', 2, 2, 111, '{\"file\":{\"id\":\"311\",\"name\":\"PB_DT_Q_HE4015_4500033204_S2P8_PROTOCOL.XLS\",\"path\":\"tasks\\/111\\/78fffc9fd48a445376f95fd85bdf5dbd423c93ba\",\"is_image\":\"0\",\"task_id\":\"111\",\"date\":\"1517297356\",\"user_id\":\"2\",\"size\":\"246487\"},\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517297311\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1741, 1517297403, 'task.update', 2, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517297403\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(1742, 1517315697, 'task.file.create', 2, 2, 108, '{\"file\":{\"id\":\"312\",\"name\":\"change the OD for white gear.JPG\",\"path\":\"tasks\\/108\\/af9e7fda7b58a7259ffd256929d33d6beaab1096\",\"is_image\":\"1\",\"task_id\":\"108\",\"date\":\"1517315697\",\"user_id\":\"2\",\"size\":\"797018\"},\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517227992\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1743, 1517315698, 'task.file.create', 2, 2, 108, '{\"file\":{\"id\":\"313\",\"name\":\"little grease will make runing little roughly.JPG\",\"path\":\"tasks\\/108\\/dd4dfd70717cc0414f214b33c56f78c426038c56\",\"is_image\":\"1\",\"task_id\":\"108\",\"date\":\"1517315698\",\"user_id\":\"2\",\"size\":\"722790\"},\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517227992\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1744, 1517315698, 'task.file.create', 2, 2, 108, '{\"file\":{\"id\":\"314\",\"name\":\"more greae will make it runing smooth.JPG\",\"path\":\"tasks\\/108\\/c323ee8fdbc53ae803e540378dc84e6ab50761df\",\"is_image\":\"1\",\"task_id\":\"108\",\"date\":\"1517315698\",\"user_id\":\"2\",\"size\":\"791750\"},\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517227992\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1745, 1517315760, 'task.update', 2, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin:\\r\\nI disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517315760\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin:\\r\\nI disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}'),
(1746, 1517316081, 'task.update', 2, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517316080\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}'),
(1747, 1517316091, 'task.assignee_change', 2, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517316091\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1748, 1517316303, 'task.update', 2, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517316303\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(1749, 1517383097, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517383097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1750, 1517383376, 'task.file.create', 2, 2, 108, '{\"file\":{\"id\":\"315\",\"name\":\"FOR  RADEMACH.pdf\",\"path\":\"tasks\\/108\\/fc63e9ba554349156358815879d3ef408069c35a\",\"is_image\":\"0\",\"task_id\":\"108\",\"date\":\"1517383376\",\"user_id\":\"2\",\"size\":\"282135\"},\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517316091\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1751, 1517383376, 'task.file.create', 2, 2, 108, '{\"file\":{\"id\":\"316\",\"name\":\"unkonw.jpg\",\"path\":\"tasks\\/108\\/e483ffb6e85e373879bdc2042fb2b4080d87b615\",\"is_image\":\"1\",\"task_id\":\"108\",\"date\":\"1517383376\",\"user_id\":\"2\",\"size\":\"479979\"},\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517316091\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1752, 1517383611, 'task.update', 2, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517383611\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}'),
(1753, 1517389699, 'task.assignee_change', 5, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1517389699\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"owner_id\":\"5\"}}'),
(1754, 1517391127, 'task.update', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n* 31.01.18 - Mail Ben: Thanks, then we will send them directly after CNY with the second batch of Order #15 - HP2\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517391127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n* 31.01.18 - Mail Ben: Thanks, then we will send them directly after CNY with the second batch of Order #15 - HP2\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1755, 1517402863, 'task.create', 2, 1, 112, '{\"task_id\":112,\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"21\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1756, 1517402876, 'task.move.position', 2, 1, 112, '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":13,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1757, 1517402883, 'task.move.position', 2, 1, 112, '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":8,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1758, 1517402889, 'task.move.position', 2, 1, 112, '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1759, 1517402930, 'task.create', 2, 1, 113, '{\"task_id\":113,\"task\":{\"id\":\"113\",\"title\":\"LBW order #2 9 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402930\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1760, 1517402949, 'task.update', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #29 - order no.: \"}}'),
(1761, 1517402959, 'task.move.position', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":15,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1762, 1517402965, 'task.move.position', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1763, 1517402975, 'task.move.position', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1764, 1517410306, 'task.update', 2, 1, 112, '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - Mail Jens: \",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517410306\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - Mail Jens: \"}}'),
(1765, 1517410536, 'task.update', 2, 1, 112, '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517410536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\"}}'),
(1766, 1517410675, 'task.update', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517410675\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\"}}'),
(1767, 1517428300, 'task.move.column', 2, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517428300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517428300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1501743965\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1768, 1517447324, 'task.assignee_change', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517447324\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517428300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1769, 1517447343, 'task.close', 1, 1, 19, '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n* 02.01.18 - The fixing of the white marks on the RDD Logo on the HP2 has resulted in 2,000RMB in Lapping Costs.\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":\"1517447343\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517447343\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511973437\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1770, 1517447354, 'task.close', 1, 1, 1, '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 04.12.17 - This I feel can be closed as we are currently planning for the whole UBW Gearbox Assembly.\\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":\"1517447354\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517447354\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512353195\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1771, 1517447362, 'task.close', 1, 1, 16, '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":\"1517447362\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517447362\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512545254\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1772, 1517447370, 'task.close', 1, 1, 11, '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":\"1517447370\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517447370\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797196\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1773, 1517447379, 'task.close', 1, 1, 17, '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":\"1517447379\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517447379\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797211\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1774, 1517447392, 'task.close', 1, 1, 34, '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\\r\\n* 01.11.17 - This has all been sent with Sally\'s goods Vessel Departure: 27.10.17.\",\"date_creation\":\"1505896818\",\"date_completed\":\"1517447392\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517447392\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797218\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(1775, 1517448007, 'task.update', 1, 1, 112, '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517448007\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\"}}'),
(1776, 1517448027, 'task.update', 1, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517448027\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1777, 1517470138, 'task.move.column', 2, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517470138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517470138\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1516797092\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1516797092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1778, 1517470312, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference.\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1517470312\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference.\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1779, 1517470355, 'task.file.create', 2, 2, 92, '{\"file\":{\"id\":\"317\",\"name\":\"5pcs spring washer dimension -2018.2.1.xlsx\",\"path\":\"tasks\\/92\\/40e9eab80ba0bb1f9eb5bb69784723bab7c7d754\",\"is_image\":\"0\",\"task_id\":\"92\",\"date\":\"1517470355\",\"user_id\":\"2\",\"size\":\"13947\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference.\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1517470312\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1780, 1517470356, 'task.file.create', 2, 2, 92, '{\"file\":{\"id\":\"318\",\"name\":\"spring sample 223-F-00-443 d _20180201.jpg\",\"path\":\"tasks\\/92\\/1a604103b54ea0760daf0766d7bdd565d37f92ea\",\"is_image\":\"1\",\"task_id\":\"92\",\"date\":\"1517470356\",\"user_id\":\"2\",\"size\":\"954469\"},\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference.\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1517470312\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1781, 1517470473, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1517470473\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1782, 1517470554, 'task.update', 2, 2, 110, '{\"task_id\":\"110\",\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. \\r\\n\\r\\nBut they can\'t pay any of your hour bill, they argue below points?\\r\\n1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. \\r\\n2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.\\r\\n3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order\\r\\n**For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517470554\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517227953\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. \\r\\n\\r\\nBut they can\'t pay any of your hour bill, they argue below points?\\r\\n1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. \\r\\n2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.\\r\\n3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order\\r\\n**For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1783, 1517470592, 'task.update', 2, 2, 110, '{\"task_id\":\"110\",\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517470592\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517227953\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\"}}'),
(1784, 1517477304, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1517477304\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1785, 1517481361, 'task.update', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n* 24.01.18 - Mail Sally: Attached change approval for the carton box shape of SX5DF. I\'ve sent the new layout 20180124 via Skype to you. Please check and confirm. New carton shape should start from the upcoming #5\\/2018. The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.\\r\\n* 01.02.18 - Mail Sally: Attached signed back from Foresee, as discussed after sending you the replacement, they will start the new carton shape for SX5DF from #4\\/2018 already.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517481361\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n* 24.01.18 - Mail Sally: Attached change approval for the carton box shape of SX5DF. I\'ve sent the new layout 20180124 via Skype to you. Please check and confirm. New carton shape should start from the upcoming #5\\/2018. The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.\\r\\n* 01.02.18 - Mail Sally: Attached signed back from Foresee, as discussed after sending you the replacement, they will start the new carton shape for SX5DF from #4\\/2018 already.\\r\\n\\r\\n\\r\\n\"}}'),
(1786, 1517481383, 'task.file.create', 2, 2, 98, '{\"file\":{\"id\":\"319\",\"name\":\"AW_PCAS_Carton box SX5DF_01.pdf\",\"path\":\"tasks\\/98\\/b97c0228b17e0845a3b0303f220580569762ab53\",\"is_image\":\"0\",\"task_id\":\"98\",\"date\":\"1517481383\",\"user_id\":\"2\",\"size\":\"3359457\"},\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n* 24.01.18 - Mail Sally: Attached change approval for the carton box shape of SX5DF. I\'ve sent the new layout 20180124 via Skype to you. Please check and confirm. New carton shape should start from the upcoming #5\\/2018. The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.\\r\\n* 01.02.18 - Mail Sally: Attached signed back from Foresee, as discussed after sending you the replacement, they will start the new carton shape for SX5DF from #4\\/2018 already.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517481361\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1787, 1517481409, 'task.move.column', 2, 2, 98, '{\"task_id\":\"98\",\"task\":{\"id\":\"98\",\"title\":\"improvement of packaging and palletizing for SX5DF\",\"description\":\"\\r\\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \\r\\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\\r\\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\\r\\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\\r\\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http:\\/\\/p.kwi9.com\\/h.xp2UvA\\r\\n\\r\\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\\r\\n2. Tension of wapping film machine we\'re using now is the minimum level already.\\r\\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\\r\\n* 15.12.17 - Mail Sally: \\r\\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\\r\\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\\r\\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\\r\\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \\r\\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\\r\\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\\r\\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\\r\\n* 18.12.17 - Sally: confirmed.\\r\\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\\r\\n* 04.01.18 - Manfred: we have received the samples currently in investigation\\r\\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\\r\\n* 24.01.18 - Mail Sally: Attached change approval for the carton box shape of SX5DF. I\'ve sent the new layout 20180124 via Skype to you. Please check and confirm. New carton shape should start from the upcoming #5\\/2018. The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.\\r\\n* 01.02.18 - Mail Sally: Attached signed back from Foresee, as discussed after sending you the replacement, they will start the new carton shape for SX5DF from #4\\/2018 already.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340608\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517481409\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517481409\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1513340608\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1513340608\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1788, 1517551683, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517551683\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1789, 1517551776, 'task.update', 6, 2, 105, '{\"task_id\":\"105\",\"task\":{\"id\":\"105\",\"title\":\"TM20 - HS XXXX - prototypes\",\"description\":\"02.02.18-Henk mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n\\r\\n* 23.01.18-Henk Mail:Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\n\\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n\\r\\n* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\",\"date_creation\":\"1516428717\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1517551776\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516428717\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"02.02.18-Henk mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n\\r\\n* 23.01.18-Henk Mail:Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\n\\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n\\r\\n* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\"}}'),
(1790, 1517554320, 'task.file.create', 1, 1, 101, '{\"file\":{\"id\":\"320\",\"name\":\"Stand Overview 1.jpg\",\"path\":\"tasks\\/101\\/eb6c77b5151800f52d5ce8141b01cee5b47aef19\",\"is_image\":\"1\",\"task_id\":\"101\",\"date\":\"1517554320\",\"user_id\":\"1\",\"size\":\"2085745\"},\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515034237\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1791, 1517554325, 'task.file.create', 1, 1, 101, '{\"file\":{\"id\":\"321\",\"name\":\"New Bracket Design.jpg\",\"path\":\"tasks\\/101\\/0ceabd1bf2734fe5a7bd6e41607e0bd47538069d\",\"is_image\":\"1\",\"task_id\":\"101\",\"date\":\"1517554325\",\"user_id\":\"1\",\"size\":\"2048123\"},\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515034237\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1792, 1517554330, 'task.file.create', 1, 1, 101, '{\"file\":{\"id\":\"322\",\"name\":\"Old Bracket Design.jpg\",\"path\":\"tasks\\/101\\/760d27457bf6eef8fed9e003a6144511e8d80041\",\"is_image\":\"1\",\"task_id\":\"101\",\"date\":\"1517554330\",\"user_id\":\"1\",\"size\":\"2057996\"},\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515034237\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1793, 1517554340, 'task.file.create', 1, 1, 101, '{\"file\":{\"id\":\"323\",\"name\":\"Stand Overview 2.jpg\",\"path\":\"tasks\\/101\\/6101b83e95b63dcde58c973aa43e78fd22dd396a\",\"is_image\":\"1\",\"task_id\":\"101\",\"date\":\"1517554340\",\"user_id\":\"1\",\"size\":\"2290625\"},\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1515034237\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(1794, 1517554443, 'task.update', 1, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1517554443\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\"}}'),
(1795, 1517554450, 'task.assignee_change', 1, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1517554450\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1796, 1517557412, 'task.update', 1, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1517557412\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\"}}'),
(1797, 1517572032, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572032\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1798, 1517572139, 'task.update', 2, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572139\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1799, 1517572182, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"324\",\"name\":\"IMG_1286.JPG\",\"path\":\"tasks\\/94\\/04bc0358e138febe84af6550e4d91609eabf97e6\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1517572182\",\"user_id\":\"2\",\"size\":\"876527\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572139\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1800, 1517572182, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"325\",\"name\":\"Nm calculation method.jpg\",\"path\":\"tasks\\/94\\/6c319bfc1af23eccb5e9be23ad88320012b99d53\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1517572182\",\"user_id\":\"2\",\"size\":\"117299\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572139\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1801, 1517572182, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"326\",\"name\":\"technical annex.png\",\"path\":\"tasks\\/94\\/0422202e1669862a69b7f7ec39a8af32d94d9ce2\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1517572182\",\"user_id\":\"2\",\"size\":\"222497\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572139\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1802, 1517572298, 'task.update', 2, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572298\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1803, 1517572583, 'task.update', 2, 1, 109, '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572583\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\"}}'),
(1804, 1517572817, 'task.update', 2, 1, 112, '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572817\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\"}}'),
(1805, 1517572837, 'task.update', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572837\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\"}}'),
(1806, 1517576645, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 7cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517576645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 7cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1807, 1517576670, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"327\",\"name\":\"43133.6454503009_IMG_4099.jpg\",\"path\":\"tasks\\/88\\/2941fac662d628a29c2cf6ded0176d56fb1893db\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517576670\",\"user_id\":\"2\",\"size\":\"67660\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 7cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517576645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1808, 1517576670, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"328\",\"name\":\"43133.6454700116_IMG_4100.jpg\",\"path\":\"tasks\\/88\\/5652b116c1187dec0783bfb3364322a7dade23d9\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517576670\",\"user_id\":\"2\",\"size\":\"62072\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 7cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517576645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1809, 1517576671, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"329\",\"name\":\"43133.6455103356_IMG_4102.jpg\",\"path\":\"tasks\\/88\\/de79770ae07c18b6d3b5fe57881df8290c03bf38\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517576671\",\"user_id\":\"2\",\"size\":\"42293\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 7cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517576645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1810, 1517576671, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"330\",\"name\":\"A4ED3EE3262D74B855CE864AF6A9A932.png\",\"path\":\"tasks\\/88\\/27dbf5eda7e46fbaff0b194928cc5f3e54281bde\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517576671\",\"user_id\":\"2\",\"size\":\"108048\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 7cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517576645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1811, 1517576671, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"331\",\"name\":\"BBC88E2E51A1250955CDA0B9BDBE3610.png\",\"path\":\"tasks\\/88\\/eaa40bb73cf81e93ff29c1de9af3183319d5dd2b\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517576671\",\"user_id\":\"2\",\"size\":\"123522\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 7cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517576645\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1812, 1517576809, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517576809\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1813, 1517577932, 'task.update', 2, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517577932\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1814, 1517578069, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"332\",\"name\":\"steel rope OD=4mm.JPG\",\"path\":\"tasks\\/94\\/0d788a251fb3243025bfab9b9bfd67dcf9485e5a\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1517578069\",\"user_id\":\"2\",\"size\":\"778730\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517577932\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1815, 1517578076, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"333\",\"name\":\"test video.mp4\",\"path\":\"tasks\\/94\\/ebc90d2aa1f2fd7056a4c82c61de09d858dce5a9\",\"is_image\":\"0\",\"task_id\":\"94\",\"date\":\"1517578076\",\"user_id\":\"2\",\"size\":\"14444204\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517577932\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1816, 1517578077, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"334\",\"name\":\"Tube OD=74mm.JPG\",\"path\":\"tasks\\/94\\/ce9c761243c03194308f3a108132025540d087f5\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1517578077\",\"user_id\":\"2\",\"size\":\"787890\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517577932\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1817, 1517578077, 'task.file.create', 2, 2, 94, '{\"file\":{\"id\":\"335\",\"name\":\"weight=30.49kgs.jpg\",\"path\":\"tasks\\/94\\/f6d6cdde2c68c8e3016309b3bb24243a1fd906e5\",\"is_image\":\"1\",\"task_id\":\"94\",\"date\":\"1517578077\",\"user_id\":\"2\",\"size\":\"90322\"},\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n*23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517577932\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1818, 1517579554, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517579554\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1819, 1517793615, 'task.file.create', 6, 2, 108, '{\"file\":{\"id\":\"336\",\"name\":\"FOR  RADEMACH.jpg\",\"path\":\"tasks\\/108\\/0e72eb66ca02ec8411a26f1a30af9273daba7677\",\"is_image\":\"1\",\"task_id\":\"108\",\"date\":\"1517793615\",\"user_id\":\"6\",\"size\":\"435331\"},\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n\\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517383611\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1820, 1517819104, 'task.update', 2, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517819104\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(1821, 1517820057, 'task.update', 2, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517820056\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(1822, 1517899370, 'task.update', 1, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517899370\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n\\r\\n\"}}'),
(1823, 1517899426, 'task.update', 1, 1, 109, '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\\r\\n* 06.02.18 - As mentioned this will be sent with Order #28 together. If we manage to get it finished sooner we will send it out earlier and let you guys know.\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517899426\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\\r\\n* 06.02.18 - As mentioned this will be sent with Order #28 together. If we manage to get it finished sooner we will send it out earlier and let you guys know.\"}}'),
(1824, 1517899531, 'task.update', 1, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n* 06.02.18 - Still waiting on the testing information from Andreas...\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517899531\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n* 06.02.18 - Still waiting on the testing information from Andreas...\\r\\n\\r\\n\\r\\n\",\"color_id\":\"green\",\"owner_id\":\"5\"}}'),
(1825, 1517899594, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517899594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1826, 1517899671, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517899671\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\"}}'),
(1827, 1517900718, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517900718\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1828, 1517900735, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"337\",\"name\":\"mass production color  (2).JPG\",\"path\":\"tasks\\/88\\/5916551d5757cf6fb52d22548605a71cb85e00b9\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517900735\",\"user_id\":\"2\",\"size\":\"1007522\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517900718\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1829, 1517900736, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"338\",\"name\":\"mass production color  (1).JPG\",\"path\":\"tasks\\/88\\/ec9a7a4112895202a7dd8b9acf389bdcd51eb6ce\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517900736\",\"user_id\":\"2\",\"size\":\"914231\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517900718\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1830, 1517900765, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"339\",\"name\":\"mass production color  (2).JPG\",\"path\":\"tasks\\/88\\/efb591eb5f5175cf84406c3ed50787a3e310d92e\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517900765\",\"user_id\":\"2\",\"size\":\"1007522\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517900718\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1831, 1517900766, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"340\",\"name\":\"mass production color  (1).JPG\",\"path\":\"tasks\\/88\\/f76cd413a94786523c1a10fa2aca8cf2db19880a\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1517900766\",\"user_id\":\"2\",\"size\":\"914231\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517900718\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1832, 1517901554, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517901554\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1833, 1517902797, 'task.create', 2, 2, 114, '{\"task_id\":114,\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517902797\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1834, 1517902851, 'task.file.create', 2, 2, 114, '{\"file\":{\"id\":\"341\",\"name\":\"P1040831.jpg\",\"path\":\"tasks\\/114\\/359dc74195a023be1f814c47287650eb284d292b\",\"is_image\":\"1\",\"task_id\":\"114\",\"date\":\"1517902851\",\"user_id\":\"2\",\"size\":\"4718394\"},\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517902797\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1835, 1517902853, 'task.file.create', 2, 2, 114, '{\"file\":{\"id\":\"342\",\"name\":\"P1040832.jpg\",\"path\":\"tasks\\/114\\/44eebf9bf7d94c060172db0042c300fa286da4d2\",\"is_image\":\"1\",\"task_id\":\"114\",\"date\":\"1517902853\",\"user_id\":\"2\",\"size\":\"4714938\"},\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517902797\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1836, 1517902854, 'task.file.create', 2, 2, 114, '{\"file\":{\"id\":\"343\",\"name\":\"P1040833.jpg\",\"path\":\"tasks\\/114\\/3636c2ab590b82c3363ff9c9b15af58f1a5d8804\",\"is_image\":\"1\",\"task_id\":\"114\",\"date\":\"1517902854\",\"user_id\":\"2\",\"size\":\"4565054\"},\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517902797\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1837, 1517963643, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1517963643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1838, 1518014388, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1518014388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1839, 1518014415, 'task.file.create', 2, 2, 99, '{\"file\":{\"id\":\"344\",\"name\":\"QR_200001432_Sonnensensor inkl. Stecker_475 534-1.5_01.pdf\",\"path\":\"tasks\\/99\\/c34910e0531dba17ab8ea941fa04e367e1778948\",\"is_image\":\"0\",\"task_id\":\"99\",\"date\":\"1518014415\",\"user_id\":\"2\",\"size\":\"358458\"},\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1518014388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1840, 1518014426, 'task.assignee_change', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW\",\"description\":\"\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1518014426\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"3\"}}'),
(1841, 1518014449, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1518014449\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\"}}'),
(1842, 1518014970, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518014970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1843, 1518073601, 'task.update', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518073600\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\"}}'),
(1844, 1518081624, 'task.update', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518081624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n\\r\\n\"}}'),
(1845, 1518081630, 'task.assignee_change', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518081630\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1846, 1518101217, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - new ETD 30.03.18\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518101217\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - new ETD 30.03.18\\r\\n\\r\\n\"}}'),
(1847, 1518102027, 'task.update', 4, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - new ETD 30.03.18\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518102027\",\"reference\":\"\",\"date_started\":\"1518102027\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"date_started\":1518102027}}'),
(1848, 1518138193, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518138193\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1849, 1518160828, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518160828\",\"reference\":\"\",\"date_started\":\"1518102000\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n\\r\\n\\r\\n\",\"date_started\":1518102000}}'),
(1850, 1518163574, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518163574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1851, 1518163633, 'task.update', 2, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518163633\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1852, 1518163664, 'task.file.create', 2, 1, 97, '{\"file\":{\"id\":\"345\",\"name\":\"18-02-08_order_4500035251_MHI(eMMC Flash Memory).pdf\",\"path\":\"tasks\\/97\\/4fef10704f1a64644f57cb2fe71eb384c3404fac\",\"is_image\":\"0\",\"task_id\":\"97\",\"date\":\"1518163664\",\"user_id\":\"2\",\"size\":\"13348\"},\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518163633\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1853, 1518168300, 'task.create', 2, 1, 115, '{\"task_id\":115,\"task\":{\"id\":\"115\",\"title\":\"LBW\",\"description\":\"\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1854, 1518168486, 'task.update', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168486\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\"}}'),
(1855, 1518168493, 'task.move.position', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168486\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1856, 1518168500, 'task.move.position', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168486\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1857, 1518168517, 'task.update', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #30 - order no.: 45000\",\"owner_id\":\"1\"}}'),
(1858, 1518341437, 'task.update', 3, 2, 47, '{\"task_id\":\"47\",\"task\":{\"id\":\"47\",\"title\":\"new product portfolio GDO 2017 - inquiry\",\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 04.01.18 - Mail Johnson: Concerning about the pricing of TA60, I communicated with our financial department, but they feedbacked that RMB 398 is the lowest price we can offer at present.\\r\\n* 15.01.18 - Ralf has sent a separate mail to James and Queenie where he again asked for a better price  .... \\\" So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 17.01.18 - Queenie has replied Ralf on 17th Jan and 10th Feb.\\r\\n\",\"date_creation\":\"1509520674\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518341437\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520674\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \\r\\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\\r\\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \\r\\n                packaging so this is not cost effective solution.\\r\\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\\r\\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\\r\\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\\r\\n09.03.17 - further discusion about the TA60 price during our visit in cw12\\r\\n21.03.17 - Johnson will check the current stock of \\\"old\\\" user guides abd packagings\\r\\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \\r\\n                pallet price OPEN\\r\\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \\r\\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \\r\\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \\r\\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\\r\\n15.05.17 - price confirmation well received, \\r\\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\\r\\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout\\/sample from Foresee, \\r\\n                new label pending\\r\\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\\r\\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\\r\\n                cut in half, so the width is shorter than real A5. Is that acceptable?\\r\\n\\r\\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\\r\\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\\r\\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\\r\\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\\r\\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\\r\\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\\r\\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\\r\\n1. cancelling the wifi section on RDM GDO board\\r\\n2. changing base material of SX5DF to PP\\r\\n3. using thinner paper for user manual\\r\\n4. using same PCB design for all GDO, to maximize the economies of scale\\r\\n\\r\\nWe hope these could considered as our effort to help both side to reduce the cost.\\r\\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\\r\\n\\r\\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\\r\\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\\r\\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\\r\\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\\r\\nTA60: 388 RMB + 10 RMB = 398.00 RMB\\r\\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\\r\\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\\r\\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\\r\\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\\r\\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 04.01.18 - Mail Johnson: Concerning about the pricing of TA60, I communicated with our financial department, but they feedbacked that RMB 398 is the lowest price we can offer at present.\\r\\n* 15.01.18 - Ralf has sent a separate mail to James and Queenie where he again asked for a better price  .... \\\" So please reconsider the TA60 pricing so we find \\u201ca solution between 345RMB and 398RMB\\u201d.\\r\\n* 17.01.18 - Queenie has replied Ralf on 17th Jan and 10th Feb.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1859, 1518412952, 'task.update', 5, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 12.02.18 - Andreas : How much does it cost? And doe you inform Ralf about the costs?\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 22.12.2017 - Andreas : Who is the stand ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1518412952\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 12.02.18 - Andreas : How much does it cost? And doe you inform Ralf about the costs?\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 22.12.2017 - Andreas : Who is the stand ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"owner_id\":\"1\"}}'),
(1860, 1518413320, 'subtask.update', 5, 1, 33, '{\"subtask\":{\"id\":\"33\",\"title\":\"Actuators IQC Reports \",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515924883\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1861, 1518413473, 'task.update', 5, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518413473\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1862, 1518414051, 'task.update', 5, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"*12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518414051\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"*12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1863, 1518414685, 'task.update', 5, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. \\r\\nAre there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518414685\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. \\r\\nAre there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"owner_id\":\"6\"}}'),
(1864, 1518415858, 'task.update', 5, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 12.02.18-Andreas : IP has been updated : we can close the point ?\\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518415858\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.02.18-Andreas : IP has been updated : we can close the point ?\\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\",\"owner_id\":\"6\"}}'),
(1865, 1518415979, 'task.update', 5, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518415979\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(1866, 1518416555, 'task.update', 5, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518416555\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"owner_id\":\"6\"}}'),
(1867, 1518450596, 'task.update', 2, 2, 110, '{\"task_id\":\"110\",\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 12.02.18 - Mail Sally: Please note that the 150pcs color carton for SX5DF which Manfred need is in this shipment - Foresee #3\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518450596\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517227953\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 12.02.18 - Mail Sally: Please note that the 150pcs color carton for SX5DF which Manfred need is in this shipment - Foresee #3\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\"}}'),
(1868, 1518450690, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n* 12.02.18 - Mail Leona: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518450690\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n* 12.02.18 - Mail Leona: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1869, 1518450734, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n* 12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518450734\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n* 12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1870, 1518450813, 'task.update', 2, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518450813\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1871, 1518451085, 'task.update', 2, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n* 12.02.18 - Mail Ben: Hi Andreas, The goods are on their way:**WAYBILL 79 6690 9882**\\r\\n\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518451085\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n* 12.02.18 - Mail Ben: Hi Andreas, The goods are on their way:**WAYBILL 79 6690 9882**\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1872, 1518451488, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518451488\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1873, 1518490961, 'task.update', 6, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 13.02.18-Henk:IR is updated ,close .\\r\\n* 12.02.18-Andreas : IP has been updated : we can close the point ?\\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518490961\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.02.18-Henk:IR is updated ,close .\\r\\n* 12.02.18-Andreas : IP has been updated : we can close the point ?\\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\"}}'),
(1874, 1518490974, 'task.move.column', 6, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 13.02.18-Henk:IR is updated ,close .\\r\\n* 12.02.18-Andreas : IP has been updated : we can close the point ?\\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1518490974\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1518490974\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1515060259\"},\"project_id\":\"2\",\"position\":6,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"8\",\"date_moved\":\"1515060259\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1875, 1518493611, 'task.update', 6, 2, 105, '{\"task_id\":\"105\",\"task\":{\"id\":\"105\",\"title\":\"TM20 - HS XXXX - prototypes\",\"description\":\"* 13.02.18-Henk\\uff1athis topic is same as 10# HE1015 motors ,can merge to topic 10# HE1015.\\r\\n* 02.02.18-Henk mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n\\r\\n* 23.01.18-Henk Mail:Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\n\\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n\\r\\n* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\",\"date_creation\":\"1516428717\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1518493611\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516428717\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.02.18-Henk\\uff1athis topic is same as 10# HE1015 motors ,can merge to topic 10# HE1015.\\r\\n* 02.02.18-Henk mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n\\r\\n* 23.01.18-Henk Mail:Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\n\\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n\\r\\n* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \\r\\n* 20.01.18 : Andreas Mail : ... RDM doesn\\u00b4t stop the production. If Dooya is sure to produce a good quality as they do in the last they don\\u00b4t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\\\" \\r\\n* 19.01.18 : Henk Mail : \\\"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\\\"\\r\\n* 18.01.18 : Andreas Mail: \\\".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\\\"\\r\\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\\r\\n* 12.17 : 50 of each type arrive to RDM\",\"owner_id\":\"5\"}}'),
(1876, 1518493750, 'task.update', 6, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then think close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518493750\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then think close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}'),
(1877, 1518493768, 'task.update', 6, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518493768\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1878, 1518494414, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"*13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518494414\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"*13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1879, 1518494427, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"_*13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video ._____\\r\\n*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518494427\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"_*13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video ._____\\r\\n*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1880, 1518494456, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"*13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518494456\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"*13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n*12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"owner_id\":\"5\"}}'),
(1881, 1518494508, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518494508\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1882, 1518510100, 'task.update', 2, 2, 114, '{\"task_id\":\"114\",\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518510100\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1883, 1519310719, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \"}}'),
(1884, 1519310770, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"346\",\"name\":\"20180220_152221_resized.jpg\",\"path\":\"tasks\\/39\\/0b54167698f4fe913bdd5045562c98fdbcb0af80\",\"is_image\":\"1\",\"task_id\":\"39\",\"date\":\"1519310770\",\"user_id\":\"2\",\"size\":\"1084466\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1885, 1519310770, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"347\",\"name\":\"20180220_152233_resized.jpg\",\"path\":\"tasks\\/39\\/e143fd6075cc04d2b4c1809662abfbd48fe49b27\",\"is_image\":\"1\",\"task_id\":\"39\",\"date\":\"1519310770\",\"user_id\":\"2\",\"size\":\"1282441\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1886, 1519310770, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"348\",\"name\":\"52-A17-067 REV.00.pdf\",\"path\":\"tasks\\/39\\/ce68e273ec4c57be2d6a6a0f1d66594d99a0c6c0\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1519310770\",\"user_id\":\"2\",\"size\":\"61574\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1887, 1519310771, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"349\",\"name\":\"PACK FOR MC-3665-3051-01_REV00.pdf\",\"path\":\"tasks\\/39\\/47fdea2917c9d6b0c62c2d3bd35ece48b4560a2b\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1519310771\",\"user_id\":\"2\",\"size\":\"156731\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1888, 1519310825, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"350\",\"name\":\"52-A17-067 REV.00.pdf\",\"path\":\"tasks\\/39\\/6d635ff0a7060ecd3901b6dd3dd71f033408dc7b\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1519310825\",\"user_id\":\"2\",\"size\":\"61574\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(1889, 1519310950, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310950\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \"}}'),
(1890, 1519311023, 'task.update', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519311023\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #30 - order no.: 4500035305\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1891, 1519311073, 'task.update', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519311073\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\"}}'),
(1892, 1519311270, 'task.assignee_change', 2, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519311270\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"owner_id\":\"1\"}}'),
(1893, 1519311639, 'task.update', 2, 2, 104, '{\"task_id\":\"104\",\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519311639\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n\\r\\n\"}}'),
(1894, 1519311648, 'task.file.create', 2, 2, 104, '{\"file\":{\"id\":\"351\",\"name\":\"180215_return_delivery_Dooya_final overview_update.xls\",\"path\":\"tasks\\/104\\/7090df299d34699af08fbd64da6c304b02c77139\",\"is_image\":\"0\",\"task_id\":\"104\",\"date\":\"1519311648\",\"user_id\":\"2\",\"size\":\"51200\"},\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519311639\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1895, 1519313478, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD_D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519313478\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD_D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1896, 1519385567, 'task.update', 2, 2, 104, '{\"task_id\":\"104\",\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519385567\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n\\r\\n\\r\\n\"}}'),
(1897, 1519719622, 'task.update', 2, 2, 114, '{\"task_id\":\"114\",\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\\r\\n\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519719622\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\\r\\n\"}}'),
(1898, 1519725716, 'task.update', 2, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639 (4500034384)\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519725716\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Order #15 - 4500033639 (4500034384)\"}}'),
(1899, 1519730494, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519730493\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1900, 1519734467, 'task.update', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\\r\\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \\r\\n* 14.11.17 - Mail Sally: Hi Andreas, Thanks for the final report, your claim accepted under service of SXMHI. Hi Manfred, After carefully reviewing with supplier, below is the updated quotation of part 586 under the circumstances of increased raw material cost(nylon has dramatically increased 40%~60% this year), increased labor cost(30%+) and with new packaging form (plastic tray, thickness 0.6mm), this is the best we can negotiate, start from next order.\\r\\n\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519734467\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629192\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\\r\\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \\r\\n* 14.11.17 - Mail Sally: Hi Andreas, Thanks for the final report, your claim accepted under service of SXMHI. Hi Manfred, After carefully reviewing with supplier, below is the updated quotation of part 586 under the circumstances of increased raw material cost(nylon has dramatically increased 40%~60% this year), increased labor cost(30%+) and with new packaging form (plastic tray, thickness 0.6mm), this is the best we can negotiate, start from next order.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1901, 1519734581, 'task.file.create', 2, 2, 58, '{\"file\":{\"id\":\"352\",\"name\":\"171114_quotation_SX-MHI_GGK 586-01-1_GGK 586-01-2.JPG\",\"path\":\"tasks\\/58\\/86da910b945f424be0d3b3edd7768f410b2c5a0b\",\"is_image\":\"1\",\"task_id\":\"58\",\"date\":\"1519734581\",\"user_id\":\"2\",\"size\":\"80907\"},\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\\r\\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \\r\\n* 14.11.17 - Mail Sally: Hi Andreas, Thanks for the final report, your claim accepted under service of SXMHI. Hi Manfred, After carefully reviewing with supplier, below is the updated quotation of part 586 under the circumstances of increased raw material cost(nylon has dramatically increased 40%~60% this year), increased labor cost(30%+) and with new packaging form (plastic tray, thickness 0.6mm), this is the best we can negotiate, start from next order.\\r\\n\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519734483\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629192\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1902, 1519738822, 'task.file.create', 2, 2, 110, '{\"file\":{\"id\":\"353\",\"name\":\"180124_SX5 carton layout(same shape as S2) _ 20180124.pdf\",\"path\":\"tasks\\/110\\/6ece84de85a44f522e7ef2f37fdc36f593312e79\",\"is_image\":\"0\",\"task_id\":\"110\",\"date\":\"1519738822\",\"user_id\":\"2\",\"size\":\"74235516\"},\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 12.02.18 - Mail Sally: Please note that the 150pcs color carton for SX5DF which Manfred need is in this shipment - Foresee #3\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518450596\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517227953\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1903, 1519740947, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 27.02.18 _Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n*12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519740947\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 27.02.18 _Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n*12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1904, 1519740993, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519740993\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1905, 1519802591, 'task.update', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519802591\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\"}}'),
(1906, 1519802998, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519802998\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1907, 1519864656, 'task.update', 6, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"* 01.03.18-Henk: Please see attached mail ,hope they can help for you understand the limit switch ring status.\\r\\n* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519864656\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 01.03.18-Henk: Please see attached mail ,hope they can help for you understand the limit switch ring status.\\r\\n* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1908, 1519864766, 'task.update', 6, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519864766\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(1909, 1519864882, 'task.update', 6, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"* 28.02.18-Andreas:these new Spring washers are okay ; We will talk next week about the next step; \\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519864882\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.02.18-Andreas:these new Spring washers are okay ; We will talk next week about the next step; \\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1910, 1519865055, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"*28.02.18-Andreas:no problems of the last delivery,we\'ll look at the problem together here in Germany next week\\r\\n* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519865055\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"*28.02.18-Andreas:no problems of the last delivery,we\'ll look at the problem together here in Germany next week\\r\\n* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1911, 1519865065, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 28.02.18-Andreas:no problems of the last delivery,we\'ll look at the problem together here in Germany next week\\r\\n* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519865065\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.02.18-Andreas:no problems of the last delivery,we\'ll look at the problem together here in Germany next week\\r\\n* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(1912, 1519888583, 'task.move.column', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519888583\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213811\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1510213811\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1913, 1519888593, 'task.assignee_change', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519888593\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1914, 1519888725, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Jens must issue a debit note\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519888725\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Jens must issue a debit note\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1915, 1519888734, 'task.move.column', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Jens must issue a debit note\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519888734\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888734\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1511409497\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1511409497\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1916, 1519888756, 'task.assignee_change', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"4\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519888756\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"4\"}}'),
(1917, 1519888771, 'task.assignee_change', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Jens must issue a debit note\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519888771\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888734\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"4\"}}'),
(1918, 1519888787, 'task.assignee_change', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519888787\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"4\"}}'),
(1919, 1519888801, 'task.assignee_change', 2, 2, 58, '{\"task_id\":\"58\",\"task\":{\"id\":\"58\",\"title\":\"586 - claim housing\",\"description\":\"\\r\\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\\r\\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\\r\\nWe sort out the defective parts during assembly and invoice them.\\r\\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn\\u2019t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\\r\\nPlease collect all defective and return to us with other unqualified products together .\\r\\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\\r\\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\\r\\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \\r\\n* 14.11.17 - Mail Sally: Hi Andreas, Thanks for the final report, your claim accepted under service of SXMHI. Hi Manfred, After carefully reviewing with supplier, below is the updated quotation of part 586 under the circumstances of increased raw material cost(nylon has dramatically increased 40%~60% this year), increased labor cost(30%+) and with new packaging form (plastic tray, thickness 0.6mm), this is the best we can negotiate, start from next order.\\r\\n\\r\\n\",\"date_creation\":\"1509622536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519888801\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629192\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1920, 1519888824, 'task.assignee_change', 2, 2, 87, '{\"task_id\":\"87\",\"task\":{\"id\":\"87\",\"title\":\"chip change application for indoor camera FC2501P\",\"description\":\"* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\\r\\n* 29.11.17 - Manfred: currently set this topic \\\"on hold\\\" because we can again order a quantity of 600 pcs of the \\\"old 1.3 MP version with \\\"old\\\" chip\\r\\n\\r\\n\",\"date_creation\":\"1510808535\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519888824\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1511518543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1921, 1519888846, 'task.move.column', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519888846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888846\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1513950530\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1513950530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1922, 1519888877, 'task.move.column', 2, 2, 110, '{\"task_id\":\"110\",\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 12.02.18 - Mail Sally: Please note that the 150pcs color carton for SX5DF which Manfred need is in this shipment - Foresee #3\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519888877\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888877\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1517227953\"},\"project_id\":\"2\",\"position\":1,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"6\",\"dst_column_id\":\"7\",\"date_moved\":\"1517227953\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1923, 1519889028, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889028\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1924, 1519889156, 'task.file.create', 2, 2, 104, '{\"file\":{\"id\":\"354\",\"name\":\"18-02-27_Auswertung_Invoice_Dooya return delivery.xlsx\",\"path\":\"tasks\\/104\\/e4156c89420ac80367cbcf04cbf92edadd6e72ca\",\"is_image\":\"0\",\"task_id\":\"104\",\"date\":\"1519889156\",\"user_id\":\"2\",\"size\":\"53608\"},\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519385567\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1925, 1519889156, 'task.file.create', 2, 2, 104, '{\"file\":{\"id\":\"355\",\"name\":\"18-02-27_Auswertung_packaging list_Dooya return delivery.xlsx\",\"path\":\"tasks\\/104\\/5c665f7e82ce747141de566bde791b89da75c7b9\",\"is_image\":\"0\",\"task_id\":\"104\",\"date\":\"1519889156\",\"user_id\":\"2\",\"size\":\"52727\"},\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519385567\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1926, 1519889156, 'task.file.create', 2, 2, 104, '{\"file\":{\"id\":\"356\",\"name\":\"18-02-27_Auswertung_R\\u00fccklieferung Dooya_Warenwert(2).xlsx\",\"path\":\"tasks\\/104\\/76613c7ceddbe209bb23d0d2e8f765b8ded0f1f9\",\"is_image\":\"0\",\"task_id\":\"104\",\"date\":\"1519889156\",\"user_id\":\"2\",\"size\":\"17358\"},\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519385567\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1927, 1519889223, 'task.update', 2, 2, 104, '{\"task_id\":\"104\",\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n* 01.03.18 - Mail Sally: Hi Jens, The document are basically OK, I add a few info, see attached updated. The debit note value is confirmed, you can issue debit note now, after Dooya receive the return motor, we will deduct the amount from one of the payment to Dooya.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889223\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n* 01.03.18 - Mail Sally: Hi Jens, The document are basically OK, I add a few info, see attached updated. The debit note value is confirmed, you can issue debit note now, after Dooya receive the return motor, we will deduct the amount from one of the payment to Dooya.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1928, 1519889242, 'task.assignee_change', 2, 2, 114, '{\"task_id\":\"114\",\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\\r\\n\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889242\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1929, 1519889253, 'task.assignee_change', 2, 2, 104, '{\"task_id\":\"104\",\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n* 01.03.18 - Mail Sally: Hi Jens, The document are basically OK, I add a few info, see attached updated. The debit note value is confirmed, you can issue debit note now, after Dooya receive the return motor, we will deduct the amount from one of the payment to Dooya.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889253\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"4\"}}'),
(1930, 1519889384, 'task.close', 2, 2, 46, '{\"task_id\":\"46\",\"task\":{\"id\":\"46\",\"title\":\"gearbox noise analysis\",\"description\":\"26.09.16 - Provide beltwinder gearbox drawings & DC-motor\\/gearbox (GSM2) sample (5x) -> analysis & proposal for \\\"low\\r\\n                noise\\\" solution, quotation -> samples to test noise reduction with German beltwinder \\/ quotation\\r\\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\\r\\n                Waiting for the signed NDA to send further information (drawings and inquiry)\\r\\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\\r\\n\\r\\n                and shaft WIP.\\r\\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\\r\\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\\r\\n                the worm and axis\\r\\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\\r\\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\\r\\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\\r\\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\\r\\n                gear which has the most effect on the noise issue\\r\\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\\r\\n14.12.16 - Proposal sent, waiting for RDD feedback.\\r\\n04.01.17 - we need some more detailed information from Silent Gear \\r\\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\\r\\n                for the worm and shaft.\\r\\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \\r\\n\\r\\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\\r\\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\\r\\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\\r\\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB\\/PC(25K pcs batch) refering to IG specification.\\r\\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\\r\\n* 08.11.17 - Silent is not willing to give us the motor supplier info\",\"date_creation\":\"1509520540\",\"date_completed\":\"1519889384\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889384\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215626\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1931, 1519889446, 'task.move.position', 2, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\",\"date_creation\":\"1513074677\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1514979252\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1514979252\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"8\",\"dst_column_id\":\"8\"},\"project_id\":\"2\",\"position\":15,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"8\",\"dst_column_id\":\"8\",\"date_moved\":\"1514979252\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1932, 1519889466, 'task.close', 2, 2, 95, '{\"task_id\":\"95\",\"task\":{\"id\":\"95\",\"title\":\"WIFI module change application for IP camera\",\"description\":\"* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\\r\\n* 12.12.17 - Peter: From my perspective it is not a \\u201eno risk\\u201d change\\u2026 If it was our equipment we had at least to perform all measurements regarding coverage (Rx\\/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\\r\\n\\r\\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\\r\\n* 03.01.18 - Peter: Sorry for my delayed answer \\u2013 yes, this documentation is sufficient \\uf0e8 GO for production.\",\"date_creation\":\"1513074677\",\"date_completed\":\"1519889466\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889466\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1514979252\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1933, 1519889483, 'task.close', 2, 2, 56, '{\"task_id\":\"56\",\"task\":{\"id\":\"56\",\"title\":\"gearbox of HM5012 failed\",\"description\":\"\\r\\n* 29.06.17 - Martin: The two special motors are still running by 2\\u00b4800 cycles. Ben:???\\r\\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3\\u00b4500cycles and still running.\\r\\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\\r\\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\\r\\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\\r\\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\\r\\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\\r\\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\\r\\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\\r\\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10\\u00b4500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\\r\\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further\\/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\\r\\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\\r\\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\\r\\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\\r\\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\\r\\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears and beyond 10000 cycles,so this can be closed .\",\"date_creation\":\"1509521559\",\"date_completed\":\"1519889483\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889483\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513572033\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1934, 1519889499, 'task.close', 2, 2, 86, '{\"task_id\":\"86\",\"task\":{\"id\":\"86\",\"title\":\"change approval application for power supply LFI 534-3\",\"description\":\"* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\\r\\n\\r\\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\\r\\n\\r\\n* 12.12.17 - Andreas: it will be okay, even for these order , I\\u00b4ve change it in the PCAS\\r\\n*LBW start from #28\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510808418\",\"date_completed\":\"1519889499\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889499\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1513079501\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1935, 1519889512, 'task.close', 2, 2, 89, '{\"task_id\":\"89\",\"task\":{\"id\":\"89\",\"title\":\"Claim GGK 593-2-1 - order no. 4500031859\",\"description\":\"* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\\r\\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\\r\\nWith please around a statement from you and timely processing of this complaint.\\r\\n* 22.11.17- Henk Mail:\\r\\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\\r\\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \\r\\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\\r\\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\\r\\n* 08.12.17-Henk :this can closed ,approved by Andreas\\r\\n\\r\\n\",\"date_creation\":\"1510919848\",\"date_completed\":\"1519889512\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889512\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512727092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1936, 1519889523, 'task.close', 2, 2, 54, '{\"task_id\":\"54\",\"task\":{\"id\":\"54\",\"title\":\"claim HM8015 no function\",\"description\":\"\\r\\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\\r\\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\\r\\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\\r\\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\\r\\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\\r\\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\\r\\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\\r\\n* 13.10.17 - Mail Henk: Dooya factory can\\u2019t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \\r\\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\\r\\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\\r\\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya\\u2019s 8D report is not claim the root cause clearly .As I know it by with Dooya\\u2019s talking, the tubular motor \\u2018s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\\r\\n* 08.12.17-Henk : this can closed ,approved by Andreas\\r\\n\",\"date_creation\":\"1509521307\",\"date_completed\":\"1519889523\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512727089\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1937, 1519889543, 'task.close', 2, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n\",\"date_creation\":\"1509520776\",\"date_completed\":\"1519889543\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1938, 1519889553, 'task.close', 2, 2, 62, '{\"task_id\":\"62\",\"task\":{\"id\":\"62\",\"title\":\"DC motor enquiry\",\"description\":\"High Quality DC motor enquiry for Tubular Motor (strategic cooperation w\\/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\\r\\n> Nominal Voltage:  325VDC (Special Requirement)\\r\\n> Nomial Torque-Range:  0.24Nm +\\/-0.02Nm (Very High Requirement)\\r\\n> Rated Speed:  <3000 1\\/min\\r\\n> Diameter:  max. 42.0mm\\r\\n> Lifetime:  min. 300h\\r\\n> Low Noise (methods & limits tbd)\\r\\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\\r\\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)\\/technical evaluation is in process, we will see if hits our target. \\r\\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\\r\\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\\r\\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies\\/data sheets\\/drawings\\/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\\r\\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\\r\\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC\\/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\\r\\n1.\\tCompany name is Fulling in Changzhou, correct?   YES\\r\\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg\\/Germany and Fulling is attending as well and I will have the chance to visit them.\\r\\n2.\\tI the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\\r\\n3.\\tAs far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\\r\\n4.\\tThe pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\\r\\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS\\/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\\r\\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170\\u2026200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\\r\\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\\r\\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http:\\/\\/www.szzhaowei.net\\/index1.html (Shenzhen Zhaowei)\\r\\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\\r\\n* 07.12.17 - Mail Ralf: Ok, noted. For the time being there are no further action items on this matter at your end.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510221637\",\"date_completed\":\"1519889553\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889553\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629085\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1939, 1519889575, 'task.close', 2, 2, 61, '{\"task_id\":\"61\",\"task\":{\"id\":\"61\",\"title\":\"Dooya tubular motor 2017 forecast & bonus\",\"description\":\"* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\\r\\n* 09.11.2017 - Jens: I\\u2018ll double check the figures with Manfred\\r\\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\\r\\n* 16.11.2017 - Sally: Please check if it is possible that we delay ETD of #2 to be 05 JAN, this way #2 should be calculated in 2018, so then we can maximum the bonus in 2018 and increase the possibility of reaching 120K?\\r\\n* 17.11.2017 - Manfred:the ETD from Dooya factory must be between 1-3.01.2018 (so absolutely in 2018 \\u2013 necessary for the calculation of the bonus 2018), planned ETD (vessel set sail)  06.01.18 and ETA Rhede - five weeks later - means 09.02.18. Maybe you must try to get a fast vessel if the ETD is a few days later - to reach the ETA.\\r\\n* 18.11.2017 - Sally: Attached updated PI of #2 and #2acc, ETD 03 Jan 2018.\",\"date_creation\":\"1510213476\",\"date_completed\":\"1519889575\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"4\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808880\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1940, 1519889583, 'task.close', 2, 2, 85, '{\"task_id\":\"85\",\"task\":{\"id\":\"85\",\"title\":\"new baseplate material for SX5DF\",\"description\":\"* 14.11.17 - Sally: Same like for S1\\/S2\\/TA50\\/TA70, Foresee apply to change the chassis material of SX5DF as well, in order to bring down the cost.2pcs sample has sent out today. TNT tracking number 166186226\\r\\n* 14.11.17 - Andreas: atteched the PCAS SX5DF, approved\",\"date_creation\":\"1510808247\",\"date_completed\":\"1519889583\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889583\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510808247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1941, 1519889594, 'task.close', 2, 2, 53, '{\"task_id\":\"53\",\"task\":{\"id\":\"53\",\"title\":\"claim Dooya #5 #7 dirty contaminated tubes\",\"description\":\"\\r\\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\\r\\nThese tubes wasn\\u00b4t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\\r\\n\\r\\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\\r\\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\\r\\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\\r\\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12\\/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\\r\\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you\\u2019ll find a copy of the shipping documents including the tracking number (GD313339106ww).\\r\\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10\\/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\\r\\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\\r\\n* 23.10.17 - debit note received from Jens, deduct from payment CW43\",\"date_creation\":\"1509521265\",\"date_completed\":\"1519889594\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510215759\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1942, 1519889609, 'task.close', 2, 2, 102, '{\"task_id\":\"102\",\"task\":{\"id\":\"102\",\"title\":\"533-16 packaging size\",\"description\":\"* 13.02.18-Henk:IR is updated ,close .\\r\\n* 12.02.18-Andreas : IP has been updated : we can close the point ?\\r\\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \\r\\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\\r\\nit is :400(length) x400(width)x 300(high)\\r\\n6 layers, per layer 124 pcs\\r\\ncardboard between each layer\\r\\ncontent 744 pcs \\/ carton \\r\\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \\r\\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\\r\\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs \\/ carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\\r\\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs \\/ carton - we need to check\\/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\\r\\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\\r\\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \\r\\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\\r\\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\\r\\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\\r\\n\\r\\n\",\"date_creation\":\"1515060259\",\"date_completed\":\"1519889609\",\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"6\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889609\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1518490974\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1943, 1519889620, 'task.close', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"1519889620\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"0\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519889620\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516699279\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1944, 1519892934, 'task.file.create', 2, 2, 104, '{\"file\":{\"id\":\"357\",\"name\":\"18-02-27_Commercial Invoice_Dooya return delivery(2).pdf\",\"path\":\"tasks\\/104\\/7fc96d5f9ed42a3cc24f5ab34b480935709ae879\",\"is_image\":\"0\",\"task_id\":\"104\",\"date\":\"1519892934\",\"user_id\":\"2\",\"size\":\"236612\"},\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n* 01.03.18 - Mail Sally: Hi Jens, The document are basically OK, I add a few info, see attached updated. The debit note value is confirmed, you can issue debit note now, after Dooya receive the return motor, we will deduct the amount from one of the payment to Dooya.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889253\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1945, 1519892935, 'task.file.create', 2, 2, 104, '{\"file\":{\"id\":\"358\",\"name\":\"18-02-27_packaging list_Dooya return delivery(2).pdf\",\"path\":\"tasks\\/104\\/e47b29f8747a3d66919dce5fae59b7167dabafb4\",\"is_image\":\"0\",\"task_id\":\"104\",\"date\":\"1519892935\",\"user_id\":\"2\",\"size\":\"287567\"},\"task\":{\"id\":\"104\",\"title\":\"Dooya - return  delivery 2017\",\"description\":\"\\r\\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\\r\\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\\r\\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\\r\\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \\r\\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\\r\\n* 23.02.18 - the forwarder \\\"Gateway Cargo Systems\\\" has contacted regarding this return delivery. So it seems everything is in the flow.\\r\\n* 01.03.18 - Mail Sally: Hi Jens, The document are basically OK, I add a few info, see attached updated. The debit note value is confirmed, you can issue debit note now, after Dooya receive the return motor, we will deduct the amount from one of the payment to Dooya.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1516115917\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519889253\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516115917\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1946, 1519892992, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find the debit note for the returned 3.599 pcs  GGK 663-1.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519892992\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888734\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find the debit note for the returned 3.599 pcs  GGK 663-1.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1947, 1519893010, 'task.file.create', 2, 2, 91, '{\"file\":{\"id\":\"359\",\"name\":\"18-03-01_debit note_return delivery_GGK 663-1_5000042830.pdf\",\"path\":\"tasks\\/91\\/92c6192b873eb9fef9bbd464a825077fb72e899c\",\"is_image\":\"0\",\"task_id\":\"91\",\"date\":\"1519893010\",\"user_id\":\"2\",\"size\":\"7856\"},\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find the debit note for the returned 3.599 pcs  GGK 663-1.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519892992\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888734\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1948, 1519895758, 'task.update', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find the debit note for the returned 3.599 pcs  GGK 663-1.\\r\\n* 01.03.18 - Mail Jens: Hi Sally,that was only a try ;-), no no sorry my fault, I didn\\u2019t had the replacement delivery on my screen anymore. In appendix you\\u2019ll find the cancallation of the debit note, sorry for confusion!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519895758\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888734\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find the debit note for the returned 3.599 pcs  GGK 663-1.\\r\\n* 01.03.18 - Mail Jens: Hi Sally,that was only a try ;-), no no sorry my fault, I didn\\u2019t had the replacement delivery on my screen anymore. In appendix you\\u2019ll find the cancallation of the debit note, sorry for confusion!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1949, 1519895766, 'task.move.column', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find the debit note for the returned 3.599 pcs  GGK 663-1.\\r\\n* 01.03.18 - Mail Jens: Hi Sally,that was only a try ;-), no no sorry my fault, I didn\\u2019t had the replacement delivery on my screen anymore. In appendix you\\u2019ll find the cancallation of the debit note, sorry for confusion!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"4\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1519895766\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519895766\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1519888734\"},\"project_id\":\"2\",\"position\":4,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1519888734\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1950, 1519902526, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519902526\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888846\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1951, 1519902533, 'task.assignee_change', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519902533\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888846\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"3\"}}'),
(1952, 1519904383, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find a corresponding debit note for the 156 pcs sun sensor 475 534-1.5. Please check and let me know, from which payment we can deduct this debit note!\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519904383\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888846\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find a corresponding debit note for the 156 pcs sun sensor 475 534-1.5. Please check and let me know, from which payment we can deduct this debit note!\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1953, 1520235066, 'task.update', 2, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 05.03.18 - Mail Leona: Supplier has received the return delivery today. \\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find a corresponding debit note for the 156 pcs sun sensor 475 534-1.5. Please check and let me know, from which payment we can deduct this debit note!\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1520235066\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888846\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 05.03.18 - Mail Leona: Supplier has received the return delivery today. \\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find a corresponding debit note for the 156 pcs sun sensor 475 534-1.5. Please check and let me know, from which payment we can deduct this debit note!\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Sally: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1954, 1520257315, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1955, 1520257337, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"360\",\"name\":\"QR_200001482_Netzkabel_YNK 1m5_00.pdf\",\"path\":\"tasks\\/88\\/821d09197f04f01c477683c9fe56804fd0761199\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1520257337\",\"user_id\":\"2\",\"size\":\"1521088\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1956, 1520329581, 'task.move.column', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520329581\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520329581\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1517428300\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1517428300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1957, 1520329593, 'task.move.position', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520329581\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520329581\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"4\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"4\",\"date_moved\":\"1520329581\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1958, 1520329804, 'task.move.column', 1, 1, 40, '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639 (4500034384)\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520329804\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520329804\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1508340536\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1959, 1520329943, 'task.update', 1, 1, 38, '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM4 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n* 06.02.18 - Still waiting on the testing information from Andreas...\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520329943\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"GSM4 Motor\"}}'),
(1960, 1520336248, 'task.move.position', 1, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\\r\\n* 23.11.17 - Mail Andreas: Manfred will contact you!\\r\\n\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1511409733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"7\"},\"project_id\":\"2\",\"position\":6,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"7\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1961, 1520336626, 'task.create', 1, 4, 116, '{\"task_id\":116,\"task\":{\"id\":\"116\",\"title\":\"RoHS Sun Sensor\",\"description\":\"06.03.18 - RoHS Requirements for the UBW and LBW Sun Sensor.\",\"date_creation\":\"1520336626\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"14\",\"owner_id\":\"0\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520336626\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520336626\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Backlog\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1962, 1520409676, 'task.update', 2, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"\\r\\n* 07.03.18 - Sally: Hi All, I hear nothing after all, how does thing going? @Henk, could you keep us CC in the loop?\\r\\n* 01.03.18-Henk: Please see attached mail ,hope they can help for you understand the limit switch ring status.\\r\\n* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520409676\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.03.18 - Sally: Hi All, I hear nothing after all, how does thing going? @Henk, could you keep us CC in the loop?\\r\\n* 01.03.18-Henk: Please see attached mail ,hope they can help for you understand the limit switch ring status.\\r\\n* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}'),
(1963, 1520415684, 'task.move.column', 3, 2, 110, '{\"task_id\":\"110\",\"task\":{\"id\":\"110\",\"title\":\"GDO - Foresee - damaged packagings SX5 DuoFern\",\"description\":\"\\r\\n\\r\\n* 12.02.18 - Mail Sally: Please note that the 150pcs color carton for SX5DF which Manfred need is in this shipment - Foresee #3\\r\\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \\r\\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro\\/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality\\/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\\r\\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\\r\\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2\\/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5\\/2018.\\r\\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\\r\\n\",\"date_creation\":\"1517227953\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520415684\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520415684\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1519888877\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1519888877\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1964, 1520415765, 'task.update', 3, 2, 99, '{\"task_id\":\"99\",\"task\":{\"id\":\"99\",\"title\":\"Sun sensor UBW - item no.: 475 534-1.5\",\"description\":\"\\r\\n* 05.03.18 - Mail Leona: Supplier has received the return delivery today. \\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find a corresponding debit note for the 156 pcs sun sensor 475 534-1.5. Please check and let me know, from which payment we can deduct this debit note!\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\",\"date_creation\":\"1513950530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1520415765\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888846\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 05.03.18 - Mail Leona: Supplier has received the return delivery today. \\r\\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find a corresponding debit note for the 156 pcs sun sensor 475 534-1.5. Please check and let me know, from which payment we can deduct this debit note!\\r\\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I\\u2019ll let you know when the parcel will go on the way!\\r\\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service\\uff1aExpress Worldwide\\r\\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\\r\\n* 07.02.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\\r\\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\\r\\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\\r\\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\\r\\n* 05.01.18 - Andreas: we \\u00b4ll do a claim report and ad it on KB the sensor does\\u00b4t work the right way. The tester said it\\u00b4s not okay.\\r\\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -\\tFrom which delivery \\/ order are these bad parts ? - what is the problem ? -\\r\\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock \\u2013 normally Sally want them back ;-)\\r\\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\\r\\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\\r\\n\"}}'),
(1965, 1520415907, 'task.update', 3, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"4\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520415907\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\"}}'),
(1966, 1520416042, 'task.assignee_change', 3, 2, 84, '{\"task_id\":\"84\",\"task\":{\"id\":\"84\",\"title\":\"New transformer for SX5DF\",\"description\":\"* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \\r\\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \\r\\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \\r\\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\\r\\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\\r\\n* 23.11.17 - Mail Andreas: Manfred will contact you!\\r\\n\\r\\n \\r\\n\",\"date_creation\":\"1510726261\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520416042\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510726261\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1967, 1520416139, 'task.update', 3, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor - WISTAR\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\\r\\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \\r\\n* 18.01.18 - Mail Sally: Dear Ralf, That would be fine. Cindy - Sales director, Sarah whom you\'ve met in hangzhou - Sales for Germany & Poland, Mr. Wan - Electronics Engineer. **They will go to meet you on March the 2nd at 10am at Rademacher booth.**\\r\\n* 02.03.18 - Feedback from Wistar: they have met Ralf and currently R&D is putting full capacity working on HP3, so this project has been put off, TBD.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520416139\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\\r\\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \\r\\n* 18.01.18 - Mail Sally: Dear Ralf, That would be fine. Cindy - Sales director, Sarah whom you\'ve met in hangzhou - Sales for Germany & Poland, Mr. Wan - Electronics Engineer. **They will go to meet you on March the 2nd at 10am at Rademacher booth.**\\r\\n* 02.03.18 - Feedback from Wistar: they have met Ralf and currently R&D is putting full capacity working on HP3, so this project has been put off, TBD.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(1968, 1520416428, 'task.assignee_change', 3, 2, 50, '{\"task_id\":\"50\",\"task\":{\"id\":\"50\",\"title\":\"superrollo 5-channel hand transmitter w\\/ timer\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: DC104 series is including: DC104 DC105 DC168 DC169, from current standard offering, there is no 5-channel. Dooya need to double check with product department next week. DC104 and DC105>> with DISPLAY, without timer function DC168(single-channel) and DC169(15-channel)>> with DISPLAY, with timer function Instantly arranged sample for DC168 DC169 first, once we have feedback for the 5 channel, we will send you more info.                Price: DC168  RMB 27.50, DC169  RMB 28.00 \\r\\n* 30.03.17 - samples well received and forwarded to Ralf\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will send in a separate mail some questions - REACH and RoHS declaration etc.\\r\\n* 26.09.17 - Mail Sally: \\u00b7Remote control, due to the sales figure - DC168\\/DC169(with screen, with timer function) - NO plan to do any cerfitcation DC104\\/DC105(no screen, no timer function) - will apply RED at the end of October. DC513\\/DC514(with screen, with timer function),             the one we saw during the visit in the electronics workshop display board - NO plan to do any cerfitcation, just FYI.\\r\\n* 04.10.17 - Mail Markus: Dear Sally, without certificates we will not be allowed to sell these products. The models DC104\\/DC105 has no timer - we need a remote control with timer as an accessory. Can you please check again whether Dooya offers remote controls with timer function and existing certificates?\\r\\n* 11.10.17 - the only one has both timer and certification(ongoing) is DC2705 (5 channels) approx 9USD. DC2703(single channel) certification possible.\\r\\n* 30.10.17 - RED certification of  DC2705(5 channel) & DC2703(single channel) sent,waiting for Markus feedback\",\"date_creation\":\"1509520959\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520416428\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509520959\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"2\"}}'),
(1969, 1520416461, 'task.move.column', 3, 2, 52, '{\"task_id\":\"52\",\"task\":{\"id\":\"52\",\"title\":\"671 - new plug & play tubular motor HAL system\",\"description\":\"23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \\r\\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\\r\\n                output etc.\\r\\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \\r\\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \\r\\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \\r\\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \\r\\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \\r\\n                checked the samples. \\r\\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\\r\\n                Further action needed: Dooya need to send material datasheet . And test tool information.\\r\\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \\r\\n                datasheet to Jorg to verify the material fire retardancy\\r\\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \\r\\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\\r\\n                mark are from Taiwan. \\r\\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\\r\\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\\r\\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\\r\\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \\r\\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\\r\\n                mass production.\\r\\n\\r\\n* 21.08.17 - Mail J\\u00f6rg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier\\u2026\\r\\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\\r\\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\\r\\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB\\u2026 We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\\r\\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\\r\\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage\\u2026 For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\\r\\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\\r\\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10\\/15\\r\\n* 18.09.17 - Mail J\\u00f6rg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\\r\\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\\r\\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\\r\\n* 11.10.17 - \\\"124 TM20 HAL&NTC test document_V4.docx\\\" sent to Jorg, technical annex pending on Jorg feedback.\\r\\n* 11.10.17 - Mail J\\u00f6rg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\\r\\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\\r\\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\\r\\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\\r\\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\\r\\n* 15.11.17 - J\\u00f6rg has sent an update of the Technical Annex\\r\\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\\r\\n* 16.11.17 - Mail J\\u00f6rg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\\r\\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\\r\\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\\r\\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\\r\\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\\r\\n* 14.12.17 - Mail Sally: Hi Jorg, Attached TM20 Technical Annex signed back by Dooya.  \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509521066\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"3\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520416461\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520416461\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509521066\"},\"project_id\":\"2\",\"position\":6,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1509521066\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1970, 1520416689, 'task.update', 3, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n* 09.11.17 - Mail Ralf: Please let me know the meaning\\/feature of the different types.\\r\\n* 13.11.17 - Mail Sally: Below is the feature of the different types, Please let us know which type you would like to get further information.\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"8\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520416689\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ralf Kern\",\"assignee_name\":\"Ralf Kern\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n* 09.11.17 - Mail Ralf: Please let me know the meaning\\/feature of the different types.\\r\\n* 13.11.17 - Mail Sally: Below is the feature of the different types, Please let us know which type you would like to get further information.\",\"owner_id\":\"8\"}}'),
(1971, 1520416872, 'task.update', 3, 2, 114, '{\"task_id\":\"114\",\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\\r\\n* 28.02.18 - Mail Leona: Attached are the quote about sea and air.\\r\\nTotal charge of air: EUR613.50+RMB1291.00\\/Shipment (without duty\\uff09\\r\\nTotal charge of sea:EUR281.50+USD30+RMB2640\\/Shipment (without duty\\uff09\\r\\nimport duty in China: 8%\\r\\n\\r\\n\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520416872\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\\r\\n* 28.02.18 - Mail Leona: Attached are the quote about sea and air.\\r\\nTotal charge of air: EUR613.50+RMB1291.00\\/Shipment (without duty\\uff09\\r\\nTotal charge of sea:EUR281.50+USD30+RMB2640\\/Shipment (without duty\\uff09\\r\\nimport duty in China: 8%\\r\\n\\r\\n\"}}'),
(1972, 1520424598, 'task.open', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"0\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520424598\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516699279\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1973, 1520424612, 'task.move.column', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520424612\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"8\",\"dst_column_id\":\"7\",\"date_moved\":\"1516699279\"},\"project_id\":\"2\",\"position\":4,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"8\",\"dst_column_id\":\"7\",\"date_moved\":\"1516699279\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1974, 1520424664, 'task.update', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520424664\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(1975, 1520424694, 'task.file.create', 2, 2, 57, '{\"file\":{\"id\":\"361\",\"name\":\"product change_approval application(1).xlsx\",\"path\":\"tasks\\/57\\/fd333931b7feefbc0f85fdaa36a58e3f496a8eff\",\"is_image\":\"0\",\"task_id\":\"57\",\"date\":\"1520424694\",\"user_id\":\"2\",\"size\":\"377028\"},\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520424664\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1976, 1520426127, 'task.update', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. ETA Rhede 02.10.18 (ETD 28.08.18) - VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. ETA Rhede 02.10.18 (ETD 28.08.18) - VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \"}}'),
(1977, 1520426143, 'task.update', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426143\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \"}}'),
(1978, 1520426460, 'task.create', 2, 1, 117, '{\"task_id\":117,\"task\":{\"id\":\"117\",\"title\":\"HP2 order #18 (black colour box) - 4500035339 \",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n\",\"date_creation\":\"1520426460\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426460\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1979, 1520426480, 'task.move.position', 2, 1, 117, '{\"task_id\":\"117\",\"task\":{\"id\":\"117\",\"title\":\"HP2 order #18 (black colour box) - 4500035339 \",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n\",\"date_creation\":\"1520426460\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426460\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":14,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1980, 1520426810, 'task.create', 2, 1, 118, '{\"task_id\":118,\"task\":{\"id\":\"118\",\"title\":\"HP2 order #19 (white colour box) - 4500035601\",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\",\"date_creation\":\"1520426810\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"23\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426810\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(1981, 1520426818, 'task.move.position', 2, 1, 118, '{\"task_id\":\"118\",\"task\":{\"id\":\"118\",\"title\":\"HP2 order #19 (white colour box) - 4500035601\",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\",\"date_creation\":\"1520426810\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426810\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":15,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1982, 1520427393, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520427393\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\"}}'),
(1983, 1520437663, 'task.move.column', 2, 2, 49, '{\"task_id\":\"49\",\"task\":{\"id\":\"49\",\"title\":\"Electronic Limit Switch Head Tubular Motor - WISTAR\",\"description\":\"\\r\\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\\r\\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\\r\\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \\\"2017\\/10\\/4 WISTAR \\/ electronic tubular motor\\\"\\r\\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\\r\\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\\r\\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10\\/14 as attached next Thursday. For the WSSD50-20\\/17, still in preparation, perhaps to be sent 1~2 weeks later.\\r\\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10\\/14 x 1pc sample delivered out from Wistar. \\r\\n(The WSSD50-20\\/17 is still in development stage, sample will not be delivery at this stage.) \\r\\nDHL WAYBILL 11 4023 1783\\r\\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\\r\\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\\r\\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \\r\\n* 18.01.18 - Mail Sally: Dear Ralf, That would be fine. Cindy - Sales director, Sarah whom you\'ve met in hangzhou - Sales for Germany & Poland, Mr. Wan - Electronics Engineer. **They will go to meet you on March the 2nd at 10am at Rademacher booth.**\\r\\n* 02.03.18 - Feedback from Wistar: they have met Ralf and currently R&D is putting full capacity working on HP3, so this project has been put off, TBD.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520879\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"3\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520437663\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520437663\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509520879\"},\"project_id\":\"2\",\"position\":8,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509520879\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1984, 1520437667, 'task.move.column', 2, 2, 50, '{\"task_id\":\"50\",\"task\":{\"id\":\"50\",\"title\":\"superrollo 5-channel hand transmitter w\\/ timer\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: DC104 series is including: DC104 DC105 DC168 DC169, from current standard offering, there is no 5-channel. Dooya need to double check with product department next week. DC104 and DC105>> with DISPLAY, without timer function DC168(single-channel) and DC169(15-channel)>> with DISPLAY, with timer function Instantly arranged sample for DC168 DC169 first, once we have feedback for the 5 channel, we will send you more info.                Price: DC168  RMB 27.50, DC169  RMB 28.00 \\r\\n* 30.03.17 - samples well received and forwarded to Ralf\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will send in a separate mail some questions - REACH and RoHS declaration etc.\\r\\n* 26.09.17 - Mail Sally: \\u00b7Remote control, due to the sales figure - DC168\\/DC169(with screen, with timer function) - NO plan to do any cerfitcation DC104\\/DC105(no screen, no timer function) - will apply RED at the end of October. DC513\\/DC514(with screen, with timer function),             the one we saw during the visit in the electronics workshop display board - NO plan to do any cerfitcation, just FYI.\\r\\n* 04.10.17 - Mail Markus: Dear Sally, without certificates we will not be allowed to sell these products. The models DC104\\/DC105 has no timer - we need a remote control with timer as an accessory. Can you please check again whether Dooya offers remote controls with timer function and existing certificates?\\r\\n* 11.10.17 - the only one has both timer and certification(ongoing) is DC2705 (5 channels) approx 9USD. DC2703(single channel) certification possible.\\r\\n* 30.10.17 - RED certification of  DC2705(5 channel) & DC2703(single channel) sent,waiting for Markus feedback\",\"date_creation\":\"1509520959\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520437667\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520437667\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509520959\"},\"project_id\":\"2\",\"position\":9,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509520959\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1985, 1520437681, 'task.move.column', 2, 2, 55, '{\"task_id\":\"55\",\"task\":{\"id\":\"55\",\"title\":\"sun-wind-sensor\",\"description\":\"\\r\\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\\r\\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \\\"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\\\", etc..\\r\\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\\r\\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\\r\\n* 12.10.17 - Mail Ralf: the size of the RF part w\\/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w\\/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \\r\\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\\r\\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\\r\\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\\r\\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\\r\\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1\\/-2\\/-3?\\r\\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\\r\\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w\\/o the \\u201cUp\\u201d and \\u201cP2\\u201d) are considered in some of the DC116 B, C, E, etc. designs?\\r\\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\\r\\n* 09.11.17 - Mail Ralf: Please let me know the meaning\\/feature of the different types.\\r\\n* 13.11.17 - Mail Sally: Below is the feature of the different types, Please let us know which type you would like to get further information.\",\"date_creation\":\"1509521407\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"8\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520437681\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520437681\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ralf Kern\",\"assignee_name\":\"Ralf Kern\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521407\"},\"project_id\":\"2\",\"position\":9,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521407\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1986, 1520437688, 'task.move.column', 2, 2, 51, '{\"task_id\":\"51\",\"task\":{\"id\":\"51\",\"title\":\"motor bracket for superrollo tubular motor\",\"description\":\"\\r\\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233\\/DZ361 as reference solution for our request base plate 50mm x 50mm w\\/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\\r\\n* 25.04.17 - further feedback from Ralf necessary\\r\\n* 27.06.17 - in progress at our product management department\\r\\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\\r\\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 \\u2013 drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\\r\\n* 15.11.17 - Mail Sally: Noted, will send together with the TM20 gauge this week.\\r\\n* 20.11.17 - RD-D has received 5 pcs samples, currentyl under investigation by a customer \\r\\n\",\"date_creation\":\"1509521002\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"2\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520437688\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520437688\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521002\"},\"project_id\":\"2\",\"position\":10,\"column_id\":\"6\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"6\",\"date_moved\":\"1509521002\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(1987, 1520437730, 'task.close', 2, 2, 91, '{\"task_id\":\"91\",\"task\":{\"id\":\"91\",\"title\":\"claim 200001403 - GGK 663-1 - color not match to RAL 9003\",\"description\":\"* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\\r\\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\\r\\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\\r\\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it\\u2019s the claim GGK 663-1, also here we\\u2019ve to check when we can get asap a replacment\\r\\ndelivery, because we\\u2019ll run empty in stock latest in the beginning of December!!!\\r\\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens\\u2019 mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \\r\\n* 28.11.17 - Mail Manfred \\/ Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \\r\\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\\r\\nPlease take a look to the annexed claim in new version (changes are marked in red).\\r\\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\\r\\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\\r\\n\\r\\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\\r\\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\\r\\n* 18.12.17 - Leona gave the \\\"go\\\" for the return delivery via forwarder IFB with MV \\u201eCosco Portugal\\u201c ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\\r\\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\\r\\n* 01.03.18 - Mail Jens: in appendix you\\u2019ll find the debit note for the returned 3.599 pcs  GGK 663-1.\\r\\n* 01.03.18 - Mail Jens: Hi Sally,that was only a try ;-), no no sorry my fault, I didn\\u2019t had the replacement delivery on my screen anymore. In appendix you\\u2019ll find the cancallation of the debit note, sorry for confusion!\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511409497\",\"date_completed\":\"1520437730\",\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"4\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520437730\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519895766\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1988, 1520437769, 'task.close', 2, 2, 59, '{\"task_id\":\"59\",\"task\":{\"id\":\"59\",\"title\":\"claim Dooya #9 dirty contaminated tubes\",\"description\":\"* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\\r\\nAbout the quantity, we have to get us an overview next week.\\r\\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\\r\\n* 06.11.17 - Mail Henk: Dear Martin:\\r\\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\\r\\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya\\u2019s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\\r\\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\\r\\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\\r\\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\\r\\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\\r\\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \\r\\n--the erosion by salt fog during transport in the sea \\r\\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \\r\\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \\r\\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\\r\\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \\\"rough\\\" surface?\\r\\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\\r\\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\\r\\nTo the whole delivery we sorted out HE3015 \\u2013 111pcs., HM2015 \\u2013 31pcs. and HE1017 \\u2013 221pcs.\\r\\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we\\u2019ll get not a problem, with HE3015 we will get a problem. @ Leona\\/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\\r\\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\\r\\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens\\u2019 mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\\r\\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\\r\\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\\r\\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface\\u2019s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\\r\\n\\r\\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\\r\\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\\r\\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\\r\\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\\r\\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\\r\\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \\r\\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \\r\\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \\r\\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\\r\\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\\r\\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\\r\\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we\\u00b4ll get a change aproval sheet information before the changes enter the series\\r\\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18\\r\\n* 22.01.18 Andreas: Okay ; We will see; please tell dooya, if their will be a problem with the survace  of the tube we will send them back! We can close this point\\r\\n \",\"date_creation\":\"1509937688\",\"date_completed\":\"1520437769\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"0\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520437769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516699303\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1989, 1520438371, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 17.05.18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520438371\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 17.05.18)\\r\\n\"}}'),
(1990, 1520438536, 'task.update', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520438536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n\"}}'),
(1991, 1520438778, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520438778\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n\"}}'),
(1992, 1520486770, 'task.update', 3, 2, 48, '{\"task_id\":\"48\",\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n* 07.03.18 - Mail Sally: Could you please help to confirm the change approval, then we can close the topic, thanks!\\r\\n* 07.03.18 - Mail Peter: Here we are \\u2013 I added manually the PCB revision number which was not explicitily mentioned in the document.\\r\\n\\r\\n\",\"date_creation\":\"1509520776\",\"date_completed\":\"1519889543\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520486770\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n* 07.03.18 - Mail Sally: Could you please help to confirm the change approval, then we can close the topic, thanks!\\r\\n* 07.03.18 - Mail Peter: Here we are \\u2013 I added manually the PCB revision number which was not explicitily mentioned in the document.\\r\\n\\r\\n\"}}'),
(1993, 1520486858, 'task.file.create', 3, 2, 48, '{\"file\":{\"id\":\"362\",\"name\":\"PCAA_FuE_S1S2SX5TA60_PCB_SW_Versions_2018_03_07.pdf\",\"path\":\"tasks\\/48\\/bd46e05209f381f40a1455ac38283cee32947079\",\"is_image\":\"0\",\"task_id\":\"48\",\"date\":\"1520486858\",\"user_id\":\"3\",\"size\":\"390786\"},\"task\":{\"id\":\"48\",\"title\":\"GDO software renewing plan\",\"description\":\"13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\\r\\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\\r\\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\\r\\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \\r\\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \\r\\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \\r\\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \\r\\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \\r\\n                fee(around RMB 150,000.00).\\r\\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\\r\\n18.07.17 - waiting for the samples of the PCB \\/ devices - the PCB\'s of the DuoFern module are still in Rhede :-(\\r\\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\\r\\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \\r\\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \\r\\n                send you to asap.\\r\\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \\r\\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20\\/Sep. \\r\\n                And Rademacher can get the Co-license end of Sep.\\r\\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\\r\\n\\r\\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\\\"Foresee can obtain the main license on 20\\/Sep. And Rademacher can get the Co-license end of Sep\\\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\\r\\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\\r\\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\\r\\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\\r\\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\\r\\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\\r\\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\\r\\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\\r\\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here \\u2013 especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\\r\\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\\r\\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\\r\\n* 29.11.17 - Johnson: co-license will be ready next week\\r\\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\\r\\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\\r\\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\\r\\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \\r\\n* 07.03.18 - Mail Sally: Could you please help to confirm the change approval, then we can close the topic, thanks!\\r\\n* 07.03.18 - Mail Peter: Here we are \\u2013 I added manually the PCB revision number which was not explicitily mentioned in the document.\\r\\n\\r\\n\",\"date_creation\":\"1509520776\",\"date_completed\":\"1519889543\",\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520486770\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0.04\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512629151\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(1994, 1520494683, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"363\",\"name\":\"cable broken.JPG\",\"path\":\"tasks\\/88\\/97b79d241e6344847104d897a65ce66675dc7251\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1520494683\",\"user_id\":\"2\",\"size\":\"665852\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(1995, 1520494683, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"364\",\"name\":\"copper  sheet broken.JPG\",\"path\":\"tasks\\/88\\/647f1bac35f9abf2a5f7669760d437bdaa531aff\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1520494683\",\"user_id\":\"2\",\"size\":\"668059\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1996, 1520494684, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"365\",\"name\":\"copper line exposed.JPG\",\"path\":\"tasks\\/88\\/85dda803a2f86011b6e99ebef11be55c21879a8c\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1520494684\",\"user_id\":\"2\",\"size\":\"686428\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1997, 1520494684, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"366\",\"name\":\"copper sheet touch the plastic sheel.JPG\",\"path\":\"tasks\\/88\\/ddaa7fec0fbb6d86b6a29143642a096d85e52c22\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1520494684\",\"user_id\":\"2\",\"size\":\"600848\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1998, 1520494684, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"367\",\"name\":\"dirty.JPG\",\"path\":\"tasks\\/88\\/f4cfec796ffb4603d50be840e8cc511ed5e1de02\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1520494684\",\"user_id\":\"2\",\"size\":\"660869\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(1999, 1520494685, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"368\",\"name\":\"empty cable lug.JPG\",\"path\":\"tasks\\/88\\/68ba605243b110473f78030108bc68399ae70ddb\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1520494685\",\"user_id\":\"2\",\"size\":\"553762\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(2000, 1520494685, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"369\",\"name\":\"IP_314_YNK 1M5_02.docx\",\"path\":\"tasks\\/88\\/fec9f06889ea8b599e8ce48b41727fcd24818fd1\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1520494685\",\"user_id\":\"2\",\"size\":\"249010\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2001, 1520494686, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"370\",\"name\":\"standard sample from Rademacher \'s warehouse.JPG\",\"path\":\"tasks\\/88\\/89c83abb087742fffe15dbc1d54475c96a50aafe\",\"is_image\":\"1\",\"task_id\":\"88\",\"date\":\"1520494686\",\"user_id\":\"2\",\"size\":\"693570\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520257315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(2002, 1520495059, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520495059\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\"}}'),
(2003, 1520496428, 'task.create', 1, 4, 119, '{\"task_id\":119,\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"0\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520496428\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496428\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2004, 1520496821, 'task.create', 1, 4, 120, '{\"task_id\":120,\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - We need to get the Sun Sensor Test box back from YJ so we can send it to Germany to get the software updated.\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520496821\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2005, 1520497026, 'task.update', 1, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - We need to get the Sun Sensor Test box back from YJ so we can send it to Germany to get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520497026\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - We need to get the Sun Sensor Test box back from YJ so we can send it to Germany to get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\"}}'),
(2006, 1520498109, 'task.assignee_change', 9, 4, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.** Waybill 2836747104**\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"14\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520498109\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Backlog\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"owner_id\":\"5\"}}'),
(2007, 1520498152, 'task.close', 9, 4, 116, '{\"task_id\":\"116\",\"task\":{\"id\":\"116\",\"title\":\"RoHS Sun Sensor\",\"description\":\"06.03.18 - RoHS Requirements for the UBW and LBW Sun Sensor.\",\"date_creation\":\"1520336626\",\"date_completed\":\"1520498152\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"14\",\"owner_id\":\"0\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520498152\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520336626\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Backlog\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(2008, 1520498317, 'task.assignee_change', 9, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"9\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520498317\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496428\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"Peter Schliwa\",\"assignee_name\":\"Peter Schliwa\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"9\"}}'),
(2009, 1520498457, 'task.update', 9, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - We need to get the Sun Sensor Test box back from YJ so we can send it to Germany to get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\\r\\n1. Henk tp rovide test equipment for sw update\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520498457\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - We need to get the Sun Sensor Test box back from YJ so we can send it to Germany to get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\\r\\n1. Henk tp rovide test equipment for sw update\",\"owner_id\":\"6\"}}'),
(2010, 1520498947, 'task.update', 9, 4, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.** Waybill 2836747104**\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"14\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520498947\",\"reference\":\"\",\"date_started\":\"1520498947\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Backlog\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"date_started\":1520498947}}'),
(2011, 1520501822, 'task.update', 9, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - We need to get the Sun Sensor Test box back from YJ so we can send it to Germany to get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\\r\\n1. Henk to rovide test equipment for sw update\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520501822\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - We need to get the Sun Sensor Test box back from YJ so we can send it to Germany to get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\\r\\n1. Henk to rovide test equipment for sw update\"}}'),
(2012, 1520502792, 'task.update', 3, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\\r\\n1. Henk to rovide test equipment for sw update\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520502792\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\\r\\n1. Henk to rovide test equipment for sw update\"}}'),
(2013, 1520502855, 'task.update', 3, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520502855\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\"}}'),
(2014, 1520502901, 'task.assignee_change', 3, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"9\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520502901\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"Peter Schliwa\",\"assignee_name\":\"Peter Schliwa\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"9\"}}'),
(2015, 1520504576, 'task.update', 9, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00e4rg to arrage SW update of all testers and send them back to RDCN\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"10\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520504576\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"J\\u00f6rg HIrschfeld\",\"assignee_name\":\"J\\u00f6rg Hirschfeld\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00e4rg to arrage SW update of all testers and send them back to RDCN\\r\\n\",\"owner_id\":\"10\"}}'),
(2016, 1520506192, 'task.update', 9, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00f6rg to arrage SW update of all testers and send them back to RDCN\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"10\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520506192\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"J\\u00f6rg HIrschfeld\",\"assignee_name\":\"J\\u00f6rg Hirschfeld\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00f6rg to arrage SW update of all testers and send them back to RDCN\\r\\n\"}}'),
(2017, 1520506221, 'task.update', 9, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00f6rg to arrange SW update of all testers and send them back to RDCN\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"10\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520506221\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"J\\u00f6rg HIrschfeld\",\"assignee_name\":\"J\\u00f6rg Hirschfeld\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00f6rg to arrange SW update of all testers and send them back to RDCN\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2018, 1520506279, 'comment.create', 9, 4, 120, '{\"comment\":{\"id\":\"1\",\"task_id\":\"120\",\"user_id\":\"9\",\"date_creation\":\"1520506279\",\"date_modification\":\"1520506279\",\"comment\":\"Diese Aufgabe wurde per Mail an &quot;joerg.hirschfeld@rademacher.de&quot; mit dem Betreff &quot;Tester SW Update &quot; gesendet.\",\"reference\":\"\",\"username\":\"Peter Schliwa\",\"name\":\"Peter Schliwa\",\"email\":\"Peter.Schliwa@rademacher.de\",\"avatar_path\":null},\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00f6rg to arrange SW update of all testers and send them back to RDCN\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"15\",\"owner_id\":\"10\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520506221\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Ready\",\"assignee_username\":\"J\\u00f6rg HIrschfeld\",\"assignee_name\":\"J\\u00f6rg Hirschfeld\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2019, 1520511050, 'task.move.column', 1, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"9\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520511050\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Peter Schliwa\",\"assignee_name\":\"Peter Schliwa\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"15\",\"dst_column_id\":\"16\",\"date_moved\":\"1520496428\"},\"project_id\":\"4\",\"position\":1,\"column_id\":\"16\",\"swimlane_id\":\"4\",\"src_column_id\":\"15\",\"dst_column_id\":\"16\",\"date_moved\":\"1520496428\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2020, 1520511052, 'task.move.column', 1, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00f6rg to arrange SW update of all testers and send them back to RDCN\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"10\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520511052\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511052\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"J\\u00f6rg HIrschfeld\",\"assignee_name\":\"J\\u00f6rg Hirschfeld\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"15\",\"dst_column_id\":\"16\",\"date_moved\":\"1520496821\"},\"project_id\":\"4\",\"position\":2,\"column_id\":\"16\",\"swimlane_id\":\"4\",\"src_column_id\":\"15\",\"dst_column_id\":\"16\",\"date_moved\":\"1520496821\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2021, 1520511181, 'task.move.column', 2, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520511181\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"14\",\"dst_column_id\":\"16\",\"date_moved\":\"1509520133\"},\"project_id\":\"4\",\"position\":3,\"column_id\":\"16\",\"swimlane_id\":\"4\",\"src_column_id\":\"14\",\"dst_column_id\":\"16\",\"date_moved\":\"1509520133\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2022, 1520511185, 'task.move.column', 2, 4, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.** Waybill 2836747104**\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520511185\",\"reference\":\"\",\"date_started\":\"1520498947\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511185\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"14\",\"dst_column_id\":\"16\",\"date_moved\":\"1513074971\"},\"project_id\":\"4\",\"position\":4,\"column_id\":\"16\",\"swimlane_id\":\"4\",\"src_column_id\":\"14\",\"dst_column_id\":\"16\",\"date_moved\":\"1513074971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2023, 1520511204, 'task.update', 1, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"9\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520511204\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Peter Schliwa\",\"assignee_name\":\"Peter Schliwa\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"blue\"}}'),
(2024, 1520511214, 'task.update', 1, 4, 120, '{\"task_id\":\"120\",\"task\":{\"id\":\"120\",\"title\":\"Sun Sensor Testing Device\",\"description\":\"08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\\r\\n08.03.18 - J\\u00f6rg to arrange SW update of all testers and send them back to RDCN\\r\\n\",\"date_creation\":\"1520496821\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"10\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520511214\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511052\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"J\\u00f6rg HIrschfeld\",\"assignee_name\":\"J\\u00f6rg Hirschfeld\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"blue\"}}'),
(2025, 1520511228, 'task.update', 1, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520511228\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(2026, 1520511236, 'task.update', 1, 4, 96, '{\"task_id\":\"96\",\"task\":{\"id\":\"96\",\"title\":\"GGK 533-51-2 Zinc adaptor wear resistance\",\"description\":\"* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\\r\\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \\r\\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\\r\\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\\r\\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\\r\\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \\r\\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \\r\\nThanks for the pictures which shows the problem for us.\\r\\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\\r\\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\\r\\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\\r\\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\\r\\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you\\u2018ll find a corresponding PO from our side - 4500034620\\r\\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.** Waybill 2836747104**\\r\\n* 19.01.18 - Mail Henk: Dear Martin:\\r\\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513074971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520511236\",\"reference\":\"\",\"date_started\":\"1520498940\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511185\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"color_id\":\"green\",\"date_started\":1520498940}}'),
(2027, 1520512069, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520512069\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\"}}'),
(2028, 1520512259, 'task.update', 2, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520512259\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2029, 1520512414, 'task.update', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n* 08.03.18 - Mail Henk: The repaired 672 mould now is working on produce ,but seems also have little appearance problem on the products ,this is the best status we can .please see the status I point in attached pictures. Maybe we have to concession to accept for this urgent shipment date .otherwise , need 1 week to repair then produce again.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520512414\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700551\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n* 08.03.18 - Mail Henk: The repaired 672 mould now is working on produce ,but seems also have little appearance problem on the products ,this is the best status we can .please see the status I point in attached pictures. Maybe we have to concession to accept for this urgent shipment date .otherwise , need 1 week to repair then produce again.\\r\\n\\r\\n\\r\\n\"}}'),
(2030, 1520512436, 'task.file.create', 2, 2, 45, '{\"file\":{\"id\":\"371\",\"name\":\"\\u5fae\\u4fe1\\u56fe\\u7247_20180308154449.jpg\",\"path\":\"tasks\\/45\\/0b29073dac50115f792c0234913fb2c6f2e10527\",\"is_image\":\"1\",\"task_id\":\"45\",\"date\":\"1520512436\",\"user_id\":\"2\",\"size\":\"414428\"},\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n* 08.03.18 - Mail Henk: The repaired 672 mould now is working on produce ,but seems also have little appearance problem on the products ,this is the best status we can .please see the status I point in attached pictures. Maybe we have to concession to accept for this urgent shipment date .otherwise , need 1 week to repair then produce again.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520512414\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700551\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(2031, 1520512447, 'task.move.column', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n* 08.03.18 - Mail Henk: The repaired 672 mould now is working on produce ,but seems also have little appearance problem on the products ,this is the best status we can .please see the status I point in attached pictures. Maybe we have to concession to accept for this urgent shipment date .otherwise , need 1 week to repair then produce again.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520512447\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520512447\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"8\",\"dst_column_id\":\"7\",\"date_moved\":\"1516700551\"},\"project_id\":\"2\",\"position\":2,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"8\",\"dst_column_id\":\"7\",\"date_moved\":\"1516700551\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2032, 1520517246, 'task.update', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520517246\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\"}}'),
(2033, 1520522006, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"372\",\"name\":\"VO-01-900_AW_PCAS_Materialnumber_designation_index(03).dotx\",\"path\":\"tasks\\/90\\/1c91bfc639611091cd88e10cb48f759d8affc555\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1520522006\",\"user_id\":\"2\",\"size\":\"550331\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516275333\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2034, 1520522118, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520522118\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(2035, 1520527514, 'task.update', 2, 2, 88, '{\"task_id\":\"88\",\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n* 08.03.18 - the main problem of the cables is the not propper crimping of the crimp contact. We discussed in Rhede a standard (DIN) \\/ IPC. The supplier should add this to his spec respectively must say what his standard is\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520527514\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n* 08.03.18 - the main problem of the cables is the not propper crimping of the crimp contact. We discussed in Rhede a standard (DIN) \\/ IPC. The supplier should add this to his spec respectively must say what his standard is\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(2036, 1520527570, 'task.file.create', 2, 2, 88, '{\"file\":{\"id\":\"373\",\"name\":\"180308_Req_and_Acceptance_for_cable_and_wire_harness_assemblies-IPC_WHMA-A-620B.pdf\",\"path\":\"tasks\\/88\\/6ab13d1b3ef46b7cd41fc53c90aab9be7fb3fcbd\",\"is_image\":\"0\",\"task_id\":\"88\",\"date\":\"1520527570\",\"user_id\":\"2\",\"size\":\"8328629\"},\"task\":{\"id\":\"88\",\"title\":\"Inquiry for cables\",\"description\":\"* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don\\u2019t know.\\r\\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB\\/ton copper price\\r\\nthe cables according to drawing 752999904-08218 Revision C\\r\\nwe need in different lengths\\r\\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery\\u2019s 5RMB\\/each\\r\\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB\\/each\\r\\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB\\/each\\r\\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB\\/each\\r\\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\\r\\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\\r\\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\\r\\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \\r\\n12.000 pieces  YNK 2M0                          three delivery\\u2019s 6.5RMB\\/each\\r\\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\\r\\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\\r\\n* 22.12.17 - RD-CN has received the sample\\r\\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \\r\\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information \\u2013 similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour \\u2013 white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\\r\\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\\r\\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end \\u2013 dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\\r\\n* 24.01.18 - Mail Jens: in appendix you\\u2018ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\\r\\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\\r\\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\\r\\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory\\u2019s holiday is beginning , no possible to check the test procedures or test equipments.**\\r\\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\\r\\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\\r\\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it\\u2019s OK from our side.\\r\\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\\r\\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\\r\\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\\r\\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code \\u2013 RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later \\u2013 after the receipt of the updated drawing \\u2013 update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables \\u2013 for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  \\u2013 we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\\r\\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\\r\\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \\\"new\\\" REACH confirmation to give the release. Please send us asap the missing document.\\r\\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\\r\\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\\r\\n* 08.03.18 - the main problem of the cables is the not propper crimping of the crimp contact. We discussed in Rhede a standard (DIN) \\/ IPC. The supplier should add this to his spec respectively must say what his standard is\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1510826188\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"3\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520527514\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1510826188\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"}}'),
(2037, 1520587477, 'task.update', 9, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"1520866800\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"9\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520587477\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Peter Schliwa\",\"assignee_name\":\"Peter Schliwa\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"priority\":1,\"date_due\":1520866800}}'),
(2038, 1520588224, 'comment.create', 9, 4, 119, '{\"comment\":{\"id\":\"2\",\"task_id\":\"119\",\"user_id\":\"9\",\"date_creation\":\"1520588224\",\"date_modification\":\"1520588224\",\"comment\":\"Diese Aufgabe wurde per Mail an &quot;johannes.tepasse@rademacher.de&quot; mit dem Betreff &quot;LBW PCB Software Update \\/\\/ Bitte am Montag transferieren&quot; gesendet.\",\"reference\":\"\",\"username\":\"Peter Schliwa\",\"name\":\"Peter Schliwa\",\"email\":\"Peter.Schliwa@rademacher.de\",\"avatar_path\":null},\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"1520866800\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"9\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520587477\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Peter Schliwa\",\"assignee_name\":\"Peter Schliwa\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"}}'),
(2039, 1520595377, 'task.update', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520595377\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2040, 1520826720, 'task.update', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520826720\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\"}}'),
(2041, 1520826726, 'task.close', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"1520826726\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"0\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520826726\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(2042, 1520826771, 'task.assignee_change', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"1520826726\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"5\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520826771\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"5\"}}'),
(2043, 1520826834, 'task.update', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"1520826726\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"5\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520826834\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"priority\":1}}'),
(2044, 1520826846, 'task.open', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"5\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520826846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2045, 1520826862, 'task.move.column', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520826862\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520826862\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1520424612\"},\"project_id\":\"2\",\"position\":4,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1520424612\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2046, 1520826873, 'task.close', 3, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"1520826873\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520826873\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520826862\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(2047, 1520861039, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 12.03.18 - Mail Henk: Dear Sally, In last week meeting ,Ralf note will check the spring washer with you for clean the stock.\\r\\n* 28.02.18 - Andreas:these new Spring washers are okay ; We will talk next week about the next step; \\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520861039\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 12.03.18 - Mail Henk: Dear Sally, In last week meeting ,Ralf note will check the spring washer with you for clean the stock.\\r\\n* 28.02.18 - Andreas:these new Spring washers are okay ; We will talk next week about the next step; \\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2048, 1520861048, 'task.assignee_change', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 12.03.18 - Mail Henk: Dear Sally, In last week meeting ,Ralf note will check the spring washer with you for clean the stock.\\r\\n* 28.02.18 - Andreas:these new Spring washers are okay ; We will talk next week about the next step; \\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"8\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520861048\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ralf Kern\",\"assignee_name\":\"Ralf Kern\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"8\"}}'),
(2049, 1520861474, 'task.open', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520861474\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520826862\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"}}'),
(2050, 1520861478, 'task.update', 9, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\\r\\n12.03.18 - SW has been sent to Ben vai email\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"1520866800\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520861478\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\\r\\n12.03.18 - SW has been sent to Ben vai email\",\"owner_id\":\"1\"}}'),
(2051, 1520861495, 'task.move.column', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"5\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520861495\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520861495\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"8\",\"dst_column_id\":\"7\",\"date_moved\":\"1520826862\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"7\",\"swimlane_id\":\"2\",\"src_column_id\":\"8\",\"dst_column_id\":\"7\",\"date_moved\":\"1520826862\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2052, 1520861607, 'task.move.column', 2, 2, 57, '{\"task_id\":\"57\",\"task\":{\"id\":\"57\",\"title\":\"#10\\/2017 30Nm 40Nm 50Nm 1 stage planetary changed already\",\"description\":\"\\r\\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\\r\\nAttached copy signed back.\\r\\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\\r\\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\\r\\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\\r\\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \\r\\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm\\/40Nm\\/50Nm motors. \\r\\nAttached test record for your reference.can we close this topic? \\r\\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\\r\\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\\r\\nAttached cycle test record and the 1st gear status pictures for your reference.\\r\\nI will update another 40Nm test record once I got \\r\\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we \\u00b4ll try to find the problem\\r\\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \\r\\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\\r\\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\\r\\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\\r\\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing \\u2026will forward the test result to you once I got\\r\\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya\\u2019s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn\\u2019t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\\r\\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\\r\\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples\\u2019 color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\\r\\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02\\/-0.05),the old gears\\u2019 base tangent length are out of tolerance .\\r\\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \\\"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\\\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\\r\\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\\r\\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck\\u2026\\u2026 Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\\r\\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02\\/-0,05), value remain the same after measurement. Henk can double verify this.\\r\\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\\r\\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N\\/40N\\/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\\r\\n\",\"date_creation\":\"1509521771\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520861607\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1520861607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1520861495\"},\"project_id\":\"2\",\"position\":4,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1520861495\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2053, 1520861735, 'task.update', 2, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"\\r\\n* 08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\\r\\n* 12.03.18 - SW has been sent to Ben vai email\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"1520866800\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520861735\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\\r\\n* 12.03.18 - SW has been sent to Ben vai email\"}}'),
(2054, 1520926495, 'task.update', 1, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520926495\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2055, 1520929372, 'task.update', 1, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520929372\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\"}}'),
(2056, 1520931654, 'task.file.create', 1, 1, 90, '{\"file\":{\"id\":\"374\",\"name\":\"Box Change Request (Iss 1.0).docx\",\"path\":\"tasks\\/90\\/58c75f9e57c736bdf20029b30df00b1d5230075f\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1520931654\",\"user_id\":\"1\",\"size\":\"1404737\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520929372\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(2057, 1520931698, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520931698\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\"}}'),
(2058, 1520931710, 'task.file.create', 1, 1, 39, '{\"file\":{\"id\":\"375\",\"name\":\"UBW Master_Carton_Analysis.pdf\",\"path\":\"tasks\\/39\\/efb693e454df190b891d32edae52294f04c59e5a\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1520931710\",\"user_id\":\"1\",\"size\":\"51589\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520931698\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2059, 1520931710, 'task.file.create', 1, 1, 39, '{\"file\":{\"id\":\"376\",\"name\":\"UBW Pallet_Analysis.pdf\",\"path\":\"tasks\\/39\\/a8cd058abe1008d951ee2675858e5073d3da7396\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1520931710\",\"user_id\":\"1\",\"size\":\"63250\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520931698\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2060, 1520933128, 'task.close', 1, 1, 30, '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":\"1520933128\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520933128\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520329581\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(2061, 1520933141, 'task.close', 1, 1, 93, '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":\"1520933141\",\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520933141\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517470138\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2062, 1520933619, 'task.update', 2, 1, 115, '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \\r\\n* 13.03.18 - Shinya has sent the PI with ETD cw36\\/2018\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520933619\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \\r\\n* 13.03.18 - Shinya has sent the PI with ETD cw36\\/2018\"}}'),
(2063, 1520933749, 'task.update', 2, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520933749\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\"}}'),
(2064, 1520934329, 'task.update', 2, 1, 117, '{\"task_id\":\"117\",\"task\":{\"id\":\"117\",\"title\":\"HP2 order #18 (black colour box) - 4500035339 \",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw30\\/2018 and 2nd batch cw35\\/2018\",\"date_creation\":\"1520426460\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520934328\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw30\\/2018 and 2nd batch cw35\\/2018\"}}'),
(2065, 1520934396, 'task.update', 2, 1, 118, '{\"task_id\":\"118\",\"task\":{\"id\":\"118\",\"title\":\"HP2 order #19 (white colour box) - 4500035601\",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw29\\/2018 and 2nd batch cw32\\/2018\",\"date_creation\":\"1520426810\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520934396\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw29\\/2018 and 2nd batch cw32\\/2018\"}}'),
(2066, 1520934444, 'task.create', 1, 1, 121, '{\"task_id\":121,\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.02.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n* LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n* HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n* UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"24\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934444\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2067, 1520934454, 'task.update', 1, 1, 121, '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.02.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n* LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n* HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n* UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"24\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934454\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(2068, 1520934518, 'task.update', 1, 1, 100, '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 13.03.18 - There seems to be a little confusion regarding this and we forget to inform Ralf in Germany. Who shall talk to him?\\r\\n* 12.02.18 - Andreas : How much does it cost? And doe you inform Ralf about the costs?\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 22.12.2017 - Andreas : Who is the stand ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1520934518\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 13.03.18 - There seems to be a little confusion regarding this and we forget to inform Ralf in Germany. Who shall talk to him?\\r\\n* 12.02.18 - Andreas : How much does it cost? And doe you inform Ralf about the costs?\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 22.12.2017 - Andreas : Who is the stand ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"owner_id\":\"5\"}}'),
(2069, 1520934533, 'task.move.column', 1, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #14\\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934533\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934533\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1506041463\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2070, 1520934537, 'task.move.column', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934537\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934537\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1506041466\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2071, 1520934550, 'task.close', 1, 1, 18, '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #14\\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":\"1520934550\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934550\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934533\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(2072, 1520934610, 'task.update', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934610\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934537\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\"}}'),
(2073, 1520934821, 'task.update', 1, 1, 41, '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\\r\\n* 09.01.18 - The first trial of the RD35 tooling has been done. There are several problems with Burrs and Flashing. They will repair the tool and do another trial on 25.01.18.\\r\\n* 13.03.18 - RX will have finished repairing the mould on Friday (16.03.18). Then they will test the mould again next week.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934821\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\\r\\n* 09.01.18 - The first trial of the RD35 tooling has been done. There are several problems with Burrs and Flashing. They will repair the tool and do another trial on 25.01.18.\\r\\n* 13.03.18 - RX will have finished repairing the mould on Friday (16.03.18). Then they will test the mould again next week.\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2074, 1520934866, 'task.update', 1, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\\r\\n* 20.12.17 - Peter has asked me to hold. If we can secure the relays for the next year then there is no need to do this.\\r\\n* 13.03.18 - Relays are secure so we can close this topic.\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520934866\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\\r\\n* 20.12.17 - Peter has asked me to hold. If we can secure the relays for the next year then there is no need to do this.\\r\\n* 13.03.18 - Relays are secure so we can close this topic.\"}}'),
(2075, 1520934875, 'task.move.column', 1, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\\r\\n* 20.12.17 - Peter has asked me to hold. If we can secure the relays for the next year then there is no need to do this.\\r\\n* 13.03.18 - Relays are secure so we can close this topic.\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520934875\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934875\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1509446403\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2076, 1520934894, 'task.update', 1, 1, 121, '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.02.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"21\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520934894\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.02.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\"}}'),
(2077, 1520935047, 'task.update', 1, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520935047\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\"}}'),
(2078, 1520935118, 'task.update', 1, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n* 13.03.18 - eMMC has all arrived and is in our factory. I will start another topic to track the quantities.\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520935118\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n* 13.03.18 - eMMC has all arrived and is in our factory. I will start another topic to track the quantities.\"}}'),
(2079, 1520935127, 'task.move.column', 1, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n* 13.03.18 - eMMC has all arrived and is in our factory. I will start another topic to track the quantities.\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520935127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520935127\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1513340326\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2080, 1520935289, 'task.create', 1, 1, 122, '{\"task_id\":122,\"task\":{\"id\":\"122\",\"title\":\"eMMC Stock Tracking\",\"description\":\"I will update this regularly so we can keep track of our eMMC stock. The HP3 must be ready before we run out or we need to upgrade to the new eMMC!\\r\\n* 13.03.18 - We currently have Order #16, #17, #18 & #19. From these three orders we have already used 3,000 units of our stock. So after taking away the outstanding orders from our stock we have 7,000 Units of eMMC in stock.\",\"date_creation\":\"1520935289\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520935289\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520935289\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(2081, 1520935302, 'task.update', 1, 1, 122, '{\"task_id\":\"122\",\"task\":{\"id\":\"122\",\"title\":\"eMMC Stock Tracking\",\"description\":\"I will update this regularly so we can keep track of our eMMC stock. The HP3 must be ready before we run out or we need to upgrade to the new eMMC!\\r\\n* 13.03.18 - We currently have Order #16, #17, #18 & #19. From these three orders we have already used 3,000 units of our stock. So after taking away the outstanding orders from our stock we have 7,000 Units of eMMC in stock.\",\"date_creation\":\"1520935289\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520935302\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520935289\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"color_id\":\"grey\",\"owner_id\":\"1\"}}'),
(2082, 1520935311, 'task.move.position', 1, 1, 122, '{\"task_id\":\"122\",\"task\":{\"id\":\"122\",\"title\":\"eMMC Stock Tracking\",\"description\":\"I will update this regularly so we can keep track of our eMMC stock. The HP3 must be ready before we run out or we need to upgrade to the new eMMC!\\r\\n* 13.03.18 - We currently have Order #16, #17, #18 & #19. From these three orders we have already used 3,000 units of our stock. So after taking away the outstanding orders from our stock we have 7,000 Units of eMMC in stock.\",\"date_creation\":\"1520935289\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520935302\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520935289\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"2\",\"dst_column_id\":\"2\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"2\",\"dst_column_id\":\"2\",\"date_moved\":\"1520935289\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2083, 1520935377, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n* 13.03.18 - This project has been stopped and will be reviewed again in 2019.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520935377\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516232922\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n* 13.03.18 - This project has been stopped and will be reviewed again in 2019.\\r\\n\",\"owner_id\":\"0\"}}'),
(2084, 1520935409, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n* 13.03.18 - This project has been stopped and will be reviewed again in 2019.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"brown\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520935409\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516232922\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"color_id\":\"brown\"}}'),
(2085, 1520935427, 'task.update', 1, 1, 60, '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW (Check in 2019)\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n* 13.03.18 - This project has been stopped and will be reviewed again in 2019.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"brown\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520935427\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516232922\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"UBW (Check in 2019)\"}}'),
(2086, 1520935452, 'task.update', 1, 1, 122, '{\"task_id\":\"122\",\"task\":{\"id\":\"122\",\"title\":\"eMMC Stock Tracking (7,000)\",\"description\":\"I will update this regularly so we can keep track of our eMMC stock. The HP3 must be ready before we run out or we need to upgrade to the new eMMC!\\r\\n* 13.03.18 - We currently have Order #16, #17, #18 & #19. From these three orders we have already used 3,000 units of our stock. So after taking away the outstanding orders from our stock we have 7,000 Units of eMMC in stock.\",\"date_creation\":\"1520935289\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520935452\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520935289\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"eMMC Stock Tracking (7,000)\"}}'),
(2087, 1520936504, 'task.update', 2, 1, 121, '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520936504\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\"}}'),
(2088, 1520936875, 'task.assignee_change', 2, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1520936875\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"owner_id\":\"6\"}}'),
(2089, 1520983786, 'task.update', 1, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"\\r\\n* 08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\\r\\n* 12.03.18 - SW has been sent to Ben vai email\\r\\n* 14.03.18 - Software has been received. As mentioned by email we have already got our PCB\'s for Order #27, so we will look at doing a trial of this software update for Order #28.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"1520866800\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520983786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\\r\\n* 12.03.18 - SW has been sent to Ben vai email\\r\\n* 14.03.18 - Software has been received. As mentioned by email we have already got our PCB\'s for Order #27, so we will look at doing a trial of this software update for Order #28.\"}}'),
(2090, 1520983879, 'task.update', 1, 4, 119, '{\"task_id\":\"119\",\"task\":{\"id\":\"119\",\"title\":\"LBW PCB Software Update\",\"description\":\"\\r\\n* 08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\\r\\n* 12.03.18 - SW has been sent to Ben vai email\\r\\n* 14.03.18 - Software has been received. As mentioned by email we have already got our PCB\'s for Order #27, so we will look at doing a trial of this software update for Order #28.\",\"date_creation\":\"1520496428\",\"date_completed\":null,\"date_due\":\"1523232000\",\"color_id\":\"blue\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520983879\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511050\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"priority\":0,\"date_due\":1523232000}}'),
(2091, 1521011440, 'task.update', 2, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1521011440\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n\"}}'),
(2092, 1521015071, 'task.update', 2, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n* 14.03.18 - Quantity increased from 200 pcs to 300 pcs\\r\\n\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1521015071\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n* 14.03.18 - Quantity increased from 200 pcs to 300 pcs\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2093, 1521034937, 'task.update', 6, 2, 94, '{\"task_id\":\"94\",\"task\":{\"id\":\"94\",\"title\":\"Dooya #10 - claim - HE1015 - RPM issue\",\"description\":\"* 14.03.18-Mail Henk:The pending 1pc defective HE1015 motor which I get from Rademacher ,it fail the lift test by Dooya factory. This one have the same test result between RD-D and Dooya. Dooya factory will check it and keep the update to us .* 28.02.18-Andreas:no problems of the last delivery,we\'ll look at the problem together here in Germany next week\\r\\n* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\",\"date_creation\":\"1512643247\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521034937\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512643247\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.03.18-Mail Henk:The pending 1pc defective HE1015 motor which I get from Rademacher ,it fail the lift test by Dooya factory. This one have the same test result between RD-D and Dooya. Dooya factory will check it and keep the update to us .* 28.02.18-Andreas:no problems of the last delivery,we\'ll look at the problem together here in Germany next week\\r\\n* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\\r\\n\\r\\n* 12.02.18 - Andreas : Information ! We \\u00b4ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we \\u00b4ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\\r\\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya\\u2019s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\\r\\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the \\u201cnot good\\u201d motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\\r\\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \\r\\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\\r\\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\\r\\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\\r\\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn\\u2019t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \\r\\nWe will forward the test result to you after we finished 2pcs another motors .\\r\\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \\r\\n* 22.01.18-Henk: so we can close this topic ?\\r\\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\\r\\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\\r\\nSo we suspect the root cause could be:\\r\\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\\r\\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\\r\\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\\r\\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \\r\\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \\r\\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\\r\\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\\r\\n* 28.12.17\\uff1aHenk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\\r\\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \\r\\n* 21.12.17 - Video Uploaded: http:\\/\\/benhulme.net\\/files\\/files\\/MVI_0929.MOV\\r\\n* 21.12.17-Mail Henk:\\r\\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\\r\\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\\r\\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \\r\\nBy the way ,could you advise the temperture of the test environment?\\r\\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 \\u2013 20cm high.\\r\\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\\r\\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\\r\\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\\r\\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\\r\\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\\r\\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\\r\\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 \\u2013 10 rpm. Now we decided to control all 2\\u00b4016 motors. That\'s a huge amount. More information will follow if we have everything checked.\\r\\n\\r\\n\"}}'),
(2094, 1521035390, 'task.update', 6, 2, 108, '{\"task_id\":\"108\",\"task\":{\"id\":\"108\",\"title\":\"Dooya - TM10 - mechanical claim to limitswitch ring\",\"description\":\"* 14.03.18-mail Henk:As last week analysis ,the grease more or less will influence the limitswitch turn smooth or roughly . Dooya factory will test and control  grease quantity how many it can get the limitswitch ring turn smooth ,this need a period of time can get the result .they will keep the update to us once they have the result .\\r\\n* 07.03.18 - Sally: Hi All, I hear nothing after all, how does thing going? @Henk, could you keep us CC in the loop?\\r\\n* 01.03.18-Henk: Please see attached mail ,hope they can help for you understand the limit switch ring status.\\r\\n* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\",\"date_creation\":\"1516700838\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521035390\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1516700838\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.03.18-mail Henk:As last week analysis ,the grease more or less will influence the limitswitch turn smooth or roughly . Dooya factory will test and control  grease quantity how many it can get the limitswitch ring turn smooth ,this need a period of time can get the result .they will keep the update to us once they have the result .\\r\\n* 07.03.18 - Sally: Hi All, I hear nothing after all, how does thing going? @Henk, could you keep us CC in the loop?\\r\\n* 01.03.18-Henk: Please see attached mail ,hope they can help for you understand the limit switch ring status.\\r\\n* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \\r\\n* 31.01.18 - Mail Henk: The \\\"unknow\\\"drawing(12.7+\\/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\\r\\n* 31.01.18 - Mail Martin: Ok. I understand.\\r\\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\\r\\nAnd why there are two different geare-wheels.\\r\\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\\r\\n* 31.01.18 - Mail Martin: We note this and I think we don\\u00b4t need any samples.\\r\\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\\r\\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components\\u2019 dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can\\u2019t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\\r\\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\\r\\n* 23.01.18 - Mail Jens: Dear Henk, we\\u2019ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\\r\\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\\r\\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\\r\\n\"}}'),
(2095, 1521035461, 'task.update', 6, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521035461\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(2096, 1521083927, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521083927\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2097, 1521083940, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521083940\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(2098, 1521084313, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521084313\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\"}}'),
(2099, 1521100882, 'task.update', 1, 1, 122, '{\"task_id\":\"122\",\"task\":{\"id\":\"122\",\"title\":\"eMMC Stock Tracking (7,000)\",\"description\":\"I will update this regularly so we can keep track of our eMMC stock. The HP3 must be ready before we run out or we need to upgrade to the new eMMC!\\r\\n* 13.03.18 - We currently have Order #16, #17, #18 & #19. From these three orders we have already used 3,000 units of our stock. So after taking away the outstanding orders from our stock we have 7,000 Units of eMMC in stock.\\r\\n* 15.03.18 - Payment deductions of 29.90RMB will happen from Order #20.\",\"date_creation\":\"1520935289\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521100882\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520935289\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"I will update this regularly so we can keep track of our eMMC stock. The HP3 must be ready before we run out or we need to upgrade to the new eMMC!\\r\\n* 13.03.18 - We currently have Order #16, #17, #18 & #19. From these three orders we have already used 3,000 units of our stock. So after taking away the outstanding orders from our stock we have 7,000 Units of eMMC in stock.\\r\\n* 15.03.18 - Payment deductions of 29.90RMB will happen from Order #20.\"}}'),
(2100, 1521101303, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521101303\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\"}}'),
(2101, 1521118908, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521118907\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2102, 1521118933, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521118933\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\"}}'),
(2103, 1521118981, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521118981\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\"}}'),
(2104, 1521161918, 'task.update', 1, 1, 121, '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521161918\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\"}}'),
(2105, 1521188978, 'task.update', 2, 1, 107, '{\"task_id\":\"107\",\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\"}}'),
(2106, 1521189052, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"377\",\"name\":\"171-001 c.pdf\",\"path\":\"tasks\\/107\\/b40f6d3ac075d906b83a17387d9195ac2f1d904a\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189052\",\"user_id\":\"2\",\"size\":\"52658\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2107, 1521189052, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"378\",\"name\":\"171-002a.PDF\",\"path\":\"tasks\\/107\\/12df44d032ce39de92c2df3304b69d5b8005e4b0\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189052\",\"user_id\":\"2\",\"size\":\"37352\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2108, 1521189053, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"379\",\"name\":\"171-003d.pdf\",\"path\":\"tasks\\/107\\/147f96d21310689f841ae0326ee4306a4913cbcc\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"34998\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2109, 1521189053, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"380\",\"name\":\"171-005h.pdf\",\"path\":\"tasks\\/107\\/e731ccef1b60e2a2fe5fe4c3cb3494022339373d\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"43758\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2110, 1521189053, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"381\",\"name\":\"171-006a.PDF\",\"path\":\"tasks\\/107\\/6b11f28b561093742cd8c82a794d82e5659ddb0d\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"51178\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2111, 1521189053, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"382\",\"name\":\"171-019.pdf\",\"path\":\"tasks\\/107\\/886e45ac19bbad916313009f60a1362571a88fcd\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"36080\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2112, 1521189053, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"383\",\"name\":\"580-054f.pdf\",\"path\":\"tasks\\/107\\/3380584fe0ee8570977c48f7eb3689d7e4f8d648\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"53493\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2113, 1521189053, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"384\",\"name\":\"2018_03_07 Transfer Hofmann-SX-MHI.XLSX\",\"path\":\"tasks\\/107\\/0a027b1ce0a6f47f738a4333bcdb764de702c48d\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"21252\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2114, 1521189053, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"385\",\"name\":\"AMBIENT_LIGHT_SENSOR.pdf\",\"path\":\"tasks\\/107\\/f2dc0584c7eabfd5a3b9fbb137ec20451aec5669\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"27062\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2115, 1521189054, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"386\",\"name\":\"NJL7302L-F3_NJL7302L-F5_E.PDF\",\"path\":\"tasks\\/107\\/086bbb820c2427f6ae8b9cfa26c2611025e5d4dc\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189054\",\"user_id\":\"2\",\"size\":\"514373\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2116, 1521189248, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"387\",\"name\":\"180207_Datenblatt_Leoni_OLW_3700_84A001HOS999_EN_20180316083336.270_X.pdf\",\"path\":\"tasks\\/107\\/b2a4bbc816eb1837f451827fe68ea4208038e3d8\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189248\",\"user_id\":\"2\",\"size\":\"72416\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2117, 1521189442, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"388\",\"name\":\"sun-sensor.JPG\",\"path\":\"tasks\\/107\\/6bdeec2d51271429a62fb7af69c5e2762ae4f4ea\",\"is_image\":\"1\",\"task_id\":\"107\",\"date\":\"1521189442\",\"user_id\":\"2\",\"size\":\"11673\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2118, 1521189526, 'task.file.create', 2, 1, 107, '{\"file\":{\"id\":\"389\",\"name\":\"2018_03_07 Transfer Hofmann-SX-MHI.XLSX\",\"path\":\"tasks\\/107\\/cd0ed7270e897b8981c28ba1505ce859defdaff3\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189526\",\"user_id\":\"2\",\"size\":\"21252\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2119, 1521189635, 'task.update', 2, 1, 106, '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189635\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(2120, 1521189647, 'task.update', 2, 1, 106, '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189647\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(2121, 1521189660, 'task.update', 2, 1, 106, '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189660\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(2122, 1521189697, 'task.update', 2, 1, 106, '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(2123, 1521189711, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"390\",\"name\":\"171-001 c.pdf\",\"path\":\"tasks\\/106\\/e982efd8f31211cf7237e4c4c4884cbcd2c078d8\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"52658\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2124, 1521189711, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"391\",\"name\":\"171-002a.PDF\",\"path\":\"tasks\\/106\\/287af2a87c8d6cb4267025d9c1445e09506370b4\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"37352\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2125, 1521189711, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"392\",\"name\":\"171-003d.pdf\",\"path\":\"tasks\\/106\\/06fbd2c9eea1f922e6bcc0b06b72ad7a178c285c\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"34998\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2126, 1521189711, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"393\",\"name\":\"171-019.pdf\",\"path\":\"tasks\\/106\\/ee598af2cee38cc418f68c6a4a69ba1ef19a1e80\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"36080\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2127, 1521189711, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"394\",\"name\":\"2018_03_07 Transfer Hofmann-SX-MHI.XLSX\",\"path\":\"tasks\\/106\\/b5a10962389871832be72157321af72d8feec1ba\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"21252\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2128, 1521189712, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"395\",\"name\":\"AMBIENT_LIGHT_SENSOR.pdf\",\"path\":\"tasks\\/106\\/e3b14ea6149cabd7e4c7a2ffcfcd1d70b0067ad4\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189712\",\"user_id\":\"2\",\"size\":\"27062\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2129, 1521189712, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"396\",\"name\":\"NJL7302L-F3_NJL7302L-F5_E.PDF\",\"path\":\"tasks\\/106\\/c3b664db52aea2b9e6e65b7e04013908f9eeb4c5\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189712\",\"user_id\":\"2\",\"size\":\"514373\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2130, 1521189774, 'task.update', 2, 1, 106, '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189774\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(2131, 1521189809, 'task.update', 2, 1, 107, '{\"task_id\":\"107\",\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. We will send you asap 50 pcs samples of the single components\\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189809\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. We will send you asap 50 pcs samples of the single components\\r\\n\\r\\n\"}}'),
(2132, 1521189911, 'task.file.create', 2, 1, 106, '{\"file\":{\"id\":\"397\",\"name\":\"light_sensor.JPG\",\"path\":\"tasks\\/106\\/32697c448e429ed38ab7e5098a2a379c481de2b8\",\"is_image\":\"1\",\"task_id\":\"106\",\"date\":\"1521189911\",\"user_id\":\"2\",\"size\":\"13173\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189774\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2133, 1521189974, 'task.assignee_change', 2, 1, 106, '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189974\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(2134, 1521189987, 'task.assignee_change', 2, 1, 107, '{\"task_id\":\"107\",\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. We will send you asap 50 pcs samples of the single components\\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189987\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2135, 1521190728, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521190728\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\"}}'),
(2136, 1521190763, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521190763\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\"}}'),
(2137, 1521190793, 'task.file.create', 2, 1, 39, '{\"file\":{\"id\":\"398\",\"name\":\"18-03-15_Auswertung_Forecast motor-gearbox-unit_10A 534-1(2).xlsx\",\"path\":\"tasks\\/39\\/915622f58a4995528e80bacc012643cf57d80f31\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1521190793\",\"user_id\":\"2\",\"size\":\"130786\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521190763\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2138, 1521205490, 'task.update', 2, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n* 16.03.18 - Mail Ben: Thanks for this everything is much clearer now. We are going to place the orders for the entire year based on your forecast. Please can you confirm that we can do this, once the orders are placed we can play around with the dates a little but not by much. I don\\u2019t need you guys to send the orders through yet for the whole year.\\r\\n\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521205490\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n* 16.03.18 - Mail Ben: Thanks for this everything is much clearer now. We are going to place the orders for the entire year based on your forecast. Please can you confirm that we can do this, once the orders are placed we can play around with the dates a little but not by much. I don\\u2019t need you guys to send the orders through yet for the whole year.\\r\\n\\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2139, 1521443918, 'task.update', 1, 1, 39, '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n* 16.03.18 - Mail Ben: Thanks for this everything is much clearer now. We are going to place the orders for the entire year based on your forecast. Please can you confirm that we can do this, once the orders are placed we can play around with the dates a little but not by much. I don\\u2019t need you guys to send the orders through yet for the whole year.\\r\\n* 19.03.18 - We are still waiting on the releases for the Worm and UBW Motor Gearbox from Andreas.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521443918\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n* 16.03.18 - Mail Ben: Thanks for this everything is much clearer now. We are going to place the orders for the entire year based on your forecast. Please can you confirm that we can do this, once the orders are placed we can play around with the dates a little but not by much. I don\\u2019t need you guys to send the orders through yet for the whole year.\\r\\n* 19.03.18 - We are still waiting on the releases for the Worm and UBW Motor Gearbox from Andreas.\\r\\n\",\"owner_id\":\"5\"}}'),
(2140, 1521449081, 'task.update', 6, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521449080\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(2141, 1521449136, 'task.update', 6, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521449136\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(2142, 1521449191, 'task.update', 6, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 16.03.18-mail Henk:Hi Henk,Thank you very much for the detail, now understood. Seem to me is the comprehensive operation training is missing. \\r\\n\\r\\nStill we hope you can get the 8D from Dooya, there is never worker\'s fault but should be the company\'s quality control loophole.\\r\\n \\r\\n* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521449191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 16.03.18-mail Henk:Hi Henk,Thank you very much for the detail, now understood. Seem to me is the comprehensive operation training is missing. \\r\\n\\r\\nStill we hope you can get the 8D from Dooya, there is never worker\'s fault but should be the company\'s quality control loophole.\\r\\n \\r\\n* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(2143, 1521449430, 'task.file.create', 6, 2, 111, '{\"file\":{\"id\":\"399\",\"name\":\"\\u65b0\\u5efa Microsoft Office Word \\u6587\\u6863.docx\",\"path\":\"tasks\\/111\\/781b87246661118ce35e7042898ce797486b2c37\",\"is_image\":\"0\",\"task_id\":\"111\",\"date\":\"1521449429\",\"user_id\":\"6\",\"size\":\"729465\"},\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 16.03.18-mail Henk:Hi Henk,Thank you very much for the detail, now understood. Seem to me is the comprehensive operation training is missing. \\r\\n\\r\\nStill we hope you can get the 8D from Dooya, there is never worker\'s fault but should be the company\'s quality control loophole.\\r\\n \\r\\n* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521449191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2144, 1521543375, 'task.update', 2, 2, 92, '{\"task_id\":\"92\",\"task\":{\"id\":\"92\",\"title\":\"bracket spring washer 539-096d tolerance alteration\",\"description\":\"\\r\\n* 19.03.18 - Mail Sally: We update old spring stock qty after checking with supplier today, good or bad. See below. The good is we actually only have 15650pcs old spring and 1830pcs small bracket mounted with old spring(94401505) BEFORE #4500034980.........the stock info from December said we have 90K+ stock is WRONG. So after #4500034980, we only have 2650pcs old spring and 830pcs small bracket mounted with old spring(94401505) left, which could be MUCH BETTER situation. The bad is we are really sorry wasting much of your time and effort on the discussion onto the wrong severity level. **We are now checking with supplier if it is possible to produce 1K~2K big bracket(94401504) in #4500034980 with new spring as pilot batch, we will come back later.**\\r\\n* 12.03.18 - Mail Henk: Dear Sally, In last week meeting ,Ralf note will check the spring washer with you for clean the stock.\\r\\n* 28.02.18 - Andreas:these new Spring washers are okay ; We will talk next week about the next step; \\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512210650\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"8\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1521543375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1512210650\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"3\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ralf Kern\",\"assignee_name\":\"Ralf Kern\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 19.03.18 - Mail Sally: We update old spring stock qty after checking with supplier today, good or bad. See below. The good is we actually only have 15650pcs old spring and 1830pcs small bracket mounted with old spring(94401505) BEFORE #4500034980.........the stock info from December said we have 90K+ stock is WRONG. So after #4500034980, we only have 2650pcs old spring and 830pcs small bracket mounted with old spring(94401505) left, which could be MUCH BETTER situation. The bad is we are really sorry wasting much of your time and effort on the discussion onto the wrong severity level. **We are now checking with supplier if it is possible to produce 1K~2K big bracket(94401504) in #4500034980 with new spring as pilot batch, we will come back later.**\\r\\n* 12.03.18 - Mail Henk: Dear Sally, In last week meeting ,Ralf note will check the spring washer with you for clean the stock.\\r\\n* 28.02.18 - Andreas:these new Spring washers are okay ; We will talk next week about the next step; \\r\\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \\r\\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\\r\\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \\r\\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\\r\\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can\\u00b4t tell you anything on the subject.\\r\\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information \\uf04aI think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\\r\\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\\r\\n* 23.01.18-Henk mail:Dear Andreas:\\r\\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally\\u2019s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer\\u2019s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven\\u2019t gotten ,I think if we got ,now need not to review these.\\r\\nI know martin hold the last order products in Nov.2017 ,but this can\\u2019t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\\r\\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally\\u2019s Saturday mail .\\r\\n\\r\\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \\r\\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +\\/- 0,5.But history is history, let\'s\\r\\nA)use up the stock \\r\\nB)we have to pay for the spring stock value at supplier\'s cost\\r\\nand from fresh batch we make the product according to drawing. Is that OK?\\r\\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\\r\\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +\\/- 0,5, so drawing and product are compliant.\\r\\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\\r\\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\\r\\nWe will tackle the topic now and try to clarify the final.\\r\\nI expect your full support for this.\\r\\nI have not said that the stock has to be scrapped.\\r\\nI said it will be hard to use.\\r\\nI will not accept to take \\\"new produced\\\" spring washer that do not correspond 100% to the drawings of our R & D.\\r\\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\\r\\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\\r\\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\\r\\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\\r\\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it\\u2019s very passive when we check with Supplier .they mentioned  it\\u2019s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\\r\\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\\r\\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\\r\\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\\r\\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\\r\\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \\r\\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \\r\\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I\\u00b4ll meet R&D to claryfy next week\\r\\n* 03.01.18-Henk Mail:\\r\\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\\r\\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can\\u2019t both meet unmount and assembly .\\r\\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\\r\\n* 02.1.2018 - Andreas: \\r\\nMail I have a big problem with your information to the spring washer.\\r\\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos\\u00b4s\\r\\n* 02.01.2018- Andreas: the sampels arrive ; i\\u00b4ve uplode two video\\u00b4s were you can see the real problem; the real problem is the mountining not the noise ;\\r\\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\\r\\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\\r\\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm\\u00b10.3 to 42.5mm\\u00b10.5 and change the 65mm\\u00b10.3 to 66mm\\u00b11 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\\r\\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \\r\\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +\\/- 0,5**. Please consider.\\r\\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\\r\\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm\\u00b10.3 seems is unreasonable .\\r\\nI use the spring GGK539-96 that is out dimension 43.5mm\\u00b10.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm\\u00b10.3, I think dimension 42.1mm~42.9mm seems better.\\r\\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don\\u2019t want to the spring is shaking and no noise after fitting .(please see attached mail).\\r\\nAbout the other dimension 65mm\\u00b10.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\\r\\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\\r\\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\\r\\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\\r\\n* 19.06.17 - Martin: we\\u00b4ll discuss this issue intern in the next days.\\r\\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +\\/- 0,5.**\\r\\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\\r\\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it\\u2019s ok, also please help check these three reports for details, many thanks! \\r\\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +\\/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\\r\\n* 20.03.17 - Martin: ok\\r\\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +\\/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +\\/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this \\u2013hope change the tolerance to  42,5 +\\/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \\r\\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\\r\\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(2145, 1521616833, 'task.update', 2, 1, 113, '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \\r\\n* 21.03.18 - Mail Ben: This won\\u2019t be a problem. Can you please resend us the order?\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521616833\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \\r\\n* 21.03.18 - Mail Ben: This won\\u2019t be a problem. Can you please resend us the order?\"}}'),
(2146, 1521622918, 'task.close', 1, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"1521622918\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521622918\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934537\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(2147, 1521622926, 'task.close', 1, 1, 42, '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\\r\\n* 20.12.17 - Peter has asked me to hold. If we can secure the relays for the next year then there is no need to do this.\\r\\n* 13.03.18 - Relays are secure so we can close this topic.\",\"date_creation\":\"1509446403\",\"date_completed\":\"1521622926\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521622926\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934875\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2148, 1521622934, 'task.close', 1, 1, 97, '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n* 13.03.18 - eMMC has all arrived and is in our factory. I will start another topic to track the quantities.\",\"date_creation\":\"1513340326\",\"date_completed\":\"1521622934\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"0\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521622934\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520935127\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"}}'),
(2149, 1521624986, 'task.move.column', 2, 1, 32, '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n* 31.01.18 - Mail Ben: Thanks, then we will send them directly after CNY with the second batch of Order #15 - HP2\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521624986\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521624986\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1503452784\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2150, 1521625035, 'task.assignee_change', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521625035\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(2151, 1521625154, 'task.update', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521625153\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\"}}'),
(2152, 1521625241, 'task.open', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625241\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934537\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(2153, 1521625260, 'task.move.column', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1520934537\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1520934537\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2154, 1521625264, 'task.move.position', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2155, 1521625269, 'task.move.position', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":16,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2156, 1521625361, 'task.update', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625361\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n\\r\\n\\r\\n\"}}'),
(2157, 1521643315, 'task.update', 2, 1, 121, '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\\r\\n* 19.03.18 - topic currently \\\"on hold\\\" . Telco 26.04.18\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521643315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\\r\\n* 19.03.18 - topic currently \\\"on hold\\\" . Telco 26.04.18\"}}'),
(2158, 1521644121, 'task.move.column', 2, 2, 45, '{\"task_id\":\"45\",\"task\":{\"id\":\"45\",\"title\":\"672 - LED Dimmer\",\"description\":\"\\r\\n27.07.17 - Mail Jens: in appendix you\\u2018ll find some information about some new plastic parts to our Project 672,  is it possible that you send\\r\\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\\r\\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \\r\\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\\r\\n                All other information about the plastic parts you can find in the appended PPTX file \\u201cinquiry - 673\\u201d, if any information missing, \\r\\n                please let us know.\\r\\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \\r\\n                Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs\\r\\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we\\u2018 will check the offer and get back to you with a feedback next week!\\r\\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\\r\\n                \\u2013 **first samples in week 46**. Unit price: GGK672-1 1.10RMB\\/each, GGK672-2 1.10RMB\\/each, MOQ: 5,000pcs - \\r\\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\\r\\n\\r\\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\\r\\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\\r\\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \\r\\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\\r\\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\\r\\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \\\"B\\\" to the order) I have attached the data with the missing deforming angle.\\r\\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\\r\\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\\r\\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\\r\\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\\r\\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\\r\\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\\r\\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\\r\\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\\r\\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\\r\\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\\r\\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \\r\\n                               Sally: to be ready next Tuesday 05Dec.\\r\\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\\r\\nIt would be fine to get improvement for the 100 sets at the following points:\\r\\n1.\\tI guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\\r\\n2.\\tThere\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\\r\\nPlease rework the burr!\\r\\n3.\\t Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\\r\\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\\r\\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\\r\\nParts like these. After some rework by hand these parts could also be used.\\r\\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\\r\\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\\r\\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\\r\\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\\r\\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\\r\\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\\r\\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\\r\\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\\r\\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\\r\\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\\r\\n* 08.03.18 - Mail Henk: The repaired 672 mould now is working on produce ,but seems also have little appearance problem on the products ,this is the best status we can .please see the status I point in attached pictures. Maybe we have to concession to accept for this urgent shipment date .otherwise , need 1 week to repair then produce again.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1509520392\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"blue\",\"project_id\":\"2\",\"column_id\":\"8\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1521644121\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1521644121\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"2\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1520512447\"},\"project_id\":\"2\",\"position\":5,\"column_id\":\"8\",\"swimlane_id\":\"2\",\"src_column_id\":\"7\",\"dst_column_id\":\"8\",\"date_moved\":\"1520512447\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2159, 1521684818, 'task.update', 1, 1, 25, '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\\r\\n* 22.03.18 - We have 10,300 Relays in Stock with 30,000 arriving in May (CW19).\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521684818\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\\r\\n* 22.03.18 - We have 10,300 Relays in Stock with 30,000 arriving in May (CW19).\"}}'),
(2160, 1521710795, 'task.update', 1, 1, 12, '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n* 12.02.18 - Mail Ben: Hi Andreas, The goods are on their way:**WAYBILL 79 6690 9882**\\r\\n* 22.03.18 - All units with the new gearbox failed in Germany. Upon further analysis it appears the motor failed on them. I have sent the motors to Actuator for further analysis. Waiting for this feedback, should be on Friday or early next week.\\r\\n\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521710795\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n* 12.02.18 - Mail Ben: Hi Andreas, The goods are on their way:**WAYBILL 79 6690 9882**\\r\\n* 22.03.18 - All units with the new gearbox failed in Germany. Upon further analysis it appears the motor failed on them. I have sent the motors to Actuator for further analysis. Waiting for this feedback, should be on Friday or early next week.\\r\\n\\r\\n\",\"owner_id\":\"1\"}}'),
(2161, 1521710943, 'task.update', 1, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521710943\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2162, 1521713799, 'task.update', 2, 1, 26, '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n* 22.03.18 - Mail Shinya: Here are attached invoice of transport cost for return HP2 11pcs, CNY5,757.00 belong to MHI. CNY608.00 belong to the RDD.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521713799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n* 22.03.18 - Mail Shinya: Here are attached invoice of transport cost for return HP2 11pcs, CNY5,757.00 belong to MHI. CNY608.00 belong to the RDD.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(2163, 1521718276, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"400\",\"name\":\"180322_PCAS_HP2 Rating Label - change company logo.pdf\",\"path\":\"tasks\\/90\\/211aa3d6e6cb5deb28e4950ca1fe3fea3da1e066\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1521718276\",\"user_id\":\"2\",\"size\":\"437969\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521718264\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(2164, 1521718276, 'task.file.create', 2, 1, 90, '{\"file\":{\"id\":\"401\",\"name\":\"180313_PCAS_HP2_Box Change Request _company logo (Iss 1.0)_signed.pdf\",\"path\":\"tasks\\/90\\/80a68a12a79ce70bb69735e0e2d99fff017a821c\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1521718276\",\"user_id\":\"2\",\"size\":\"448833\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521718264\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(2165, 1521718292, 'task.move.column', 2, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521718292\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521718292\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1511360391\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2166, 1521786786, 'task.update', 1, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 23.03.18 - Still waiting on the motors for the TM Testing Stand.\\r\\n* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1521786786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 23.03.18 - Still waiting on the motors for the TM Testing Stand.\\r\\n* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\"}}'),
(2167, 1521786792, 'task.assignee_change', 1, 1, 101, '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 23.03.18 - Still waiting on the motors for the TM Testing Stand.\\r\\n* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1521786792\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"owner_id\":\"2\"}}'),
(2168, 1521794233, 'task.update', 2, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n* 14.03.18 - Quantity increased from 200 pcs to 300 pcs\\r\\n* 23.03.18 - Mail Leona: 500pcs of GGK 223-468 are ready for ship. 200pcs are the gift for you. We will ship these today WAYBILL 3007381495\\r\\n\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1521794233\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n* 14.03.18 - Quantity increased from 200 pcs to 300 pcs\\r\\n* 23.03.18 - Mail Leona: 500pcs of GGK 223-468 are ready for ship. 200pcs are the gift for you. We will ship these today WAYBILL 3007381495\\r\\n\"}}'),
(2169, 1521800951, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521800951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n\"}}'),
(2170, 1521808059, 'task.update', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521808059\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2171, 1521808099, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521808099\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n\"}}'),
(2172, 1522043549, 'task.move.column', 1, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522043549\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1522043549\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1521718292\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1521718292\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2173, 1522043556, 'task.move.position', 1, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522043549\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1522043549\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1522043549\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2174, 1522043565, 'task.move.position', 1, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522043549\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1522043549\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1522043549\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2175, 1522043737, 'task.update', 1, 1, 90, '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\\r\\n* 26.03.18 - This is not quite finished yet. We are still waiting for the samples from MX for the power supply.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522043737\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1522043549\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\\r\\n* 26.03.18 - This is not quite finished yet. We are still waiting for the samples from MX for the power supply.\"}}'),
(2176, 1522045201, 'task.update', 1, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522045201\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them.\"}}'),
(2177, 1522050143, 'task.update', 1, 1, 121, '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\\r\\n* 19.03.18 - topic currently \\\"on hold\\\" . Telco 26.04.18\\r\\n* 26.03.18 - This has been agreed after the conference call between Ralf, Manfred, Daniel, Gustav and Ben.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1522050143\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\\r\\n* 19.03.18 - topic currently \\\"on hold\\\" . Telco 26.04.18\\r\\n* 26.03.18 - This has been agreed after the conference call between Ralf, Manfred, Daniel, Gustav and Ben.\"}}'),
(2178, 1522050219, 'task.move.column', 1, 1, 121, '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\\r\\n* 19.03.18 - topic currently \\\"on hold\\\" . Telco 26.04.18\\r\\n* 26.03.18 - This has been agreed after the conference call between Ralf, Manfred, Daniel, Gustav and Ben.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1522050219\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1522050219\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1520934444\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2179, 1522058706, 'task.update', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522058706\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\"}}'),
(2180, 1522058734, 'task.update', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522058734\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\"}}'),
(2181, 1522060471, 'task.update', 2, 1, 103, '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n* 24.03.18 - Mail Ben: No problem I will get this worked out and with the first batch of Order #17 we will make a plan to ship out some single HP2 units to you guys!\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522060471\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n* 24.03.18 - Mail Ben: No problem I will get this worked out and with the first batch of Order #17 we will make a plan to ship out some single HP2 units to you guys!\\r\\n\"}}'),
(2182, 1522064802, 'task.update', 2, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\\r\\n* 26.03.18 - Mail Andreas: Okay ! Thank you very much for the information! We will send you the information you want at the end of next week, because Martin and I are on holiday in the moment.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522064802\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\\r\\n* 26.03.18 - Mail Andreas: Okay ! Thank you very much for the information! We will send you the information you want at the end of next week, because Martin and I are on holiday in the moment.\\r\\n\"}}'),
(2183, 1522117170, 'task.update', 6, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"* 27.03.18-Henk: dimension 28.2mm 0\\/-0.2 with little bigger,this related with the plastic flash which is on the mould line .when measuring this dimension ,should check more place.\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1522117170\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 27.03.18-Henk: dimension 28.2mm 0\\/-0.2 with little bigger,this related with the plastic flash which is on the mould line .when measuring this dimension ,should check more place.\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\"}}'),
(2184, 1522117260, 'task.update', 6, 2, 44, '{\"task_id\":\"44\",\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"* 27.03.18-Henk: dimension 28.2mm 0\\/-0.2 little bigger than drawing required ,this related with the plastic flash which is on the mould line .when measuring this dimension ,should check more place.\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1522117260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 27.03.18-Henk: dimension 28.2mm 0\\/-0.2 little bigger than drawing required ,this related with the plastic flash which is on the mould line .when measuring this dimension ,should check more place.\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\"}}'),
(2185, 1522117401, 'task.file.create', 6, 2, 44, '{\"file\":{\"id\":\"402\",\"name\":\"drawing 533-011f.jpg\",\"path\":\"tasks\\/44\\/5e495023b0a373901db21b9708c17991941929ca\",\"is_image\":\"1\",\"task_id\":\"44\",\"date\":\"1522117401\",\"user_id\":\"6\",\"size\":\"3620962\"},\"task\":{\"id\":\"44\",\"title\":\"GGK 533-1 - claim - Motorhead\",\"description\":\"* 27.03.18-Henk: dimension 28.2mm 0\\/-0.2 little bigger than drawing required ,this related with the plastic flash which is on the mould line .when measuring this dimension ,should check more place.\\r\\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\\r\\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\\r\\n* 30.01.18 - Andreas : Should be on the way!\\r\\n* 19.01.18-Henk Mail:Dear Jens\\/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\\r\\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Henk: Dear Jens\\/Martin:\\r\\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\\r\\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\\r\\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\\r\\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\\r\\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\\r\\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \\r\\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\\r\\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\\r\\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\\r\\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\\r\\n\",\"date_creation\":\"1509520262\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"6\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1522117260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1519888583\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Henk Huang\",\"assignee_name\":\"Henk Huang\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"}}'),
(2186, 1522129204, 'task.create', 1, 1, 123, '{\"task_id\":123,\"task\":{\"id\":\"123\",\"title\":\"Sintered Gear Supplier\",\"description\":\"* 27.03.18 - I have been searching for a new Sintered Gear supplier for a very long time and finally come up with a company that seems like it could be a viable alternative. They are based in Ningbo and are a Small to Mid Sized Japanese\\/German Venture. Their prices are 0.40RMB cheaper then NBJX for the full set and their MOQ and Payment terms are better. We can discuss this on Thursday and if you\'d like to proceed I can.\",\"date_creation\":\"1522129203\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1522129203\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1522129203\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2187, 1522129245, 'task.file.create', 1, 1, 123, '{\"file\":{\"id\":\"403\",\"name\":\"Screenshot taken 27\\/03\\/2018 05:40.png\",\"path\":\"tasks\\/123\\/5f4d5c0c01f4a5d52600c5ec6940795b4b26c299\",\"is_image\":\"1\",\"task_id\":\"123\",\"date\":\"1522129245\",\"user_id\":\"1\",\"size\":\"23201\"},\"task\":{\"id\":\"123\",\"title\":\"Sintered Gear Supplier\",\"description\":\"* 27.03.18 - I have been searching for a new Sintered Gear supplier for a very long time and finally come up with a company that seems like it could be a viable alternative. They are based in Ningbo and are a Small to Mid Sized Japanese\\/German Venture. Their prices are 0.40RMB cheaper then NBJX for the full set and their MOQ and Payment terms are better. We can discuss this on Thursday and if you\'d like to proceed I can.\",\"date_creation\":\"1522129203\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1522129203\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1522129203\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2188, 1522131808, 'task.update', 2, 4, 43, '{\"task_id\":\"43\",\"task\":{\"id\":\"43\",\"title\":\"223 clip for tubular motor head\",\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n* 14.03.18 - Quantity increased from 200 pcs to 300 pcs\\r\\n* 23.03.18 - Mail Leona: 500pcs of GGK 223-468 are ready for ship. 200pcs are the gift for you. We will ship these today WAYBILL 3007381495\\r\\n* 27.03.18 - today we have received the delivery and forwarded them to Tim Nibbeling\\r\\n\",\"date_creation\":\"1509520133\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"3\",\"date_modification\":\"1522131808\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1520511181\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"1\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Sally Zhang\",\"creator_name\":\"Sally Zhang\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\\r\\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\\r\\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\\r\\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08\\/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\\r\\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \\r\\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\\r\\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\\r\\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\\r\\n* 13.09.17 - Henk has sent the FSIR to Berthold\\r\\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\\r\\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\\r\\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\\r\\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\\r\\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\\r\\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\\r\\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\\r\\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\\r\\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\\r\\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\\r\\n* 14.03.18 - Quantity increased from 200 pcs to 300 pcs\\r\\n* 23.03.18 - Mail Leona: 500pcs of GGK 223-468 are ready for ship. 200pcs are the gift for you. We will ship these today WAYBILL 3007381495\\r\\n* 27.03.18 - today we have received the delivery and forwarded them to Tim Nibbeling\\r\\n\"}}'),
(2189, 1522251604, 'task.update', 2, 2, 114, '{\"task_id\":\"114\",\"task\":{\"id\":\"114\",\"title\":\"17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 \",\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\\r\\n* 28.02.18 - Mail Leona: Attached are the quote about sea and air.\\r\\nTotal charge of air: EUR613.50+RMB1291.00\\/Shipment (without duty\\uff09\\r\\nTotal charge of sea:EUR281.50+USD30+RMB2640\\/Shipment (without duty\\uff09\\r\\nimport duty in China: 8%\\r\\n* 28.03.18 - Mail Lisa: Hello Sally, the goods got picked up today. ETA Shanghai is ( plan right now) May 17th.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1517902797\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"2\",\"column_id\":\"7\",\"owner_id\":\"2\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522251603\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517902797\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"\\r\\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \\r\\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\\r\\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\\r\\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\\r\\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\\r\\n* 28.02.18 - Mail Leona: Attached are the quote about sea and air.\\r\\nTotal charge of air: EUR613.50+RMB1291.00\\/Shipment (without duty\\uff09\\r\\nTotal charge of sea:EUR281.50+USD30+RMB2640\\/Shipment (without duty\\uff09\\r\\nimport duty in China: 8%\\r\\n* 28.03.18 - Mail Lisa: Hello Sally, the goods got picked up today. ETA Shanghai is ( plan right now) May 17th.\\r\\n\\r\\n\\r\\n\"}}'),
(2190, 1522316314, 'task.update', 2, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1522316314\",\"reference\":\"\",\"date_started\":\"1518102000\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(2191, 1522316618, 'task.update', 2, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522316618\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\"}}'),
(2192, 1522650024, 'task.update', 1, 1, 33, '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\\r\\n* 26.03.18 - Mail Andreas: Okay ! Thank you very much for the information! We will send you the information you want at the end of next week, because Martin and I are on holiday in the moment.\\r\\n* 02.04.18 - We have sent out 5 LBW Samples to RD-D via DHL. Please put these on life cycle test as soon as you receive them. We have also sent 4 Samples to Actuator for them to life cycle test.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522650024\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\\r\\n* 26.03.18 - Mail Andreas: Okay ! Thank you very much for the information! We will send you the information you want at the end of next week, because Martin and I are on holiday in the moment.\\r\\n* 02.04.18 - We have sent out 5 LBW Samples to RD-D via DHL. Please put these on life cycle test as soon as you receive them. We have also sent 4 Samples to Actuator for them to life cycle test.\"}}'),
(2193, 1522802563, 'task.update', 6, 2, 111, '{\"task_id\":\"111\",\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 30.03.18-mail Henk:Dear Martin,Please see attached 8D report from Dooya factory for HE4015 gearbox  broken . \\r\\n\\r\\n* 16.03.18-mail Henk:Hi Henk,Thank you very much for the detail, now understood. Seem to me is the comprehensive operation training is missing. \\r\\n\\r\\nStill we hope you can get the 8D from Dooya, there is never worker\'s fault but should be the company\'s quality control loophole.\\r\\n \\r\\n* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522802563\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.03.18-mail Henk:Dear Martin,Please see attached 8D report from Dooya factory for HE4015 gearbox  broken . \\r\\n\\r\\n* 16.03.18-mail Henk:Hi Henk,Thank you very much for the detail, now understood. Seem to me is the comprehensive operation training is missing. \\r\\n\\r\\nStill we hope you can get the 8D from Dooya, there is never worker\'s fault but should be the company\'s quality control loophole.\\r\\n \\r\\n* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\"}}'),
(2194, 1522802584, 'task.file.create', 6, 2, 111, '{\"file\":{\"id\":\"404\",\"name\":\"8D report for HE4015 gear box broken.xls\",\"path\":\"tasks\\/111\\/62a6385e0a364f42685061016926b90a966afab0\",\"is_image\":\"0\",\"task_id\":\"111\",\"date\":\"1522802584\",\"user_id\":\"6\",\"size\":\"5215232\"},\"task\":{\"id\":\"111\",\"title\":\"Dooya - claim gearbox broken - HE4015\",\"description\":\"* 30.03.18-mail Henk:Dear Martin,Please see attached 8D report from Dooya factory for HE4015 gearbox  broken . \\r\\n\\r\\n* 16.03.18-mail Henk:Hi Henk,Thank you very much for the detail, now understood. Seem to me is the comprehensive operation training is missing. \\r\\n\\r\\nStill we hope you can get the 8D from Dooya, there is never worker\'s fault but should be the company\'s quality control loophole.\\r\\n \\r\\n* 16.03.18-mail Henk:Dear Sally,The \\\"non-standard operation\\\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\\r\\n\\r\\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\\r\\n\\r\\nThe \\\"non-standard operation\\\" seems unusual to us, normally in production every step should be standard in normal condition. \\r\\n\\r\\nFurthermore, can you explain further what kind of  \\\"non-standard operation\\\"  it is exactly which could cause this failure?\\r\\n\\r\\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\\r\\n* 28.02.18-Andreas:still running (by telco) \\r\\n* 12.02.18 - Andreas : still running  :-)\\r\\n* 05.02.18 - Mail Martin: still now, I don\\u00b4t found another broken gearbox. There are four more HE4015 in test active.\\r\\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\\r\\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\\r\\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\\r\\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\\r\\n\",\"date_creation\":\"1517297311\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"2\",\"column_id\":\"6\",\"owner_id\":\"5\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522802563\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"2\",\"date_moved\":\"1517297311\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Sourcing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(2195, 1522996008, 'task.create', 11, 4, 124, '{\"task_id\":124,\"task\":{\"id\":\"124\",\"title\":\"UBW grease specification\",\"description\":\"please specifie the grease we are using in the gearboxes for the LBW. I guess we\'ll use the same grease for the build of the UBW gearboxes.\\r\\nNeed exact specification for the UBW specification sheet.\",\"date_creation\":\"1522996008\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"purple\",\"project_id\":\"4\",\"column_id\":\"16\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"11\",\"date_modification\":\"1522996008\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"4\",\"date_moved\":\"1522996008\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"R&D\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Berthold Eller\",\"creator_name\":\"Berthold Eller\",\"category_description\":null,\"column_position\":\"3\"}}');
INSERT INTO `project_activities` (`id`, `date_creation`, `event_name`, `creator_id`, `project_id`, `task_id`, `data`) VALUES
(2196, 1523243095, 'task.update', 1, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1523243095\",\"reference\":\"\",\"date_started\":\"1518102000\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.\"}}'),
(2197, 1523243106, 'task.move.column', 1, 1, 31, '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1523243106\",\"reference\":\"\",\"date_started\":\"1518102000\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1523243106\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1503452729\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(2198, 1523243122, 'task.update', 1, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1523243122\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.\"}}'),
(2199, 1523243130, 'task.move.column', 1, 1, 64, '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1523243130\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1523243130\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1510248012\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');

-- --------------------------------------------------------

--
-- Table structure for table `project_daily_column_stats`
--

CREATE TABLE `project_daily_column_stats` (
  `id` int(11) NOT NULL,
  `day` char(10) NOT NULL,
  `project_id` int(11) NOT NULL,
  `column_id` int(11) NOT NULL,
  `total` int(11) NOT NULL DEFAULT '0',
  `score` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `project_daily_column_stats`
--

INSERT INTO `project_daily_column_stats` (`id`, `day`, `project_id`, `column_id`, `total`, `score`) VALUES
(5, '2017-07-02', 2, 7, 1, 0),
(15, '2017-07-02', 1, 3, 5, 0),
(16, '2017-07-02', 1, 9, 3, 0),
(73, '2017-07-03', 2, 7, 1, 0),
(76, '2017-07-03', 1, 3, 17, 0),
(77, '2017-07-03', 1, 9, 4, 0),
(148, '2017-07-04', 1, 2, 1, 0),
(149, '2017-07-04', 1, 3, 17, 0),
(150, '2017-07-04', 1, 4, 2, 0),
(151, '2017-07-04', 1, 9, 2, 0),
(160, '2017-07-05', 1, 2, 1, 0),
(161, '2017-07-05', 1, 3, 17, 0),
(162, '2017-07-05', 1, 4, 2, 0),
(163, '2017-07-05', 1, 9, 2, 0),
(164, '2017-07-06', 1, 2, 1, 0),
(165, '2017-07-06', 1, 3, 17, 0),
(166, '2017-07-06', 1, 4, 2, 0),
(167, '2017-07-06', 1, 9, 2, 0),
(176, '2017-07-10', 1, 2, 1, 0),
(177, '2017-07-10', 1, 3, 17, 0),
(178, '2017-07-10', 1, 4, 2, 0),
(179, '2017-07-10', 1, 9, 2, 0),
(244, '2017-07-11', 1, 2, 1, 0),
(245, '2017-07-11', 1, 3, 19, 0),
(246, '2017-07-11', 1, 4, 2, 0),
(247, '2017-07-11', 1, 9, 2, 0),
(312, '2017-07-12', 1, 2, 1, 0),
(313, '2017-07-12', 1, 3, 20, 0),
(314, '2017-07-12', 1, 4, 2, 0),
(315, '2017-07-12', 1, 9, 2, 0),
(380, '2017-07-13', 1, 2, 1, 0),
(381, '2017-07-13', 1, 3, 20, 0),
(382, '2017-07-13', 1, 4, 2, 0),
(383, '2017-07-13', 1, 9, 2, 0),
(396, '2017-07-14', 1, 2, 1, 0),
(397, '2017-07-14', 1, 3, 20, 0),
(398, '2017-07-14', 1, 4, 2, 0),
(399, '2017-07-14', 1, 9, 2, 0),
(408, '2017-07-17', 1, 2, 1, 0),
(409, '2017-07-17', 1, 3, 20, 0),
(410, '2017-07-17', 1, 4, 2, 0),
(411, '2017-07-17', 1, 9, 2, 0),
(416, '2017-07-18', 1, 2, 1, 0),
(417, '2017-07-18', 1, 3, 20, 0),
(418, '2017-07-18', 1, 4, 2, 0),
(419, '2017-07-18', 1, 9, 2, 0),
(424, '2017-07-19', 1, 2, 1, 0),
(425, '2017-07-19', 1, 3, 20, 0),
(426, '2017-07-19', 1, 4, 2, 0),
(427, '2017-07-19', 1, 9, 2, 0),
(452, '2017-07-20', 1, 2, 1, 0),
(453, '2017-07-20', 1, 3, 19, 0),
(454, '2017-07-20', 1, 4, 2, 0),
(455, '2017-07-20', 1, 9, 3, 0),
(476, '2017-07-21', 1, 2, 1, 0),
(477, '2017-07-21', 1, 3, 19, 0),
(478, '2017-07-21', 1, 4, 2, 0),
(479, '2017-07-21', 1, 9, 3, 0),
(512, '2017-07-24', 1, 2, 1, 0),
(513, '2017-07-24', 1, 3, 18, 0),
(514, '2017-07-24', 1, 4, 2, 0),
(515, '2017-07-24', 1, 9, 4, 0),
(520, '2017-07-25', 1, 2, 1, 0),
(521, '2017-07-25', 1, 3, 18, 0),
(522, '2017-07-25', 1, 4, 2, 0),
(523, '2017-07-25', 1, 9, 4, 0),
(552, '2017-07-26', 1, 2, 1, 0),
(553, '2017-07-26', 1, 3, 18, 0),
(554, '2017-07-26', 1, 4, 2, 0),
(555, '2017-07-26', 1, 9, 4, 0),
(584, '2017-07-27', 1, 2, 1, 0),
(585, '2017-07-27', 1, 3, 19, 0),
(586, '2017-07-27', 1, 4, 2, 0),
(587, '2017-07-27', 1, 9, 4, 0),
(596, '2017-07-28', 1, 2, 1, 0),
(597, '2017-07-28', 1, 3, 19, 0),
(598, '2017-07-28', 1, 4, 2, 0),
(599, '2017-07-28', 1, 9, 4, 0),
(612, '2017-08-01', 1, 2, 1, 0),
(613, '2017-08-01', 1, 3, 18, 0),
(614, '2017-08-01', 1, 4, 3, 0),
(615, '2017-08-01', 1, 9, 4, 0),
(656, '2017-08-02', 1, 2, 1, 0),
(657, '2017-08-02', 1, 3, 18, 0),
(658, '2017-08-02', 1, 4, 3, 0),
(659, '2017-08-02', 1, 9, 4, 0),
(708, '2017-08-03', 1, 2, 2, 0),
(709, '2017-08-03', 1, 3, 18, 0),
(710, '2017-08-03', 1, 4, 3, 0),
(711, '2017-08-03', 1, 9, 4, 0),
(720, '2017-08-08', 1, 2, 2, 0),
(721, '2017-08-08', 1, 3, 17, 0),
(722, '2017-08-08', 1, 4, 4, 0),
(723, '2017-08-08', 1, 9, 4, 0),
(732, '2017-08-09', 1, 2, 2, 0),
(733, '2017-08-09', 1, 3, 17, 0),
(734, '2017-08-09', 1, 4, 4, 0),
(735, '2017-08-09', 1, 9, 4, 0),
(740, '2017-08-14', 1, 2, 2, 0),
(741, '2017-08-14', 1, 3, 17, 0),
(742, '2017-08-14', 1, 4, 4, 0),
(743, '2017-08-14', 1, 9, 4, 0),
(768, '2017-08-15', 1, 2, 2, 0),
(769, '2017-08-15', 1, 3, 16, 0),
(770, '2017-08-15', 1, 4, 4, 0),
(771, '2017-08-15', 1, 9, 5, 0),
(772, '2017-08-16', 1, 2, 2, 0),
(773, '2017-08-16', 1, 3, 16, 0),
(774, '2017-08-16', 1, 4, 4, 0),
(775, '2017-08-16', 1, 9, 5, 0),
(780, '2017-08-17', 1, 2, 2, 0),
(781, '2017-08-17', 1, 3, 16, 0),
(782, '2017-08-17', 1, 4, 4, 0),
(783, '2017-08-17', 1, 9, 5, 0),
(816, '2017-08-21', 1, 2, 2, 0),
(817, '2017-08-21', 1, 3, 14, 0),
(818, '2017-08-21', 1, 4, 6, 0),
(819, '2017-08-21', 1, 9, 5, 0),
(824, '2017-08-22', 1, 2, 2, 0),
(825, '2017-08-22', 1, 3, 14, 0),
(826, '2017-08-22', 1, 4, 6, 0),
(827, '2017-08-22', 1, 9, 5, 0),
(864, '2017-08-23', 1, 2, 1, 0),
(865, '2017-08-23', 1, 3, 16, 0),
(866, '2017-08-23', 1, 4, 7, 0),
(867, '2017-08-23', 1, 9, 5, 0),
(872, '2017-08-25', 1, 2, 1, 0),
(873, '2017-08-25', 1, 3, 16, 0),
(874, '2017-08-25', 1, 4, 7, 0),
(875, '2017-08-25', 1, 9, 5, 0),
(936, '2017-08-30', 1, 2, 1, 0),
(937, '2017-08-30', 1, 3, 16, 0),
(938, '2017-08-30', 1, 4, 9, 0),
(939, '2017-08-30', 1, 9, 3, 0),
(944, '2017-09-01', 1, 2, 1, 0),
(945, '2017-09-01', 1, 3, 16, 0),
(946, '2017-09-01', 1, 4, 9, 0),
(947, '2017-09-01', 1, 9, 3, 0),
(972, '2017-09-06', 1, 2, 1, 0),
(973, '2017-09-06', 1, 3, 17, 0),
(974, '2017-09-06', 1, 4, 9, 0),
(975, '2017-09-06', 1, 9, 3, 0),
(1000, '2017-09-07', 1, 2, 1, 0),
(1001, '2017-09-07', 1, 3, 17, 0),
(1002, '2017-09-07', 1, 4, 9, 0),
(1003, '2017-09-07', 1, 9, 3, 0),
(1004, '2017-09-11', 1, 2, 1, 0),
(1005, '2017-09-11', 1, 3, 17, 0),
(1006, '2017-09-11', 1, 4, 9, 0),
(1007, '2017-09-11', 1, 9, 3, 0),
(1012, '2017-09-13', 1, 2, 1, 0),
(1013, '2017-09-13', 1, 3, 17, 0),
(1014, '2017-09-13', 1, 4, 9, 0),
(1015, '2017-09-13', 1, 9, 3, 0),
(1036, '2017-09-20', 1, 2, 1, 0),
(1037, '2017-09-20', 1, 3, 18, 0),
(1038, '2017-09-20', 1, 4, 9, 0),
(1039, '2017-09-20', 1, 9, 3, 0),
(1072, '2017-09-22', 1, 2, 1, 0),
(1073, '2017-09-22', 1, 3, 16, 0),
(1074, '2017-09-22', 1, 4, 9, 0),
(1075, '2017-09-22', 1, 9, 3, 0),
(1078, '2017-09-25', 1, 2, 1, 0),
(1079, '2017-09-25', 1, 3, 16, 0),
(1080, '2017-09-25', 1, 4, 9, 0),
(1081, '2017-09-25', 1, 9, 3, 0),
(1110, '2017-09-29', 1, 2, 1, 0),
(1111, '2017-09-29', 1, 3, 16, 0),
(1112, '2017-09-29', 1, 4, 9, 0),
(1113, '2017-09-29', 1, 9, 3, 0),
(1154, '2017-10-09', 1, 2, 1, 0),
(1155, '2017-10-09', 1, 3, 16, 0),
(1156, '2017-10-09', 1, 4, 12, 0),
(1184, '2017-10-10', 1, 2, 1, 0),
(1185, '2017-10-10', 1, 3, 16, 0),
(1186, '2017-10-10', 1, 4, 12, 0),
(1196, '2017-10-13', 1, 2, 2, 0),
(1197, '2017-10-13', 1, 3, 16, 0),
(1198, '2017-10-13', 1, 4, 12, 0),
(1236, '2017-10-16', 1, 2, 2, 0),
(1237, '2017-10-16', 1, 3, 15, 0),
(1238, '2017-10-16', 1, 4, 13, 0),
(1239, '2017-10-17', 1, 2, 2, 0),
(1240, '2017-10-17', 1, 3, 15, 0),
(1241, '2017-10-17', 1, 4, 13, 0),
(1292, '2017-10-18', 1, 2, 2, 0),
(1293, '2017-10-18', 1, 3, 15, 0),
(1294, '2017-10-18', 1, 4, 14, 0),
(1307, '2017-10-20', 1, 2, 2, 0),
(1308, '2017-10-20', 1, 3, 16, 0),
(1309, '2017-10-20', 1, 4, 14, 0),
(1310, '2017-10-21', 1, 2, 2, 0),
(1311, '2017-10-21', 1, 3, 16, 0),
(1312, '2017-10-21', 1, 4, 14, 0),
(1322, '2017-10-24', 1, 2, 2, 0),
(1323, '2017-10-24', 1, 3, 15, 0),
(1324, '2017-10-24', 1, 4, 15, 0),
(1331, '2017-10-31', 1, 2, 2, 0),
(1332, '2017-10-31', 1, 3, 16, 0),
(1333, '2017-10-31', 1, 4, 15, 0),
(1388, '2017-11-01', 2, 7, 10, 0),
(1411, '2017-11-01', 1, 2, 2, 0),
(1412, '2017-11-01', 1, 3, 15, 0),
(1413, '2017-11-01', 1, 4, 15, 0),
(1414, '2017-11-01', 1, 9, 1, 0),
(1417, '2017-11-02', 1, 2, 2, 0),
(1418, '2017-11-02', 1, 3, 15, 0),
(1419, '2017-11-02', 1, 4, 15, 0),
(1420, '2017-11-02', 1, 9, 1, 0),
(1423, '2017-11-02', 2, 7, 11, 0),
(1433, '2017-11-03', 2, 7, 11, 0),
(1442, '2017-11-03', 1, 2, 2, 0),
(1443, '2017-11-03', 1, 3, 15, 0),
(1444, '2017-11-03', 1, 4, 15, 0),
(1445, '2017-11-03', 1, 9, 1, 0),
(1450, '2017-11-05', 1, 2, 2, 0),
(1451, '2017-11-05', 1, 3, 15, 0),
(1452, '2017-11-05', 1, 4, 15, 0),
(1453, '2017-11-05', 1, 9, 1, 0),
(1482, '2017-11-06', 1, 2, 2, 0),
(1483, '2017-11-06', 1, 3, 18, 0),
(1484, '2017-11-06', 1, 4, 15, 0),
(1485, '2017-11-06', 1, 9, 1, 0),
(1492, '2017-11-06', 2, 6, 2, 0),
(1493, '2017-11-06', 2, 7, 15, 0),
(1496, '2017-11-07', 2, 6, 2, 0),
(1497, '2017-11-07', 2, 7, 15, 0),
(1512, '2017-11-08', 2, 6, 2, 0),
(1513, '2017-11-08', 2, 7, 15, 0),
(1522, '2017-11-08', 1, 2, 2, 0),
(1523, '2017-11-08', 1, 3, 19, 0),
(1524, '2017-11-08', 1, 4, 15, 0),
(1525, '2017-11-08', 1, 9, 1, 0),
(1607, '2017-11-09', 2, 6, 6, 0),
(1608, '2017-11-09', 2, 7, 11, 0),
(1609, '2017-11-09', 2, 8, 2, 0),
(1670, '2017-11-09', 1, 2, 2, 0),
(1671, '2017-11-09', 1, 3, 20, 0),
(1672, '2017-11-09', 1, 4, 15, 0),
(1673, '2017-11-09', 1, 9, 1, 0),
(1682, '2017-11-10', 2, 6, 6, 0),
(1683, '2017-11-10', 2, 7, 11, 0),
(1684, '2017-11-10', 2, 8, 2, 0),
(1685, '2017-11-10', 1, 2, 2, 0),
(1686, '2017-11-10', 1, 3, 20, 0),
(1687, '2017-11-10', 1, 4, 15, 0),
(1688, '2017-11-10', 1, 9, 1, 0),
(1751, '2017-11-13', 1, 2, 2, 0),
(1752, '2017-11-13', 1, 3, 20, 0),
(1753, '2017-11-13', 1, 4, 15, 0),
(1754, '2017-11-13', 1, 9, 1, 0),
(1773, '2017-11-13', 2, 6, 5, 0),
(1774, '2017-11-13', 2, 7, 12, 0),
(1775, '2017-11-13', 2, 8, 2, 0),
(1795, '2017-11-14', 1, 2, 2, 0),
(1796, '2017-11-14', 1, 3, 20, 0),
(1797, '2017-11-14', 1, 4, 15, 0),
(1798, '2017-11-14', 1, 9, 1, 0),
(1802, '2017-11-14', 2, 6, 5, 0),
(1803, '2017-11-14', 2, 7, 12, 0),
(1804, '2017-11-14', 2, 8, 2, 0),
(1907, '2017-11-15', 2, 6, 5, 0),
(1908, '2017-11-15', 2, 7, 13, 0),
(1909, '2017-11-15', 2, 8, 2, 0),
(1910, '2017-11-15', 1, 2, 2, 0),
(1911, '2017-11-15', 1, 3, 20, 0),
(1912, '2017-11-15', 1, 4, 15, 0),
(1913, '2017-11-15', 1, 9, 1, 0),
(1980, '2017-11-16', 1, 2, 2, 0),
(1981, '2017-11-16', 1, 3, 20, 0),
(1982, '2017-11-16', 1, 4, 15, 0),
(1983, '2017-11-16', 1, 9, 1, 0),
(2032, '2017-11-16', 2, 6, 5, 0),
(2033, '2017-11-16', 2, 7, 15, 0),
(2034, '2017-11-16', 2, 8, 4, 0),
(2066, '2017-11-17', 1, 2, 2, 0),
(2067, '2017-11-17', 1, 3, 20, 0),
(2068, '2017-11-17', 1, 4, 15, 0),
(2069, '2017-11-17', 1, 9, 1, 0),
(2082, '2017-11-17', 2, 6, 6, 0),
(2083, '2017-11-17', 2, 7, 15, 0),
(2084, '2017-11-17', 2, 8, 4, 0),
(2091, '2017-11-18', 2, 6, 6, 0),
(2092, '2017-11-18', 2, 7, 15, 0),
(2093, '2017-11-18', 2, 8, 4, 0),
(2098, '2017-11-19', 1, 2, 2, 0),
(2099, '2017-11-19', 1, 3, 20, 0),
(2100, '2017-11-19', 1, 4, 15, 0),
(2101, '2017-11-19', 1, 9, 1, 0),
(2110, '2017-11-20', 1, 2, 2, 0),
(2111, '2017-11-20', 1, 3, 20, 0),
(2112, '2017-11-20', 1, 4, 15, 0),
(2113, '2017-11-20', 1, 9, 1, 0),
(2117, '2017-11-21', 2, 6, 6, 0),
(2118, '2017-11-21', 2, 7, 15, 0),
(2119, '2017-11-21', 2, 8, 4, 0),
(2124, '2017-11-21', 1, 2, 2, 0),
(2125, '2017-11-21', 1, 3, 20, 0),
(2126, '2017-11-21', 1, 4, 15, 0),
(2127, '2017-11-21', 1, 9, 1, 0),
(2160, '2017-11-22', 2, 6, 6, 0),
(2161, '2017-11-22', 2, 7, 15, 0),
(2162, '2017-11-22', 2, 8, 4, 0),
(2171, '2017-11-22', 1, 2, 2, 0),
(2172, '2017-11-22', 1, 3, 21, 0),
(2173, '2017-11-22', 1, 4, 15, 0),
(2174, '2017-11-22', 1, 9, 1, 0),
(2184, '2017-11-23', 2, 6, 7, 0),
(2185, '2017-11-23', 2, 7, 15, 0),
(2186, '2017-11-23', 2, 8, 4, 0),
(2259, '2017-11-24', 2, 6, 8, 0),
(2260, '2017-11-24', 2, 7, 14, 0),
(2261, '2017-11-24', 2, 8, 4, 0),
(2262, '2017-11-24', 1, 2, 2, 0),
(2263, '2017-11-24', 1, 3, 21, 0),
(2264, '2017-11-24', 1, 4, 15, 0),
(2265, '2017-11-24', 1, 9, 1, 0),
(2274, '2017-11-25', 1, 2, 2, 0),
(2275, '2017-11-25', 1, 3, 21, 0),
(2276, '2017-11-25', 1, 4, 15, 0),
(2277, '2017-11-25', 1, 9, 1, 0),
(2295, '2017-11-27', 2, 6, 8, 0),
(2296, '2017-11-27', 2, 7, 14, 0),
(2297, '2017-11-27', 2, 8, 4, 0),
(2298, '2017-11-27', 1, 2, 2, 0),
(2299, '2017-11-27', 1, 3, 21, 0),
(2300, '2017-11-27', 1, 4, 15, 0),
(2301, '2017-11-27', 1, 9, 1, 0),
(2305, '2017-11-28', 2, 6, 8, 0),
(2306, '2017-11-28', 2, 7, 14, 0),
(2307, '2017-11-28', 2, 8, 4, 0),
(2364, '2017-11-29', 1, 2, 2, 0),
(2365, '2017-11-29', 1, 3, 20, 0),
(2366, '2017-11-29', 1, 4, 16, 0),
(2367, '2017-11-29', 1, 9, 1, 0),
(2368, '2017-11-29', 2, 6, 8, 0),
(2369, '2017-11-29', 2, 7, 14, 0),
(2370, '2017-11-29', 2, 8, 4, 0),
(2371, '2017-11-30', 2, 6, 8, 0),
(2372, '2017-11-30', 2, 7, 14, 0),
(2373, '2017-11-30', 2, 8, 4, 0),
(2374, '2017-11-30', 1, 2, 2, 0),
(2375, '2017-11-30', 1, 3, 20, 0),
(2376, '2017-11-30', 1, 4, 16, 0),
(2377, '2017-11-30', 1, 9, 1, 0),
(2393, '2017-12-02', 2, 6, 9, 0),
(2394, '2017-12-02', 2, 7, 14, 0),
(2395, '2017-12-02', 2, 8, 4, 0),
(2436, '2017-12-04', 2, 6, 9, 0),
(2437, '2017-12-04', 2, 7, 14, 0),
(2438, '2017-12-04', 2, 8, 4, 0),
(2439, '2017-12-04', 1, 2, 1, 0),
(2440, '2017-12-04', 1, 3, 20, 0),
(2441, '2017-12-04', 1, 4, 17, 0),
(2442, '2017-12-04', 1, 9, 1, 0),
(2450, '2017-12-05', 1, 2, 1, 0),
(2451, '2017-12-05', 1, 3, 20, 0),
(2452, '2017-12-05', 1, 4, 17, 0),
(2453, '2017-12-05', 1, 9, 1, 0),
(2463, '2017-12-05', 2, 6, 9, 0),
(2464, '2017-12-05', 2, 7, 14, 0),
(2465, '2017-12-05', 2, 8, 4, 0),
(2493, '2017-12-06', 1, 2, 1, 0),
(2494, '2017-12-06', 1, 3, 17, 0),
(2495, '2017-12-06', 1, 4, 18, 0),
(2496, '2017-12-06', 1, 9, 3, 0),
(2512, '2017-12-06', 2, 6, 9, 0),
(2513, '2017-12-06', 2, 7, 14, 0),
(2514, '2017-12-06', 2, 8, 4, 0),
(2567, '2017-12-07', 2, 6, 11, 0),
(2568, '2017-12-07', 2, 7, 11, 0),
(2569, '2017-12-07', 2, 8, 6, 0),
(2590, '2017-12-07', 1, 2, 1, 0),
(2591, '2017-12-07', 1, 3, 18, 0),
(2592, '2017-12-07', 1, 4, 18, 0),
(2593, '2017-12-07', 1, 9, 3, 0),
(2675, '2017-12-08', 2, 6, 9, 0),
(2676, '2017-12-08', 2, 7, 11, 0),
(2677, '2017-12-08', 2, 8, 8, 0),
(2678, '2017-12-08', 1, 2, 1, 0),
(2679, '2017-12-08', 1, 3, 18, 0),
(2680, '2017-12-08', 1, 4, 18, 0),
(2681, '2017-12-08', 1, 9, 3, 0),
(2682, '2017-12-11', 1, 2, 1, 0),
(2683, '2017-12-11', 1, 3, 18, 0),
(2684, '2017-12-11', 1, 4, 18, 0),
(2685, '2017-12-11', 1, 9, 3, 0),
(2689, '2017-12-12', 1, 2, 1, 0),
(2690, '2017-12-12', 1, 3, 18, 0),
(2691, '2017-12-12', 1, 4, 18, 0),
(2692, '2017-12-12', 1, 9, 3, 0),
(2717, '2017-12-12', 2, 6, 9, 0),
(2718, '2017-12-12', 2, 7, 12, 0),
(2719, '2017-12-12', 2, 8, 9, 0),
(2723, '2017-12-13', 2, 6, 9, 0),
(2724, '2017-12-13', 2, 7, 12, 0),
(2725, '2017-12-13', 2, 8, 9, 0),
(2733, '2017-12-14', 1, 2, 1, 0),
(2734, '2017-12-14', 1, 3, 18, 0),
(2735, '2017-12-14', 1, 4, 18, 0),
(2736, '2017-12-14', 1, 9, 3, 0),
(2743, '2017-12-14', 2, 6, 9, 0),
(2744, '2017-12-14', 2, 7, 12, 0),
(2745, '2017-12-14', 2, 8, 9, 0),
(2791, '2017-12-15', 2, 6, 9, 0),
(2792, '2017-12-15', 2, 7, 13, 0),
(2793, '2017-12-15', 2, 8, 9, 0),
(2794, '2017-12-15', 1, 2, 1, 0),
(2795, '2017-12-15', 1, 3, 19, 0),
(2796, '2017-12-15', 1, 4, 18, 0),
(2797, '2017-12-15', 1, 9, 3, 0),
(2798, '2017-12-17', 2, 6, 9, 0),
(2799, '2017-12-17', 2, 7, 13, 0),
(2800, '2017-12-17', 2, 8, 9, 0),
(2816, '2017-12-18', 2, 6, 8, 0),
(2817, '2017-12-18', 2, 7, 13, 0),
(2818, '2017-12-18', 2, 8, 10, 0),
(2823, '2017-12-18', 1, 2, 1, 0),
(2824, '2017-12-18', 1, 3, 19, 0),
(2825, '2017-12-18', 1, 4, 18, 0),
(2826, '2017-12-18', 1, 9, 3, 0),
(2880, '2017-12-19', 2, 6, 8, 0),
(2881, '2017-12-19', 2, 7, 13, 0),
(2882, '2017-12-19', 2, 8, 10, 0),
(2887, '2017-12-19', 1, 2, 1, 0),
(2888, '2017-12-19', 1, 3, 19, 0),
(2889, '2017-12-19', 1, 4, 18, 0),
(2890, '2017-12-19', 1, 9, 3, 0),
(2902, '2017-12-20', 1, 2, 1, 0),
(2903, '2017-12-20', 1, 3, 19, 0),
(2904, '2017-12-20', 1, 4, 18, 0),
(2905, '2017-12-20', 1, 9, 3, 0),
(2915, '2017-12-20', 2, 6, 8, 0),
(2916, '2017-12-20', 2, 7, 13, 0),
(2917, '2017-12-20', 2, 8, 10, 0),
(2930, '2017-12-21', 2, 6, 8, 0),
(2931, '2017-12-21', 2, 7, 13, 0),
(2932, '2017-12-21', 2, 8, 10, 0),
(2933, '2017-12-21', 1, 2, 1, 0),
(2934, '2017-12-21', 1, 3, 19, 0),
(2935, '2017-12-21', 1, 4, 18, 0),
(2936, '2017-12-21', 1, 9, 3, 0),
(2953, '2017-12-22', 2, 6, 9, 0),
(2954, '2017-12-22', 2, 7, 13, 0),
(2955, '2017-12-22', 2, 8, 10, 0),
(2960, '2017-12-22', 1, 2, 2, 0),
(2961, '2017-12-22', 1, 3, 19, 0),
(2962, '2017-12-22', 1, 4, 18, 0),
(2963, '2017-12-22', 1, 9, 3, 0),
(2967, '2017-12-27', 2, 6, 9, 0),
(2968, '2017-12-27', 2, 7, 13, 0),
(2969, '2017-12-27', 2, 8, 10, 0),
(2973, '2017-12-28', 2, 6, 9, 0),
(2974, '2017-12-28', 2, 7, 13, 0),
(2975, '2017-12-28', 2, 8, 10, 0),
(2976, '2017-12-29', 2, 6, 9, 0),
(2977, '2017-12-29', 2, 7, 13, 0),
(2978, '2017-12-29', 2, 8, 10, 0),
(3049, '2018-01-02', 2, 6, 9, 0),
(3050, '2018-01-02', 2, 7, 13, 0),
(3051, '2018-01-02', 2, 8, 10, 0),
(3052, '2018-01-02', 1, 2, 2, 0),
(3053, '2018-01-02', 1, 3, 19, 0),
(3054, '2018-01-02', 1, 4, 18, 0),
(3055, '2018-01-02', 1, 9, 3, 0),
(3112, '2018-01-03', 1, 2, 3, 0),
(3113, '2018-01-03', 1, 3, 19, 0),
(3114, '2018-01-03', 1, 4, 18, 0),
(3115, '2018-01-03', 1, 9, 3, 0),
(3125, '2018-01-03', 2, 6, 9, 0),
(3126, '2018-01-03', 2, 7, 12, 0),
(3127, '2018-01-03', 2, 8, 11, 0),
(3153, '2018-01-04', 1, 2, 4, 0),
(3154, '2018-01-04', 1, 3, 18, 0),
(3155, '2018-01-04', 1, 4, 18, 0),
(3156, '2018-01-04', 1, 9, 3, 0),
(3160, '2018-01-04', 2, 6, 10, 0),
(3161, '2018-01-04', 2, 7, 12, 0),
(3162, '2018-01-04', 2, 8, 11, 0),
(3166, '2018-01-05', 1, 2, 4, 0),
(3167, '2018-01-05', 1, 3, 18, 0),
(3168, '2018-01-05', 1, 4, 18, 0),
(3169, '2018-01-05', 1, 9, 3, 0),
(3194, '2018-01-05', 2, 6, 10, 0),
(3195, '2018-01-05', 2, 7, 12, 0),
(3196, '2018-01-05', 2, 8, 11, 0),
(3205, '2018-01-08', 1, 2, 4, 0),
(3206, '2018-01-08', 1, 3, 18, 0),
(3207, '2018-01-08', 1, 4, 18, 0),
(3208, '2018-01-08', 1, 9, 3, 0),
(3209, '2018-01-08', 2, 6, 10, 0),
(3210, '2018-01-08', 2, 7, 12, 0),
(3211, '2018-01-08', 2, 8, 11, 0),
(3253, '2018-01-09', 1, 2, 4, 0),
(3254, '2018-01-09', 1, 3, 19, 0),
(3255, '2018-01-09', 1, 4, 18, 0),
(3256, '2018-01-09', 1, 9, 3, 0),
(3257, '2018-01-09', 2, 6, 10, 0),
(3258, '2018-01-09', 2, 7, 12, 0),
(3259, '2018-01-09', 2, 8, 11, 0),
(3276, '2018-01-10', 1, 2, 4, 0),
(3277, '2018-01-10', 1, 3, 19, 0),
(3278, '2018-01-10', 1, 4, 18, 0),
(3279, '2018-01-10', 1, 9, 3, 0),
(3283, '2018-01-11', 2, 6, 10, 0),
(3284, '2018-01-11', 2, 7, 12, 0),
(3285, '2018-01-11', 2, 8, 11, 0),
(3290, '2018-01-12', 1, 2, 4, 0),
(3291, '2018-01-12', 1, 3, 19, 0),
(3292, '2018-01-12', 1, 4, 18, 0),
(3293, '2018-01-12', 1, 9, 3, 0),
(3294, '2018-01-12', 2, 6, 10, 0),
(3295, '2018-01-12', 2, 7, 12, 0),
(3296, '2018-01-12', 2, 8, 11, 0),
(3300, '2018-01-13', 2, 6, 10, 0),
(3301, '2018-01-13', 2, 7, 12, 0),
(3302, '2018-01-13', 2, 8, 11, 0),
(3303, '2018-01-13', 1, 2, 4, 0),
(3304, '2018-01-13', 1, 3, 19, 0),
(3305, '2018-01-13', 1, 4, 18, 0),
(3306, '2018-01-13', 1, 9, 3, 0),
(3311, '2018-01-14', 1, 2, 4, 0),
(3312, '2018-01-14', 1, 3, 19, 0),
(3313, '2018-01-14', 1, 4, 18, 0),
(3314, '2018-01-14', 1, 9, 3, 0),
(3321, '2018-01-14', 2, 6, 10, 0),
(3322, '2018-01-14', 2, 7, 12, 0),
(3323, '2018-01-14', 2, 8, 11, 0),
(3357, '2018-01-15', 2, 6, 10, 0),
(3358, '2018-01-15', 2, 7, 12, 0),
(3359, '2018-01-15', 2, 8, 11, 0),
(3398, '2018-01-16', 1, 2, 4, 0),
(3399, '2018-01-16', 1, 3, 19, 0),
(3400, '2018-01-16', 1, 4, 18, 0),
(3401, '2018-01-16', 1, 9, 3, 0),
(3408, '2018-01-16', 2, 6, 10, 0),
(3409, '2018-01-16', 2, 7, 13, 0),
(3410, '2018-01-16', 2, 8, 11, 0),
(3419, '2018-01-17', 1, 2, 5, 0),
(3420, '2018-01-17', 1, 3, 18, 0),
(3421, '2018-01-17', 1, 4, 18, 0),
(3422, '2018-01-17', 1, 9, 3, 0),
(3423, '2018-01-18', 2, 6, 10, 0),
(3424, '2018-01-18', 2, 7, 13, 0),
(3425, '2018-01-18', 2, 8, 11, 0),
(3430, '2018-01-18', 1, 2, 5, 0),
(3431, '2018-01-18', 1, 3, 18, 0),
(3432, '2018-01-18', 1, 4, 18, 0),
(3433, '2018-01-18', 1, 9, 3, 0),
(3461, '2018-01-19', 2, 6, 10, 0),
(3462, '2018-01-19', 2, 7, 13, 0),
(3463, '2018-01-19', 2, 8, 11, 0),
(3470, '2018-01-20', 2, 6, 11, 0),
(3471, '2018-01-20', 2, 7, 13, 0),
(3472, '2018-01-20', 2, 8, 11, 0),
(3503, '2018-01-22', 2, 6, 11, 0),
(3504, '2018-01-22', 2, 7, 13, 0),
(3505, '2018-01-22', 2, 8, 11, 0),
(3561, '2018-01-23', 2, 6, 10, 0),
(3562, '2018-01-23', 2, 7, 12, 0),
(3563, '2018-01-23', 2, 8, 14, 0),
(3576, '2018-01-23', 1, 2, 5, 0),
(3577, '2018-01-23', 1, 3, 21, 0),
(3578, '2018-01-23', 1, 4, 18, 0),
(3579, '2018-01-23', 1, 9, 3, 0),
(3621, '2018-01-24', 1, 2, 5, 0),
(3622, '2018-01-24', 1, 3, 20, 0),
(3623, '2018-01-24', 1, 4, 21, 0),
(3624, '2018-01-24', 1, 9, 1, 0),
(3628, '2018-01-24', 2, 6, 10, 0),
(3629, '2018-01-24', 2, 7, 12, 0),
(3630, '2018-01-24', 2, 8, 14, 0),
(3635, '2018-01-25', 1, 2, 5, 0),
(3636, '2018-01-25', 1, 3, 20, 0),
(3637, '2018-01-25', 1, 4, 21, 0),
(3638, '2018-01-25', 1, 9, 1, 0),
(3639, '2018-01-25', 2, 6, 10, 0),
(3640, '2018-01-25', 2, 7, 12, 0),
(3641, '2018-01-25', 2, 8, 14, 0),
(3642, '2018-01-29', 2, 6, 11, 0),
(3643, '2018-01-29', 2, 7, 12, 0),
(3644, '2018-01-29', 2, 8, 14, 0),
(3657, '2018-01-30', 2, 6, 12, 0),
(3658, '2018-01-30', 2, 7, 12, 0),
(3659, '2018-01-30', 2, 8, 14, 0),
(3664, '2018-01-31', 2, 6, 12, 0),
(3665, '2018-01-31', 2, 7, 12, 0),
(3666, '2018-01-31', 2, 8, 14, 0),
(3695, '2018-01-31', 1, 2, 5, 0),
(3696, '2018-01-31', 1, 3, 21, 0),
(3697, '2018-01-31', 1, 4, 21, 0),
(3698, '2018-01-31', 1, 9, 2, 0),
(3731, '2018-02-01', 1, 2, 5, 0),
(3732, '2018-02-01', 1, 3, 21, 0),
(3733, '2018-02-01', 1, 4, 22, 0),
(3734, '2018-02-01', 1, 9, 1, 0),
(3753, '2018-02-01', 2, 6, 12, 0),
(3754, '2018-02-01', 2, 7, 11, 0),
(3755, '2018-02-01', 2, 8, 15, 0),
(3797, '2018-02-02', 2, 6, 12, 0),
(3798, '2018-02-02', 2, 7, 11, 0),
(3799, '2018-02-02', 2, 8, 15, 0),
(3800, '2018-02-02', 1, 2, 5, 0),
(3801, '2018-02-02', 1, 3, 21, 0),
(3802, '2018-02-02', 1, 4, 22, 0),
(3803, '2018-02-02', 1, 9, 1, 0),
(3807, '2018-02-05', 2, 6, 12, 0),
(3808, '2018-02-05', 2, 7, 11, 0),
(3809, '2018-02-05', 2, 8, 15, 0),
(3833, '2018-02-06', 1, 2, 5, 0),
(3834, '2018-02-06', 1, 3, 21, 0),
(3835, '2018-02-06', 1, 4, 22, 0),
(3836, '2018-02-06', 1, 9, 1, 0),
(3837, '2018-02-06', 2, 6, 12, 0),
(3838, '2018-02-06', 2, 7, 12, 0),
(3839, '2018-02-06', 2, 8, 15, 0),
(3849, '2018-02-07', 2, 6, 12, 0),
(3850, '2018-02-07', 2, 7, 12, 0),
(3851, '2018-02-07', 2, 8, 15, 0),
(3864, '2018-02-08', 1, 2, 5, 0),
(3865, '2018-02-08', 1, 3, 21, 0),
(3866, '2018-02-08', 1, 4, 22, 0),
(3867, '2018-02-08', 1, 9, 1, 0),
(3868, '2018-02-09', 2, 6, 12, 0),
(3869, '2018-02-09', 2, 7, 12, 0),
(3870, '2018-02-09', 2, 8, 15, 0),
(3891, '2018-02-09', 1, 2, 5, 0),
(3892, '2018-02-09', 1, 3, 22, 0),
(3893, '2018-02-09', 1, 4, 22, 0),
(3894, '2018-02-09', 1, 9, 1, 0),
(3895, '2018-02-11', 2, 6, 12, 0),
(3896, '2018-02-11', 2, 7, 12, 0),
(3897, '2018-02-11', 2, 8, 15, 0),
(3933, '2018-02-12', 1, 2, 5, 0),
(3934, '2018-02-12', 1, 3, 22, 0),
(3935, '2018-02-12', 1, 4, 22, 0),
(3936, '2018-02-12', 1, 9, 1, 0),
(3937, '2018-02-12', 2, 6, 12, 0),
(3938, '2018-02-12', 2, 7, 12, 0),
(3939, '2018-02-12', 2, 8, 15, 0),
(3967, '2018-02-13', 2, 6, 11, 0),
(3968, '2018-02-13', 2, 7, 12, 0),
(3969, '2018-02-13', 2, 8, 16, 0),
(3982, '2018-02-22', 1, 2, 5, 0),
(3983, '2018-02-22', 1, 3, 22, 0),
(3984, '2018-02-22', 1, 4, 22, 0),
(3985, '2018-02-22', 1, 9, 1, 0),
(3989, '2018-02-22', 2, 6, 11, 0),
(3990, '2018-02-22', 2, 7, 12, 0),
(3991, '2018-02-22', 2, 8, 16, 0),
(3992, '2018-02-23', 2, 6, 11, 0),
(3993, '2018-02-23', 2, 7, 12, 0),
(3994, '2018-02-23', 2, 8, 16, 0),
(3998, '2018-02-27', 1, 2, 5, 0),
(3999, '2018-02-27', 1, 3, 22, 0),
(4000, '2018-02-27', 1, 4, 22, 0),
(4001, '2018-02-27', 1, 9, 1, 0),
(4011, '2018-02-27', 2, 6, 11, 0),
(4012, '2018-02-27', 2, 7, 12, 0),
(4013, '2018-02-27', 2, 8, 16, 0),
(4017, '2018-02-28', 2, 6, 11, 0),
(4018, '2018-02-28', 2, 7, 12, 0),
(4019, '2018-02-28', 2, 8, 16, 0),
(4107, '2018-03-01', 2, 6, 7, 0),
(4108, '2018-03-01', 2, 7, 15, 0),
(4109, '2018-03-01', 2, 8, 17, 0),
(4113, '2018-03-05', 2, 6, 7, 0),
(4114, '2018-03-05', 2, 7, 15, 0),
(4115, '2018-03-05', 2, 8, 17, 0),
(4123, '2018-03-06', 1, 2, 5, 0),
(4124, '2018-03-06', 1, 3, 21, 0),
(4125, '2018-03-06', 1, 4, 23, 0),
(4126, '2018-03-06', 1, 9, 1, 0),
(4127, '2018-03-06', 4, 14, 3, 0),
(4196, '2018-03-07', 2, 6, 11, 0),
(4197, '2018-03-07', 2, 7, 8, 0),
(4198, '2018-03-07', 2, 8, 18, 0),
(4207, '2018-03-07', 1, 2, 5, 0),
(4208, '2018-03-07', 1, 3, 23, 0),
(4209, '2018-03-07', 1, 4, 23, 0),
(4210, '2018-03-07', 1, 9, 1, 0),
(4263, '2018-03-08', 4, 14, 1, 0),
(4264, '2018-03-08', 4, 16, 4, 0),
(4275, '2018-03-08', 1, 2, 5, 0),
(4276, '2018-03-08', 1, 3, 23, 0),
(4277, '2018-03-08', 1, 4, 23, 0),
(4278, '2018-03-08', 1, 9, 1, 0),
(4279, '2018-03-08', 2, 6, 11, 0),
(4280, '2018-03-08', 2, 7, 9, 0),
(4281, '2018-03-08', 2, 8, 17, 0),
(4282, '2018-03-09', 4, 14, 1, 0),
(4283, '2018-03-09', 4, 16, 4, 0),
(4284, '2018-03-09', 1, 2, 5, 0),
(4285, '2018-03-09', 1, 3, 23, 0),
(4286, '2018-03-09', 1, 4, 23, 0),
(4287, '2018-03-09', 1, 9, 1, 0),
(4317, '2018-03-12', 2, 6, 11, 0),
(4318, '2018-03-12', 2, 7, 8, 0),
(4319, '2018-03-12', 2, 8, 18, 0),
(4320, '2018-03-12', 4, 14, 1, 0),
(4321, '2018-03-12', 4, 16, 4, 0),
(4436, '2018-03-13', 1, 2, 6, 0),
(4437, '2018-03-13', 1, 3, 20, 0),
(4438, '2018-03-13', 1, 4, 27, 0),
(4439, '2018-03-13', 1, 9, 1, 0),
(4442, '2018-03-13', 4, 14, 1, 0),
(4443, '2018-03-13', 4, 16, 4, 0),
(4446, '2018-03-14', 4, 14, 1, 0),
(4447, '2018-03-14', 4, 16, 4, 0),
(4454, '2018-03-14', 2, 6, 11, 0),
(4455, '2018-03-14', 2, 7, 8, 0),
(4456, '2018-03-14', 2, 8, 18, 0),
(4485, '2018-03-15', 1, 2, 6, 0),
(4486, '2018-03-15', 1, 3, 20, 0),
(4487, '2018-03-15', 1, 4, 27, 0),
(4488, '2018-03-15', 1, 9, 1, 0),
(4529, '2018-03-16', 1, 2, 6, 0),
(4530, '2018-03-16', 1, 3, 20, 0),
(4531, '2018-03-16', 1, 4, 27, 0),
(4532, '2018-03-16', 1, 9, 1, 0),
(4533, '2018-03-19', 1, 2, 6, 0),
(4534, '2018-03-19', 1, 3, 20, 0),
(4535, '2018-03-19', 1, 4, 27, 0),
(4536, '2018-03-19', 1, 9, 1, 0),
(4543, '2018-03-19', 2, 6, 11, 0),
(4544, '2018-03-19', 2, 7, 8, 0),
(4545, '2018-03-19', 2, 8, 18, 0),
(4546, '2018-03-20', 2, 6, 11, 0),
(4547, '2018-03-20', 2, 7, 8, 0),
(4548, '2018-03-20', 2, 8, 18, 0),
(4585, '2018-03-21', 1, 2, 6, 0),
(4586, '2018-03-21', 1, 3, 20, 0),
(4587, '2018-03-21', 1, 4, 26, 0),
(4588, '2018-03-21', 1, 9, 2, 0),
(4589, '2018-03-21', 2, 6, 11, 0),
(4590, '2018-03-21', 2, 7, 7, 0),
(4591, '2018-03-21', 2, 8, 19, 0),
(4608, '2018-03-22', 1, 2, 6, 0),
(4609, '2018-03-22', 1, 3, 19, 0),
(4610, '2018-03-22', 1, 4, 27, 0),
(4611, '2018-03-22', 1, 9, 2, 0),
(4616, '2018-03-23', 4, 14, 1, 0),
(4617, '2018-03-23', 4, 16, 4, 0),
(4626, '2018-03-23', 1, 2, 6, 0),
(4627, '2018-03-23', 1, 3, 19, 0),
(4628, '2018-03-23', 1, 4, 27, 0),
(4629, '2018-03-23', 1, 9, 2, 0),
(4662, '2018-03-26', 1, 2, 6, 0),
(4663, '2018-03-26', 1, 3, 19, 0),
(4664, '2018-03-26', 1, 4, 27, 0),
(4665, '2018-03-26', 1, 9, 2, 0),
(4669, '2018-03-27', 2, 6, 11, 0),
(4670, '2018-03-27', 2, 7, 7, 0),
(4671, '2018-03-27', 2, 8, 19, 0),
(4672, '2018-03-27', 1, 2, 6, 0),
(4673, '2018-03-27', 1, 3, 20, 0),
(4674, '2018-03-27', 1, 4, 27, 0),
(4675, '2018-03-27', 1, 9, 2, 0),
(4676, '2018-03-27', 4, 14, 1, 0),
(4677, '2018-03-27', 4, 16, 4, 0),
(4678, '2018-03-28', 2, 6, 11, 0),
(4679, '2018-03-28', 2, 7, 7, 0),
(4680, '2018-03-28', 2, 8, 19, 0),
(4685, '2018-03-29', 1, 2, 6, 0),
(4686, '2018-03-29', 1, 3, 20, 0),
(4687, '2018-03-29', 1, 4, 27, 0),
(4688, '2018-03-29', 1, 9, 2, 0),
(4689, '2018-04-02', 1, 2, 6, 0),
(4690, '2018-04-02', 1, 3, 20, 0),
(4691, '2018-04-02', 1, 4, 27, 0),
(4692, '2018-04-02', 1, 9, 2, 0),
(4693, '2018-04-04', 2, 6, 11, 0),
(4694, '2018-04-04', 2, 7, 7, 0),
(4695, '2018-04-04', 2, 8, 19, 0),
(4696, '2018-04-06', 4, 14, 1, 0),
(4697, '2018-04-06', 4, 16, 5, 0),
(4710, '2018-04-09', 1, 2, 6, 0),
(4711, '2018-04-09', 1, 3, 18, 0),
(4712, '2018-04-09', 1, 4, 27, 0),
(4713, '2018-04-09', 1, 9, 4, 0);

-- --------------------------------------------------------

--
-- Table structure for table `project_daily_stats`
--

CREATE TABLE `project_daily_stats` (
  `id` int(11) NOT NULL,
  `day` char(10) NOT NULL,
  `project_id` int(11) NOT NULL,
  `avg_lead_time` int(11) NOT NULL DEFAULT '0',
  `avg_cycle_time` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `project_daily_stats`
--

INSERT INTO `project_daily_stats` (`id`, `day`, `project_id`, `avg_lead_time`, `avg_cycle_time`) VALUES
(5, '2017-07-02', 2, 0, 0),
(11, '2017-07-02', 1, 469, 0),
(42, '2017-07-03', 2, 82636, 138),
(44, '2017-07-03', 1, 40705, 214),
(67, '2017-07-04', 1, 139155, 4877),
(70, '2017-07-05', 1, 221000, 0),
(71, '2017-07-06', 1, 285035, 0),
(74, '2017-07-10', 1, 656927, 0),
(91, '2017-07-11', 1, 678689, 0),
(108, '2017-07-12', 1, 761679, 0),
(125, '2017-07-13', 1, 812264, 319),
(129, '2017-07-14', 1, 877905, 3173),
(132, '2017-07-17', 1, 1168301, 15799),
(134, '2017-07-18', 1, 1224829, 18257),
(136, '2017-07-19', 1, 1272252, 20319),
(143, '2017-07-20', 1, 1354425, 23891),
(149, '2017-07-21', 1, 1440887, 27651),
(158, '2017-07-24', 1, 1728984, 40177),
(160, '2017-07-25', 1, 1753745, 41253),
(168, '2017-07-26', 1, 1862980, 46003),
(176, '2017-07-27', 1, 1845757, 46590),
(179, '2017-07-28', 1, 1923040, 49810),
(183, '2017-08-01', 1, 2241000, 63059),
(194, '2017-08-02', 1, 2360125, 68022),
(207, '2017-08-03', 1, 2309440, 67033),
(210, '2017-08-08', 1, 2688914, 82212),
(213, '2017-08-09', 1, 2781784, 85927),
(215, '2017-08-14', 1, 3195440, 102473),
(222, '2017-08-15', 1, 3259789, 105072),
(223, '2017-08-16', 1, 3360661, 109458),
(225, '2017-08-17', 1, 3400127, 111174),
(234, '2017-08-21', 1, 3710594, 124672),
(236, '2017-08-22', 1, 3787142, 128001),
(246, '2017-08-23', 1, 3644174, 124074),
(248, '2017-08-25', 1, 3742023, 127988),
(264, '2017-08-30', 1, 4139346, 144085),
(266, '2017-09-01', 1, 4234549, 148412),
(273, '2017-09-06', 1, 4435260, 159004),
(280, '2017-09-07', 1, 4490525, 161407),
(281, '2017-09-11', 1, 4752405, 172793),
(283, '2017-09-13', 1, 4873041, 178038),
(289, '2017-09-20', 1, 5177043, 192347),
(303, '2017-09-22', 1, 5149948, 210622),
(306, '2017-09-25', 1, 5347484, 219601),
(317, '2017-09-29', 1, 5641104, 232948),
(328, '2017-10-09', 1, 6303053, 263036),
(338, '2017-10-10', 1, 6349917, 265166),
(342, '2017-10-13', 1, 6330577, 265070),
(356, '2017-10-16', 1, 6568827, 275429),
(357, '2017-10-17', 1, 6583404, 276239),
(376, '2017-10-18', 1, 6440298, 271176),
(381, '2017-10-20', 1, 6358557, 268990),
(382, '2017-10-21', 1, 6361001, 269113),
(386, '2017-10-24', 1, 6538106, 277968),
(389, '2017-10-31', 1, 6716088, 288345),
(425, '2017-11-01', 2, 36380, 0),
(437, '2017-11-01', 1, 6785305, 291641),
(440, '2017-11-02', 1, 6825231, 293543),
(443, '2017-11-02', 2, 93330, 0),
(447, '2017-11-03', 2, 169738, 0),
(450, '2017-11-03', 1, 6875851, 295953),
(452, '2017-11-05', 1, 6979929, 300909),
(462, '2017-11-06', 1, 7172203, 277880),
(466, '2017-11-06', 2, 432745, 0),
(468, '2017-11-07', 2, 501966, 0),
(474, '2017-11-08', 2, 581539, 0),
(477, '2017-11-08', 1, 7111827, 276683),
(507, '2017-11-09', 2, 604414, 0),
(523, '2017-11-09', 1, 6970040, 271462),
(526, '2017-11-10', 2, 693852, 0),
(527, '2017-11-10', 1, 7011046, 273245),
(545, '2017-11-13', 1, 7193371, 280425),
(552, '2017-11-13', 2, 969805, 0),
(558, '2017-11-14', 1, 7247584, 282684),
(560, '2017-11-14', 2, 1056160, 0),
(594, '2017-11-15', 2, 1066762, 0),
(595, '2017-11-15', 1, 7303756, 285025),
(614, '2017-11-16', 1, 7337759, 286441),
(631, '2017-11-16', 2, 976402, 0),
(640, '2017-11-17', 1, 7392023, 288702),
(645, '2017-11-17', 2, 1011590, 0),
(648, '2017-11-18', 2, 1102887, 0),
(650, '2017-11-19', 1, 7506880, 293488),
(653, '2017-11-20', 1, 7549523, 295265),
(655, '2017-11-21', 2, 1340758, 0),
(657, '2017-11-21', 1, 7619347, 298174),
(667, '2017-11-22', 2, 1450972, 0),
(670, '2017-11-22', 1, 7482310, 292989),
(674, '2017-11-23', 2, 1444017, 0),
(695, '2017-11-24', 2, 1552530, 0),
(696, '2017-11-24', 1, 7580056, 297062),
(699, '2017-11-25', 1, 7640389, 299576),
(705, '2017-11-27', 2, 1817051, 0),
(706, '2017-11-27', 1, 7746972, 304017),
(708, '2017-11-28', 2, 1889455, 0),
(726, '2017-11-29', 1, 7859400, 308701),
(727, '2017-11-29', 2, 2007596, 0),
(728, '2017-11-30', 2, 2075214, 0),
(729, '2017-11-30', 1, 7902124, 310482),
(735, '2017-12-02', 2, 2164553, 0),
(746, '2017-12-04', 2, 2351990, 0),
(747, '2017-12-04', 1, 8122942, 319682),
(750, '2017-12-05', 1, 8160276, 321238),
(754, '2017-12-05', 2, 2434247, 0),
(762, '2017-12-06', 1, 8211323, 323365),
(768, '2017-12-06', 2, 2546548, 0),
(785, '2017-12-07', 2, 2502829, 0),
(791, '2017-12-07', 1, 8087437, 318626),
(817, '2017-12-08', 2, 2594472, 0),
(818, '2017-12-08', 1, 8123432, 320066),
(819, '2017-12-11', 1, 8270740, 325958),
(821, '2017-12-12', 1, 8328540, 328270),
(830, '2017-12-12', 2, 2742700, 0),
(832, '2017-12-13', 2, 2830119, 0),
(835, '2017-12-14', 1, 8435402, 332545),
(838, '2017-12-14', 2, 2931076, 0),
(853, '2017-12-15', 2, 2908431, 0),
(854, '2017-12-15', 1, 8294848, 327039),
(855, '2017-12-17', 2, 3102831, 0),
(861, '2017-12-18', 2, 3161577, 0),
(863, '2017-12-18', 1, 8465199, 333591),
(879, '2017-12-19', 2, 3261156, 0),
(881, '2017-12-19', 1, 8520004, 335699),
(885, '2017-12-20', 1, 8555764, 337074),
(889, '2017-12-20', 2, 3344624, 0),
(894, '2017-12-21', 2, 3424235, 0),
(895, '2017-12-21', 1, 8628803, 339883),
(901, '2017-12-22', 2, 3406436, 0),
(903, '2017-12-22', 1, 8473876, 333734),
(905, '2017-12-27', 2, 3822947, 0),
(907, '2017-12-28', 2, 3895213, 0),
(908, '2017-12-29', 2, 3997284, 0),
(928, '2018-01-02', 2, 4362758, 0),
(929, '2018-01-02', 1, 9089318, 356528),
(946, '2018-01-03', 1, 8929044, 350129),
(950, '2018-01-03', 2, 4450195, 0),
(958, '2018-01-04', 1, 8975742, 351797),
(960, '2018-01-04', 2, 4382182, 0),
(962, '2018-01-05', 1, 9013020, 353128),
(971, '2018-01-05', 2, 4476546, 0),
(974, '2018-01-08', 1, 9195977, 359663),
(975, '2018-01-08', 2, 4736193, 0),
(987, '2018-01-09', 1, 9055430, 353933),
(988, '2018-01-09', 2, 4832216, 0),
(993, '2018-01-10', 1, 9113289, 355928),
(995, '2018-01-11', 2, 4976011, 0),
(997, '2018-01-12', 1, 9214796, 359428),
(998, '2018-01-12', 2, 5075801, 0),
(1000, '2018-01-13', 2, 5174927, 0),
(1001, '2018-01-13', 1, 9285895, 361880),
(1003, '2018-01-14', 1, 9330909, 363432),
(1006, '2018-01-14', 2, 5245105, 0),
(1018, '2018-01-15', 2, 5342179, 0),
(1029, '2018-01-16', 1, 9442098, 367266),
(1032, '2018-01-16', 2, 5275185, 0),
(1035, '2018-01-17', 1, 9533788, 370428),
(1036, '2018-01-18', 2, 5421513, 0),
(1038, '2018-01-18', 1, 9561741, 371392),
(1048, '2018-01-19', 2, 5509098, 0),
(1051, '2018-01-20', 2, 5429742, 0),
(1062, '2018-01-22', 2, 5639091, 0),
(1079, '2018-01-23', 2, 5542126, 0),
(1083, '2018-01-23', 1, 9230905, 357234),
(1095, '2018-01-24', 1, 9280715, 358790),
(1097, '2018-01-24', 2, 5641861, 0),
(1099, '2018-01-25', 1, 9331131, 360366),
(1100, '2018-01-25', 2, 5729383, 0),
(1101, '2018-01-29', 2, 5905123, 0),
(1106, '2018-01-30', 2, 5836250, 0),
(1108, '2018-01-31', 2, 5903558, 0),
(1116, '2018-01-31', 1, 9315082, 357025),
(1125, '2018-02-01', 1, 9341324, 357414),
(1132, '2018-02-01', 2, 6001356, 0),
(1145, '2018-02-02', 2, 6097879, 0),
(1146, '2018-02-02', 1, 9403848, 357414),
(1148, '2018-02-05', 2, 6340004, 0),
(1155, '2018-02-06', 1, 9587848, 357414),
(1156, '2018-02-06', 2, 6258058, 0),
(1160, '2018-02-07', 2, 6370231, 0),
(1164, '2018-02-08', 1, 9702404, 357414),
(1165, '2018-02-09', 2, 6493454, 0),
(1171, '2018-02-09', 1, 9545594, 351596),
(1172, '2018-02-11', 2, 6696698, 0),
(1184, '2018-02-12', 1, 9709484, 357247),
(1185, '2018-02-12', 2, 6806749, 0),
(1195, '2018-02-13', 2, 6865361, 0),
(1199, '2018-02-22', 1, 10208277, 374447),
(1201, '2018-02-22', 2, 7668739, 0),
(1202, '2018-02-23', 2, 7740828, 0),
(1204, '2018-02-27', 1, 10448770, 382740),
(1208, '2018-02-27', 2, 8096254, 0),
(1210, '2018-02-28', 2, 8158259, 0),
(1240, '2018-03-01', 2, 8254694, 0),
(1242, '2018-03-05', 2, 8489982, 0),
(1245, '2018-03-06', 1, 10799221, 394824),
(1246, '2018-03-06', 4, 6026049, 0),
(1268, '2018-03-07', 2, 8596454, 0),
(1271, '2018-03-07', 1, 10445030, 381732),
(1295, '2018-03-08', 4, 3724441, 2663),
(1299, '2018-03-08', 1, 10494714, 383334),
(1300, '2018-03-08', 2, 8652241, 0),
(1301, '2018-03-09', 4, 3784616, 17707),
(1302, '2018-03-09', 1, 10538387, 384743),
(1313, '2018-03-12', 2, 8859921, 0),
(1314, '2018-03-12', 4, 4004022, 72559),
(1344, '2018-03-13', 1, 10343808, 376811),
(1346, '2018-03-13', 4, 4101737, 96987),
(1348, '2018-03-14', 4, 4126691, 103226),
(1351, '2018-03-14', 2, 8967992, 0),
(1359, '2018-03-15', 1, 10445184, 380190),
(1370, '2018-03-16', 1, 10493245, 381792),
(1371, '2018-03-19', 1, 10625705, 386207),
(1374, '2018-03-19', 2, 9225176, 0),
(1375, '2018-03-20', 2, 9283723, 0),
(1385, '2018-03-21', 1, 10735726, 389900),
(1386, '2018-03-21', 2, 9346348, 0),
(1391, '2018-03-22', 1, 10774603, 391288),
(1393, '2018-03-23', 4, 4750021, 259058),
(1396, '2018-03-23', 1, 10821170, 392951),
(1405, '2018-03-26', 1, 10954275, 397705),
(1407, '2018-03-27', 2, 9640462, 0),
(1408, '2018-03-27', 1, 10787893, 391645),
(1409, '2018-03-27', 4, 5020081, 326573),
(1410, '2018-03-28', 2, 9723972, 0),
(1412, '2018-03-29', 1, 10886711, 395052),
(1413, '2018-04-02', 1, 11062507, 401114),
(1414, '2018-04-04', 2, 10066461, 0),
(1415, '2018-04-06', 4, 4759534, 416178),
(1419, '2018-04-09', 1, 11375236, 411898);

-- --------------------------------------------------------

--
-- Table structure for table `project_has_categories`
--

CREATE TABLE `project_has_categories` (
  `id` int(11) NOT NULL,
  `name` varchar(255) NOT NULL,
  `project_id` int(11) NOT NULL,
  `description` text
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `project_has_files`
--

CREATE TABLE `project_has_files` (
  `id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `name` varchar(255) NOT NULL,
  `path` varchar(255) NOT NULL,
  `is_image` tinyint(1) DEFAULT '0',
  `size` int(11) NOT NULL DEFAULT '0',
  `user_id` int(11) NOT NULL DEFAULT '0',
  `date` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `project_has_groups`
--

CREATE TABLE `project_has_groups` (
  `group_id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `role` varchar(255) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `project_has_metadata`
--

CREATE TABLE `project_has_metadata` (
  `project_id` int(11) NOT NULL,
  `name` varchar(50) NOT NULL,
  `value` varchar(255) DEFAULT '',
  `changed_by` int(11) NOT NULL DEFAULT '0',
  `changed_on` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `project_has_notification_types`
--

CREATE TABLE `project_has_notification_types` (
  `id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `notification_type` varchar(50) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `project_has_roles`
--

CREATE TABLE `project_has_roles` (
  `role_id` int(11) NOT NULL,
  `role` varchar(255) NOT NULL,
  `project_id` int(11) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `project_has_users`
--

CREATE TABLE `project_has_users` (
  `project_id` int(11) NOT NULL,
  `user_id` int(11) NOT NULL,
  `role` varchar(255) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `project_has_users`
--

INSERT INTO `project_has_users` (`project_id`, `user_id`, `role`) VALUES
(1, 1, 'project-manager'),
(1, 2, 'project-manager'),
(1, 3, 'project-manager'),
(1, 4, 'project-manager'),
(1, 5, 'project-manager'),
(1, 6, 'project-manager'),
(1, 7, 'project-member'),
(1, 8, 'project-member'),
(1, 9, 'project-manager'),
(2, 1, 'project-manager'),
(2, 2, 'project-manager'),
(2, 3, 'project-manager'),
(2, 4, 'project-manager'),
(2, 5, 'project-manager'),
(2, 6, 'project-manager'),
(2, 8, 'project-manager'),
(2, 9, 'project-manager'),
(4, 1, 'project-manager'),
(4, 2, 'project-manager'),
(4, 3, 'project-member'),
(4, 5, 'project-manager'),
(4, 6, 'project-manager'),
(4, 8, 'project-manager'),
(4, 9, 'project-manager'),
(4, 10, 'project-member'),
(4, 11, 'project-member');

-- --------------------------------------------------------

--
-- Table structure for table `project_role_has_restrictions`
--

CREATE TABLE `project_role_has_restrictions` (
  `restriction_id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `role_id` int(11) NOT NULL,
  `rule` varchar(255) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `remember_me`
--

CREATE TABLE `remember_me` (
  `id` int(11) NOT NULL,
  `user_id` int(11) DEFAULT NULL,
  `ip` varchar(45) DEFAULT NULL,
  `user_agent` varchar(255) DEFAULT NULL,
  `token` varchar(255) DEFAULT NULL,
  `sequence` varchar(255) DEFAULT NULL,
  `expiration` int(11) DEFAULT NULL,
  `date_creation` bigint(20) DEFAULT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `remember_me`
--

INSERT INTO `remember_me` (`id`, `user_id`, `ip`, `user_agent`, `token`, `sequence`, `expiration`, `date_creation`) VALUES
(191, 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 'deed95cfa0fbd90baee977361a6a1fd49b03282152bf461cf48d5c01e4ebc2f4', 'fc7f63f47b84ae4e8c9030e51a47c87a047e59419958568cf2037b937386', 1520584986, 1515400986),
(236, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '770106de4cc2ad2c275015c30d770c6293dbc8ebde194806869652448ff2578e', '392dbbaef0a86bc8b2fadaf0db98cfa01b3f88a321c98d63024c2f24230a', 1522499617, 1517315617),
(237, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', 'f7ac6bd60bb82921a7cb017c6fbe54f8af381c08461f23ed7cbee04cb8e47c0d', 'bfc530e7226047334ea3693a29d94fe1f2c3a83199c9dcd84fd156cd2fc7', 1522574769, 1517390769),
(244, 1, '116.225.124.184', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '115e9aa01a0ace6d9aa9673d71d864af4c0666d25794a8ac5feea3d98e41cddb', '56ab0913d75c98dcbf6013478968fc54421e072e83e3eb4abec0475917d1', 1522659123, 1517475123),
(246, 1, '116.225.124.184', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '1244af4becde6bc7a297a01e3781b81c733181dcdc9330e3b28001f2f87c1bd7', '6d7cffa77da079ec3502c2203aff5f404677515eec7acd2c5d23e9c1bd66', 1522738178, 1517554178),
(247, 1, '180.156.244.155', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '364cc6f2a35369c5badd056a03edae961f4f919570593fa429cfc90e8a599b30', '3c6203b35941f02c7b3a00811823862be39957ff34ab6cc4f3f7bd7a2a55', 1522908959, 1517724959),
(249, 8, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.140 Safari/537.36', 'f8df7f53d9e9e57a769d0d3b5c58c9287704816e921b7265b841aabc6c20d0e9', '6c2bb7e97c10daa2e5806086f42b6c69bed01788c27ad8980763caaea84e', 1523009371, 1517825371),
(250, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '916ee049919fd85c4259b411be7e415a0e8c11668be701b10c09ae2776120ced', '11eb6dd42b1ff3dbe57ddedd5a7fd13045c4bf95ed145d62be30a5e7abf4', 1523084658, 1517900658),
(253, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', 'ba84b2d6755535d51acac5d759a03705e05ebef793f8ef920a6f19ce22659be0', 'ea66eaf925feb764c2571074b3fdf5ea0cd33b32c337b35aaf1ad26e70b3', 1523258423, 1518074423),
(255, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '7a7110157ec5931488ce14cb8b594e60b79641770b354e5ebef9cb35c442af45', '7decd35d92ce1ef2bccbc5a18cf79ddb660d430bd5cbf5037a88965e6322', 1523265532, 1518081532),
(257, 1, '116.225.124.184', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '4c56043aa54ca53621ec741ff8bf86a53678953ad8a1718b1572c96ecbb58379', '9915c5e2476b69210bd0e4e5011d9c013bc5303e7177312b9f9f08d8f52c', 1523590653, 1518406653),
(263, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', 'ef8719ec73be48c03c9969551c453e6f43e5d08eea91fe77feede5252d5b7703', 'ca5682eb7367f2c4baee0aabbd4e861747cb68067aa9b228736c65b22e23', 1523959503, 1518775503),
(264, 6, '180.157.116.105', 'Mozilla/5.0 (Windows NT 10.0; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36', '1af257d6f7f85776a1f91c376e0a483fda0d64e4d5245d4c0150817201f8eb34', 'f0fe165228843043e14d472cc185e0f7007091698203df24120cc0db8172', 1524381725, 1519197725),
(269, 3, '116.226.111.167', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', '7fe5e29c296d6a1cfbf22188c1d3bdf46d976f72580e2c1b99580d6f322993cb', '04081a8c3dafe86f871a21cbcb8761e29ff47731f7569c67ba73435a584c', 1525073773, 1519889773),
(270, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '2b8a99027eecc6a2a84720933f066f52d4c1c3ccbc075a51baa57b0f6b2a3d0b', 'e60a309e100106066760ac0c984fff8a2f762bb3f7bac845203c80e0c4c4', 1525076861, 1519892861),
(272, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 'ee0b5ded668ee9839a811759ac2689178ef9af16f09186ea0dcf0f68841fb17b', 'b881e1986b10966c613b2c3075564c2564ac57e4dcb058304a962ec05366', 1525097254, 1519913254),
(273, 1, '180.162.73.112', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', '99445e7c308fa7b08ca3cc6f81695849c0e83a1fec3bf78d32900a5715b09c3d', '93c3da9183cddd4bebcc18f86e4c888456adaf5abb07c9a08e3c66ee4fd1', 1525156620, 1519972620),
(274, 1, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '47d605dfeda42376cbfe3e2a56d2993145c7c616c08e12f68abef17f5fc2f112', '961cb3a7ac8a99021cea86e0cae3da65340accd1cac8f558d8c078c0a271', 1525513300, 1520329300),
(275, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '5b1b02ff6e0d19af87079808e350d4c63bcb6de55b2ba216445f3a5e590a945b', 'fb4af86375f49f87da0e4996792dc77782332c22703e868b3c2f77d827df', 1525513328, 1520329328),
(276, 1, '82.113.121.4', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/604.4.7 (KHTML, like Gecko) Version/11.0.2 Safari/604.4.7', '46a3b148578841a739e9d07db80dfadddb13d0be75769ced63f56e1e61a5faa6', 'a1bf0f1e1e5ede7324edcf14dc3b8e8740dadeeb9eacd9ae77679a8fb9f8', 1525519221, 1520335221),
(278, 1, '82.113.121.4', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/63.0.3239.132 Safari/537.36', 'e9002664dd940896be7052e3c1809b4dc01f4e360914348d74323dbb6a4c9f04', '6b0333f6715392709ab9a86ce4ade9940d3225d485a5baa512380a14d9a2', 1525535262, 1520351262),
(279, 5, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64; Trident/7.0; rv:11.0) like Gecko', 'f3c0d03dc7c6e4356183dc465ed74e7b3abc2064c0ebc950f014e806b32af340', '6b4f9bd03c741db9227044b44379f2b30182068d2d11d774c6c1eeb73135', 1525535457, 1520351457),
(280, 1, '185.46.137.15', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '0fecd639cfbf21ce923770284bef2063c1c0113704980e51e08acae92dc6f93c', '7e34424006afaeb60276c12e427a2961dbeb3c1ff65e982dea3055709ad3', 1525585378, 1520401378),
(282, 9, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', 'b0beae002ea11e92d7a2a91fcabf9e4060bc99a6dd4fbdffb78a341206854a42', '3c68b0147256a5b403ef5690fb221b884cebda7467f3a1b5a31e5990069f', 1525681741, 1520497741),
(283, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '5c22a85b84dbb105d4f8d420b83339446895f17d705f152e467c3d85190067bd', 'b39ef6c71cdcdbab5063eb8e36b13b52c3250b4a4c5a6898e25db62be3cd', 1525694918, 1520510918),
(287, 2, '185.22.142.168', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '27e90f9d0cf7047dfd382cbe26f2c9bc7f41699ce1b91c73d23a89111b230556', 'a7b80553c820b8b405fbb2d1e8467eb5845ab084fc363f824859f26bdb60', 1525711393, 1520527393),
(288, 11, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:58.0) Gecko/20100101 Firefox/58.0', '53ba12c05f8d242ccad12ad497303119a964ba5126775b4cb750708167290384', '7be14ede9d32bc124e77e7bfa4516ed40c5d1f365ca1184f1463782c7d83', 1525773450, 1520589450),
(290, 1, '180.162.73.112', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 'cef5d5fc320e04cad1536f7f1f3966f78e8d321482542a3a80a0afc7349f18dd', '5fd0aa6b31534b9fd92365960618a39ba576ce8151170bbeee786e0357a8', 1526113326, 1520929326),
(291, 1, '180.162.73.112', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', 'd7ec2612415f0add804e7e6ce66579cebb68dc49761da804392e539a7f835a5d', 'c7e3c909d42e82051bd1f4afc2bf3d13113c52340b16039c4596fdfcd2e4', 1526167698, 1520983698),
(292, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.162 Safari/537.36', 'e75e849efed8623aec52d19558663159c7a0fe289f1c70a18b09c51b24b99501', '39fa312a28002fc3c255870ac13e5841cf78f5c667579a9e3fe8c876efe5', 1526195400, 1521011400),
(294, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '236d041228c899a27e693e6774ce3476491e800196f618e72de9ef454bfda7e4', '526ef37f195923b7290753bfbed557931a293432d8a2c1e3fff0c891afd1', 1526221172, 1521037172),
(296, 1, '180.162.73.112', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '2c06caec4933883e939e0224778229004285c14d148494d94ac85759b2034503', 'e342971e12fdf29558995d923746d06571822da44a390d706a31d6f30c94', 1526279397, 1521095397),
(299, 1, '180.162.73.112', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '0935b9324c0595f6685e9d6f1f6535e0ed3d84b4c7e3f66c3a3ced4726e11182', '4f10ee9f4293ad08543d8d6a389cb87406aa0faeda90464111b059c802e1', 1526345612, 1521161612),
(300, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.162 Safari/537.36', '36a877d69d19d33053bd37c27ce92c3e90dca17b9ca13a4a220fcd753c3299ca', 'aafc3c7cb9d78e7499fd4616a8d4f0769e656f2b5eea60df80a5a451555c', 1526374670, 1521190670),
(301, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '0edcc72c2f4c82496e393931d062f4676fcb17ac8afc0be10a774deb4ce01802', 'f0d2c507b36456caa41cbb7277ae391d17399944c37a46cdf46a07208490', 1526380173, 1521196173),
(302, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.162 Safari/537.36', '1160008e71b5efa6a9ad684e81f66e2012af452d5b9e808884d54e2591cb258a', 'e034ce747a34901d345a855241b726256410666ca1ef3274b4f444a9e177', 1526389453, 1521205453),
(303, 1, '180.162.73.112', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '96567695a55b991823c4c19386c824a48e1d85f8579620248220f764e96c8f0d', '838d18bad2f4f9e07008537fa05c034a8a8f00b5b5d4576d000fce16a6e1', 1526688054, 1521504054),
(305, 1, '180.156.245.7', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '4012efe2bd61e49874a53a06641eb5f721c91cbc3cf9a2d7af9283fc56f61e75', '2e4f94bd3014a6e7755bec45cf507f7fe9f16d15d43925c9e93d5c0711c5', 1526740571, 1521556571),
(306, 4, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; WOW64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '1bbb4af81250f68d84afa709dd694793dd311d6df1bd48fb5fc883c910db966b', '66010d7d226d084dc473c4f7da5cfcce808e3578643f8cb81ef66c89a54f', 1526804811, 1521620811),
(307, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 'daa761aebda20fcf1d7a67caacd13e5f3f363970a526ce5a54f0f8987fc7b729', '04521cacc33b3307d4b87509b9cabff9953355e77130a0244bde8957d9e2', 1526808797, 1521624797),
(309, 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_2) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/64.0.3282.186 Safari/537.36', '3c275cd29b771fdb0b510ebf737ffbcb3e6c2ee756b4fe5b4e9976cad2cc0f9f', 'c7eba2677aea20e1ede6a5b15c14ccfcfa8deb56f0962e1c4cab78e06898', 1526868662, 1521684662),
(310, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', 'c1e173011e63becae7703ee0811e004078c6ddf85a9af2f0a142948d3d3b3323', '8f48ca3aa7eddeb7f9c039ab4e36b70c97dd7175d0d33e90ba63228c94a9', 1526889872, 1521705872),
(313, 2, '91.137.118.106', 'Mozilla/5.0 (Windows NT 10.0; Win64; x64) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', '641694d1071a70ea5736535993ae0058ae02ad6d48de974b5c45432826200b46', 'a58be222491af6e5da48ecf8748e94c4c12abdc36d2ff69bc31ec66d0e93', 1527229314, 1522045314),
(316, 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', '189dcf7294f713e7a587d051570fcaf13caa576a9ce9e361731808cd2f62f568', '4c3c3162dfdc83296e2f5f6660a063b4559cda32472bd83468179085076d', 1527323959, 1522139959),
(317, 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', '0058e8b1e3d0a8dbcf067e93d20cb081514b26af4eb0b574be51ebb7dc2f9cdb', 'deded7daa2b25cf12530224d71fc696b7c4700e14a13e25bd05206c36c0f', 1527410839, 1522226839),
(318, 2, '46.245.219.150', 'Mozilla/5.0 (Windows NT 6.3; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 'd6976535a0b7760a5cfc9603b794e94ac7d1f02fd99ac57d22579ae7610bd7c0', 'ffd24e1caa9fdcf43796530d9955a8bad6c18d7d19d1974b1d211bd22baa', 1527437413, 1522253413),
(320, 1, '119.9.77.100', 'Mozilla/5.0 (Macintosh; Intel Mac OS X 10_13_3) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/65.0.3325.181 Safari/537.36', '3800c9a953306f80ef21a05c1dfebf5f8cca3c9c53c4dd896b1eab544d8e6ed1', '6b474cd3fb487ac7b18ca75a1b825803f7dd25a2511c968d89df8a7488ea', 1527554801, 1522370801),
(322, 11, '91.137.118.106', 'Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:59.0) Gecko/20100101 Firefox/59.0', 'b88cc0967639539f4ebcbe0dbf3903486b16c0682fed3bc6464bc94a9691dca6', 'b3a7ffab157b116d53f69231a57dbf0d30d85d7ce8da7f52d28de5b862f1', 1528178047, 1522994047);

-- --------------------------------------------------------

--
-- Table structure for table `schema_version`
--

CREATE TABLE `schema_version` (
  `version` int(11) DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `schema_version`
--

INSERT INTO `schema_version` (`version`) VALUES
(124);

-- --------------------------------------------------------

--
-- Table structure for table `settings`
--

CREATE TABLE `settings` (
  `option` varchar(100) NOT NULL,
  `value` text,
  `changed_by` int(11) NOT NULL DEFAULT '0',
  `changed_on` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `settings`
--

INSERT INTO `settings` (`option`, `value`, `changed_by`, `changed_on`) VALUES
('api_token', '7b7306fb38aa10046043df6e9631f51193ef58dc14b0b62836d00b2bb03e', 0, 0),
('application_currency', 'USD', 0, 0),
('application_date_format', 'd/m/Y', 1, 1499910677),
('application_language', 'en_US', 1, 1499910677),
('application_stylesheet', '', 1, 1499910677),
('application_timezone', 'UTC', 1, 1499910677),
('application_time_format', 'H:i', 1, 1499910677),
('application_url', '', 1, 1499910677),
('board_columns', '', 0, 0),
('board_highlight_period', '172800', 0, 0),
('board_private_refresh_interval', '10', 0, 0),
('board_public_refresh_interval', '60', 0, 0),
('calendar_project_tasks', 'date_started', 0, 0),
('calendar_user_subtasks_time_tracking', '0', 0, 0),
('calendar_user_tasks', 'date_started', 0, 0),
('cfd_include_closed_tasks', '1', 0, 0),
('default_color', 'yellow', 0, 0),
('integration_gravatar', '0', 0, 0),
('mail_sender_address', 'rdd@benhulme.net', 1, 1499069007),
('mail_transport', 'smtp', 1, 1499069007),
('password_reset', '1', 1, 1499910677),
('project_categories', '', 0, 0),
('subtask_restriction', '0', 0, 0),
('subtask_time_tracking', '1', 0, 0),
('webhook_token', '384d5b69ffd7315f2cf1eef2c170b5ed0dbf6d2a2e63462e39dca5d24db2', 0, 0),
('webhook_url', '', 0, 0);

-- --------------------------------------------------------

--
-- Table structure for table `subtasks`
--

CREATE TABLE `subtasks` (
  `id` int(11) NOT NULL,
  `title` varchar(255) NOT NULL,
  `status` int(11) DEFAULT '0',
  `time_estimated` float DEFAULT NULL,
  `time_spent` float DEFAULT NULL,
  `task_id` int(11) NOT NULL,
  `user_id` int(11) DEFAULT NULL,
  `position` int(11) DEFAULT '1'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `subtasks`
--

INSERT INTO `subtasks` (`id`, `title`, `status`, `time_estimated`, `time_spent`, `task_id`, `user_id`, `position`) VALUES
(1, 'Send Micrometer to SGS (3.7.17)', 2, 0, 1.81, 1, 1, 1),
(2, 'Test Micrometer After Calibration', 2, 0, 0, 1, 1, 2),
(3, 'CW28 Work with Martin on IP\'s', 2, 0, 0, 1, 1, 3),
(4, 'Receive Stock Plug Samples', 2, 0, 0, 2, 1, 1),
(5, 'Test and Measure Samples (PS)', 2, 0, 0, 2, 1, 2),
(6, 'Send Few Samples to YJ', 2, 0, 0, 2, 1, 3),
(7, 'Receive YJ Assembled and Test', 2, 0, 0, 2, 1, 4),
(8, 'Write Report for RDD QC', 2, 0, 0, 2, 1, 5),
(9, 'Receive Part Samples', 0, 0, 0, 12, 1, 1),
(10, 'Verify Dimensions + Function Test', 0, 0, 0, 12, 1, 2),
(11, 'Send Report to Germany (FFT+DIM)', 0, 0, 0, 12, 1, 3),
(12, 'Start Life Cycle Testing', 0, 0, 0, 12, 1, 4),
(13, 'Gain Release from RDD', 0, 0, 0, 12, 1, 5),
(14, 'Receive Samples from Carry', 2, 0, 0, 13, 1, 1),
(15, 'Verify Dimensions & Function', 2, 0, 0, 13, 1, 2),
(16, 'Send Report to Germany', 2, 0, 0, 13, 1, 3),
(17, 'Gain Release from Germany', 2, 0, 0, 13, 1, 4),
(18, 'Shinya Book LCL Shipment #19 Rework', 2, 0, 0, 5, 1, 2),
(19, 'Sent Rework Units', 2, 0, 0, 5, 1, 3),
(20, 'Purchase Relays', 0, 0, 0, 25, 1, 1),
(21, 'Relays Arrive In Factory', 2, 0, 0, 25, 1, 2),
(22, 'RD-CN needs 35K plugs from RD-D', 2, 0, 0, 2, 4, 6),
(23, 'Receive Document from Customs', 2, 0, 0, 5, 1, 1),
(24, 'Get Price and Timeline from ZX', 2, 0, 0, 27, 1, 1),
(25, 'Receive Labels from Supplier', 2, 0, 0, 27, 1, 2),
(26, 'Work out Assembly Increase Price', 2, 0, 0, 27, 1, 3),
(27, 'Send Samples to Germany', 2, 0, 0, 27, 1, 4),
(28, 'Martin\'s Reply to IQC of Chinese Gears', 2, 0, 0, 1, 2, 4),
(29, 'Receive Drawings From Dieter', 2, 0, 0, 28, 1, 1),
(30, 'RX Quote for Stamp Update', 2, 0, 0, 28, 1, 2),
(31, 'Rework RD35/45 Covers', 2, 0, 0, 28, 1, 3),
(32, 'Quote Germany for CN Plugs', 2, 0, 0, 2, 1, 7),
(33, 'Actuators IQC Reports ', 1, 0, 700.45, 33, 1, 1),
(34, '2 Ok and 2 NOK Samples from DE', 0, 0, 0, 33, 5, 2),
(35, 'Updated Report on Current Failures', 0, 0, 0, 33, 5, 3),
(36, 'Measuring Force at RD-D Life Cycle Testing', 0, 0, 0, 33, 5, 4),
(37, 'Receive Testing Info From Andreas', 2, 0, 0, 39, 1, 1),
(38, 'Receive Package from Germany', 2, 0, 0, 39, 1, 2),
(39, '01/12/2017 Receive Motors from Nichibo', 2, 0, 0, 39, 1, 3),
(40, 'Send Pricing to Manfred', 2, 0, 0, 39, 1, 4),
(41, 'Testing Parameters ', 0, 0, 0, 38, 2, 1),
(42, '21/11/2017 Worm Samples Arrive', 2, 0, 0, 39, 1, 5),
(43, 'Motor Samples Testing Running in China', 0, 0, 0, 39, 1, 6),
(44, 'Motor Samples Sent to Germany', 0, 0, 0, 39, 1, 7),
(45, 'Motor Samples Testing Running in Germany', 0, 0, 0, 39, 1, 8),
(46, 'update TA60 user manual according to TUV request', 2, 0, 0, 48, 2, 1),
(48, 'obtain GDO co-license', 2, 0, 0.04, 48, 3, 2),
(49, 'Change LBW Worm Drawing for Nichibo', 0, 0, 0, 39, 2, 9),
(50, 'Plastic Parts Tooling Information', 0, 0, 0, 60, 2, 1),
(51, 'Label Photos', 0, 0, 0, 60, 2, 2);

-- --------------------------------------------------------

--
-- Table structure for table `subtask_time_tracking`
--

CREATE TABLE `subtask_time_tracking` (
  `id` int(11) NOT NULL,
  `user_id` int(11) NOT NULL,
  `subtask_id` int(11) NOT NULL,
  `start` bigint(20) DEFAULT NULL,
  `end` bigint(20) DEFAULT NULL,
  `time_spent` float DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `subtask_time_tracking`
--

INSERT INTO `subtask_time_tracking` (`id`, `user_id`, `subtask_id`, `start`, `end`, `time_spent`) VALUES
(1, 1, 1, 1498988871, 1498988874, 0),
(2, 1, 1, 1499070051, 1499070052, 0),
(3, 1, 2, 1499070055, 1499070057, 0),
(4, 1, 1, 1499072637, 1499072640, 0),
(5, 1, 21, 1499150360, 1499150361, 0),
(6, 1, 20, 1499695092, 1499695096, 0),
(7, 1, 4, 1499752927, 1499752928, 0),
(8, 1, 5, 1499752929, 1499752930, 0),
(9, 1, 24, 1499846140, 1499846141, 0),
(10, 1, 23, 1499846674, 1499846674, 0),
(11, 1, 6, 1499868942, 1499868943, 0),
(12, 1, 18, 1499910453, 1499910454, 0),
(13, 1, 19, 1499910455, 1499910456, 0),
(14, 1, 29, 1500297143, 1500297146, 0),
(15, 1, 2, 1500427508, 1500427510, 0),
(16, 1, 21, 1501564397, 1501564398, 0),
(17, 1, 25, 1501564422, 1501564423, 0),
(18, 1, 26, 1501564425, 1501564426, 0),
(19, 1, 27, 1501564429, 1501564430, 0),
(20, 1, 7, 1502700764, 1502700765, 0),
(21, 1, 3, 1503502019, 1503502020, 0),
(22, 1, 8, 1504063101, 1504063101, 0),
(23, 1, 8, 1504063104, 1504063105, 0),
(24, 1, 3, 1504752779, 1504752781, 0),
(25, 2, 28, 1504752782, 1504752783, 0),
(26, 1, 38, 1509507939, 1509507940, 0),
(27, 1, 40, 1509507944, 1509507945, 0),
(28, 1, 31, 1509507962, 1509507963, 0),
(29, 1, 30, 1509508175, 1509508176, 0),
(30, 5, 35, 1509557509, 1509557510, 0),
(31, 1, 12, 1510216320, 1510216322, 0),
(32, 1, 12, 1510216328, 1510216329, 0),
(33, 1, 1, 1510221726, 1510228255, 1.81),
(34, 2, 46, 1510221829, 1510221833, 0),
(38, 3, 48, 1510222123, 1510222238, 0.03),
(39, 3, 48, 1510222265, 1510222284, 0.01),
(40, 3, 48, 1510222290, 1510222303, 0),
(41, 2, 46, 1510820216, 1510820216, 0),
(42, 1, 42, 1511257868, 1511257869, 0),
(43, 2, 41, 1511855708, 1511855710, 0),
(44, 1, 39, 1511920073, 1511920074, 0),
(45, 2, 46, 1511950115, 1511950116, 0),
(46, 1, 37, 1512118166, 1512118166, 0),
(47, 3, 48, 1512628023, 1512628024, 0),
(48, 1, 37, 1512701733, 1512701734, 0),
(49, 5, 36, 1514873304, 1514873307, 0),
(50, 5, 34, 1514987275, 1514987278, 0),
(51, 5, 34, 1514987284, 1514987286, 0),
(52, 5, 36, 1515119134, 1515119135, 0),
(53, 5, 36, 1515119136, 1515119137, 0),
(54, 2, 41, 1515856133, 1515856136, 0),
(55, 1, 20, 1515856216, 1515856216, 0),
(56, 1, 33, 1518413320, 1520934944, 700.45);

-- --------------------------------------------------------

--
-- Table structure for table `swimlanes`
--

CREATE TABLE `swimlanes` (
  `id` int(11) NOT NULL,
  `name` varchar(200) NOT NULL,
  `position` int(11) DEFAULT '1',
  `is_active` int(11) DEFAULT '1',
  `project_id` int(11) DEFAULT NULL,
  `description` text
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `swimlanes`
--

INSERT INTO `swimlanes` (`id`, `name`, `position`, `is_active`, `project_id`, `description`) VALUES
(1, 'Default swimlane', 1, 1, 1, ''),
(2, 'Default swimlane', 1, 1, 2, ''),
(4, 'Default swimlane', 1, 1, 4, '');

-- --------------------------------------------------------

--
-- Table structure for table `tags`
--

CREATE TABLE `tags` (
  `id` int(11) NOT NULL,
  `name` varchar(255) NOT NULL,
  `project_id` int(11) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `tags`
--

INSERT INTO `tags` (`id`, `name`, `project_id`) VALUES
(2, 'HP2', 1),
(1, 'LBW', 1),
(36, 'LCT', 1),
(34, 'UBW', 1),
(38, 'UBW-GB', 1),
(9, '223', 2),
(12, '385', 2),
(18, '533', 2),
(28, '534', 2),
(32, '539', 2),
(17, '586', 2),
(30, '593', 2),
(31, '663', 2),
(16, '671', 2),
(11, '672', 2),
(15, 'Dooya', 2),
(13, 'GDO', 2),
(29, 'IP camera', 2),
(37, 'QC', 2),
(35, 'sun sensor', 2),
(33, 'tubular motor', 2),
(14, 'Wistar', 2);

-- --------------------------------------------------------

--
-- Table structure for table `tasks`
--

CREATE TABLE `tasks` (
  `id` int(11) NOT NULL,
  `title` varchar(255) NOT NULL,
  `description` text,
  `date_creation` bigint(20) DEFAULT NULL,
  `date_completed` bigint(20) DEFAULT NULL,
  `date_due` bigint(20) DEFAULT NULL,
  `color_id` varchar(50) DEFAULT NULL,
  `project_id` int(11) NOT NULL,
  `column_id` int(11) NOT NULL,
  `owner_id` int(11) DEFAULT '0',
  `position` int(11) DEFAULT NULL,
  `score` int(11) DEFAULT NULL,
  `is_active` tinyint(4) DEFAULT '1',
  `category_id` int(11) DEFAULT '0',
  `creator_id` int(11) DEFAULT '0',
  `date_modification` int(11) DEFAULT '0',
  `reference` varchar(50) DEFAULT '',
  `date_started` bigint(20) DEFAULT NULL,
  `time_spent` float DEFAULT '0',
  `time_estimated` float DEFAULT '0',
  `swimlane_id` int(11) NOT NULL,
  `date_moved` bigint(20) DEFAULT NULL,
  `recurrence_status` int(11) NOT NULL DEFAULT '0',
  `recurrence_trigger` int(11) NOT NULL DEFAULT '0',
  `recurrence_factor` int(11) NOT NULL DEFAULT '0',
  `recurrence_timeframe` int(11) NOT NULL DEFAULT '0',
  `recurrence_basedate` int(11) NOT NULL DEFAULT '0',
  `recurrence_parent` int(11) DEFAULT NULL,
  `recurrence_child` int(11) DEFAULT NULL,
  `priority` int(11) DEFAULT '0',
  `external_provider` varchar(255) DEFAULT NULL,
  `external_uri` varchar(255) DEFAULT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `tasks`
--

INSERT INTO `tasks` (`id`, `title`, `description`, `date_creation`, `date_completed`, `date_due`, `color_id`, `project_id`, `column_id`, `owner_id`, `position`, `score`, `is_active`, `category_id`, `creator_id`, `date_modification`, `reference`, `date_started`, `time_spent`, `time_estimated`, `swimlane_id`, `date_moved`, `recurrence_status`, `recurrence_trigger`, `recurrence_factor`, `recurrence_timeframe`, `recurrence_basedate`, `recurrence_parent`, `recurrence_child`, `priority`, `external_provider`, `external_uri`) VALUES
(1, 'UBW GB Parts', '* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\r\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\r\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\r\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\r\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\r\n* 24.08.16 - we should receive the goods today\r\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\r\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\r\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\r\n* 08.02.17 - we will start the mass production for the first 1K\r\n* 28.02.17 - mass production will be in cw10\r\n* 08.03.17 - How did the mass production go?\r\n* 15.03.17 - Until end of March they plan to produce 800 pcs\r\n* 20.04.17 - all the devices were produced without any problems \r\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\r\n* 23.05.17 - Manfred is collection all necessary information for a further order\r\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\r\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\r\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\r\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13/07/17)\r\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\r\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\r\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\r\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\r\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\r\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\r\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\r\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\r\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\r\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\r\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit – with LBW gearbox + worm and with Nichibo motor for life cycle tests\r\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\r\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \r\n* 04.12.17 - This I feel can be closed as we are currently planning for the whole UBW Gearbox Assembly.\r\n', 1498988735, 1517447354, 0, 'grey', 1, 4, 0, 2, 0, 0, 0, 1, 1517447354, '', 1499934060, 1.81, 0, 1, 1512353195, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(2, 'Stocko Plug (Chinese Source)', '* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\r\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\r\n* 11.11.16 - Ben will receive new samples from YJ in cw46\r\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\r\n* 03.05.17 - Will get to work on this \r\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\r\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\r\n* \r\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\r\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\r\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\r\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\r\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\r\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\r\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \r\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\r\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\r\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\r\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\r\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\r\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\r\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\r\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11/08/17)\r\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\r\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\r\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\r\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\r\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\r\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\r\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\r\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\r\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\r\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   ', 1498989271, 1509937770, 0, 'yellow', 1, 4, 1, 3, 0, 0, 0, 1, 1509937770, '', 0, 0, 0, 1, 1508828913, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(5, 'LBW Order #19 (Rework)', '* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\r\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\r\n* 27.07.16 - we are chasing Schellenberg\r\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49/50\r\n* 03.11.16 - Everything is on track and going well.\r\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\r\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\r\n* 11.01.17 - All done and sent out.\r\n* 23.01.17 - we have received the goods\r\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\r\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\r\n* 15.02.17 - waiting for the rates from your/our forward for the return delivery of the 1604 pcs\r\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\r\n* 07.03.17 -  vessel M/V ‚COSCO Spain‘ , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\r\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\r\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\r\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\r\n* 08.06.17 - rework has to be done after #23\r\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\r\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\r\n* 06.07.17 - plan is to send them out at the 16.07.17\r\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\r\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \"In Transit\"\r\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\r\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\r\n* 21.07.17 - We have chased them for B/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\r\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B/L will arrive next week Monday/Tuesday.\r\n* 24.07.17 - Seems the rework goods got onto the 22/07/2017 vessel not the 20/07/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\r\n* 25.07.17 - Updated with the stamped B/L\r\n* 27.07.17 - I will leave this as In-Transit until they arrive in Germany if that\'s ok.', 1498989543, 1508196778, 0, 'yellow', 1, 4, 2, 1, 0, 0, 0, 1, 1508196778, '', 0, 0, 0, 1, 1504112500, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(6, 'LBW Order #21', '* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 22.05.17 - delay of max. 1-2 weeks  \r\n* 10.04.17 - Mail Ben: I had a call with Ralf this morning and because of the current production numbers and situation we have decided to do the following. 1080 Units RD45 will leave by vessel on the 20th and we will send out 360 units Air Freight (We Pay) at the end of the month to make up for this delay in sea freight. As for the further schedule I will let you know later this week.\r\n* 18.04.17 - 1600 x RD45 will leave with ETD 20.04.17 \r\n* 25.04.17 - we received the information that the ETD changed to 23.04.17\r\n* 03.05.17 - Air freight has left we are working on the next batch which is looking like it will hit the previous timeline.\r\n* 16.05.17 - Mail Ben: We managed to take care of most of the 60 User Guides, however sadly we are sending 1 box (20 Units) without User Guides. We will send you these 20 user guides with the next delivery as discussed. The box and the pallet have been clearly marked.\r\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\r\n* 23.05.17 - remaining quantity 3120 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\r\n* 26.06.17 - delay to ETA 29.06.17', 1498989723, 1499910791, 0, 'yellow', 1, 4, 2, 2, 0, 0, 0, 1, 1499910791, '', 0, 0, 0, 1, 1499150322, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(7, 'Security Stock', '* 01.03.17 - Jens has sent a new order for security stock 1400 pcs\r\n* 02.03.17 - Mail Ben: Regarding this delivery, the date is rather tight, we are currently looking into shipping this with Order #21, however this is still quite tight. Please give us till next week before we can confirm 100% on this. We don’t have stock of a lot of key components to handle the normal orders we and this one as well.\r\n* 16.03.17 - Mail Shinya: Just confirm and send to order with supplier one by one, they will catch up our time in this end of March or beginning of April, We will delivery 1400pcs together with LBW#21. Means ETA Rhede CW21/2017 (22.05.17)\r\n* 10.04.17 - Mail Jens: as mentioned last week in our Telco, I double checked the necessity of the each ordered 2oo pcs. safety stock of the international RD35/RD45. After internal double checking we do not need the security stocks of the international variants, due to this you’ll find appended our updated PO 4500030433 without the two positions of RD35/RD45int. The each 2 time of 200 pcs. I add to the national variants, so RD35 increased to 600pcs. and RD45 increased to 800pcs. Please send us your corresponding order comfirmation (PI)!\r\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\r\n* 23.05.17 - security stock - 1400 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\r\n* 26.06.17 - delay to 29.06.17', 1498989833, 1499910780, 0, 'yellow', 1, 4, 2, 1, 0, 0, 0, 1, 1499910780, '', 0, 0, 0, 1, 1499150300, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(8, 'LBW Order #22', '* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \r\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\r\n* 09.02.17 - Mail Jens: Dear Shinya, attached you’ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \r\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\r\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \r\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\r\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\r\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30/31\r\n* 21.08.17 - Checked with Jens and this as arrived and already been sent to Schellenberg.', 1498989954, 1504063321, 0, 'yellow', 1, 4, 2, 1, 0, 0, 0, 1, 1504063321, '', 0, 0, 0, 1, 1503297969, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(9, 'LBW Order #23', '* 17.02.17 - Mail Jens: Dear Shinya, attached you’ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \r\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\r\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\r\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\r\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v/v: YM WIDTH 007W, ETA RTM:  Aug 15\r\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\r\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\r\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\r\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\r\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\r\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\r\n* 24.07.17 - These goods got on the vessel with no problems.', 1498990023, 1508196789, 0, 'yellow', 1, 4, 2, 2, 0, 0, 0, 1, 1508196789, '', 0, 0, 0, 1, 1504112534, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(10, 'LBW Order #24', '* 17.02.17 - Mail Jens: Dear Shinya,attached you’ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\r\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\r\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 / Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \r\n* 31.05.17 - Mail Shinya: It doesn’t matter change the quantity for order LBW#24. Please send the update the PO for us.\r\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\r\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20/08/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\r\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\r\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\r\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\r\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\r\n* 21.08.17 - Goods got on the vessel without a problem. Set sail 20.08.17', 1498990120, 1508196810, 0, 'yellow', 1, 4, 2, 4, 0, 0, 0, 1, 1508196810, '', 0, 0, 0, 1, 1507562109, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(11, 'LBW Order #25', '* 14.06.17 - Mail Jens: attached you’ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\r\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49/2017 (means ETD end of October)\r\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\r\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\r\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\r\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\r\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\r\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\r\n* 17.10.17 - Carry tooling has been approved.\r\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\r\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\r\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\r\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12/11/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\r\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\r\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\r\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\r\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\r\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\r\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text “New Cover” so you know. See attached photo.\r\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\r\n', 1499060242, 1517447370, 0, 'yellow', 1, 4, 1, 4, 0, 0, 0, 1, 1517447370, '', 0, 0, 0, 1, 1516797196, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(12, 'FHJ 036/037 Tooling', '* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \r\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\r\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren’t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn’t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\r\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\r\n* 27.07.17 - FHJ have said the mould will be finish around 19/08/2017.\r\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\r\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\r\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\r\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\r\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\r\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\r\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\r\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\r\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\r\n* 09.01.18-Henk,the forth samples will be received almost one week later \r\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\r\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\r\n* 12.02.18 - Mail Ben: Hi Andreas, The goods are on their way:**WAYBILL 79 6690 9882**\r\n* 22.03.18 - All units with the new gearbox failed in Germany. Upon further analysis it appears the motor failed on them. I have sent the motors to Actuator for further analysis. Waiting for this feedback, should be on Friday or early next week.\r\n\r\n', 1499060336, NULL, 0, 'red', 1, 3, 1, 7, 0, 1, 0, 1, 1521710795, '', 0, 0, 0, 1, 1499060336, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(13, 'Carry 001/002 Tooling', '* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \r\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\r\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it’ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\r\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\r\n* 26.07.17 - Current status ? \r\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\r\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\r\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\r\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\r\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\r\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th/15th with a full FSIR Report.\r\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\r\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\r\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\r\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\r\n* 10.10.17 - the new samples are accept by Quality.\r\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\r\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\r\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\r\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \r\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\r\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\r\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\r\n* 27.11.17 - Mail Henk: Dear Andreas/Berthold/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\r\n* 27.11.17 - Mail Berthold: Thanks for the info, noted. Do we need to change the drawings to fit the new measures, or do they fix the next parts to fit the drawing?\r\n* 27.11.17 - Mail Ben: I would personally leave everything alone for the moment with the drawings and just consider the current situation a “concession” for the moment (based on your and Andreas’s measurements too). Once we have received 2 more orders from Carry we can see where their measurements stand on a longer timeline then we can considering locking in the drawings to this. Hope thats ok.\r\n\r\n\r\n', 1499060388, 0, 0, 'green', 1, 2, 1, 5, 0, 1, 0, 1, 1515034259, '', 0, 0, 0, 1, 1515034259, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(14, 'HP2 Order #11', '* \"16.01.17 - we have send you a new order - Quantity 1K, 1st batch 500 pcs with ETA 02.05.17 (ETD Ende KW12) and 2nd batch with ETA 20.06.17 (ETD Ende KW19) . Please send us an order confirmation.\r\n* 17.01.17 - Shinya has sent the order confirmation\r\n* 08.03.17 - On track so far.\r\n* 29.03.17 - Mail Manfred: We plan with 160 pcs without packaging, power supply, foam or ethernet cable by air. Next 300 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 11.05.17. Next 200 pcs must be shipped on your side with ETD 06.04.17 at the latest - ETA 17.05.17. The remaing quantity of #11 - 340 pcs - must be shipped on your side with ETD 28.04.17 - ETA 02.06.17\r\n* 06.04.17 - 160 pcs via DHL well received, further 144 via air freight with ETD 09.04.17, quantity 492 pcs via vessel ETD 09.04.17. Remaining quantity 251 pcs - best case cw24 ETA Rhede\r\n* 18.04.17 - 492 pcs with ETD 09.04.17 - ETA Rhede approx. 19.05.17\r\n* 23.05.17 - if everything goes well we will receive them this week\r\n* 31.05.17 - well received, further 149 pcs via LCL with ETD 11.06.17 means ETA 16.07.17 and remaining quantity 102 pcs with 40\' container ETD 18.07.17 - ETA 23.07.17\r\n* 08.06.17 - Mail Shinya: 149 pcs HP2  have send out on time at 11th June. I will push IFB give to us B/L and send to you soon.\r\n* 21.08.17 - HP2 Order #11 has also been fully received!', 1499060495, 1504063345, 0, 'yellow', 1, 4, 2, 2, 0, 0, 0, 1, 1504063345, '', 0, 0, 0, 1, 1503300208, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(15, 'HP2 Order #12', '* 09.02.17 - Mail Jens: Dear Shinya, attached you’ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \r\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12，I will check with our suppliers and send you order confirmation  in the next week.\r\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\r\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\r\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \r\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \r\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\r\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\r\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\r\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\r\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\r\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\r\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\r\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31/07/2017. We will send out the other batch via LCL as soon as its ready.\r\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\r\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31/07/17 vessel. We will send the remaining units later.\r\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\r\n', 1499060607, 1508196799, 0, 'yellow', 1, 4, 2, 3, 0, 0, 0, 1, 1508196799, '', 0, 0, 0, 1, 1507562092, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(16, 'HP2 Order #13', '* 20.03.17 - Mail Jens: Dear Shinya, attached you’ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\r\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\r\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\r\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\r\n* 22.08.17 - Mail received from Manfred ETD China CW36.\r\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\r\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\r\n* 11.09.17 - Pallets done, sending goods out tomorrow 12/09/17\r\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\r\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\r\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\r\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\r\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\r\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\r\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17', 1499060678, 1517447362, 0, 'yellow', 1, 4, 1, 3, 0, 0, 0, 1, 1517447362, '', 0, 0, 0, 1, 1512545254, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(17, 'HP2 Order #14 - 4500032237', '* 28.06.17 - Mail Jens: attached you’ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\r\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\r\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\r\n* 23.08.17 - RD-D has payed the deposit\r\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\r\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic „inventory stock“ for end of 2017.        ETA for first batch #14 – 09.01.18 – means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\r\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\r\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\r\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\r\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\r\n* 17.11.17 - Manfred: we need a DDP delivery\r\n* 17.11.17 - I will inform Shinya and change the terms DDP.\r\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\r\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03/12/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49/CW50.\r\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03/12/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48/49 and send the remaining goods out ETD 08/12/17.\r\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\r\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\r\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\r\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs（8ctns）to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\r\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\r\nAttached documents, the tracking number: 45 3075 2413 .\r\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\r\n\r\n', 1499060719, 1517447379, 0, 'yellow', 1, 4, 1, 5, 0, 0, 0, 1, 1517447379, '', 0, 0, 0, 1, 1516797211, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(18, 'HP2 Claims (RD-D Programming)', '* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05ß15352004756 error in programm process The issue with this is we test the HP2’s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can’t seem to use them either. Also because Guangyue doesn’t know exactly what you are doing at your end we can’t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\r\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \r\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\r\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \r\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\r\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #14\r\n', 1499060791, 1520934550, 0, 'green', 1, 4, 1, 1, 0, 0, 0, 1, 1520934550, '', 0, 0, 0, 1, 1520934533, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL);
INSERT INTO `tasks` (`id`, `title`, `description`, `date_creation`, `date_completed`, `date_due`, `color_id`, `project_id`, `column_id`, `owner_id`, `position`, `score`, `is_active`, `category_id`, `creator_id`, `date_modification`, `reference`, `date_started`, `time_spent`, `time_estimated`, `swimlane_id`, `date_moved`, `recurrence_status`, `recurrence_trigger`, `recurrence_factor`, `recurrence_timeframe`, `recurrence_basedate`, `recurrence_parent`, `recurrence_child`, `priority`, `external_provider`, `external_uri`) VALUES
(19, 'HP2 Tool Repair', '* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: • Scratch issues on the front, corners and Sides • Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\r\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work / repair. The costs are herewith confirmed - please send us the invoice.\r\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\r\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\r\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\r\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\r\n* 22.11.17 - Mail Henk: Dear Andreas/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\r\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\r\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\r\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\r\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\r\n* 02.01.18 - The fixing of the white marks on the RDD Logo on the HP2 has resulted in 2,000RMB in Lapping Costs.\r\n', 1499060836, 1517447343, 0, 'red', 1, 4, 1, 1, 0, 0, 0, 1, 1517447343, '', 0, 0, 0, 1, 1511973437, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(20, 'HP2 Short Quantities', '* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you’ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I’ve a discrepancy of -74pcs. HP2 which we still miss\r\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\r\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit/credit notes.\r\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\r\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \r\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\r\n* 10.10.17 - I believe this is done?', 1499060901, 1509937761, 0, 'yellow', 1, 4, 1, 2, 0, 0, 0, 1, 1509937761, '', 0, 0, 0, 1, 1508340374, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(21, 'Cable Harness Order', '* \"07.11.16 - RD-D will send asap from each type 3 pcs samples\r\n* 23.11.16 - RD-D will send out the samples before end of cw47\r\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\r\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\r\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\r\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\r\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \r\n* 08.02.17 - RD-D has sent the updated drawing\r\n* 08.03.17 - We will produce these in CW11\r\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\r\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\r\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\r\n* 28.04.17 - Jens has send the the order for the cable harness samples\r\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\r\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\r\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\r\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\"\r\n* 04.07.17 - Input Manfred: \"on hold\"\r\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\r\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\r\n* 21.08.17 - After Ralf\'s email regarding Dresden, I think we can close this?', 1499060971, 1504063353, 0, 'grey', 1, 4, 2, 3, 0, 0, 0, 1, 1504063353, '', 0, 0, 0, 1, 1503501955, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(22, 'LBW PCB DTC', '* 08.02.17 - in further discussion with Ralf Huenting\r\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\r\n* 22.02.17 - Telco with Ralf Hünting and Johannes - further telco on Thursday\r\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\r\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA /0121ZSPT – what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay…\r\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\r\n* 03.04.17 - Mail Ben: We’ve managed to get 10 samples of these, however they’ve said the feet placement is different. We’ll see what they look like when we receive them.\r\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\r\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\r\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\r\n* 10.05.17 - samples well received - further feedback from Ralf Hünting\r\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\r\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\r\n* 10.10.17 - Waiting for Ralf\'s Reply.\r\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\r\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\r\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\r\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\r\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\r\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\r\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\r\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\r\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\r\n* 25.01.18 - Guangyue has been busy recently but now he has time, so after Spring Festival I will push him on this and we should have samples early March.\r\n\r\n', 1499061048, NULL, 0, 'yellow', 1, 3, 1, 8, 0, 1, 0, 1, 1516867066, '', 0, 0, 0, 1, 1499061048, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(24, 'HP2 FOB Pricing', '* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\r\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\r\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply/Feedback\r\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\r\n* 01.08.17 - Agreed on 7.94RMB. Shinya will send PI Tomorrow.', 1499066024, 1502762524, 0, 'yellow', 1, 4, 1, 1, 0, 0, 0, 1, 1502762524, '', 0, 0, 0, 1, 1501701945, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(25, 'LBW Relay Purchasing', '\r\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\r\n* 29.06.17 - Mail Ben: I’ve just checked the stock. We are secure till Order #26. Order #27 we don’t have stock, but as mentioned we are beginning to look.    \r\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\r\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\r\n* 01.08.17 - Relays Arrived (14,000)\r\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\r\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\r\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\r\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\r\n* 22.03.18 - We have 10,300 Relays in Stock with 30,000 arriving in May (CW19).', 1499129530, NULL, 0, 'grey', 1, 2, 1, 1, 0, 1, 0, 1, 1521684818, '', 0, 0, 0, 1, 1501743026, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(26, 'HP2 Claims (General)', '* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05ß15352004756 error in programm process The issue with this is we test the HP2’s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can’t seem to use them either. Also because Guangyue doesn’t know exactly what you are doing at your end we can’t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\r\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \r\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\r\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \r\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\r\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\r\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\r\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\r\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15/07/2016, Order #8: 01/08/2016\r\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don’t test for and aren’t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\r\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\r\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\r\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\r\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I’m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \r\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\r\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\r\n* 22.03.18 - Mail Shinya: Here are attached invoice of transport cost for return HP2 11pcs, CNY5,757.00 belong to MHI. CNY608.00 belong to the RDD.\r\n\r\n\r\n\r\n', 1499734621, 0, 0, 'green', 1, 3, 1, 14, 0, 1, 0, 1, 1521713799, '', 0, 0, 0, 1, 1521625260, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(27, 'Sun Sensor Labels', '* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\r\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\r\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\r\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\r\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\r\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\r\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday/Tuesday next week (CW30). \r\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\r\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\r\n* 02.08.17 - Manfred: current status of the label (sample / picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\r\n* 03.08.17 - The price for the Sun Sensor labels has been agreed on. Shinya with resend the PI\'s to Germany for the Label Change.\r\n* 08.08.17 - Prices sent. Task Closed.', 1499758031, 1502762510, 0, 'yellow', 1, 4, 1, 2, 0, 0, 0, 1, 1502762510, '', 0, 0, 0, 1, 1502153437, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(28, 'LBW Model Number on Cover', '* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35/45 Covers for Order #24.\r\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\r\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy/Rasterised format again (PSD\'s). I have replied to the email.\r\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\r\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\r\n* 20.07.17 - Dieter is going to make the label design for the RD35/45 so we are ready incase we need to use it.\r\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\r\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\r\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\r\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples / picture) ?\r\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\r\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\r\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday/Tuesday.\r\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\r\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\r\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\r\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\r\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\r\n* 13.11.17 - Andreas has sent back the change approval sheet', 1499848745, 1511332109, 0, 'green', 1, 4, 1, 1, 0, 0, 0, 1, 1511332109, '', 0, 0, 0, 1, 1510532112, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(29, '100 German Sun Sensor Packaging', '* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\r\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\r\n* 15.08.17 - Everything looking good to leave with Order #24.\r\n* 17.08.17 - Sent along with Order #24.\r\n* 21.08.17 - Goods left with Order #24. Set Sail 20.08.17.', 1501139675, 1508196819, 0, 'yellow', 1, 4, 2, 5, 0, 0, 0, 1, 1508196819, '', 0, 0, 0, 1, 1507562126, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(30, 'LBW Order #26', '* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\r\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\r\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\r\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\r\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\r\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\r\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it’s possible to change to the above mentioned updated quantities?\r\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you’ve requested. Shinya will send the update orders to you Tuesday next week.\r\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\r\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\r\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\r\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\r\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\r\n\r\n\r\n', 1501743965, 1520933128, 0, 'yellow', 1, 4, 2, 1, 0, 0, 0, 1, 1520933128, '', 0, 0, 0, 1, 1520329581, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(31, 'LBW Order #27', '\r\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\r\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\r\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\r\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it’s possible to change to the above mentioned updated quantities?\r\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you’ve requested. Shinya will send the update orders to you Tuesday next week.\r\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\r\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\r\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\r\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn’t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we’ll have no problems.\r\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\r\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27’s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB’s: The PCB’s are arriving on January 23rd/24th.\r\nI really don’t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\r\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn’t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\r\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\r\n* 08.02.18 - **new ETD 30.03.18**\r\n* 09.02.18 - Mail Ben: I don’t think this will be a problem! We should be able to manage CW14/CW15 ETD for Order #27.\r\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q’ty:11200KGS/44CBM by 40GP, Cargo ready date:Apr-4, V/v:OOCL INDONESIA/002w, ETD:Apr-10, ETA RTM:May-11\r\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.', 1503452729, NULL, 0, 'yellow', 1, 9, 1, 3, 0, 1, 0, 1, 1523243106, '', 1518102000, 0, 0, 1, 1523243106, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(32, 'Sun Sensor (800 DE)', '\r\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\r\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\r\n (ETD cw21/18 - ETA 22.05.18) ?\r\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\r\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\r\nHowever unfortunately we couldn’t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\r\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\r\n* 31.01.18 - Mail Ben: Thanks, then we will send them directly after CNY with the second batch of Order #15 - HP2\r\n\r\n\r\n\r\n\r\n\r\n', 1503452784, NULL, 0, 'yellow', 1, 9, 1, 2, 0, 1, 0, 1, 1521624986, '', 0, 0, 0, 1, 1521624986, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(33, 'LBW - Claim RD45', '* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\r\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\r\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don´t know the differenzens; We´ll test 5 pices of the next delivery  #25\r\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don´t know the differenzens; We´ll test 5 pices of the next delivery  #25 \r\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\r\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\r\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\r\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What´s your experiences with these devices? I will open and analyze another device tomorrow.\r\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\r\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\r\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you’ve tested and how many have failed so I know when this problem started to occur.\r\n* 26.03.18 - Mail Andreas: Okay ! Thank you very much for the information! We will send you the information you want at the end of next week, because Martin and I are on holiday in the moment.\r\n* 02.04.18 - We have sent out 5 LBW Samples to RD-D via DHL. Please put these on life cycle test as soon as you receive them. We have also sent 4 Samples to Actuator for them to life cycle test.', 1504703765, NULL, 0, 'green', 1, 3, 1, 9, 0, 1, 0, 2, 1522650024, '', 0, 700.45, 0, 1, 1504703765, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(34, 'LBW Packaging', '* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \"300 pcs of VKA 566-3, Loco BW RD35/RD45 sun sensor packaging\r\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\" We will arrange for this to be sent around 20th October 2017.\r\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\r\n* 01.11.17 - This has all been sent with Sally\'s goods Vessel Departure: 27.10.17.', 1505896818, 1517447392, 0, 'yellow', 1, 4, 1, 6, 0, 0, 0, 1, 1517447392, '', 0, 0, 0, 1, 1516797218, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(38, 'GSM4 Motor', '* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\r\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\r\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\r\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\r\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\r\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\r\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\r\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don’t know if modifications need to be made.\r\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\r\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\r\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I’m not sure as the hall sensor is turning.\r\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\r\n* 06.02.18 - Still waiting on the testing information from Andreas...\r\n\r\n\r\n', 1506042124, NULL, 0, 'green', 1, 3, 5, 15, 0, 1, 0, 1, 1520329943, '', 0, 0, 0, 1, 1506042124, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(39, 'UBW Gearbox Production', '\r\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\r\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \r\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit – with LBW gearbox + worm and with Nichibo motor for life cycle tests\r\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\r\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \r\n* \r\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\r\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\r\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\r\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\r\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\r\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21/11/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23/12/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\r\n* 14.11.17 - Andreas has sent the testing information\r\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\r\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\r\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\r\n* 24.17.17 - REMINDER for Andreas to\r\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\r\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\r\n* 21.02.18 - Mail Manfred: we have set up a project team for the project „UBW motor gearbox unit“. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. …. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\r\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\r\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \r\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\r\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\r\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\r\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\r\n* 15.03.18 - Packaging has been confirmed by Peter.\r\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\r\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\r\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I’ve refined the infos about the purchase orders, maybe now it’s a bit clearer!\r\n* 16.03.18 - Mail Ben: Thanks for this everything is much clearer now. We are going to place the orders for the entire year based on your forecast. Please can you confirm that we can do this, once the orders are placed we can play around with the dates a little but not by much. I don’t need you guys to send the orders through yet for the whole year.\r\n* 19.03.18 - We are still waiting on the releases for the Worm and UBW Motor Gearbox from Andreas.\r\n', 1507886160, NULL, 0, 'red', 1, 3, 5, 1, 0, 1, 0, 1, 1521685497, '', 0, 0, 0, 1, 1507886160, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(40, 'HP2 Order #15 - 4500033639 (4500034384)', '* 18.10.17 - Mail Jens: in appendix you’ll find the next order for the home pilot, it’s purchase order #15/2018. I’ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\r\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06/2018 and 500 x ETD cw10/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\r\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02/2018) and 2nd batch ETA 15.03.18 (ETD cw06/2018)\r\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06/18)\r\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\r\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\r\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\r\n', 1508340536, NULL, 0, 'red', 1, 9, 1, 1, 0, 1, 0, 2, 1520329804, '', 0, 0, 0, 1, 1520329804, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(41, 'RD35 013/063 Tooling (RX)', '* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\r\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\r\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\r\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\r\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT’s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\r\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\r\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\r\n* 02.01.18 - We are looking at Next Monday 08.01.18 for feedback on the first test of the new tooling.\r\n* 09.01.18 - The first trial of the RD35 tooling has been done. There are several problems with Burrs and Flashing. They will repair the tool and do another trial on 25.01.18.\r\n* 13.03.18 - RX will have finished repairing the mould on Friday (16.03.18). Then they will test the mould again next week.\r\n', 1508540627, NULL, 0, 'yellow', 1, 3, 1, 6, 0, 1, 0, 1, 1520934821, '', 0, 0, 0, 1, 1508540627, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL);
INSERT INTO `tasks` (`id`, `title`, `description`, `date_creation`, `date_completed`, `date_due`, `color_id`, `project_id`, `column_id`, `owner_id`, `position`, `score`, `is_active`, `category_id`, `creator_id`, `date_modification`, `reference`, `date_started`, `time_spent`, `time_estimated`, `swimlane_id`, `date_moved`, `recurrence_status`, `recurrence_trigger`, `recurrence_factor`, `recurrence_timeframe`, `recurrence_basedate`, `recurrence_parent`, `recurrence_child`, `priority`, `external_provider`, `external_uri`) VALUES
(42, 'HP2 - RED 2014/53/EU (Radio Emissions Directive) and the EMC 2014/30/EU compliance', '\r\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I’d like to ask you to “activate” Guanguye to provide certificates (most likely start re-certification process) for this product.\r\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work/testing we need to do. This wouldn’t include any redesigns that would be required incase we didn’t meet the certification at the moment. However he feels this wouldn’t be required and we should meet the requirements. \r\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\r\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement “by money” knowing more precise numbers.\r\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\r\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\r\n* 24.10.17 - Mail Ben: I’ll update our files an use yours. Any idea on if and when we need to do this? \r\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\r\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\r\n* 31.10.17 - Mail Ben: Have you received Shinya’s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don’t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\r\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\r\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\r\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided i\r\n* 20.12.17 - Peter has asked me to hold. If we can secure the relays for the next year then there is no need to do this.\r\n* 13.03.18 - Relays are secure so we can close this topic.', 1509446403, 1521622926, 0, 'yellow', 1, 4, 1, 2, 0, 0, 0, 2, 1521622926, '', 0, 0, 0, 1, 1520934875, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(43, '223 clip for tubular motor head', '\r\n* 07.06.17 - Mail Sally: offer from RX - Tool (4 cavities): 32000 RMB, lead time 45days, unit price: 0.40 RMB, MOQ: 50,000pcs\r\n* 13.07.17 - Mail Jens: we would like to go with RX but mould price nedds to be 30K RMB, please try to negotiate the price and send us an updated quotation\r\n* 19.07.17 - Mail Sally: When we sent the quotation, this is the final version already after negotiation.\r\n* 19.07.17 - Jens has sent the order for the mould.  No. of cavities: 4 cavities, surface: surface eroded VDI 3400 step 21 to 24, tooling guarantee shots: 500.000, tooling costs: 32.000RMB, unit price: 0,40RMB, MOQ: 50.000pcs., leadtime: 45 days (end 08/17) Payment term:50% on Order, 50% on Sample Approval, Incoterm:  FOB Shanghai.\r\n* 25.07.17 - Mail Berthold: I\'ve made the changes according to the DFM and reworked the drawing. You\'ll find a table in the new drawing that shows the tolerances according to the  DIN 16742 TG4. We never know if the toolmaker is familiar with these German DIN                 standardization. Please send these new drawing and .step model to the tool maker and if there occur questions, feel free to ask. \r\n* 23.08.17 - RD-D has received the updated DFMEA and the STE data file of the mould\r\n* 31.08.17 - Mail Sally: Just an update, mould is done 99%, now doing the surface texture, tool will be ready for sampling next week.\r\n* 12.09.17 - Mail Sally: We had the parts yesterday, now our QC manager Henk is arranging the dimension check according to drawing, meanwhile supplier is doing the FSIR.\r\n* 13.09.17 - Henk has sent the FSIR to Berthold\r\n* 13.09.17 - Mail Henk: we have 80pcs clips can be ready for use ,but we have not others components can fitting with clip. So I think you have to verify the clips by yourselves .if you need ,Sally will express the clips to you tomorrow.\r\n* 13.09.17 - Mail Berthold: please send the samples to Rhede\r\n* 14.09.17 - Mail Leona: We have sent 80pcs of GGK 223-468 today.The DHL tracking number is  71 0284 4766.\r\n* 09.10.17 - we have received the samples - Berthold will give you asap a feedback\r\n* 11.10.17 - Mail Berthold: We got the parts and they seem to be fine for first samples. Our toolmaking department has  to rework some motor heads in a way to fit clips. After that there comes a time for lifecycle tests and this will take a while. So please be patient, you\'ll get more info asap.\r\n* 11.10.17 - FSIR and material test report sent, 1st sample is OK, awaiting for feedback from Berthold regarding life cycle test.\r\n* 08.03.18 - Mail Jens: Is it possible for you to ask supplier about a further sample quantity of 200 pcs? What could be the fastes ready date for the 200 pcs?\r\n* 08.03.18 - Mail Sally: The minimal mould set up charge is 300USD, please 80RMB product cost. Lead time 2 weeks ARO.\r\n* 13.03.18 - Jens has sent the official order for 200 pcs - 4500035693\r\n* 14.03.18 - Mail Sally: due to the sample qty, supplier can\'t dye the material, so this 200pcs we will make to POM nature color (white). For mass production we will dye to drawing color code RAL 3020.\r\n* 14.03.18 - Quantity increased from 200 pcs to 300 pcs\r\n* 23.03.18 - Mail Leona: 500pcs of GGK 223-468 are ready for ship. 200pcs are the gift for you. We will ship these today WAYBILL 3007381495\r\n* 27.03.18 - today we have received the delivery and forwarded them to Tim Nibbeling\r\n', 1509520133, NULL, 0, 'yellow', 4, 16, 2, 3, 0, 1, 0, 3, 1522131808, '', 0, 0, 0, 4, 1520511181, 0, 0, 0, 0, 0, NULL, NULL, 1, NULL, NULL),
(44, 'GGK 533-1 - claim - Motorhead', '* 27.03.18-Henk: dimension 28.2mm 0/-0.2 little bigger than drawing required ,this related with the plastic flash which is on the mould line .when measuring this dimension ,should check more place.\r\n* 06.03.18 - Wechat group Sally: @Henk Huang please add 533-1 into topic list when you are in Rhede, the key point is: what was the problem and how should we improve in the future.\r\n* 28.02.18 - Mail Sally: You can create the debit note for the 3.968 pcs. GGK 533-1, we will pay for it though we are not getting the return shipment, which means you can create a ghost shipment for this batch and we will still refund.Because originally this batch is coming from nowhere, nobody has paid YQ for this batch as well.\r\n* 30.01.18 - Andreas : Should be on the way!\r\n* 19.01.18-Henk Mail:Dear Jens/Martin:Please advise the tracking number after you sent the samples GGK533-1 to us .\r\nPS. Please help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\r\n* 04.01.18 - Mail Henk: Dear Jens/Martin:\r\nPlease help to make a mark on the drawing and point which dimensions are rejected for 10pcs ,then we can refer to check .the marked drawing can with 10pcs samples to us together.\r\n* 04.01.18 - Mail Sally: As discussed in telco, after discuss with Henk, please send back 10pcs NOK parts for Henk to keep as NOK sample. Henk will also double check the 5000pcs in our warehouse for PO#4500033986 (IR-2017-12-15-01).\r\nAnd how is the below 5000pcs(PO#4500031226) sent in October produced by FHJ?\r\n* 04.01.18 - telco Manfred: approx. 4K NOK in total.\r\n* 04.12.17 - from 2400 pcs we select 600 pcs OK. Now we will select the remaining quantity\r\n* 18.10.17 - Result of the meeting: we will wait for the 1K which you send out asap via air freight, in parallel we will a last try to select the 7.220 pcs. Martin has made a proposal. \r\n* 11.10.17 - On Friday we have a meeting RE this part and the problems and hopefully know later how we can go on and whether we need a new tooling or not\r\n* 10.10.17 - Mail Jens: please send 1 carton and the 400 pcs, so in total 1.000 pcs, via DHL and the rest with next LCL shipment! Please send us an info about the DHL costs and the DHL paperwork for confirmation in advance!\r\n* 09.10.17 - Mail Jens: we had already requested the figures regarding the freight costs (in September), how we should we now send back the 7.220 pcs GGK 533-1?\r\n* 06.10.17 - Mail Martin: I want to return to this complaint again.  Please, see the Mails below. In my opinion, we cannot reliably separate the OK from the NOK parts. So we must send back the whole delivery.\r\n', 1509520262, NULL, 0, 'green', 2, 7, 6, 2, 0, 1, 0, 3, 1522117260, '', 0, 0, 0, 2, 1519888583, 0, 0, 0, 0, 0, NULL, NULL, 1, NULL, NULL),
(45, '672 - LED Dimmer', '\r\n27.07.17 - Mail Jens: in appendix you‘ll find some information about some new plastic parts to our Project 672,  is it possible that you send\r\n                us an offer about the moulds and also a price offer with the mentioned quantities in the attached PPTX file for each part?\r\n                Below some details about the planned annual quantities: 1.year 1000 pcs, 2.year 1500 pcs, 3. year 2000 pcs - \r\n                first samples: 15.09.2017, planned start of production in Rhede: 16.10.2017\r\n                All other information about the plastic parts you can find in the appended PPTX file “inquiry - 673”, if any information missing, \r\n                please let us know.\r\n08.08.17 - Mail Sally: Hi Jens, Here is offer from RX. Tool (1+1 cavity): 39,500 RMB, lead time 45 days, \r\n                Unit price: GGK672-1 1.10RMB/each, GGK672-2 1.10RMB/each, MOQ: 5,000pcs\r\n10.08.17 - Mail Jens: thanks a lot for sending the offer, we‘ will check the offer and get back to you with a feedback next week!\r\n19.09.17 - Mail Maik: Dear Sally, We herewith order according to your offer below: Tool (1+1 cavity): 39,500 RMB, lead time 45 days\r\n                – **first samples in week 46**. Unit price: GGK672-1 1.10RMB/each, GGK672-2 1.10RMB/each, MOQ: 5,000pcs - \r\n                500.000 shots tooling guarantee. The current drawings and STP data you find attached. Please send your order confirmation ASAP.\r\n\r\n* 19.09.17 - Mail Sally: Hi Maik, Thank you for your order, well received. Currently we are in internal order process change. We will release the order confirmation to you next week. Sorry for the inconvenience. However we will start the tool DFM at supplier\'s end right away.\r\n* 10.10.17 - Mail Sally: Hi Maik, Attached PI. I have received the DFM from supplier but unfortunately can\'t open because of format problem, we will send you tomorrow the DFM.\r\n* 11.10.17 - Mail Sally: Hi Maik, Attached DFM, please check and send us feedback. \r\n* 11.10.17 - Mail Jens: today a got a info from Dieter that we need in CW46 100 pcs of the parts out of the new mould here in Rhede. Could you please take this into account, when supplier will start the sampling?\r\n* 11.10.17 - Mail Sally: Hi Jens, **CW46 is very difficult, as we are still checking DFM stage, we need 6 weeks for making a new tool.**\r\n* 12.10.17 - Mail Dieter: Dear Sally, attached my comments to the DFM-document. Attention: The DFM is not with the current data! (19.09. data with Index \"B\" to the order) I have attached the data with the missing deforming angle.\r\n* 18.10.17 - Mail Sally: Hi Dieter, Attached updated DFM, please check.\r\n* 18.10.17 - Mail Dieter: please check the attachment (Material, lifter parting line ...)\r\n* 30.10.17 - Tool 3D model sent to Dieter, waiting for feedback\r\n* 02.11.17 - Mail Dieter: Hello Sally, thank you for the datas. I think, it is o.k.\r\n* 02.11.17 - Mail Sally: Hello Manfred, The raw material for the tool has been prepared before we receive your feedback about the tool 3D. Normally we need 4 weeks to make the tool, which mean the quickest 1st sample date is beginning of December. If we push too hard, supplier will rush and it is not good to guarantee we get the fine tool.\r\n* 13.11.17 -1st mould sampling will be this Thursday 16 NOV\r\n* 15.11.17 -1st sample received, FSIR will be done tomorrow. Dimension 1st check is OK, but surface texture need to be improved.\r\n* 23.11.17 -2nd sample will be shoot 29 NOV after mould surface texturing\r\n* 24.11.17 - Chat Sally: Leona will send out the 1st sample without surface texture to Jens next Monday\r\n* 27.11.17 - Mail Leona: 3 sets (upper + bottom part) - Waybill 4961840855\r\n* 28.11.17 - Skype Jens: we need 100pcs pilot run produce together with final sample. \r\n                               Sally: to be ready next Tuesday 05Dec.\r\n* 30.11.17 - Mail Berthold: Got the samples today and after a very quick review I can say that they seem ok for first samples.\r\nIt would be fine to get improvement for the 100 sets at the following points:\r\n1.	I guess the red marked push rods stuck in the mold when opening. Do we need to change the ejection chamfer?\r\n2.	There\'s still a very thin film of plastic (marked blue) that holds this pusher in position while trying to press the switch.\r\nPlease rework the burr!\r\n3.	 Structure on the surface is missing, but that\'s no problem for first parts and the 100 samples.\r\nWhen molds will be reworked and parts approved, we need the surface(VDI 3400 step 21-24)  as mentioned in the drawing.\r\nPlease try to fix the points 1 and 2  for the 100 pieces. If it will take several weeks to improve the parts we would be able to use 100 of the\r\nParts like these. After some rework by hand these parts could also be used.\r\nPlease let me know asap when the 100 sets will be send out, and forward the FSIR of the parts.\r\n* 07.12.17 - Mail Sally: We\'ve got the 3rd sample on Tuesday as scheduled but Henk found some problem on surface and button bar, so the pilot run has been called off, hopefully we can still have supplier correct and produce them this week, Leona will follow up the timeline and keep you posted! For the urgent reason, we will try to fix the button bar by hand and deliver the pilot order asap!\r\n* 07.12.17 - Mail Henk: Please see attached FSIR for 672 3rd samples and material properities sheet for your reference.\r\n* 08.12.17 - 125pcs 672 sent out by DHL WAYBILL 52 9051 3196\r\n* 13.12.17 - today we have received the goods - waiting for Berthold\'s feedback\r\n* 08.01.18 - Mail Berthold: I check the FSIR and found some points that need a closer look. Some measures marked as NG are within tolerance and fine for me. Please double-check!\r\nFound also measures that aren\'t within tolerance and marked as OK. These measures are indeed not relevant but not within tolerance. Please have a look at the pictures. We have some burr at the red marked spots from the ejector. If the manufacturer can guarantee that these won\'t occur in mass production we will release these parts hereby for mass production.\r\n* 09.01.18 - Mail Henk: Dear Berthold, In your mail attached FSIR is the first one that I sent to you on Nov.30th.2017 ,actually ,we also noticed several mistake in this FSIR ,so I sent the second corrected one on Dec.7th.2017 as the second samples FSIR. Attached is the Second one for your reference. I will forward your pictures to our supplier for attention , this issue must be improved before shipment and our QC also will attention for this defect.\r\n* 23.01.18 - Mail Berthold: Hereby the two plastic parts GGK 672-1 and GGK 672-2 with the corresponding drawings 672-F-00-001b and  672-F-00-002b are released for mass production.\r\nPlease keep in mind what\'s noticed in my mail to Henk on 08.01.18. The burr on the ejectors needs rework in the tool.\r\n* 08.03.18 - Mail Henk: The repaired 672 mould now is working on produce ,but seems also have little appearance problem on the products ,this is the best status we can .please see the status I point in attached pictures. Maybe we have to concession to accept for this urgent shipment date .otherwise , need 1 week to repair then produce again.\r\n\r\n\r\n', 1509520392, NULL, 0, 'blue', 2, 8, 2, 5, 0, 1, 0, 3, 1521644121, '', 0, 0, 0, 2, 1521644121, 0, 0, 0, 0, 0, NULL, NULL, 2, NULL, NULL),
(46, 'gearbox noise analysis', '26.09.16 - Provide beltwinder gearbox drawings & DC-motor/gearbox (GSM2) sample (5x) -> analysis & proposal for \"low\r\n                noise\" solution, quotation -> samples to test noise reduction with German beltwinder / quotation\r\n20.10.16 - we have already sent the samples of the motor-gearbox (8pcs) and worm (5pcs) and axis (5 pcs)\r\n                Waiting for the signed NDA to send further information (drawings and inquiry)\r\n26.10.16 - NDA signed. gearbox drawing received by Silent, timeline for the project will be sent asap. RFQ for worm\r\n\r\n                and shaft WIP.\r\n04.11.16 - Silent is currently reviewing our parts, they will send us feedback before next Wednesday (09.11.16)\r\n11.11.16 - Eddy will send the detailed analysis report in English until Wednesday together with the quotation for\r\n                the worm and axis\r\n23.11.16 - RD-D has received the report, main reason of the noise is the real parts doesn\'t meet the drawing requirement.\r\n                If the gear part can be produced according to the drawing specification, the noise should be reduced. Housing\r\n                need to be optimized for better locating and supporting the gear parts in side, later we will get a quote for the\r\n                optimized sample (10~20pcs, with expected db after improvement). We could try to ask them what is the key\r\n                gear which has the most effect on the noise issue\r\n06.12.16 - Silent will prepare the solution of gearbox optimization before the end of this weekend or early next week.\r\n14.12.16 - Proposal sent, waiting for RDD feedback.\r\n04.01.17 - we need some more detailed information from Silent Gear \r\n19.01.17 - All information and quotation sent, waiting for the feedback from Manfred for the next step, and target price\r\n                for the worm and shaft.\r\n16.02.17 - still in progress - we check whether we can make as an alternative some improvements on the motor \r\n\r\n* 17.07.17 - Mail Manfred: improvements on the motor are not successful. Would it be possible for Silent Gear to deliver the gearbox already with 230V motor ? Can they source a comparable motor on the Chinese market and deliver a complete assembled and tested unit to us ?\r\n* 18.07.17 - Mail Sally: Silient is reviewing the cost down proposal based on the recent quotation. Thus, for the 230V motor they will contact their supplier and deliver the quotation in short term.\r\n* 23.08.17 - the interest from Silent forthis project is not hot, maybe they will make an offer at thge end of this month\r\n* 11.10.17 - tomorrow Eddy will reply me if they can unveil the 230V supplier to us for direct contact regarding technical level, this supplier has all tools, price quote by Silent is 33.90RMB/PC(25K pcs batch) refering to IG specification.\r\n* 31.10.17 - seems Silent is not willing to unveil the motor supplier for our direct contact\r\n* 08.11.17 - Silent is not willing to give us the motor supplier info', 1509520540, 1519889384, 0, 'grey', 2, 8, 3, 5, 0, 0, 0, 3, 1519889384, '', 0, 0, 0, 2, 1510215626, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(47, 'new product portfolio GDO 2017 - inquiry', '17.01.17 - Mail Sally: Foresee confirms SX5Duofern (510RMB) and S2-Long (447RMB), but for S2 the best they can do is \r\n                434RMB. Would you consider to cancel the knife card (2x) in S2 packaging, this can bring cost saving for 4.2RMB then\r\n                the target could be met? The motor head is actually tied on the rail already, this is only used for Rademacher \r\n                packaging so this is not cost effective solution.\r\n13.02.17 - Mail Sally: After negotiation, RMB 392(FOB Shunde) is the best price Foresee can offer for TA60.\r\n25.02.17 - Mail Sally: Foresee confirmed the really lowest price for TA60 is 388RMB (reduce another 4RMB from 392RMB as final).\r\n01.03.17 - Ralf will have a telco with Mike at the 2nd of March regarding the price of the TA60\r\n09.03.17 - further discusion about the TA60 price during our visit in cw12\r\n21.03.17 - Johnson will check the current stock of \"old\" user guides abd packagings\r\n29.03.17 - price for TA60 - on hold, project kick-off for new GHO portfolio soon, update technical annex, confirmation for \r\n                pallet price OPEN\r\n09.05.17 - 1RMB pallet fee finally confirmed, now we go forward with following price, waiting for Foresee sign back \r\n                quotation sheet 5-9: S2: 434 RMB - plus 1 RMB - minus 4.0 RMB = 431 RMB, \r\n                S2-Long: 447 RMB - plus 1 RMB - minus 4.2 RMB = 443.80 RMB, \r\n                SX5Duofern: 510 RMB - plus 1 RMB - minus 4.0 RMB = 501 RMB\r\n15.05.17 - price confirmation well received, \r\n07.06.17 - I will try to send the printing files for the carton boxes tomorrow\r\n04.07.17 - New carton box released for mass production, user manual file received waiting for layout/sample from Foresee, \r\n                new label pending\r\n18.07.17 - RD-D has received the samples files of the user manuals - hopefully we can send the release on Wednesday\r\n22.07.17 - Mail Sally: Yes, you are correct, the size is not exactly DIN A5, what the local printing house do here is using the A4 and\r\n                cut in half, so the width is shorter than real A5. Is that acceptable?\r\n\r\n* 22.07.17 - Mail Manfred: what is the final Chinese size for the user manual in mm (B x H) in comparison to the German (original) size ? Answer Sally: 210 x 142 mm (should be 210 x 148,5 mm) - OK. Change approval sheet for user manuals ??? Change approval sheet for CE declaration ???\r\n* 30.08.17 - RD-D is still working on the technical annex to describe the GDO\'s more precise, packaging TA60 and user manual is in progress\r\n* 11.10.17 - 5 RMB increase on S2 and SX5DF from #10 due to material increase(new price list need to be signed by Foresee) detail refer to Ralf meeting minutes CW38), TA60 price under checking. New transformer option(sample, certification) will be discussed afterward. S2 packaging updated, waiting for printing layout from Foresee. TA60 carton and user manual file received, waiting for printing layout from Foresee.\r\n* 24.10.17 - confirmation for the quotation still OPEN, furthermore final TA60 price\r\n* 28.10.17 - speechless high price of TA60 and S1 received from Foresee\r\n* 24.11.17 - Mail Sally: Hi Johnson, As briefly discussed in phone, we hope for S1 and TA60, can follow our conclusion after our meeting on 2017.09.22, so we do not need to repeat the same trip again. We understand the cost situation from your price increase list but also hope you understand our situation regarding the price competition in western market.\r\nWe have followed your DTC solution(change approval sheet signed) after meeting so far, like:\r\n1. cancelling the wifi section on RDM GDO board\r\n2. changing base material of SX5DF to PP\r\n3. using thinner paper for user manual\r\n4. using same PCB design for all GDO, to maximize the economies of scale\r\n\r\nWe hope these could considered as our effort to help both side to reduce the cost.\r\nFinally let\'s reach conclusion of increase 5RMB on all GDOs using the same motor head, so we can asap process the upcoming orders of S1 and TA60 with no open question.\r\n\r\n* 01.12.17 - Ralf will get on board talk with Foresee on this topic.\r\n* 04.12.17 - Current status (Johnson mail 2017-12-04) _New portfolio:\r\nS1-1: 403.57 RMB + increase 5.43 RMB = 409 RMB\r\nS1-2: 426.60 RMB + increase 5.4 RMB = 432 RMB\r\nTA60: 388 RMB + 10 RMB = 398.00 RMB\r\n*Our argument is we maximum accept 5RMB increase on each GDO, same for S1 and TA60, like we accepted on S2 and SX5DF.\r\n**DTC of SX5DF transformer is ongoing but this should be another topic. (further 16RMB minus on SX5DF), we will discuss with Foresee separately, this time maybe we should focus on S1 and TA60?\r\n* 15.12.17 - Mail Ralf: So from the markets point of view the TA60 pricing is not fitting as the min. margin for a two-stage sales channel is about 40% which leads to\r\napprox. 345RMB for the TA60. In understand that it is very difficult to meet this requirement but please also understand that we supported you very much to cut costs and rearrange our GDO portfolio that you have only ONE main PCB. Also you should consider the product & volume\r\nmix of our portfolio and see the TA60 as an complement at the lower end with lower margins for you and us. So please reconsider the TA60 pricing so we find “a solution between 345RMB and 398RMB”.\r\n* 04.01.18 - Mail Johnson: Concerning about the pricing of TA60, I communicated with our financial department, but they feedbacked that RMB 398 is the lowest price we can offer at present.\r\n* 15.01.18 - Ralf has sent a separate mail to James and Queenie where he again asked for a better price  .... \" So please reconsider the TA60 pricing so we find “a solution between 345RMB and 398RMB”.\r\n* 17.01.18 - Queenie has replied Ralf on 17th Jan and 10th Feb.\r\n', 1509520674, NULL, 0, 'blue', 2, 7, 2, 4, 0, 1, 0, 3, 1518341437, '', 0, 0, 0, 2, 1509520674, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(48, 'GDO software renewing plan', '13.02.17 - Mail Sally: Due to the new version of EN 60335-2-95 which add the clause 22.46 Addition, Foresee is working on renewing\r\n                the GDO software, suppose to be finished in June, they will then provide sample for your testing.\r\n03.04.17 - Mail Johnson: concerning about this new standrad - software evaluation, for PCB of RDM products, we will do some changes\r\n                as following. Please check and confirm so that we can proceed. For S1, S2, SX5, TA50 & TA70, PCB of those models are \r\n                same as Foresee\'s standrad PCB. To fulfill new software evaluation standrad, structure of standrad PCB will be updated. \r\n                And PCB of these 5 RDM models will be updated accordingly. Foresee will bear the GS certification fee and Rademacher will \r\n                just bear the Co-lincense fee. But for SX5DF with a special Duofern module, as new PCB has no enough place for fixing this \r\n                module. We will update the program and chip basing on current PCB. Rademacher bear the GS certification & Co-lincense \r\n                fee(around RMB 150,000.00).\r\n04.07.17 - Johnson, sample of new PCB has some pull force problem, under checking, sample delivery date is pending\r\n18.07.17 - waiting for the samples of the PCB / devices - the PCB\'s of the DuoFern module are still in Rhede :-(\r\n02.08.17 - Mail Sally: Test will finish today (Wednesday), hopefully in the afternoon we will have the samples send out\r\n03.08.17 - Mail Sally: Samples with new PCB of S2, SX5, SX5Duofern, each type 2pcs(complete kit with rail, etc.) has sent out yesterday \r\n                afternoon. DHL tracking no.: 70 7446 4471. Meanwhile, we are pushing for the specification of new pcb from Foresee, will \r\n                send you to asap.\r\n09.08.17 - Mail Johnson: Dear Ralf, sorry for late reply. Attached please find the specification of the new PCB (with comparison of the old \r\n                version). TUV testing will be started next week. If everything proceeds smoothly, we can obtain the main license on 20/Sep. \r\n                And Rademacher can get the Co-license end of Sep.\r\n23.08.17 - discussion between Dieter and Johnson about one function of the software which seems to be not correct\r\n\r\n* 28.08.17 - Mail Sally: Doubled checked with Foresee, the timeline for the TUV certification progress >>\"Foresee can obtain the main license on 20/Sep. And Rademacher can get the Co-license end of Sep\" stay unchanged. And Foresee will try to expedite the timeline wherever possible.\r\n* 30.08.17 - Further discussion with Peter an Monday 04.09.17 about the new PCB (release YES or NO) - life cycle test etc.\r\n* 13.09.17 - Peter has released the PCB and software. Currently not clear whether he wants new samples of the PCB or not\r\n* 22.09.17 - Ralf brought back 6pcs new PCB(2pcs each type) with updated SW with him back to Rhede. updated schematics received (now same pcb design for all GDOs).\r\n* 02.10.17 - Mail Ralf: Dear Sally, please find attached the signed application. Please note that I have added the missing parts and also limited the statement about the costs as we can not accept a card blanche for a cost increase. As I have written in an earlier mail Foresee              should also provide the full test reports (safety, EMC, RF, etc.) for our documentation.\r\n* 21.10.17 - Mail Sally: Hi Ralf, We should be able to receive the co-license and reports next week, if no problem, the exact info will follow next Monday.\r\n* 24.10.17 - Mail Sally: Hi Peter, According to the new portfolio and new PCB co-license, some info on the CE declaration need to be updated.\r\n* 24.10.17 - Mail Peter: Hi Sally. What about all EMC standards? Can Foresee provide a list we can use for the EC declaration?\r\n* 26.10.17 - Mail Peter: Hi Sally. I created two new declarations for printing  which are  valid for TA and for  S families till end of 2017.Regarding 2018 I made a new declaration for the S-family only. For the TA portfolio there is a need for internal discussion here – especially considering all types of remote controls mentioned there. After this clarification I will come back with a new 2018-TA declaration. Change approval sheet - done\r\n* 31.10.17 - safety, EMC, RF report and RED cert sent. Waiting for updated TA60 user manual so then co-license could be issued.\r\n* 17.11.17 - Mail Nicole: attached you will find the manual of the TA60 with the changes on the 2nd page of each language. I hope it will help you to get the certificate from tuev.\r\n* 29.11.17 - Johnson: co-license will be ready next week\r\n* 07.12.17 - Co-license obtained and sent to Peter, original copy will be sent soon.\r\n* 13.12.17 - Original copy sent out to Peter, DHL tracking no. is 2387206496.\r\n* 30.12.17 - Mail Sally:As discussed, we missed a change approval here(change of old PCB&SW->new PCB&SW), please see attached, please sign back if no problem, sorry for slipped that.\r\nPS: Later we\'ve signed the PCB schematic change from ver.0810 to ver.0927 already (WIFI removal). Also attached, FYI. So 0927 is the final PCB schematics version till now. \r\n* 07.03.18 - Mail Sally: Could you please help to confirm the change approval, then we can close the topic, thanks!\r\n* 07.03.18 - Mail Peter: Here we are – I added manually the PCB revision number which was not explicitily mentioned in the document.\r\n\r\n', 1509520776, 1519889543, 0, 'grey', 2, 8, 2, 10, 0, 0, 0, 3, 1520486770, '', 0, 0.04, 0, 2, 1512629151, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(49, 'Electronic Limit Switch Head Tubular Motor - WISTAR', '\r\n* 19.06.17 - visit from Cindy and Tina in Rhede - main topic - electronic limit switch head tubular motor\r\n* 17.07.17 - Wistar has provide the (1) TUV certificates and the full test reports of you WSEC intelligent motor series and (2) pictures of the different type of limit switch heads available for the WSEC series\r\n* 11.10.17 - technical annex feedback update ongoing based on 0913 version per Markus comment on mail \"2017/10/4 WISTAR / electronic tubular motor\"\r\n* 15.10.17 - technical annex feedback update based on 0913 sent, waiting for Markus feedback\r\n* 18.10.17 - Mail Sally: Hi Ralf, Wistar is preparing the sample, but recently sales are on trip, later we will send you the tracking no\r\n* 19.10.17 - Mail Sally: Dear all, Wistar will send out the WSSD40-10/14 as attached next Thursday. For the WSSD50-20/17, still in preparation, perhaps to be sent 1~2 weeks later.\r\n* 26.10.17 - Mail Sally: Hi Jens, WSSD40-10/14 x 1pc sample delivered out from Wistar. \r\n(The WSSD50-20/17 is still in development stage, sample will not be delivery at this stage.) \r\nDHL WAYBILL 11 4023 1783\r\n* 16.11.17 - Mail Markus: Sorry for the missing feedback. We have to discuss the topic internally with the sales department.I\'ll contact you as soon as I have new information.\r\n* 08.01.18 - Mail Sally: Dear Ralf, Wistar would like to pay a visit to you in Rhede after R+T, do you have time on 5th March?\r\n* 14.01.18 - Mail Ralf: Dear Sally, the 5th of March would be directly after the fair and I schedule is already quite tight. I would rather suggest a meeting at the R+T fair in Stuttgart. What about having a meeting on March the 2nd at 10am at our booth? \r\n* 18.01.18 - Mail Sally: Dear Ralf, That would be fine. Cindy - Sales director, Sarah whom you\'ve met in hangzhou - Sales for Germany & Poland, Mr. Wan - Electronics Engineer. **They will go to meet you on March the 2nd at 10am at Rademacher booth.**\r\n* 02.03.18 - Feedback from Wistar: they have met Ralf and currently R&D is putting full capacity working on HP3, so this project has been put off, TBD.\r\n\r\n\r\n\r\n\r\n', 1509520879, NULL, 0, 'blue', 2, 6, 3, 8, 0, 1, 0, 3, 1520437663, '', 0, 0, 0, 2, 1520437663, 0, 0, 0, 0, 0, NULL, NULL, 1, NULL, NULL),
(50, 'superrollo 5-channel hand transmitter w/ timer', '\r\n* 24.03.17 - Mail Sally: DC104 series is including: DC104 DC105 DC168 DC169, from current standard offering, there is no 5-channel. Dooya need to double check with product department next week. DC104 and DC105>> with DISPLAY, without timer function DC168(single-channel) and DC169(15-channel)>> with DISPLAY, with timer function Instantly arranged sample for DC168 DC169 first, once we have feedback for the 5 channel, we will send you more info.                Price: DC168  RMB 27.50, DC169  RMB 28.00 \r\n* 30.03.17 - samples well received and forwarded to Ralf\r\n* 27.06.17 - in progress at our product management department\r\n* 30.08.17 - RD-D will send in a separate mail some questions - REACH and RoHS declaration etc.\r\n* 26.09.17 - Mail Sally: ·Remote control, due to the sales figure - DC168/DC169(with screen, with timer function) - NO plan to do any cerfitcation DC104/DC105(no screen, no timer function) - will apply RED at the end of October. DC513/DC514(with screen, with timer function),             the one we saw during the visit in the electronics workshop display board - NO plan to do any cerfitcation, just FYI.\r\n* 04.10.17 - Mail Markus: Dear Sally, without certificates we will not be allowed to sell these products. The models DC104/DC105 has no timer - we need a remote control with timer as an accessory. Can you please check again whether Dooya offers remote controls with timer function and existing certificates?\r\n* 11.10.17 - the only one has both timer and certification(ongoing) is DC2705 (5 channels) approx 9USD. DC2703(single channel) certification possible.\r\n* 30.10.17 - RED certification of  DC2705(5 channel) & DC2703(single channel) sent,waiting for Markus feedback', 1509520959, NULL, 0, 'blue', 2, 6, 2, 11, 0, 1, 0, 3, 1520437667, '', 0, 0, 0, 2, 1520437667, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(51, 'motor bracket for superrollo tubular motor', '\r\n* 24.03.17 - Mail Sally: Attached Dooya drawing of standard bracket DZ233/DZ361 as reference solution for our request base plate 50mm x 50mm w/ 10mm x 10mm square hole, minor customization could be done(like punching hole dimension).\r\n* 25.04.17 - further feedback from Ralf necessary\r\n* 27.06.17 - in progress at our product management department\r\n* 30.08.17 - RD-D will use the bracket DZ233 in the future - more details asap\r\n* 14.11.17 - Mail Manfred: can you please ask Dooya to send us 2-5 samples of the motor bracket DZ233 – drawing attached ? It is necessary that some customers have a sample in advance before we maybe switch to this bracket.\r\n* 15.11.17 - Mail Sally: Noted, will send together with the TM20 gauge this week.\r\n* 20.11.17 - RD-D has received 5 pcs samples, currentyl under investigation by a customer \r\n', 1509521002, NULL, 0, 'blue', 2, 6, 2, 10, 0, 1, 0, 3, 1520437688, '', 0, 0, 0, 2, 1520437688, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(52, '671 - new plug & play tubular motor HAL system', '23.05.17 - in the first step we could fix the price with 7 RMB. Currently waiting for the drawings and STEP data files of the four \r\n                plastic parts, we must inform DOOYA how we would like to QC the motor, because now we have a semi-motor with encoder\r\n                output etc.\r\n02.06.17 - RD-D has released the drawings and data, first samples will be ready at the end of July \r\n09.06.17 - Mail Linda: Due to the difficult purchase of the MURATA thermistor, we suggested you another Thermistor which produced in \r\n                Taiwan(specification attached). The sample will also be sent to you by the end of June.  Please check after you get the sample \r\n                and then let me know if it is ok to use this TAIWAN thermistor to replace the MURATA one. \r\n12.06.17 - Mail Joerg: I just checked the datasheet and can confirm, that both NTCs work almost the same. I let you know as soon as I \r\n                checked the samples. \r\n12.06.17 - Jorg: sample looks good. Is it V0 compliant. What is the existing test tool looks like, I will add the test for NTC\r\n                Further action needed: Dooya need to send material datasheet . And test tool information.\r\n                Sally:  tooling specification sheet for the four HAL plastic part sent to Manfred. Dooya will later send the material \r\n                datasheet to Jorg to verify the material fire retardancy\r\n14.06.17 - Mail Linda: Materials are flame retardant. Please check attached the schematics of the testing gauge. \r\n28.06.17 - Linda has sent the samples of the NTC. The yellow marked ones are from Japan. The rest two of them are without any\r\n                mark are from Taiwan. \r\n04.07.17 - The TM20 pilot batch(3pcs each full BOM - in total 21 pcs) will be ready middle of Aug, Jorg confirms using Taiwan TKS NTC is OK.\r\n06.07.17 - Joerg has sent Dooya the release for the Taiwan NTC - TKS - part no.: TSM2B104J4253RZA\r\n29.07.17 - The TM20 samples (20 pcs - for small 10Nm only 2 pcs) are ready - DHL tracking no. 66 8877 7012- free of charge\r\n16.08.17 - Mail Sally: Please help to ask your QC department add this check point (cable color sequence on the connector) into TM20 IP, \r\n                our QC will control during OQC. This should be a onetime mistake during sample stage and later must be corrected during\r\n                mass production.\r\n\r\n* 21.08.17 - Mail Jörg: I\'m just back and already have another change request on the colour sequence. Dieter has updated the drawing accordingly which now should not leave any open questions. Also the turning direction is mentioned within. I\'m sorry for not finding this issue earlier…\r\n* 22.08.17 - Mail Sally: Changes on the cable color sequence and relative rotating direction noted. Dooya will update their internal drawing accordingly. Later today or tomorrow, we will deliver 2pcs sample (1x 35mm, 1x 45mm) as mentioned to Dieter, as confirmation.\r\n* 24.08.17 - Mail Sally:  Thus, we will send out 30pcs motor connector HX39600-3Y tomorrow, so you can correct the previous sample batch with wrong wire color sequence if you like. Can you send us the reply for the attached question regarding extended wire length?\r\n* 25.08.17 - Mail Joerg: length is OK, Never the less our production team hardly complained about the little connector for the sensor PCB… We discussed about a solution with only one connector for both the Motor and the sensor PCB. Can you discus about using the bigger motor connector as a 6 wire type for both the motor and the sensor?\r\n* 28.08.17 - Mail Sally: We will try to send a proposal regarding combine the HAL and motor connector, but since motor connector is high voltage and HAL is low voltage, it could be some challenge, engineering team need to review the possibility and later send you a detailed reply.\r\n* 28.08.17 - Mail Joerg: we just checked the connector on our side and we are not able to place it on our PCB. Furthermore a different connector with smaller pitch would not fit the insulation requirements due to the high voltage… For now we will work on other solutions. The TUV ask for the specification of the sensor wire. Could you provide some datasheet?\r\n* 29.08.17 - Mail Sally: Attached specification of the HAL wire, waiting for your input for the connectors.\r\n* 12.09.17 - Mail Sally: instead of HE please use in the future HS. Dooya part number for example DM45G-10/15\r\n* 18.09.17 - Mail Jörg: Hi Sally, attached is the latest version of the tech. annex together with the updated drawings. If there is any trouble with that .zip file let me know.\r\n* 11.10.17 - Sally is in close contact with Joerg RE the technical annex and the testing of the HAL sensor etc. After the release of the TM20 specification we would like to order asap via air freight 50 pcs form each type (7 x 50 = 350 pcs)\r\n* 11.10.17 - Mail Sally: For the testing gauge, do you need a same one from Dooya for testing in Rhede?\r\n* 11.10.17 - \"124 TM20 HAL&NTC test document_V4.docx\" sent to Jorg, technical annex pending on Jorg feedback.\r\n* 11.10.17 - Mail Jörg: Hi Sally, Would be great if Dooya can provide another testing gauge for us in Rhede.\r\n* 18.10.17 - RD-D has sent the first order of 50pcs per each type - IP, delivery date and decision for testing gauge OPEN\r\n* 20.10.17 - Mail Sally: Hi Jens, Estimated delivery date is 30th NOV, we will try to follow up with Dooya and expedite.\r\n* 24.10.17 - Mail Sally: Hi Manfred, It is on our list. The gauge will be finished at the beginning of November. We will send you picture and user guide.\r\n* 03.11.17 - Mail Sally: Hi Manfred, hi Jorg, Just an info, the gauge should be ready next Friday (10.11.17). Motors could be ready until 20th of November (ETD)\r\n* 10.11.17 - Mail Sally: It seems we need to wait until early next week, sorry for the delay.\r\n* 15.11.17 - Jörg has sent an update of the Technical Annex\r\n* 15.11.17 - Mail Sally: Well received, already inform Henk, our QC manager to arrange inspection on the motor and sensor wire alignment newly added. Later we will ask Dooya to sign off the annex.\r\n* 16.11.17 - Mail Jörg: This is an issue inside the drawing 671-Z-00-101a which we will correct in the future. RD will send asap an updated drawing\r\n* 22.11.17 - Mail Joerg: I updated the annex. Please check if everything is clear that way.\r\n* 23.11.17 - Mail Sally: Hi Jorg, Fantastic! We will have Dooya sign off the attached final copy > Dooya_TechnicalAnnex_TM20_Ver171123.doc <\r\n* 27.11.17 - Mail Peter: Hi Sally. This is  a problem cause this was the basic idea how to test (100%!) the presence of the rotor-magnet and the NTC. What is Dooyas proposal how to solve this issue?\r\n* 27.11.17 - Mail Sally: Hi Peter, Dooya said adding heat protection test 100% is impossible based on the current price as this will dramatically bring down the production speed, they only agree to do sample check 1%(same as for the other motor). The test of NTC only takes 4 minutes the same as the moist expulsion process.\r\n* 14.12.17 - Mail Sally: Hi Jorg, Attached TM20 Technical Annex signed back by Dooya.  \r\n\r\n\r\n\r\n\r\n\r\n', 1509521066, NULL, 0, 'blue', 2, 8, 3, 3, 0, 1, 0, 3, 1520416461, '', 0, 0, 0, 2, 1520416461, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(53, 'claim Dooya #5 #7 dirty contaminated tubes', '\r\n* 14.07.17 - Mail Martin: Dear Sally,at the last delivery, we found more than 20 motors with dirty contaminated tubes.\r\nThese tubes wasn´t in the upper level. We found them three and four levels deeper.Please, see pictures in annex and note for the future deliveries.The rest of Order 5 was top.\r\n\r\n* 25.08.17 - Mail Martin: Dear Sally, we have a big issue with the new delivery from Dooya. We found a lot of tubes with contaminated tube surfaces. Please, see the pictures in my reports. Now, we must still control the other type and then we must select all tubes by 100%. Further we will discuss a possible method to rework these tubes. We\'ll get back to you next week.\r\n* 30.08.17 - see above - RD-D will sort out the whole delivery on Friday 01.09.17\r\n* 07.09.17 - Mail Martin: we have sorted out 1148 pcs. From these - the types HE0628 and HE1015 are urgend and here we need a replacement .All motors we send back at the end of this year.\r\n* 12.09.17 - Mail Sally: Dooya will send out via air freight 135 pcs HE0628 and 353 pcs HE1015. Departure approx. 12/13.10.17 ETA Rhede approx. 18.10.17. Dooya will pay the air freight and duty. Furthermore they have paid the costs for the sorting out.\r\n* 13.09.17 - Mail Jens: I got a info from TNT, that they will pickup the parcel tomorrow, in appendix you’ll find a copy of the shipping documents including the tracking number (GD313339106ww).\r\n* 27.09.17 - Mail Sally: Hi Jens, Replacement cargo DDP by air - 10/10 - 135 pcs HE0628 -  from #10 4500033024 and 353 pcs HE1015 - from LCL #4500032912. Dooya\'s forwarder somehow can\'t  handle the import duty in Germany so they can\'t send the cargo by DDP but can only by DDU, please pay the duty at your end first then book the duty amount on the debit note to Dooya.\r\n* 18.10.17 - We have received the goods and will send you debit note as soon as we have receive the paperwork\r\n* 23.10.17 - debit note received from Jens, deduct from payment CW43', 1509521265, 1519889594, 0, 'grey', 2, 8, 3, 6, 0, 0, 0, 3, 1519889594, '', 0, 0, 0, 2, 1510215759, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(54, 'claim HM8015 no function', '\r\n* 25.08.17 - Mail Martin: in the last delivery 4500031732 we have found from 50 pcs two pcs of HM8015 which have no function.\r\n* 25.08.17 - Mail Sally: Dear Martin, Claim well noted. Sorry for the failure at your end again. We will work with supplier to investigate this issue and get back to you asap! Could be we need you to help to send back the failure motor to Dooya next Monday!\r\n* 29.08.17 - Mail Martin: I send to you now only two HM8015. (no function)\r\n* 01.09.17 - Mail Leona: Dooya has arranged the courier which in Germany to pick up these two samples. They will contact you soon.\r\n* 07.09.17 - Mail Leona: Hi Jens, The TNT has picked up these  in 4th Sep. The tracking number is 312873212.Dooya will receive soon.\r\n* 07.09.17 - Mail Jens: Hi Leona, thanks for your Info, until today I heard nothing from this package, I will direcly ask our guys in warehouse about the paperwork!\r\n* 11.10.17 - Dooya has received the defective sample weeks ago. Henk is following up with Dooya regarding the analysis\r\n* 13.10.17 - Mail Henk: Dooya factory can’t find the root cause what is in HM8015,So they ask their supplier to help to analyze together ,now they are working on this . \r\n* 18.10.17 - Mail Henk: Dear Martin, please check attached 8D report for HM8015 no function from Supplier Dooya.\r\n* 19.10.17 - Mail Andreas: Hey Henk, Thank you for the information. I have one last question: Why was the product delivered with a defect if each part was checked correctly ? There is no information about this in the 8D report\r\n* 19.10.17 - Mail Henk: Dear Andreas: Maybe Dooya’s 8D report is not claim the root cause clearly .As I know it by with Dooya’s talking, the tubular motor ‘s inspection procedure required should do the full test for the function, this can screening the function defective. In this Batch HM8015 ,the tester follow the test procedure ,but during several HM8015 motor testing ,they facing with the working shift conversion( meaning is day shift over ,night shift begin),in this short time ,made the testing deviation. In the 8D report ,Dooya mentioned this, but seems is not clear enough. So make you confusion.\r\n* 08.12.17-Henk : this can closed ,approved by Andreas\r\n', 1509521307, 1519889523, 0, 'grey', 2, 8, 6, 11, 0, 0, 0, 3, 1519889523, '', 0, 0, 0, 2, 1512727089, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL);
INSERT INTO `tasks` (`id`, `title`, `description`, `date_creation`, `date_completed`, `date_due`, `color_id`, `project_id`, `column_id`, `owner_id`, `position`, `score`, `is_active`, `category_id`, `creator_id`, `date_modification`, `reference`, `date_started`, `time_spent`, `time_estimated`, `swimlane_id`, `date_moved`, `recurrence_status`, `recurrence_trigger`, `recurrence_factor`, `recurrence_timeframe`, `recurrence_basedate`, `recurrence_parent`, `recurrence_child`, `priority`, `external_provider`, `external_uri`) VALUES
(55, 'sun-wind-sensor', '\r\n* 15.09.17 - Mail Ralf: in preparation to our Dooya visit I like to send some information regarding a new project we want to address. The idea is to use the DC116 sun-wind-sensor from Dooya and integrate our RF interface DuoFern into this product. Attached please find the documents which I like to discuss with Jeffrey and maybe an engineer during our visit.\r\n* 27.09.17 - Mail Sally: Attached CE certification of DC116W (IP44), Dooya doesn\'t do the TUV safety certification for this standard type, but only did for DC116B(ongoing still), a customized type. We are checking what is the product difference and maybe it also can be our reference for safe evaluation. Also the product information of solar version DC118 (how many pcs sample of                 DC118 do you need further?). Price indication: DC116W, Unit Price: RMB132.32, DC118 Unit Price: RMB178.63 .The other points to be clarified later, for example, DuoFern RF interface, product modifications on page 3 of             \"Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf\", etc..\r\n* 04.10.17 - Mail Ralf: we need further information RE the CE certification. When can we get a feedback on the other issues from the meeting ?\r\n* 11.10.17 - Mail Sally: Dear Ralf, before reply your mail, one quick question, what is the frame size(minimum envelope size) of our Duofern RF module to put on Dooya\'s main PCB? For both option 1(physical module) and 2(an area on the main board)?\r\n* 12.10.17 - Mail Ralf: the size of the RF part w/o antenna is approx. 17x30mm^2. If we implement a PCB antenna like in the picture below an additional area with approx. 20x30mm^2 w/o any other electrical components or metal is needed. A simple wire as antenna is possible as well. Does this answer your question? \r\n* 13.10.17 - Mail Sally: attached the answers to the open question from the meeting minutes with Dooya\r\n* 18.10.17 - Mail Sally: Attached schematic refer to point 1, we can\'t open here, so please check and let us know if there is any question. Regarding the topics for the certifications, we are following up, will come back asap.\r\n* 18.10.17 - Mail Sally: Hi Peter, Attached PCB layout, FYI.\r\n* 26.10.17 - Mail Sally: Regarding the certification question from Ralf, see attached reports which Dooya have.See attached test report from 2017. The certification paper of 2013 sent from Dooya earlier is expired, the new one they have not received yet.\r\n* 30.10.17 - Mail Ralf: one last question: What is the difference between DC116W and all the other variants like DC116B from the test reports? Why is DC116W not listed in the test reports DOE-17AU0836VTSPB-1/-2/-3?\r\n* 02.11.17 - Mail Sally: Dooya can add our DC116W into the report later, they normally do the certification for each customized type after finalized. The standard DC116W now has no valid certification. DC116B,C, E, etc..are customized type with customized modification(mostly are one customer dedicated), sth like change housing to be transparent PC, remove light sensor function, add transmitter, or add some special PCB design, special power supply type, special housing structure design, etc...\r\n* 07.11.17 - Mail Ralf: Dear Sally, thanks for the update. Do you know if some of our requirements (lower stand by power, housing w/o the “Up” and “P2”) are considered in some of the DC116 B, C, E, etc. designs?\r\n* 08.11.17 - Mail Sally: Hi Ralf, Reviewing the detail in Chinese, I don\'t think so, but we will let Dooya check again.\r\n* 09.11.17 - Mail Ralf: Please let me know the meaning/feature of the different types.\r\n* 13.11.17 - Mail Sally: Below is the feature of the different types, Please let us know which type you would like to get further information.', 1509521407, NULL, 0, 'blue', 2, 6, 8, 9, 0, 1, 0, 3, 1520437681, '', 0, 0, 0, 2, 1520437681, 0, 0, 0, 0, 0, NULL, NULL, 2, NULL, NULL),
(56, 'gearbox of HM5012 failed', '\r\n* 29.06.17 - Martin: The two special motors are still running by 2´800 cycles. Ben:???\r\n* 17.07.17 - Mail Martin: the two samples 50Nm have now 3´500cycles and still running.\r\n* 20.07.17 - Mail Sally - Info: For this change Dooya need to modify the tool, so we start from 50Nm firstly to verify the route, if good for 50Nm then they will make the same change on 40Nm as well later, step by step. Attached report for your reference. There are 5pcs 50Nm sample running in Dooya for life cycle test, ongoing.\r\n* 26.07.17 - Mail Sally: Here we kept some sample of the new(gear width 1.3mm) and old(gear width 1.2mm) 1st stage single gear of 50Nm motor from Dooya, see attached, would you like us to send you for reference?\r\n* 26.07.17 - Please send us the tracking number for the delivery of the samples to Andreas\r\n* 27.07.17 - Mail Leona: DHL tracking number is 77 1808 1254\r\n* 24.08.17 - Mail Sally: Hi Andreas, hi Martin, Please let me know if the below mentioned gear has arrived your end or not? The life cycle test in Dooya has finished, attached report, all PASS. Our QC witness the testing process and disassembled one of the testing motor after 9973 cycles on 08 AUG, attached pictures showing the gear worn status is acceptable.\r\n* 14.08.17 - Mail Martin: yes, these samples are here in my office now. I give a feedback as soon as possible.\r\n* 24.08.17 - Mail Sally: Just an update, have you finished the life cycle test at your end with these 2pcs special 50Nm of increased gear width? How is the result?\r\n* 24.08.17 - Mail Martin: yes, I tested two motore with new gear-wheels who has a tooth thickness 1,3mm. These booth motors are still running with 10´500 Zycles. These motors run smoothly. I mean you wanted two more motors to send to me. Anyway, I\'ve now changed three more motor with the samples gear-wheels. These tests begin now.\r\n* 26.09.17 - Mail Sally: Hi Martin, hi Andreas. During Dooya visit, we heard further/different news regarding the testing at your end of the 50Nm motor with improved tooth width. (2pcs complete samples from Dooya and 3pcs built by RDD with improved single gear). Please update us the test result and we will follow up with further action. (further 5 complete 50Nm samples with improved tooth for further lifecycle tests in Rhede? or do you need more single gear with improved teeth?) Please advise.\r\n* 10.10.17 - Mail Sally: Dooya has sent out further sample at 30.09.17 - WAYBILL 25 6672 0730                5pcs 50Nm motor with improved 1st stage gear teeth width for your further testing and 9pcs single gears(improved).\r\n* 11.10.17 - Andreas: computer still NOK, will feedback later regarding the discrepancy on the testing result in Rhede. Sally: 5 complete 50Nm and 9pcs single gear samples with improved tooth, for further test in Rhede sent on 30 Sep.\r\n* 13.10.17 - Andreas:the engines are here. We will soon take this into the LiveCycle test.\r\n* 08.12.17-Henk: Andreas will check the life cycly report of RD-D ,then confirm close this or not .\r\n* 15.12.17-Henk: Andreas mentioned the new gearboxes are running with the green gears and beyond 10000 cycles,so this can be closed .', 1509521559, 1519889483, 0, 'grey', 2, 8, 6, 14, 0, 0, 0, 3, 1519889483, '', 0, 0, 0, 2, 1513572033, 0, 0, 0, 0, 0, NULL, NULL, 3, NULL, NULL),
(57, '#10/2017 30Nm 40Nm 50Nm 1 stage planetary changed already', '\r\n* 12.03.18 - Mail Sally:Thanks. Yes, normally we must firstly sign the change approval before the implementation at supplier\'s end, this time is Dooya\'s fault and we RD-CN caught them. We have emphasized this rule to Dooya and they must follow our process.\r\nAttached copy signed back.\r\n* 10.03.18 - Mail Andreas:Please use the corresponding new document in the future.\r\nI expect information in the future before the changes flow into the delivery. Please communicate this also to Dooya. Please also sign the supplier in the future.\r\n* 07.03.18 - Mail Sally: Dear Andreas, please sign the change approval if you feel everything is OK, then we can close this topic on document level. Thanks!\r\n* 22.01.18-Andreas : we have also finish the life cyletest and there is no problem; we can close the topic! \r\n* 22.01.18-Henk mail:Dear Andreas:The  life cycle test for 1st stage gear in last 40Nm motor is finished ,the 1st gears are no broken and beyond  10000pcs cycle times ,so until to now .the 1st stage gears are pass the life cycle test for 30Nm/40Nm/50Nm motors. \r\nAttached test record for your reference.can we close this topic? \r\n* 15.01.18-Henk mail: Dear Andreas:the 1st stage gear life cycle test for 30Nm motors (3pcs ) and 40Nm(2pcs) are finished ,all are beyond 10000 times and 1st stage gears no broken .\r\nstill have 1pc 40Nm motor is testing ,because bearing and steel wire broken caused the testing interrupt ,so have the result will later than others ,it will be finished one week later .\r\nAttached cycle test record and the 1st gear status pictures for your reference.\r\nI will update another 40Nm test record once I got \r\n* 22.12.17 - one 50 Nm motor has an defect; there is no problem with the gearbox :-) ; we ´ll try to find the problem\r\n* 21.12.17-Henk:The testing will be finished almost on Dec.28th.2017 ,now is running almost 8200 cycles without problem \r\n* 08.12.17- Henk: Andreas want to check the life testing result, Henk will forward it to him once get .\r\n* 21.11.17 - Mail Henk: Attached is the compare info for the 1st stage gear by new and old ,these data for your reference . Another test item that the 1st stage gear fitting in the tubular motor still is going on ,almost will finish on Oct.20th.2017, I will forward the result to you once I got .\r\n* 15.11.17 - Mail Henk: at first Dooya check all dimensions (1 stage gear for 30,40  and 50Nm) and secondly they make the life cycle test. The life cycle test for 30 and 40 Nm is ongoing\r\n* 09.11.17 - Mail Henk: Dear Andreas, Attached 1st gear planet test result for your reference . the life cycle test for 30Nm and 40Nm are ongoing …will forward the test result to you once I got\r\n* 07.11.17 - Mail Henk: In order to distinguish between the old 1st gear in Dooya’s warehouse ,in Oct.2017,so they change the gear color from red to green. Yes ,Dooya factory hadn’t done the test for the 1st stage gear in 30Nm Motor ,but they begun to do this test from 2 weeks ago .\r\n* 01.11.2017 - Henk: the 50Nm already pass the test ,now supplier is woring on the test 1st stage gear for 30Nm and 40Nm\r\n* 26.10.17 - Mail Henk: Dooya change the color almost in October.2017 from the PO 4500033024(order 10#) ,**the new green 1st stage gear for 50Nm** test  had been finished in August .2017,at that time ,the samples’ color are red . The material change to get the good strength of the gear wheel .The material of 1st stage gear for 40Nm and 50Nm are not material change ,still is Nylon, only the color changed to Green . The 30Nm 1st stage gear both change the material and color ,now is Nylon and green . From PO 4500033024(order 10#),start to use the new green 1st stage gear for 30Nm &40Nm&50Nm.Dooya only finished the lifecycle for 50Nm motor(please see attached ), now they  arrange the test for 30Nm and 40Nm,almost will spend 45days for the testing. Now the new 1st green stage gear use the Nylon, Dooya already ask for the material test report from the supplier ,will copy to you once I got.\r\n* 24.10.17 - Mail Henk: Yes ,Dooya only finished the test for 50Nm.I will follow the testing and ask for the result for 30Nm and 40Nm. From the measure result to compare the standard dimension(Wk=5.73-0.02/-0.05),the old gears’ base tangent length are out of tolerance .\r\n* 24.10.17 - Mail Sally: Hi Henk, Thanks! \"5pcs new samples passed the cycles test more than 10,000 by Dooya in Aug.2017 .\" I believe this mean for the 50Nm, we also need Dooya to do the life cycle test for 30Nm and 40Nm with new 1st stage planetary gear as well, the report for the single gearbox old and new (like noise, efficiency..etc..) also necessary.\r\n* 24.10.17 - Mail Sally: Hi Manfred, Your right, Dooya need to provide the similar report as attached, also for 30Nm and 40Nm. We will come back shortly with material datasheet.\r\n* 23.10.17 - Mail Henk: Please see attached measuring dimension for the 1st gear tooth : (1) the tooth width is changed to more than 1.3mm (2) the color is change to green (3) the material is nylon ,confirmed by Dooya (4) the tooth dimension of common normal  have little change,Dooya is recheck…… Our QC still on check more new 1st gear tooth dimensions ,will forward to you once I got.\r\n* 23.10.17 - Mail Sally: Attached updated drawing and change approval sheet, 30-60Nm 1st stage gear now combined to be the same, this means 30Nm 1st stage gear material also changed from POM to be Nylon, the color of the 1st stage gear is now green. Regarding the base tangent length over 3 teeth (Wk = 5.73 -0,02/-0,05), value remain the same after measurement. Henk can double verify this.\r\n* 20.10.17 - Mail Sally: Hi Manfred, FYI. Unfortunately there is not teeth width info on the old drawing.\r\n* 19.10.2017 - Sally: just received last minute information that Dooya has changed already #10 the 1st stage gear for all 30N/40N/50N gearbox with new gear width.Attached **change approval sheet **with detail, sorry for using excel format the last time.\r\n', 1509521771, 0, 0, 'red', 2, 8, 5, 4, 0, 1, 0, 3, 1520861607, '', 0, 0, 0, 2, 1520861607, 0, 0, 0, 0, 0, NULL, NULL, 1, NULL, NULL),
(58, '586 - claim housing', '\r\n* 02.11.17 - Mail Martin: Dear Henk, by this parts we found a lot of damaged earth terminals.\r\nPlease, see my pictures in report.I can not explain the damage. I think was caused during transport, but the cartons are not damaged.Anyway, I suggest the following procedure:\r\nWe sort out the defective parts during assembly and invoice them.\r\n* 03.11.17 - Mail Henk: Sorry for make this trouble to you .I will check this with Sally and forward your complain to our supplier . As you noticed ,the carton didn’t damage when you received ,so I think this caused by the transport or unreasonable packing. We did the full inspection before delivery and the products in the carton were ok that as attached pictures showing .\r\nPlease collect all defective and return to us with other unqualified products together .\r\n* 08.11.17 - Mail Henk: Dear Martin, please see attached corrective action report .Supplier mentioned that will try to find a good and simply way to improve the packing by next time .\r\n* 13.11.17 - Mail Andreas: 1500 pcs selected, 178 pcs repaired, 12 pcs scrapped - 3,5 hours\r\n* 13.11.17 - Mail Sally: Claim accepted. Due to the fact of material and labor cost, tray packing(FHJ rejected Andreas\' proposal of new packaging way), new price sent and start from next order. \r\n* 14.11.17 - Mail Sally: Hi Andreas, Thanks for the final report, your claim accepted under service of SXMHI. Hi Manfred, After carefully reviewing with supplier, below is the updated quotation of part 586 under the circumstances of increased raw material cost(nylon has dramatically increased 40%~60% this year), increased labor cost(30%+) and with new packaging form (plastic tray, thickness 0.6mm), this is the best we can negotiate, start from next order.\r\n\r\n', 1509622536, NULL, 0, 'blue', 2, 6, 2, 3, 0, 1, 0, 2, 1519888801, '', 0, 0, 0, 2, 1512629192, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(59, 'claim Dooya #9 dirty contaminated tubes', '* 03.11.2017 - Martin: currently, we check the new delivery from Dooya. And we found also some contaminated tube surfaces again.\r\nAbout the quantity, we have to get us an overview next week.\r\n* 04.11.2017 - Sally: This is a bad news, because in the last 8D report for the same issue (in #5 and #7), Dooya correct the tube coating process from #9, but seems now #9 still have same problem which means the correction activity is not working. :-( Our QC team will investigate with Dooya next Monday immediately.\r\n* 06.11.17 - Mail Henk: Dear Martin:\r\nThis morning I forward your complain to Dooya factory ask for  review their corrective action or reanalysis the root cause of  this contaminated . this will need several days. Dooya factory want to know these contaminated products are placed in same layer or different layer compare last contaminated products in the crate ? others ,please advise the contaminated quantity and product model after your full inspection .\r\n* 14.11.17 - Mail Henk: Since we received the second claim for tubular motor surface contaminated Nov.3rd.2017 from Martin, we ask for Dooya factory reanalysis the root cause for the contaminate, but until last Sunday ,seems they have no new found. So yesterday ,I visit the power coating factory with Dooya’s guys. Before this visit ,from my experience, I ready below item go to the powder coating factory want to find if the contaminate related with below item\r\n--coating material: powder coating supplier mentioned the coating material no any change ,but supplier only got this confirm by the coating supplier ,hard to recheck by theirselves when material coming. I think this is a big relevant cause\r\n--the HP of chemical liquid:I check the HP result of chemical liquid by test paper ,the result show the chemical liquid HP result is good .so this point can be canceled.\r\n--baking temperature and time: the baking room temperature is 170oC,keep 30min,this can dry the pipe thoroughly after water washing. So this point can be canbeled.\r\n--coating thickness: the pipe have the different coating thickness ,from 0.05mm~0.11mm. I think this is one of the cause for contaminated\r\n--Packing: they packing the pipe with the hot temperature when they packing the pipe into the bubble bag ,not sure if this point is the cause for contaminated \r\n--the erosion by salt fog during transport in the sea \r\nAttached powder coating procedure for your reference. Else ,seems two times contaminated all happen on the summer (Aug.~Oct.) and all on the same side ,this contaminated issue only be found in Rademacher tubular motor surface. Now ,Dooya factory still working on analysis and contact with their supplier want to find the root cause \r\n* 15.11.17 - Mail Henk: Dear Martin, Have you finished the full inspection for the received tubular motor ,if yes, Could you advise the quantity of the tube surface contaminated and the product model in this batch ? \r\n* 16.11.17 - Mail Martin: Dear Henk, attached I send you new interim reports. The other articles are in progress and the reports will follow soon. HE1017 - tested 30 pcs - 4 pcs n.OK, HM2015 - tested 8 pcs - 1 pcs n.OK, HE3015 - tested 30 pcs - 5 pcs n.OK\r\n* 17.11.17 - Mail Andreas:It is possible that the surface is roughened by the pretreatment of the pipes (mechanical treatment) so far that the thin layer thickness does not adequately cover them. So could the surface protection be destroyed by the \"rough\" surface?\r\n* 17.11.17 - Mail Henk: Now Dooya is working on find the root cause of tube contaminated ,they focus on checking the material now .I forward your idea to them for reference .\r\n* 18.11.17 - Mail Martin: now I send you the final reports from the last Dooya-delivery.\r\nTo the whole delivery we sorted out HE3015 – 111pcs., HM2015 – 31pcs. and HE1017 – 221pcs.\r\n* 21.11.17 - Mail Jens: with HE1017 and HM2015 we’ll get not a problem, with HE3015 we will get a problem. @ Leona/Sally: For this reason, please get in contact with Dooya and discuss with them how fast they can send 111 pcs HE3015 via airfreight?\r\n* 21.11.17 - Mail Sally: We need to wait until the root cause is found and send the motor after fixing the problem, otherwise no matter how many replacement are sent, they are bad and will go contaminated after arrive your end.\r\n* 24.11.17 - Mail Henk: I know your security stock situation for HE3015 in Jens’ mail .from my understand by the contact with Dooya, they are cautious for issue their final analysis result ,because their final result hard to validate in a short term .now the natural condition is different like summer .They just issued  the 8D report for tube contaminated in September ,but in October ,they again to receive the contaminated complain ,so this time they will not quickly to issue the 8D report ,but they mentioned will strict with the control for powder material ,powder coating process .,etc , these are have the big related with the powder coating tube be oxidated .\r\n* 27.11.17 - Mail Andreas: Hey Henk, a question I think I\'ve seen a photo in your report that looks like the tubes are being machined before the powder coating is done. Is that so ? (Rotation and brush) Maybe there are too much surface roughness on the spot, which is not properly dealt with by the powder coatings?\r\n* 27.11.17 - Mail Henk: The tubes polish by the fine sand belt and with rotation .\r\nYou are right ,too rough surface will make the tube surface has the bad coating adhesion ,the too smooth tube surface also is .At the coating factory ,I touch with the tube surface ,it is only little rough ,this can help the powder coating adhesion on the surface strong. The polish has another function that is remove the tube surface’s metal oxide and other impurities before powder coating. Coating supplier is review their polish process after I forward your suggestion to them ,they think the tube surface polish is appropriate .\r\n\r\n* 08.12.17-Henk :Andreas ask for Dooya take new material coating tube( full resin) and old material coating tube(epoxy resin) together to do hte salt spray test to check the result .the temperture and the salinity of the tesing environment better like the summer in the sea .\r\n* 21.12.17-Henk:Dooya finished the 6pcs powder coating tubes with the new material( change the material epoxy polyester to full polyester ,it have the better oxidation resistance ),tomorrow they will start the salt spray testing for the old tube and the new tube together ,the salinity is 5% ,duration is 30days\r\n* 02.01.18-Henk:the new and old tube surface all appear the white mark when the salt spray testing to 72 hours ,but the new samples\' white mark is less than the old one,this is meaning the pure polyester is better than epoxy polyester.Dooya factory will discuss this in their internal meeting .\r\n* 09.01-18-Henk:Dooya will not use the new material(pure polyester)to replace the old material(epoxy polyester) ,because the new material also have the white mark during the salt spray testing ,though the result is slightly better .\r\nCurrently,Dooya factory keep tight contorl for material and production process,both continue to find the root cause.\r\n* 11.01.18-Henk:Dooya mailed to us mentioned they still not found the root cause of tube contaminated and will not issue the 8D report after we pushed many times .but they will improve the production process from below aspectes: \r\n1.extend the oil immersion time to 60mins and shake each 10mins,keep the PH is 11-13( previous the immersion time is 45mins) \r\n 2.keep the derusting immersion time to 30mins and shake each 10mins,make the PH is 1-3,check for rust stain be cleaned or not before go to next process \r\n3.increase the baking temperature to 195 degrees after powder coating and the keep 30mins_\r\nDooya promised will going on to replace the contaminated motors if this issue happened in future productions.\r\nMeantime ,Dooya proposed whether can use the big PP pocket into crate and seal all motors to protect the motors be oxidized, because the contaminated tubes ,two sides is good which be protected by white teflon packing covered.\r\n* 14.01.18-Andreas : If a surface treatment is to be implemented, we´ll get a change aproval sheet information before the changes enter the series\r\n* 15.01.18 Henk:Dooya will not change the powder material to pure polyester, only do a little improve and strict control the production process ,please see my comment on 11.01.18\r\n* 22.01.18 Andreas: Okay ; We will see; please tell dooya, if their will be a problem with the survace  of the tube we will send them back! We can close this point\r\n ', 1509937688, 1520437769, 0, 'red', 2, 8, 0, 3, 0, 0, 0, 3, 1520437769, '', 0, 0, 0, 2, 1516699303, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(60, 'UBW (Check in 2019)', '* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor/power supply - Options should be checked until end of October\r\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\r\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\r\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB’s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \r\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\r\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\r\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF’s of the user manuals (3) the PDF’s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\r\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\r\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \r\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\r\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\r\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\r\n* 13.03.18 - This project has been stopped and will be reviewed again in 2019.\r\n', 1510137991, NULL, 0, 'brown', 1, 2, 0, 6, 0, 1, 0, 2, 1520935427, '', 0, 0, 0, 1, 1516232922, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(61, 'Dooya tubular motor 2017 forecast & bonus', '* 09.11.17 - Sally: Hi Jens, Now we have received the #3 from you. Here is the updated overview.Is there any possibility that you can bring forward the ETD of #3 and #3A to be the end of December, in this way we can just catch up 100K and get 1% kick back(approx $15,000)? Since the term is DAT, the stock will be booked in January 2018 so won\'t affect RDD\'s stock turn over value at year end of 2017?\r\n* 09.11.2017 - Jens: I‘ll double check the figures with Manfred\r\n* 15.11.2017 - Manfred: after further internal discussions with our Controlling I received this morning the feedback that we are not able to accept an earlier delivery of Dooya #3 and #3A.We are limited by our working capital :-(\r\n* 16.11.2017 - Sally: Please check if it is possible that we delay ETD of #2 to be 05 JAN, this way #2 should be calculated in 2018, so then we can maximum the bonus in 2018 and increase the possibility of reaching 120K?\r\n* 17.11.2017 - Manfred:the ETD from Dooya factory must be between 1-3.01.2018 (so absolutely in 2018 – necessary for the calculation of the bonus 2018), planned ETD (vessel set sail)  06.01.18 and ETA Rhede - five weeks later - means 09.02.18. Maybe you must try to get a fast vessel if the ETD is a few days later - to reach the ETA.\r\n* 18.11.2017 - Sally: Attached updated PI of #2 and #2acc, ETD 03 Jan 2018.', 1510213476, 1519889575, 0, 'grey', 2, 8, 4, 8, 0, 0, 0, 3, 1519889575, '', 0, 0, 0, 2, 1510808880, 0, 0, 0, 0, 0, NULL, NULL, 3, NULL, NULL),
(62, 'DC motor enquiry', 'High Quality DC motor enquiry for Tubular Motor (strategic cooperation w/ German competitor) - see 651 Product Development Inquiry and Approval Sheet V2.doc\r\n> Nominal Voltage:  325VDC (Special Requirement)\r\n> Nomial Torque-Range:  0.24Nm +/-0.02Nm (Very High Requirement)\r\n> Rated Speed:  <3000 1/min\r\n> Diameter:  max. 42.0mm\r\n> Lifetime:  min. 300h\r\n> Low Noise (methods & limits tbd)\r\n* 30.10.17 - Mail Ralf: Is there any update? Do you have already an indication if our requirements are somehow realistic?\r\n* 30.10.17 - Mail Sally: Hi Ralf, We are in contact with 2 suppliers in Jiangsu, the quotation(design, tool, unit price)/technical evaluation is in process, we will see if hits our target. \r\n* 30.10.17 - Mail Sally: Hi Ralf, Just an update, recently none of the suppliers we contact can do high voltage brushed DC motor, are you interested in going back to brushless, if yes, we can update the budget for you.\r\n* 26.11.17 - Mail Ralf: sorry for not responding earlier but this means there is NO DC motor in the Chinese market which can full fill our requirements?\r\nAs I said in September the requirements are really tough but your feedback means we have no chance to find any DC motor fitting in our concept. Do you have some companies/data sheets/drawings/etc. which come close to our requirements? Or are all the infos you got far away? Regarding the BLDC set up I have to get back to you at a later stage when we have a clearer picture.\r\n* 26.11.17 - Mail Sally: So far one of the supplier can only do attached BLDC but there is no way to hit the target price(170~200RMB each, approx.100KRMB tooling). If BLDC is no go, then we will have to enlarge the enquiry range(more suppliers) again.\r\n* 26.11.17 - Mail Ralf: thanks for the quick reply ;-) Under these circumstances please put this topic (DC/BLDC motor) on hold for the time being. Regarding the data sheet I have some questions:\r\n1.	Company name is Fulling in Changzhou, correct?   YES\r\nBackground info: Next week there is the SPS IPC Drives fair in Nurnberg/Germany and Fulling is attending as well and I will have the chance to visit them.\r\n2.	I the motor in the data sheet already available means is it more or less from the catalogue or is it a development 100kRMB for tooling is needed? Sally: it is a special solution(such as using sintered magnetic steel) designed for our requirement, 100KRMB tooling is needed.\r\n3.	As far as I can see it is a high voltage (325V-DC) variant, correct? Are there any certificates already available? For which other application Fulling is selling this kind of motor? Sally: Not yet\r\n4.	The pricing of 170~200RMB per pcs. is really far off also for BLDC. For which annual volume did they feedback? Are they really serious about the prices? What is your impression? For me it looks like they are not interested in consumer products (e.g. tubular motors) but in industry Products (e.g. robotics, automation) Sally: The price is just an indication to get the budget in, I believe there is room for further reduction depends on how we define our final product. They are serious and interested in our enquiry.\r\n* 27.11.17 - Mail Sally: Fulling\'s booth in Nurnberg SPS/IPC is: Hall- stand Nr.1-159. Jolin and Mr. Li (the engineer) who is responsible for this project will be there. Can you please let us know the rough time of your visit so we can make sure you meet both of them?\r\n* 29.11.17 - Mail Ralf: Fulling was with DELTA LINE SA, a Swiss company, who is the European distributor for Fulling. I thought that you approached them as a Chinese company and tried to avoid to disclose our connection. I am not quite sure if it worked out. Anyway it looks like that Fulling is used to Swiss pricing which explains the 170…200RMB ;-) At the fair I also got in touch with a company Constar Micromotor (Shenzhen). It seems they have done a high voltage\r\nbrushless DC motor development for a German tubular motor company. Also I met Zhaowei (Shenzhen) a company which is doing planetary gearboxes for SOMFY tubular motors. Maybe you can check as a Chinese customer.\r\n* 30.11.17 - Mail Sally: Thanks a lot for the fruitful information! Fulling and us know each other very well for quite a while, I guess there is no way for me to hide the connection with RDD. Maybe I can convince them by that actually our factory in Jiading is going to use this motor for assembly so they must not give me an international pricing.  ;-) Please let us know when we should restart with them. Constar: We will try to contact them. Regarding Zhaowei, we also know them very well, they are Dooya gearbox supplier for 16~25mm small motor, price is on higher level, but they are very professional gearbox supplier (also recommended by Feierge), they only supply the small gearbox for Dooya which request high requirement for assembly process. http://www.szzhaowei.net/index1.html (Shenzhen Zhaowei)\r\n* 05.12.17 - Mail Sally: We contact Constar, they don\'t want to develop high voltage DC motor neither brushed nor brushless, since there is no existing technology base there.\r\n* 07.12.17 - Mail Ralf: Ok, noted. For the time being there are no further action items on this matter at your end.\r\n\r\n\r\n\r\n\r\n\r\n\r\n', 1510221637, 1519889553, 0, 'grey', 2, 8, 3, 9, 0, 0, 0, 2, 1519889553, '', 0, 0, 0, 2, 1512629085, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(64, 'HP2 order #16 - 4500033946', '\r\n* 09.11.17 - Mail Jens: in appendix you’ll find the next order #16/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10/18), please don’t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\r\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I’ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\r\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can’t currently make the delivery date you’ve requested for Order #16 Pt. 1.\r\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11/18 (ETA cw16) and 500 pcs with ETD cw16/18 (ETA cw21)\r\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11/2018) and 2nd batch ETA 17.05.18 (ETD cw15/2018)\r\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\r\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\r\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\r\n* 23.03.18 - Mail Ben: I’m afraid HP2 16 Part 2 isn’t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\r\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q’ty:11200KGS/44CBM by 40GP, Cargo ready date:Apr-4, V/v:OOCL INDONESIA/002w, ETD:Apr-10, ETA RTM:May-11\r\n* 09.04.18 - Goods put into the container. Vessel is set to set sail on 12.04.18.', 1510248012, NULL, 0, 'red', 1, 9, 1, 4, 0, 1, 0, 2, 1523243130, '', 0, 0, 0, 1, 1523243130, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(84, 'New transformer for SX5DF', '* 04.01.2017 - After price discussion with Foresee during Mike and Sally\'s visit in end of 2016, using new transformer can bring unit price of SX5DF down by 16RMB, and no risk since many of Foresee\'s client is using new type for a long time. \r\n* 14.11.2017 - 2pcs sample base plate with new transformer sent, together with 5pcs new transformer and 5pcs old transformer for comparison. TNT tracking number 166186226. \r\nManfred: we only plan to use the new transforma from #3 the ealiest since R&D is busy and we need sufficient time for testing and evaluation. \r\nForesee: In the latest TUV test report(for main license) we\'ve already listed the new transformer as an option. For the co-license, the new transformer is also on the CDF. **Cost reduction 16 RMB** information from Meeting end of 2016\r\n* 17.11.17 - Mail Sally: Hi Andreas, Furthermore, attached change approval sheet for your information.\r\n* 23.11.17 - Mail Andreas: Manfred will contact you!\r\n\r\n \r\n', 1510726261, NULL, 0, 'blue', 2, 7, 2, 5, 0, 1, 0, 3, 1520416042, '', 0, 0, 0, 2, 1510726261, 0, 0, 0, 0, 0, NULL, NULL, 2, NULL, NULL),
(85, 'new baseplate material for SX5DF', '* 14.11.17 - Sally: Same like for S1/S2/TA50/TA70, Foresee apply to change the chassis material of SX5DF as well, in order to bring down the cost.2pcs sample has sent out today. TNT tracking number 166186226\r\n* 14.11.17 - Andreas: atteched the PCAS SX5DF, approved', 1510808247, 1519889583, 0, 'grey', 2, 8, 3, 7, 0, 0, 0, 3, 1519889583, '', 0, 0, 0, 2, 1510808247, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(86, 'change approval application for power supply LFI 534-3', '* 14.11.17 - Sally: Attached change approval application for power supply LFI 534-3, improvement on the structure design. We delivered the sample for HRB plug, the power supply body is already with the new change for adding a plastic cover on the wire, so you should already have the sample. No price increase.\r\n\r\n* 08.12.17 - Sally: Hi Andreas,We\'ve just received new order #4500034384 from Jens, we hope we can start the change from this order. Attached updated PCAS with new start PO.\r\n\r\n* 12.12.17 - Andreas: it will be okay, even for these order , I´ve change it in the PCAS\r\n*LBW start from #28\r\n\r\n\r\n', 1510808418, 1519889499, 0, 'grey', 2, 8, 3, 13, 0, 0, 0, 3, 1519889499, '', 0, 0, 0, 2, 1513079501, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(87, 'chip change application for indoor camera FC2501P', '* 15.11.17 - Sally: Hi Peter, Attached change approval application for indoor camera FC2501P. How many pcs sample do you need for test?@Manfred, attached quotation based on the new chip, since it degrade from 960P to 720P, the price has decreased to be the same as the outdoor type.\r\n* 29.11.17 - Manfred: currently set this topic \"on hold\" because we can again order a quantity of 600 pcs of the \"old 1.3 MP version with \"old\" chip\r\n\r\n', 1510808535, NULL, 0, 'blue', 2, 6, 2, 1, 0, 1, 0, 3, 1519888824, '', 0, 0, 0, 2, 1511518543, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(88, 'Inquiry for cables', '* 15.11.17 - Mail Rudi: As an attachment, I send you a request for connection cables, which we use in larger quantities. We need this cables for our Roller shutter drive! The Company where they come from we don’t know.\r\n* 21.11.17 - Sally: Price see below, in RMB, Exworks, MOQ is 20K meter for one color, based on 55000RMB/ton copper price\r\nthe cables according to drawing 752999904-08218 Revision C\r\nwe need in different lengths\r\n150.000 pieces  YNK 1M5  (1,50 meter)      ten delivery’s 5RMB/each\r\n    1.000 pieces  70000017  (2,00 meter)      one delivery  6RMB/each\r\n    3.000 pieces  70000018  (3,00 meter)      one delivery  7RMB/each\r\n    2.000 pieces  70000019  (5,00 meter)      one delivery  10RMB/each\r\nthe cable according to drawing SFtioned by you are 30 - 35% too high.\r\n* 22.11.17 - Sally: Supplier confirm this is the best they can do.\r\n* 18.12.17 - Manfred has sent the updated overview with target prices. All prices are based on a frame contract with copper.During the period of the frame contract we will not have any negativ effects based on the different copper quotation.\r\n* 19.12.17 - Sally: Thanks a lot for the info-01+SF-85A WIRE: \r\n12.000 pieces  YNK 2M0                          three delivery’s 6.5RMB/each\r\n* 21.11.17 - Rudi:The prices menrmation, your target price I can also find from Taobao(even cheaper), there are lots of ways to cost down the cable depends on the copper % and inner wire diameter according to what customer need. Can you send us one or two pcs sample? We will try to find the same and re-quote again.\r\n* 20.12.17 - RD-D will send samples asap - DHL Tracking Number: 8047187536\r\n* 22.12.17 - RD-CN has received the sample\r\n* 10.01.18 - RD-CN send samples with WAYBILL 4536085352 - 10 x YNK 2M0 + 9 x YNK 1M5 \r\n* 12.01.18 - Mail Manfred: Dear Leona and Sally, today we have received the samples. Looks not bad. Could you please send us the following information at short term: (1) CE declaration from the supplier (2) Drawing with necessary information – similar to the one we have send to you (3) Data sheet of the wire H03VVH2-F  (4) Specification of the colour – white RAL ??? (5) RoHS and REACH confirmation from the supplier - not from the distributor\r\n* 19.01.18 - Mail Sally: VDE certification and specification sheet(including drawing)  sent\r\n* 24.01.18 - Mail Manfred: **can you please send us separate only the drawing as PDF from the attached spec ? Normally the supplier should at some tolerance into the drawing for the length or also for the open end – dimension 20 mm. Can you please also send us the REACH and RoHS declarations ?**\r\n* 24.01.18 - Mail Jens: in appendix you‘ll find the order of the discussed pilot run of 1.000pcs cable YNK 1M5 order no.: 4500034995. Please double check the fastes possible completion date, so that we can send the 1.000 pcs before CNY vacation starts!\r\n* 25.01.18 - Mail Sally: **Estimated delivery time is 8th Feb.**\r\n* 25.01.18 - Mail Jens: please have in mind that we want them via air freight. So out of my view we should take care about the airfreight as early as possible due to CNY!.\r\n* 02.02.18 - Maik Henk: **The cable supplier audit will be scheduled after Chinese Spring Festival (almost on Mar.1st.2018) ,because the factory’s holiday is beginning , no possible to check the test procedures or test equipments.**\r\n* 02.02.18 - Mail Sally: Order ready to ship. Attached packaging form for your information.\r\n* 02.02.18 - Mail Leona: We will receive 1000pcs cables next Monday, then QC will inspect. Total 10cartons,total weight:71.7kgs,dimension of carton:30*27.5*19cm. Because of CNY,the air freight is high ,l think DHL is more suitable.The DHL cost is about 410USD.\r\n* 02.02.18 - Mail Jens: if we talk about 410USD from door to door, then it’s OK from our side.\r\n* 06.02.18 - Mail Henk: The mass production from YJ has the same color .\r\n I will check the color compare the samples once I received ,the sample is on the way ,tomorrow morning will note  to you .\r\n* 07.02.18 - Mail Henk: The cable color is white bright than the sample that from supplier , it caused by the material of mass products is not the same batch with the sample(material not enough for order quantity) , so made the different white . Supplier mentioned this will be correct in next time , this order is urgent to delivery ,so made this different . But the mass products with the same color ,no different.\r\n* 07.02.18 - Mail Manfred: Dear Sally, let me summarize what we discussed in our telco a few minutes ago: (1) As I said, please do not use the old Rademacher drawing. Please ask the new supplier to update his drawing with the color code – RAL 9003. Sally:Work in process, we will send you the updated drawing from supplier adding the color code for your confirmation. (2) We on our side can later – after the receipt of the updated drawing – update the IP with the color code Sally: OK, thanks in advance. (3) You can send out the quantity of 1K cables – for this we will not give you a release until we will receive the new REACH declaration (without any warnings). We will put the goods on stock and will not sell them Sally: After discussed with supplier, they have agreed to send you this batch without payment guarantee (since the total value is affordable based on our relationship with YJ), you can pay for the goods only after you have received the REACH(pass) after CNY which we have put on schedule. (4) If you cannot send us the new REACH declaration in time (after CNY)  – we will scrap the goods and will not pay for the cables and also not for the freight Sally: Agreed. We, especially Henk will stay tuned on the REACH report after CNY.\r\n* 12.02.18 - Mail Leona: Goods have been sent out with DHL **Waybill 38 8124 4102**\r\n* 22.02.18 - RD-D has received the delivery. The quality is ok. The color is alos acceptable. nevertheless we need the \"new\" REACH confirmation to give the release. Please send us asap the missing document.\r\n* 01.03.18 - Henk will send asap his audit report. In parrallel Sally said that we will get lastest in 2 weeks the new RoHS and REACH declarations of the complete two products. After that the supplier need approx. 2 weeks for the mass production. Partial delivery for middle of April ETA Rhede confirmed\r\n* 05.03.18 - Today the colleagues from the Qc have sent a claim report for the 1K pieces which we received at te 14th of February :-(\r\n* 08.03.18 - the main problem of the cables is the not propper crimping of the crimp contact. We discussed in Rhede a standard (DIN) / IPC. The supplier should add this to his spec respectively must say what his standard is\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n', 1510826188, NULL, 0, 'red', 2, 7, 3, 3, 0, 1, 0, 2, 1520527514, '', 0, 0, 0, 2, 1510826188, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(89, 'Claim GGK 593-2-1 - order no. 4500031859', '* 17.11.17 - Mail Andre: unfortunately we have to complain about the last delivery to GGK 593-2-1.\r\nA large part of the delivery was delivered with goods that do not conform to the drawing. Moreover, the date stamp is in the future at the half of the delivery. Also, the print of the cavity is missing by the half of the delivery. Please look at the claim. Now is the question, why do you not see these mistakes ? The specifications are clear in the drawing.\r\nWith please around a statement from you and timely processing of this complaint.\r\n* 22.11.17- Henk Mail:\r\nSorry for reply your mail late. These days we are review some things of  this components, because this components is distance from the  delivery date have a long time .\r\nThis components seems made by our canceled  supplier that name is YQ ,at that times , modify the mold several times ,add the supplier management confusion ,so make two components have the same parts name that is GGK593-2-1 .(attached picture).0ne question ,do you confirm this quality issue is from the batch quantity is 2500pcs ? \r\nNo matter how ,our QC did the inspection work for this batch is failure ,we will correct this in the quality internal .\r\nPlease check attached correct action report ,we will attention for these issue and will follow ask our new supplier to improve .\r\n* 08.12.17-Henk :this can closed ,approved by Andreas\r\n\r\n', 1510919848, 1519889512, 0, 'grey', 2, 8, 6, 12, 0, 0, 0, 2, 1519889512, '', 0, 0, 0, 2, 1512727092, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL);
INSERT INTO `tasks` (`id`, `title`, `description`, `date_creation`, `date_completed`, `date_due`, `color_id`, `project_id`, `column_id`, `owner_id`, `position`, `score`, `is_active`, `category_id`, `creator_id`, `date_modification`, `reference`, `date_started`, `time_spent`, `time_estimated`, `swimlane_id`, `date_moved`, `recurrence_status`, `recurrence_trigger`, `recurrence_factor`, `recurrence_timeframe`, `recurrence_basedate`, `recurrence_parent`, `recurrence_child`, `priority`, `external_provider`, `external_uri`) VALUES
(90, 'HP2 -  change company logo', '\r\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) – please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\r\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \r\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn’t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector/AI formats of the logo.\r\nAs far as I know and have seen the logo isn’t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\r\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\r\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\r\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\r\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\r\nShe told me that verything is the same like in the past, she had only deleted the „2“ as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\r\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\r\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI – we have the letter „homepilot“ plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she / we definitely want this in silver. That means „homepilot“ + logo + smart home. So everything what you can see in the jpg file.\r\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\r\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\r\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \r\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\r\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\r\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\r\n* 26.03.18 - This is not quite finished yet. We are still waiting for the samples from MX for the power supply.', 1511360391, NULL, 0, 'yellow', 1, 3, 1, 10, 0, 1, 0, 2, 1522043737, '', 0, 0, 0, 1, 1522043549, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(91, 'claim 200001403 - GGK 663-1 - color not match to RAL 9003', '* 22.11.2017 - Andre: please take a look to the annexed claim.We urgently need a replacement delivery.\r\n* 23.11.2017 - Sally: We accept your claim, this is our fault.There is 2 solution proposed by us:\r\n(1) Since there is only 6 buttons shows to the customer, are you willing to concession accept this batch, we can credit you 25% because of the color default. (2) Return the whole batch to us, and we will send you the newly produced batch with correct color by air freight, but this will take 6~8 weeks to arrive your end, considering the production schedule at supplier\'s end.\r\n* 23.11.17-Jens: Hi Sally, sorry, but I must add one topic, it’s the claim GGK 663-1, also here we’ve to check when we can get asap a replacment\r\ndelivery, because we’ll run empty in stock latest in the beginning of December!!!\r\n* 28.11.17 - Mail Henk: Recently ,our supplier ready to produce the GGK633-1 for replace the color defective. In Jens’ mail ,this replacement is urgent for your stock empty in December .But the mould date stamper in GGK633-1 mould is 2016 .so this make us difficult .Could you have a discuss for this and advise how to process? \r\n* 28.11.17 - Mail Manfred / Henk: please go on without changing the mould stamp. We have absolutely no time for this alteration. I will discuss this in detail with Andreas.What is the timeline for the production (when will RX start the production) ? Henk: Supplier RuiXuan mention will schedule this into their production plan ,no date be told ,Maybe several weeks later,need to check with RuiXuan. When can you send out the next batch (ETD) ? Henk: **Almost at the end of December ** How many pieces will they produce ? Henk: The quantity is like your claim quantity ,the color defective should return to us with yearly return together . Can RX make the alteration for the stamp with the next production ? Henk: This will check with RX ,then reply to you. What about the color ?Henk: we will arrange the QC follow the produce and compare the color with RAL9003 card. Are you sure that now the color is correct according to the last deliveries ?  Henk: we will double attention the color . \r\n* 05.12.17 - Mail RD-D: we have received another delivery. (delivery note 14895021) Fortunately, we can process 347pcs from this delivery. The remaining 143pcs were blocked because the color does not fit here. So we need a replacement about 3617pcs GGK 663-1\r\nPlease take a look to the annexed claim in new version (changes are marked in red).\r\n* 06.12.17 - Mail Sally: Thanks for the report, well noted. 3456+490-347pcs=3599pcs replacement, please confirm. As discussed with Manfred, replacement is being prepared under pressure, we will try to send out by air before the end of this month asap. Please also prepare the return delivery of 3599pcs defective part to us together with the return HP2, thanks!\r\n* 07.12.17 - Mail Henk: Dear Andre: Sorry for make this trouble. We will implement some actions to correct these problem .please see attached CAR for this .\r\n\r\n* 14.12.17 - 4080pcs replacement ready to ship, inspection report sent, color match, Martin released. 3599pcs will be returned with HP2, the extra qty 4080-3599=481pcs, we need a new PO from Jens.\r\n* 15.12.17 - tracking number of replacement delivery via DHL - WAYBILL 4721007336\r\n* 18.12.17 - Leona gave the \"go\" for the return delivery via forwarder IFB with MV „Cosco Portugal“ ets. Hamburg 31.12.17, eta. Shanghai 31.01.18\r\n*12.02.18 - Mail Sally: Hi Jens, The returned 663-1 has arrived our warehouse today.\r\n* 01.03.18 - Mail Jens: in appendix you’ll find the debit note for the returned 3.599 pcs  GGK 663-1.\r\n* 01.03.18 - Mail Jens: Hi Sally,that was only a try ;-), no no sorry my fault, I didn’t had the replacement delivery on my screen anymore. In appendix you’ll find the cancallation of the debit note, sorry for confusion!\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n', 1511409497, 1520437730, 0, 'blue', 2, 8, 4, 4, 0, 0, 0, 3, 1520437730, '', 0, 0, 0, 2, 1519895766, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(92, 'bracket spring washer 539-096d tolerance alteration', '\r\n* 19.03.18 - Mail Sally: We update old spring stock qty after checking with supplier today, good or bad. See below. The good is we actually only have 15650pcs old spring and 1830pcs small bracket mounted with old spring(94401505) BEFORE #4500034980.........the stock info from December said we have 90K+ stock is WRONG. So after #4500034980, we only have 2650pcs old spring and 830pcs small bracket mounted with old spring(94401505) left, which could be MUCH BETTER situation. The bad is we are really sorry wasting much of your time and effort on the discussion onto the wrong severity level. **We are now checking with supplier if it is possible to produce 1K~2K big bracket(94401504) in #4500034980 with new spring as pilot batch, we will come back later.**\r\n* 12.03.18 - Mail Henk: Dear Sally, In last week meeting ,Ralf note will check the spring washer with you for clean the stock.\r\n* 28.02.18 - Andreas:these new Spring washers are okay ; We will talk next week about the next step; \r\n* 27.02.18 - Mail Henk: Have you have any feedback from Berthold for spring washer test? \r\nOur supplier want to assembly the inventory spring washer to the new order ,because the delivery date is coming. They push us many times .\r\n* 12.02.18 - Andreas : Berthold will check the springwasher this week. Next week we can decide the next step  \r\n* 01.02.18 - Mail Sally: Okay, it is up to you. PS: PO#4500034980 ETA begging of MAY, please feedback asap, production of spring is on hold until we hear back from your side. PPS: Start from next week, factory is on 4 weeks holiday.\r\n* 01.02.18 - Mail Andreas: Without the sighting of the springwasher and consultation in the house, I can´t tell you anything on the subject.\r\n* 01.02.18:Mail Sally:Thanks Andreas,How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\r\n* 01.02.18:Mail Andreas:Hey Sally, Hey Henk,thank you very much for the information I think that in the past the relation between mounted and unassembled dimensions was underestimated.Okay I think we will be on the right way to solve this problem finally.\r\n* 01.02.18 - Mail Sally: We send out 5pcs spring sample according to drawing 223-F-00-443 d today, DHL WAYBILL 28 9118 7202. Henk has tried the assembly with motor head, the function is perfect, attached measurement for your reference. How about the stock, are we going to respect the former agreement with RDD keep using them until deplete or are you going to stop the agreement, so to pay and scrap?\r\n* 23.01.18-Henk mail:Dear Andreas:\r\nThis is a problem of left over a long time ,many information showing now the spring washer is approved by RD-D that confirmed by Dirk from Sally’s mail, so that we delivery spring washer more than 2 years .From the mail ,we were agreement with the spring washer’s dimensions and function ,though it not follow the old drawing(drawing No.539-f-00-096d) ,we ask RD-D issue the new drawing many times ,but haven’t gotten ,I think if we got ,now need not to review these.\r\nI know martin hold the last order products in Nov.2017 ,but this can’t involve the inventory 93000pcs spring washer,the stocks were made before Oct.2017, until to Nov.2017 ,Martin mentioned little problem with spring washer but no any document be issue. From that time ,no new spring washer be made. I think if you want to the new spring washer follow the new drawing in Mar.2018 ,  we should clean 93000cps inventory  , total the cost is 94000x0.5=RMB46500 .\r\nAttached mail that one is check with the spring washer inventory with martin ,another is from Sally on last Saturday for RD-D confirm the spring washer is ok . please check it and waiting your reply for Sally’s Saturday mail .\r\n\r\n* 22.01.18- Andreas-mail : ... he ist not happy... RD has complained several deleveries bevor ... Henk should produce a sampel and send it to RD release it until calenderweek 5 .... release the delivery (450033986 ; 10.000+ 3.000) \r\n* 20.01.18-Sally mail:PS: attached full mail loop, FYI. We didn\'t mean to deliver deviation, it is not manufacturing tolerance or mistake but somehow an agreed optimization, and our delivery are always stable at this optimized dimension and always within 42,5 +/- 0,5.But history is history, let\'s\r\nA)use up the stock \r\nB)we have to pay for the spring stock value at supplier\'s cost\r\nand from fresh batch we make the product according to drawing. Is that OK?\r\n* 20.01.18-Sally mail:The problem at our end is, if we produce the spring 100% according to the drawing, then the function have problem, it is too loosen and can\'t lock the motor head properly, that is why we keep asking you to optimize the drawing dimension according to the result in real life.\r\nOn the other hand we\'ve delivered the same dimension for over 2 years and over these years acceptable to RDD and RDD confirms our dimension is better and should be more correct than drawing, and we should keep producing the spring under this optimized dimension.. So the only thing we miss here is just to update the drawing to be 42,5 +/- 0,5, so drawing and product are compliant.\r\nSee attached mail RE discussion of the spring, I highlight the confirmation below:\r\n* 20.01.18-Andreas mail:Excuse me, but so far you was not able to deliver the spring washer as showing as drawing. This has always been reminded of Martin.Instead of creating the spring washer after drawing (as it was already done in the past), you are constantly asking for a new drawing with other dimantions. That is not the way and it will not be.The springs that you have delivered so far are sometimes functional and sometimes not. This is not good. At the end of last year, we received some unpleasant feedback from our customers.\r\nWe will tackle the topic now and try to clarify the final.\r\nI expect your full support for this.\r\nI have not said that the stock has to be scrapped.\r\nI said it will be hard to use.\r\nI will not accept to take \"new produced\" spring washer that do not correspond 100% to the drawings of our R & D.\r\nMaybe we have to keep working with the incorrect spring washer to a clear definition.\r\n* 18.01.18-Sally Mail:Beside, we\'ve asked three times(20.03.17 , 19.06.17, 02.12.17), see attached,  to closed the gap between drawing dimension and functionality friendly dimension, but nobody from your side give us any feedback so far. It is not fair that now we receive claim and being asked to scrap all the spring stock.\r\nPlease allow supplier to use up the stock and they will produce according to the new drawing start from the fresh batch.\r\n* 18.01.18-Henk Mail:We forward the new spring washer drawing to supplier ask for the new samples, got the new samples almost need 1 week .\r\nOther ,supplier is not willing to accept the inventory spring wash as the unqualified . After all ,the existing dimension spring washers were used beyond two years and not received any complain every time when the order was issued to supplier ,until the inspection report of last order PO4500033986 to you ,we was told have some bad news for this by RD-D(but no complain document to us) .So it’s very passive when we check with Supplier .they mentioned  it’s unfair for after the products be finished then suddenly to refuse. They hope can delivery the finished order PO4500033986 and start to using the new spring from next order. Supplier hope can get the complain content ,in order to correct the problem in the new samples .\r\nFor the inventory , they have to do more ready for next order to delivery timely  and if only according the order quantity to do ,this is meaning the higher cost and no spring washer supplier willing to this business .\r\nNow we are keep contact with ours supplier for this ,hope this can smooth to resolve, In your side ,please also try to have a recheck .\r\n* 16.01.18 Andreas: Mail is send ; need further sampels ;\r\n* 16.01.18-Henk mail:Dera Andreas:Please copy your new drawing to us ASAP. Hope the dimensions in the new drawing compare current spring washer no big different.\r\nCurrent spring washer have the good fitting with bracket and have the good function after assembly with plastic components(GGK 262-9), I hope RD-D re-evaluation the hold products of PO4500033986 and  if can release it ? \r\n* 14.01.18 - Andreas: A drawing has been revised by R & D, which we would like to have transposed accordingly. This spring fulfills our wishes and ensures safe installation of the TurbularMotor. I send the drawing on 15.01. so we can get another example. \r\n* 03.01.18 -Andreas: Thank you for the inforamtion; i know what i doe ;-) ; I´ll meet R&D to claryfy next week\r\n* 03.01.18-Henk Mail:\r\nYou refer the dimensions as unmount requirement ,but all spring washer were assembly with bracket before delivery ,so we check spring washer dimensions refer after assembly ( please see right side in attached drawing.)\r\nwe tested if the spring washer dimensions within unmount requirement ,but the dimensions will out tolerance after assembly. this is meaning the spring dimensions can’t both meet unmount and assembly .\r\nAnother 5pcs spring samples which are inventory from delivery remain  ,they have the good function after assembly with plastic components(GGK 262-9) ,although the dimensions out the tolerance a little .you can test the function use this 5pcs samples .\r\n* 02.1.2018 - Andreas: \r\nMail I have a big problem with your information to the spring washer.\r\nI can not accept the statement about the spring washer and tolerances and expect an explanation please! Look at the fotos´s\r\n* 02.01.2018- Andreas: the sampels arrive ; i´ve uplode two video´s were you can see the real problem; the real problem is the mountining not the noise ;\r\n* 19.12.17-Henk: 5pcs 539-096 springs are within the drawing and 5pcs out of tolerance, will be sent to Andreas in the early of Jan.2018\r\n* 08.12.17-Henk: Andreas need several standard spring sample that all dimension are within the drawing and several spring samples that we using now ,RD-D will compare and check .\r\n* 05.12.17-Henk:Many thanks for your confirm !We will stay tuned to this topic, but before the new conclusion be performed , we need to clear the spring inventory that the quantity almost is 93000pcs . I think in this period of time ,we have the enough time to check this topic .We still propose that change the dimension 43.5mm±0.3 to 42.5mm±0.5 and change the 65mm±0.3 to 66mm±1 or as the reference dimension. This thinking is base on your requirment (no shaking and no noise) and facilitate production process control .\r\n* 05.12.17-Martin:ok, pease release this charge.But please stay tuned to this topic.               \r\n* 02.12.17 - Our **proposed dimension for Pos,3 is  42,5 +/- 0,5**. Please consider.\r\n* 01.12.17 - Henk: Today I am in supplier factory to check the GGK 539-96 and GGK 539-97 and below is my found :\r\nI ask supplier did several standard spring GGK539-96 follow the drawing dimension and fitting with GGK 539-97,but result is the spring shaking freely and with the noise ,assembly the plastic components ,sometimes, the black plastic components can pull out by hand . so I think the dimension 43.5mm±0.3 seems is unreasonable .\r\nI use the spring GGK539-96 that is out dimension 43.5mm±0.3 to do the fitting test again,no shaking and fitting tight without noise, it also can lock the plastic components fastness .I measured the dimensions almost are from 42.1~42.9mm, compare the dimension 43.5mm±0.3, I think dimension 42.1mm~42.9mm seems better.\r\nI notice this suitation was found and discussed in Mar.2017 ,in your side also don’t want to the spring is shaking and no noise after fitting .(please see attached mail).\r\nAbout the other dimension 65mm±0.3  out tolerance in GGK 539-96  ,I think want to get the dimension 42.1mm~42.9mm,have to press the spring and this will make the dimension 65mm become big.\r\n* 29.11.17 - Martin: after internal consultation, I came to the following decision:\r\nWe can not accept the deviations by GGK 539-96 and GGK 539-97 ! These deviations are too large.To have a good performance of these parts, the tolerances must be adhered on the drawing, even if these deviations were accepted by us in the past.We can not always go on still like this.Please, contact the supplyer.Is there maybe a problem with the tool?\r\n* 26.11.17 - Henk: Attached inspection report for GGK 539-096 and GGK 539-097 are from PO4500033641,Several dimensions are out of tolerance, but these deviations are like previous. Please advise they can be released or not ?\r\n* 19.06.17 - Martin: we´ll discuss this issue intern in the next days.\r\n* 19.06.17 - Sally: for the this spring, if supplier manufacture according to the drawing, then it would be too loosening to lock the motor head. Jonny has also the same conclusion. So **we suggest to change the drawing dimension to be 42,5 +/- 0,5.**\r\n* 19.06.17 - Martin: you can release this delivery.But please contact the supplier. The measure from the spring washer are out of tolerance. Maybe he can optimize the mould for the next production.\r\n* 19.06.17 - Jello: the attached is the reports for 539-096,097,099, problem remains same, mainly focuses on the dimension of spring(make the spring tighter), compared to data in previous reports, I think it’s ok, also please help check these three reports for details, many thanks! \r\n* 20.03.17 - Sally: Generally our supplier must make the part according to drawing as the only fixed standard, so if the actual **dimension 42,5 +/- 0,5 generate better functionality**, please help to update drawing and IP to avoid any confusion.\r\n* 20.03.17 - Martin: ok\r\n* 20.03.17 - Jonny: we did a test for trial assembly with plastic parts,  to confirm the dimension 42,5 +/- 0,5 mm have the better effect of touching,  if fulfilled the dimension to 43,5 +/- 0,3mm, touched with the plastic parts is very loose, in the past, I  discussed with Dirk for this –hope change the tolerance to  42,5 +/- 0,5 mm in the drawing, Dike said  RD never received the relevant customer claim  for the spring , so  maintain the status quo. Please reference the above \r\n* 20.03.17 - Martin: we accept the deviations of the spring washer, like latest deliveries.  But why is this form not correct, please ask the supplier whether he can produce the spring according to drawing.\r\n* 20.03.17 - Jonny: Re 539-096 ,  pos.2 & Pos. 3  or  Pos.7 &8 ( in 539-097 & 539-099  report ) ,the measured values are out of  tolerances, and trial assembly with plastic part, feeling is OK , compared with the history records ,  suggested to accept this batch of goods.\r\n\r\n\r\n\r\n\r\n', 1512210650, NULL, 0, 'red', 2, 6, 8, 2, 0, 1, 0, 3, 1521543375, '', 0, 0, 0, 2, 1512210650, 0, 0, 0, 0, 0, NULL, NULL, 3, NULL, NULL),
(93, 'HP2 - white lower packaging for HP2 starter kit', '\r\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\r\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\r\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \r\nCan you please asap provide a quotation/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\r\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\r\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I’ll be able to give you the quotation tomorrow or latest Monday next week!\r\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\r\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\r\n* 02.01.18 - Mail Ben: I’ve gone through a couple of samples while you’ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I’ll let you know more tomorrow!\r\n* 04.01.18 - Waybill 4244581154\r\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\r\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\r\n* 15.01.18 - Mail Jens: in appendix you’ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\r\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \r\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\r\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\r\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\r\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\r\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\r\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \"In Transit\" so after the goods arrive we can confirm this if everything is ok.\r\n\r\n\r\n', 1512634655, 1520933141, 0, 'red', 1, 4, 2, 2, 0, 0, 0, 2, 1520933141, '', 0, 0, 0, 1, 1517470138, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(94, 'Dooya #10 - claim - HE1015 - RPM issue', '* 14.03.18-Mail Henk:The pending 1pc defective HE1015 motor which I get from Rademacher ,it fail the lift test by Dooya factory. This one have the same test result between RD-D and Dooya. Dooya factory will check it and keep the update to us .* 28.02.18-Andreas:no problems of the last delivery,we\'ll look at the problem together here in Germany next week\r\n* 13.02.18-Henk: the second returned HE1015 motors all pass the lift testing by Dooya factory,the different test result also make Dooya factory confusion. please check the test video .\r\n\r\n* 12.02.18 - Andreas : Information ! We ´ve **no problem** with the last delivery. There are no abnormalities during testing;  Now we ´ve to check the problem with the last delivery. We test some bad motors without electronic and they run a littel better. But they do not the 120% test correctly. They lift the load for round about 70 cm. Are there any more information from dooya to clarify the problem ?\r\n* 02.02.18 - Mail Henk: Yes ,I know the project of the tubular motor is  very important. Anytime when we received the motors quality claim from Martin, I am nervous, afraid have the defective during our quality control . when I trip to Dooya factory ,I always like to work shop have a look and  chatting with our QC and operator to learn more . We always keep to check the motor power problem why have this different with your test equipment and  Dooya’s, so we use the two test equipment to test same return motor want to find the differences ,but the results are same. Our QC also force on this problem ,now, we want to random check some motors do the lift test again in another test equipment after the first lift test finished .Attached test video and pictures for your reference.\r\n* 02.02.18 - Mail Ralf: the documents look all fine in a first glance. One final question as I like to understand where we (Germany) are maybe looking into the false direction. The weight is really 30,76kg? You have personally measured it? The reason is that with this diameter (74+4mm) and lifting height of 1,8 m within 55sec you have a speed of 7,8rpm which we do not see for the “not good” motors. For us it looks like the power is not as it was in earlier deliveries. Therefore all these nerving questions from my side. I just want to understand as the power (characteristic curve) of the motor is a crucial criteria for our blocking function and I want to avoid substantial customer claims.\r\n* 02.02.18 - Mail Henk: The test equipment tube OD is 74mm, steel rope OD is 4mm, test voltage is 230V. I follow the attached calculation method to know the weight . \r\nAccording the technical annex ,if spent the time less than 55s to lift to 1.8m, then the motor is qualified\r\n* 02.02.18 - Mail Ralf: i am just curious but what is the diameter of the tube where the 30kg are connected to. Just for my understanding, the motor needed 55sec to lift the 30kg up to the heihht of 1,8m, correct?\r\n* 02.02.18-Henk Mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\r\n* 23.01.18-Henk Mail: Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn’t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \r\nWe will forward the test result to you after we finished 2pcs another motors .\r\n* 22.01.18-Andreas : Sorry my mistake; we have to forget the information on dashbord from  20.01.18 ; we dubbel check all HE1015 motors but there was the same problem ; see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motors? \r\n* 22.01.18-Henk: so we can close this topic ?\r\n* ~~20.01.18 - Andreas : We dobbel check all HE 1015 motors not pass the Risatti-Test. perhaps an operator error was the problem.~~\r\n* 18.01.18-Sally: Because we\'ve tested the first 2pcs NOK you sent back and the test result shows the motor is OK when room temperature is 10 degree.\r\nSo we suspect the root cause could be:\r\n 1. in your video shows motor can\'t lift more than 20CM: this could be typical winter issue, as the low temperature could cause the grease in the gearbox somehow less fluidity. So we\'ve asked you to redo the test after running the motor for 2 minutes with no load in order to warm up the grease. Dooya\'s grease can only withstand -10 degree while the fresh motor coming from the sea then right after send to the test stand could be colder. (we had same claim on HE1017 in the end of 2015 due to grease problem)\r\n 2. in Martin\'s photo shows motor rpm is 8-10rpm which is slower than usual 11-12rpm(PS: this standard we have not agreed with Dooya yet, we just take it as phenomenon for concern): also could also be same grease issue above or the calibration problem on RDD\'s RPM tester, see attached mail with similar issue in 2015 as well.\r\nNevertheless, **please help to send back another 2pcs NOK as discussed**, and Henk will arrange Dooya to test again, if Dooya can reproduce the same problem as at your end (motor can\'t lift), then we will investigate the root cause based on the phenomenon, now our problem is we didn\'t find the same phenomenon at our end\r\n* 15.01.18-Henk: Dooya mentioned last defective 2pcs HE1015 motors are pass the lift test in Dooya factory ,maybe is the temperture caused the grease less fluidity, hope you can retest \r\n* 14.01.18 - Andreas : Hey Sally, that not the way. We never worm up the Motor bevor we do the test ; @ Henk: What do dooya say to the video of out testing ? \r\n* 03.01.2018:Sally mail,Hi Andreas,Can you try to warm up the motor by running 2mins without load and try again? in the end of 2015 we also had the same claim on HE1017 in winter while it was a grease problem cause the lifting failure.\r\n* 02.01.2018 : Andreas : we do the test once more and you can see the video!\r\n* 28.12.17：Henk: Dear Andreas,please hold return 2pcs bad motor to us again, could you please arrange to retest the bad motors after calibrate the offline tester Risatti again. By the way , Could you help us redo the lift height test in load 120% weight before let the motor no-load runing 2 mins first, then check the lift height is improved or not ?\r\n* 22.12.17 Andreas: we send you 2 pcs of the bad motors so you can do the test once more. \r\n* 21.12.17 - Video Uploaded: http://benhulme.net/files/files/MVI_0929.MOV\r\n* 21.12.17-Mail Henk:\r\nToday I am testing the 2pcs return HE1015 motors in Dooya factory ,they can easy lift the 120% weight to 1.8m height and only spend almost 40 seconds (required less than 83s according the TM09 Technical Annex 5.1.3),the test frame is approved by Rademacher and also can use for HE1017 . The temperture of testing environment almost is 10 degree . we think maybe the lower temperature is caused the grease solidification ,then hard to lift the weight .\r\nHope you can help us redo the lift height test in load 120% weight ,but let the motor no-load runing 2 mins first.\r\n* 15.12.17-Mail Henk:Could you help us redo the lift height test in load 120% weight ,but need to let the motor no-load runing 2 mins first ,then check the lift height still is 10~20cm or more ? \r\nBy the way ,could you advise the temperture of the test environment?\r\n* 15.12.17-Mail Martin:These motors lift the weight by 120% not more than 10 – 20cm high.\r\n* 15.12.17-Mail Henk:We still want to know how many times spend for HE1015 motor running under the attached test environment, hope you can random to choose some to test from qualified motors and  slowly speed-limit motors.\r\n* 15.12.17-Mail Martin:now we finished the 100% controle and we blocked still 381 motors where the speed-limit is too slow.Please see the updated report attached.\r\n* 14.12.17-Mail Henk:please advise the testing result to us once you finished for how many times does the HE1015 motor running under the attached  test environment\r\n* 14.12.17-Mail Jens:send 2pcs HE1015 motor to RD-CN for recheck.\r\n* 07.12.17-Mail Henk:Dear Martin,Could you help to return 2pcs defective HE1015 and 2pcs good from last delivery to us for recheck ?\r\n* 07.12.17 - Mail Sally: Hi Martin, Well noted. I am working with Henk to study the TM09 technical annex, last year we\'ve worked with R&D together to define how the motor speed should be. Unfortunately rpm check is not in IP and on the annex it is defined under 120% rated load, could you please help to re-test and let us know how many time does it take under the annex test environment, so then we can firm the claim to Dooya on the agreed standard.\r\n* 07.12.17 - Mail Martin: Dear Henk, we have a big problem with the new delivery HE1015 from Dooya. These tubular motors has not enough power.  Please note the report attached. At 10Nm load, the speed drops significantly too low. We had not been able to find this problem during the last delivery. At the current delivery we sort out 14 Motors from 80 who we testet. Normally, the speed is 11-12 rpm. By these 14 motors we we only measure 8 – 10 rpm. Now we decided to control all 2´016 motors. That\'s a huge amount. More information will follow if we have everything checked.\r\n\r\n', 1512643247, NULL, 0, 'red', 2, 6, 5, 4, 0, 1, 0, 2, 1521034937, '', 0, 0, 0, 2, 1512643247, 0, 0, 0, 0, 0, NULL, NULL, 2, NULL, NULL),
(95, 'WIFI module change application for IP camera', '* 12.12.17- Sally: Hi Peter,Attached change approval application for both indoor and outdoor camera, for the WIFI module.It seems this is not well planned, so Fostar need to start right away from PO#4500034107, so it is quite urgent.\r\n* 12.12.17 - Peter: From my perspective it is not a „no risk” change… If it was our equipment we had at least to perform all measurements regarding coverage (Rx/Tx performance), execute a field trial and a longer system test (stability within the Linux firmware).It would be great to see the release documentation they (hopefully) did internally in front of the market introduction.At least we need the declaration of compliance with EU Radio Equipment Directive.\r\n\r\n* 19.12.17 - Sally: attached internal reliability test report from Fostar with the new WIFI module, and RED certs of the new WIFI module. They did another thermal shock test but in Chinese.\r\n* 03.01.18 - Peter: Sorry for my delayed answer – yes, this documentation is sufficient  GO for production.', 1513074677, 1519889466, 0, 'grey', 2, 8, 3, 15, 0, 0, 0, 3, 1519889466, '', 0, 0, 0, 2, 1514979252, 0, 0, 0, 0, 0, NULL, NULL, 1, NULL, NULL),
(96, 'GGK 533-51-2 Zinc adaptor wear resistance', '* 12.12.17 - Berthold: We do have some problems with the parts GGK 533-51-2. While the measures are fine we still have a serious problem with wear out at the inner square. We tested these parts with the 50Nm tubular motor and after about 8000 cycles the square output shaft of the gearbox had worn out the inner square of the Zinc-alloy part.\r\nPlease ask the manufacturer if they have the opportunity to mold these parts in a different material that makes them stronger so that they are able to withstand the live cycle test. \r\n* 13.12.17 - Sally: Well noted, we will work with supplier and send you proposal to increase the wear resistant for the Zinc adaptor. We will come back asap.\r\n* 20.12.17 - Sally: Attached new Zinc alloy proposal, which has higher Cu% so with better mechanical property, price is approx. 5000RMB higher than old per ton (+approx. 20%).\r\nThe cost of making 50-100pcs sample is RMB 2500.Please advise.\r\n* 20.12.17- Mail Berthold: Could you please ask the manufacturer for a detailed datasheet of these materials? We would like to compare the mechanical strengths at least of these two. Maybe the manufacturer has some more materials to choose. Please take a look at the pictures. Here you see a new one and two that are worn out by the square output of a 50Nm tubular motor. Maybe these pictures can help the manufacturer  to find a material that lasts longer. We need to be able to compare possible materials and therefore we need datasheets that show the mechanical properties. \r\n* 20.12.17 - Mail Sally: I asked the mechanical property of new material in the morning, right now we don\'t have it yet, we will try to send you asap once obtain, perhaps with more options. \r\nThanks for the pictures which shows the problem for us.\r\n* 27.12.17 - Mail Sally: Attached material datasheet of proposed new material (Zamak 2) and old material now we are using(Zamak 5), for your comparison.\r\nPS: there is no other options in the supplier\'s end with better mechanical property. Supplier produce Zamak 2, 3, 5, 7. ZAMAK 2 is the one with best mechanical property.\r\n* 03.01.18 - Mail Berthold: Thanks for the data sheets and your effort. After a short discussion with Andreas Schulte we have decided that we need to produce the 100 pcs. for RMB 2500. With these we perform some life cycle tests and make a decision for the future based on the results. Please send the parts to my hands so that there will be no mix-up with the series. It would be nice to get a rough timeline.\r\n* 03.01.18 - Mail Sally: Attached invoice for the sampling, estimated delivery date is 2nd Feb.\r\n* 03.01.18 - Mail Jens: thanks a lot for sending, in appendix you‘ll find a corresponding PO from our side - 4500034620\r\n* 19.01.18 - Mail Sally: FHJ has prepared sample earlier than expected, Henk is arranging the inspection and later we will send out via DHL.** Waybill 2836747104**\r\n* 19.01.18 - Mail Henk: Dear Martin:\r\n100pcs new material GGK533-51-2 (PO4500034620) are pass the shipment inspection ,attached inspection report for your reference.\r\n\r\n\r\n\r\n\r\n\r\n', 1513074971, NULL, 0, 'green', 4, 16, 5, 4, 0, 1, 0, 3, 1520511236, '', 1520498940, 0, 0, 4, 1520511185, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(97, 'HP2 - new eMMC', '* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\r\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\r\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\r\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\r\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \r\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \r\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case – we see a lot of effort needed to ensure proper market introduction.\r\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-	setup a new project – unplanned release for the current sw architecture (we are already in transition for a new one)  this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we’d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\r\n@Manfred – please support Ben as far as possible\r\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won’t be cheap as the eMMC has been slowly increasing for a while.\r\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \r\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter’s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\r\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\r\nThe rest of the qty, we are still waiting for the feedback from RTS.\r\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\r\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \r\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\r\n* 09.02.18 - Mail Jens: in appendix you’ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \r\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\r\n* 13.03.18 - eMMC has all arrived and is in our factory. I will start another topic to track the quantities.', 1513340326, 1521622934, 0, 'yellow', 1, 4, 1, 3, 0, 0, 0, 2, 1521622934, '', 0, 0, 0, 1, 1520935127, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL);
INSERT INTO `tasks` (`id`, `title`, `description`, `date_creation`, `date_completed`, `date_due`, `color_id`, `project_id`, `column_id`, `owner_id`, `position`, `score`, `is_active`, `category_id`, `creator_id`, `date_modification`, `reference`, `date_started`, `time_spent`, `time_estimated`, `swimlane_id`, `date_moved`, `recurrence_status`, `recurrence_trigger`, `recurrence_factor`, `recurrence_timeframe`, `recurrence_basedate`, `recurrence_parent`, `recurrence_child`, `priority`, `external_provider`, `external_uri`) VALUES
(98, 'improvement of packaging and palletizing for SX5DF', '\r\n* 29.11.17 - Sally: Our German colleagues has come up with several ideas regarding how to improve the packaging and palletizing of SX5DF, that we would like to share and discuss with you. (because #9 has arrived and 3pcs SX5 carton was a bit damaged.) \r\n1. Can we design the shape of the carton for SX5 the same as S2 which has further edge and much stronger for stacking? Can your packaging supplier manually prepare 3~5 white sample then we can test it? Please let us know the sample price and lead time, we will arrange DHL to pick up.\r\n2. It seems the foil wrapping on each pallet is too tight so sometimes it squeeze the carton and cause deformation, also it seems there are too many layers of the foil are being placed. Can you reduce the layers of foil that is wrapped on each pallet(maybe 2 layer is enough? this is also more environment friendly ;-)) and reduce the force while wrapping them?\r\n3. Try to stack the each layer one by one neatly , so the pressure placed on each GDO carton is even.\r\n4. Can you add paper corner protector for each pallet, our factory use the same from Taobao and very good so far: http://p.kwi9.com/h.xp2UvA\r\n\r\n* 14.12.17 - Mail Johnson: 1. We will change the design of  carton for SX5 the same as S2 after all the old version cartons are run out of. We will send samples to you for testing ASAP.\r\n2. Tension of wapping film machine we\'re using now is the minimum level already.\r\n3. We think the mian reason for deformation is uneven pressure becuase of way of stagger stacking. We will stack the goods in the same direction and add paper corner protector for each pallet. For the coming #2 order, we would like to pack 4 pallets by using this packing way for transportation testing. Could you please check and confirm if it\'s OK?\r\n* 15.12.17 - Mail Sally: \r\n1. Please let us know when the sample could be ready. PS: we must avoid the delivery to Germany during holiday week.\r\n2. Okay.. maybe you can consult with your supplier to re-calibrate the machine? It looks unusual that the minimal level already has this force.\r\n3. It make sense to apply the improvement on all pallets of #2, as we believe the action must be positive. We will send you feedback once our Rhede warehouse receive this container.\r\n* 15.12.17 - Info Sally via wechat: Foresee will try to deliver 2-5 pcs sample of the new SX5 packaging at the beginning of January \r\n* 15.12.17 - Question Manfred: How many old SX5 packaging does Foresee have at the moment ? Starting with which order do we have the new packaging ?\r\n* 16.12.17 - Mail Sally: 5pcs white sample of new SX5DF carton (in similar shape of S2) will be ready next week, considering to avoid delivery during your holiday, we will send out at beginning of Jan. Right now, Foresee has 843pcs old SX5DF carton in stock, so we can expect to use new design start from #4 (after #2 400pcs, #3 400pcs).\r\n* 18.12.17 - Mail Johnson: 1. Feedback from our supplier, unit price for the sample is RMB 50. We will send you 5pcs for your testing after new year holiday.2. We will pack the goods as attached pictures. Could you please check and confirm if it is OK?\r\n* 18.12.17 - Sally: confirmed.\r\n* 29.12.17 - 5pcs white sample of new SX5DF carton (in similar shape of S2) sent out, TNT tracking no. 170980703\r\n* 04.01.18 - Manfred: we have received the samples currently in investigation\r\n* 13.01.18 - Mail Manfred: Dear Sally, we have checked the new packagings. Andreas and his colleagues from the QC gave us the release. If Foresee will stack the goods in the same direction and add paper corner protector for each pallet plus the new packaging, this will solve our problems. Can you confirm that Foresee fort he coming #2 will pack 4 pallets by using this packing way for transportation testing ? Please ask Johnson to send us change approval sheet for the above mentioned alterations will all necessary information.\r\n* 24.01.18 - Mail Sally: Attached change approval for the carton box shape of SX5DF. I\'ve sent the new layout 20180124 via Skype to you. Please check and confirm. New carton shape should start from the upcoming #5/2018. The improved stacking and wrapping with paper edges has already fully started from #2/2018.\r\n* 01.02.18 - Mail Sally: Attached signed back from Foresee, as discussed after sending you the replacement, they will start the new carton shape for SX5DF from #4/2018 already.\r\n\r\n\r\n', 1513340608, NULL, 0, 'blue', 2, 8, 2, 1, 0, 1, 0, 2, 1517481409, '', 0, 0, 0, 2, 1517481409, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(99, 'Sun sensor UBW - item no.: 475 534-1.5', '\r\n* 05.03.18 - Mail Leona: Supplier has received the return delivery today. \r\n* 01.03.18 - Mail Jens: the DHL tracking number is: 7548884851\r\n* 01.03.18 - Mail Jens: in appendix you’ll find a corresponding debit note for the 156 pcs sun sensor 475 534-1.5. Please check and let me know, from which payment we can deduct this debit note!\r\n* 27.02.18 - Mail Jens: 1 carton with 6,0 Kg., dimension of the carton: 37 x 24 x 21 cm. I’ll let you know when the parcel will go on the way!\r\n* 27.02.18 - Mail Leona: You can arrange the DHL by your side with our account. Our DHL import account is 954611707. Service：Express Worldwide\r\n* 20.02.18 - Mail Sally: For the 156 pcs. 475 534-1.5 sun sensor UGW:  Leona will arrange DHL pick up(using our account) after we come back to work after holiday.\r\n* 07.02.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. (new Version). We send back all the defective pieces back to you.\r\n* 22.01.18 - Mail Sally: Thank you for the report, please return all of the defective pieces and we will rework them and send them back to you. This happened during the time when we had no tester (tester NG and sent back to Rhede for repair), and it was agreed that the goods would be tested in Rhede instead during the interim period. PS: The defective qty should be from more than one batch. Here is the shipping record during this interim period for your reference.\r\n* 22.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001432. With request for timely processing and statement of this claim.\r\n* 05.01.18 - Sally: @Andreas. Yes we want them back and we want to know the problem(now we know it is NOK because it doesn\'t pass tester, not cosmetics issue or etc..) then we can repair them for you.\r\n* 05.01.18 - Andreas: we ´ll do a claim report and ad it on KB the sensor does´t work the right way. The tester said it´s not okay.\r\n* 04.01.18 - Manfred: Could you please send Sally some further information (claim report etc.) for this topic. -	From which delivery / order are these bad parts ? - what is the problem ? -\r\n pictures - etc. BTW: Where are thes parts currently because I cannot find them in the blocked stock – normally Sally want them back ;-)\r\n* 04.01.18 - Sally: Please send back to us for rework and we will send back the reworked ones(good) to you with next shipment.\r\n* 22.12.17 - Andreas: we have a lot bad sunsensor (> 300 pcs) ; The sensors are from the time when the tester in CN was not available. How do we want to handle this? Officially complain with the total quantity?\r\n', 1513950530, NULL, 0, 'yellow', 2, 7, 3, 1, 0, 1, 0, 5, 1520415765, '', 0, 0, 0, 2, 1519888846, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(100, 'Life cycle test rack LBW', '* 13.03.18 - There seems to be a little confusion regarding this and we forget to inform Ralf in Germany. Who shall talk to him?\r\n* 12.02.18 - Andreas : How much does it cost? And doe you inform Ralf about the costs?\r\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\r\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\r\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ?\r\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\r\n* 22.12.2017 - Andreas : Who is the stand ?\r\n\r\n\r\n\r\n', 1513950843, NULL, 0, 'green', 1, 2, 5, 3, 0, 1, 0, 5, 1520934518, '', 0, 0, 0, 1, 1513950843, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(101, 'Life cycle test rack turbular motors', '* 23.03.18 - Still waiting on the motors for the TM Testing Stand.\r\n* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\r\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.', 1514989366, NULL, 0, 'green', 1, 2, 2, 4, 0, 1, 0, 5, 1521786792, '', 0, 0, 0, 1, 1514989366, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(102, '533-16 packaging size', '* 13.02.18-Henk:IR is updated ,close .\r\n* 12.02.18-Andreas : IP has been updated : we can close the point ?\r\n* 16.01.18-Henk:we finished the carton change,total 39 cartons .the quantity is 28828pcs (required Qty is 29040pcs),the lack quantity will produce with next order. \r\n* 09.01.18-Henk mail:I according the packaging requirement to find one carton , it is very close the required carton size ,\r\nit is :400(length) x400(width)x 300(high)\r\n6 layers, per layer 124 pcs\r\ncardboard between each layer\r\ncontent 744 pcs / carton \r\ntotal need 39pcs cartons ,the cost almost is RMB230.Have another cost that is corrugated board for replace the carton of GGK533-16 ,234pcs=RMB202 . \r\n* 09.01.18 - Manfred gave the release for the carton size, RD-D QC will send updated IP\r\n* 09.01.18 - Henk:I according the packaging requirement to find one carton , it is very close the required carton size ,it is :400(length) x400(width)x 300(high),6 layers, per layer 124 pcs,cardboard between each layer,content 744 pcs / carton ,total need 39pcs cartons ,the cost almost is RMB230. Dear Martin: Please help to updated the IP for GGK533-16 packing information.We will change the carton for 29040pcs GGK533-16 of PO4500032232 once the new cartons arrived .\r\n* 05.01.18 - Sally: @Henk: Please help to send the new packaging form from RX in advance for the next delivery of 533-16 (if it is not carton size approx. 405 x 380x 300 mm (L x B x W), 6 layers, per layer 124 pcs, cardboard between each layer, content 744 pcs / carton - we need to check/confirm and update the packaging form is necessary, this old form is from YQ must be depleted.\r\n* 05.01.18 - Sally: By the way, does it make sense that we work together a IP list, showing the latest drawing version and IP version we have, to make sure we are on same page and using the most up-to-date drawing& IP? It could be reviewed and updated quarterly like our other mould list. @Henk, what do you think? Can you compile this file summarize the drawing and IP version on our hand, so we can have Andreas update us if he sees a depleted version?\r\n* 05.01.18 - Andreas: The packing size is put in IP (since jun)and in the  order text \r\n* 04.01.18 - Mail Sally: Hi Andreas, We\'ve heard that our current 533-16 packaging size had made inconvenience in your lean production management.\r\nIs that possible that you put the maximum carton envelope size (biggest length width and height that you can accept for your production line) in IP so that our QC can double check before shipment to you?\r\nWe indicate envelope size not a fixed size so supplier has more flexibility to use the carton which is in stock.\r\n\r\n', 1515060259, 1519889609, 0, 'blue', 2, 8, 6, 5, 0, 0, 0, 3, 1519889609, '', 0, 0, 0, 2, 1518490974, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(103, 'HP2 order #17 - 4500034742', '\r\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19/2018 and 750 pcs ETD cw23/2018\r\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\r\n* 09.01.18 - Mail Jens: in appendix you’ll find the next order for the home pilot, it’s purchase order #17/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22/18)\r\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\r\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \r\n* 24.03.18 - Mail Ben: No problem I will get this worked out and with the first batch of Order #17 we will make a plan to ship out some single HP2 units to you guys!\r\n', 1515506964, NULL, 0, 'yellow', 1, 3, 1, 11, 0, 1, 0, 2, 1522060471, '', 0, 0, 0, 1, 1515506964, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(104, 'Dooya - return  delivery 2017', '\r\n* 19.01.18 - Mail Sally: Confirmed with Dooya, the quickest pick up time for the return delivery is beginning of March after CNY, since the return shipment behaviour will effect Dooya\'s export license (also return value has limitation) so they have to plan internally strictly on these matter with Ningbo custom, we will be at priority, but still not possible to move before CNY.\r\n* 01.12.17 - Mail Sally: Hi Manfred, After negotiation, we have got the confirmation from Dooya that you can take your time and no need to pack up the return delivery now, they will arrange the pick up next year (approx. February). Furthermore: The return qty will not be deduct from 2018 motor qty, they will handle the figure in the accounting of this year, so better you can provide us the return motor list in advance before 30 DEC, the physical motor can be handled next year.\r\n* 15.02.18 - Mail Manfred: please find attached the final overview of the return delivery 2017 to Dooya. We talk about 2281 pcs tubular motor in 11 boxes. For more details (weight, volume) please check the attached file. Please discuss all details with Dooya and let us know the further steps. **The aim should be: ETD Rhede latest at the beginning of March.**\r\n* 23.02.18 - Mail Sally: Thanks a lot for the comprehensive list with all necessary info included. \r\nPlease note that the pickup of this return shipment is currently scheduled at CW12~13.\r\n* 23.02.18 - the forwarder \"Gateway Cargo Systems\" has contacted regarding this return delivery. So it seems everything is in the flow.\r\n* 01.03.18 - Mail Sally: Hi Jens, The document are basically OK, I add a few info, see attached updated. The debit note value is confirmed, you can issue debit note now, after Dooya receive the return motor, we will deduct the amount from one of the payment to Dooya.\r\n\r\n\r\n\r\n', 1516115917, NULL, 0, 'yellow', 2, 7, 4, 6, 0, 1, 0, 2, 1519889253, '', 0, 0, 0, 2, 1516115917, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(105, 'TM20 - HS XXXX - prototypes', '* 13.02.18-Henk：this topic is same as 10# HE1015 motors ,can merge to topic 10# HE1015.\r\n* 02.02.18-Henk mail:Dear Andreas:In Dooya factory , we test the second time returned 2pcs HE1015 motors ,they can lift 120% weight(30kgs) to 1.8m and spent the time less than 55s. We  do the lift test in two test equipments ,the results are no different .\r\n\r\n* 23.01.18-Henk Mail:Dear Andreas:Ok ,we will retest your another 2pcs motors ,hope we can get ASAP .As we know that Dooya follow the technical Annex 6.1.3 do the lift test motors 100% and all are ok before shipment .one point need your attention , the instantaneous low rpm is not requirement in the technical annex and it isn’t show the motors is unqualified, for example ,spend 4mins finished run 1000m is qualified, if someone running slow in a short time  during the process ,but finally only spend 3.5mins finished, then we can say he is fail? So I think that calculate the time to finished the lift height is reasonable in technical annex 6.1.3 ,are not instantaneous rpm. \r\n\r\nWe will forward the test result to you after we finished 2pcs another motors .\r\n\r\n* 22.01.18-Andreas : see mail from 22.01.18 ; please ask dooya for more information how it can be the differences between the motor? \r\n* 20.01.18 : Andreas Mail : ... RDM doesn´t stop the production. If Dooya is sure to produce a good quality as they do in the last they don´t have to be afraid to do that. Please talk to Dooya ! We meet R&D on Monday and I hope to give you more information...\" \r\n* 19.01.18 : Henk Mail : \"...You mentioned that Dooya factory can produce the TM20 motors,but they very worry ,they want to know what is the problem with it, so they waitting for our feedback. no some big problem with TM20,Dooya factory can produce it need not worry?\"\r\n* 18.01.18 : Andreas Mail: \".....the motor have no serial problem. It is currently not necessary to stop production. Risatti make the test and the result of a few motor is bad. We have to check tolerance and discuss the test result. ...\"\r\n* 12.17 : a few motors do not consist the Risatty Test; probably because oft littel tolerance deviations; there was no information to CN because it was not nessasary\r\n* 12.17 : 50 of each type arrive to RDM', 1516428717, NULL, 0, 'yellow', 2, 6, 5, 5, 0, 1, 0, 5, 1518493611, '', 0, 0, 0, 2, 1516428717, 0, 0, 0, 0, 0, NULL, NULL, 3, NULL, NULL),
(106, 'Light Sensor', '* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\r\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\r\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \r\n* sensor – SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags – 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\r\n', 1516669136, NULL, 0, 'yellow', 1, 3, 1, 16, 0, 1, 0, 1, 1521189974, '', 0, 0, 0, 1, 1516669136, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(107, 'Sun Sensor (GSM2)', '* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\r\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\r\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. We will send you asap 50 pcs samples of the single components\r\n\r\n', 1516669216, NULL, 0, 'yellow', 1, 3, 1, 17, 0, 1, 0, 1, 1521189987, '', 0, 0, 0, 1, 1516669216, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(108, 'Dooya - TM10 - mechanical claim to limitswitch ring', '* 14.03.18-mail Henk:As last week analysis ,the grease more or less will influence the limitswitch turn smooth or roughly . Dooya factory will test and control  grease quantity how many it can get the limitswitch ring turn smooth ,this need a period of time can get the result .they will keep the update to us once they have the result .\r\n* 07.03.18 - Sally: Hi All, I hear nothing after all, how does thing going? @Henk, could you keep us CC in the loop?\r\n* 01.03.18-Henk: Please see attached mail ,hope they can help for you understand the limit switch ring status.\r\n* 13.01.18-Henk: as our telco yesterday afternoon ,waitting your feedback after you check with Martin,then close or not \r\n* 31.01.18 - Mail Henk: The \"unknow\"drawing(12.7+/-0.1) is from Dooya\'s client for mute motor,not for us.our motors fitting with the gear OD is 13.4mm(for Rademacher drawing).\r\n* 31.01.18 - Mail Martin: Ok. I understand.\r\nThere are two different geare-wheels.  Are these correct assembled? In the right motors?\r\nAnd why there are two different geare-wheels.\r\n* 31.01.18 - Mail Henk: Please see attached drawings ,Martin!\r\n* 31.01.18 - Mail Martin: We note this and I think we don´t need any samples.\r\nDo you have a drawing from this gear-wheel?  I mean the different between OD 12,7 and 13,4mm is very big. How is the tolerance?\r\n* 30.01.18 - Mail Henk: Dear Martin, Actually ,you returned 2pcs motors all have good function ,though one running little roughly.\r\n* 30.01.18 - Mail Henk: Dear Martin, I disassembly two limitwitch which you mentioned that one is smooth and another is roughly .though the components’ dimensions are within the drawing ,but actually it caused by one gear OD too big to running smooth( big meshing pressure).but the grease in the limitswitch more will make it run smooth than grease little, so returned one is running smooth and another one is roughly, but the grease can’t complete solve this problem . I check this with Dooya factory ,their customer also have this problem in the previous ,they had solved this problem after reduce the gear OD .I replace the new gear then test again ,limitwitch running smooth and no stuck or big noise .our white gear OD is 13.4mm ,new gear OD is 12.7mm. please see attached pictures .\r\nNow I keep the new gear in the motor ,if you want ,I can send 2pcs new white gear(OD=12.7mm) and the motor to you for evaluation.\r\n* 23.01.18 - Mail Jens: Dear Henk, we’ll send out the sample delivery today via TNT, the tracking number is: GD237720916ww\r\n* 23.01.18 - Mail Henk: Ok ,we will check and feedback to you once received .\r\n* 23.01.18 - Mail Martin: Dear Sally and Henk, I send you also two other motors in the same package. Please note this new claim. Once, the limitswitch ring turn smoothly. At the ohter motor the ring turn roughly. Where ist he difference? Please, let analyse these motores and give us a feedback.\r\n', 1516700838, NULL, 0, 'yellow', 2, 6, 5, 6, 0, 1, 0, 2, 1521035390, '', 0, 0, 0, 2, 1516700838, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(109, ' LBW - security stock - 4500034925', '\r\n\r\n* 19.01.18 - Mail Jens: in appendix you’ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\r\n* 23.01.18 - Mail Ben: Hi Jens, We’re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don’t have any stock as we’ve Ordered for Order #26 and #27 and because Order #28 hasn’t been placed yet we can’t put this on the                  back of that order. Sadly as I am sure you know, RX won’t produce 150 units so I’m afraid we’re going to need to wait until we receive Order #28 from you guys.\r\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let’s wait until order #28, hopefully we’ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed ) !\r\n* 02.02.18 - Shinya has sent the PI - ETD cw23/2018\r\n* 06.02.18 - As mentioned this will be sent with Order #28 together. If we manage to get it finished sooner we will send it out earlier and let you guys know.', 1516710973, NULL, 0, 'yellow', 1, 3, 1, 5, 0, 1, 0, 2, 1520426839, '', 0, 0, 0, 1, 1516710973, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(110, 'GDO - Foresee - damaged packagings SX5 DuoFern', '\r\n\r\n* 12.02.18 - Mail Sally: Please note that the 150pcs color carton for SX5DF which Manfred need is in this shipment - Foresee #3\r\n* 01.02.18 - Mail Sally: Discussed with supplier about the replacement, seeing from the damage rate seen in your picture plus the confidence of the way they pack according to they experience, they argue there won\'t be as much as 150pcs carton which are necessarily to be replaced,  after friendly negotiation, finally they would agreed to provide the full replacement carton you claimed - 150pcs new carton, considering the long term cooperation. \r\nHope you are satisfied with this result. But they can\'t pay any of your hour bill, they argue below points? 1. Cancelling cardboard honeycomb is initiated by RDD in order to save 4 RMB cost on unit price. 2. The rate 80 Euro/hour has never been agreed (this was jumped out recently without any pre-discussion between both party), plus there is no way for them to verify the hours being claimed.3. In each of the order invoice, Foresee has already applied 1% deduction which is to cover such quality/replacement cost which might happen after delivery(see below), this start from the very beginning of the business, the cost was already seen and was prepaid on each order. **For the replacement carton, they are 98 old structure and 52pcs new structure, will be sent with #3 container stuffing tomorrow.**\r\n* 29.01.18 - Mail Sally: Somehow after sending you the 150pcs replacement (if Foresee agree), we still can start new packaging from #4.\r\n* 26.01.18 - Mail Sally: Thanks for the report, we are sorry for the problem happened. As soon as heard this on 29 NOV 2017, we are already on top of this problem! The improved stacking and wrapping with paper edges has already fully started from #2/2018.And the new design of SX5DF carton (add extra edge like S2 carton for better stacking strength) will start from  #5/2018.\r\n* 26.01.18 - Mail Andre: Dear Sally, please note the attached claim 200001452. With request for timely processing and statement of this claim.\r\n', 1517227953, NULL, 0, 'yellow', 2, 8, 3, 2, 0, 1, 0, 2, 1520415684, '', 0, 0, 0, 2, 1520415684, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(111, 'Dooya - claim gearbox broken - HE4015', '* 30.03.18-mail Henk:Dear Martin,Please see attached 8D report from Dooya factory for HE4015 gearbox  broken . \r\n\r\n* 16.03.18-mail Henk:Hi Henk,Thank you very much for the detail, now understood. Seem to me is the comprehensive operation training is missing. \r\n\r\nStill we hope you can get the 8D from Dooya, there is never worker\'s fault but should be the company\'s quality control loophole.\r\n \r\n* 16.03.18-mail Henk:Dear Sally,The \"non-standard operation\" is when the operator fitting attached  components match not good , knock heavy until looks fitting well ,actually it with the fitting deviation .during the assembly process ,have this status had been found by production team lead . they scrap some semi-finished products ,but maybe have little into the next process.\r\n\r\n* 15.03.18-mail Sally: Hi Henk,It is not little(rare) we say it is little, we need 8D report(which you asked from Dooya yesterday) explaining why did this can ever happen and which action would be taken to avoid this from happening in the future again.\r\n\r\nThe \"non-standard operation\" seems unusual to us, normally in production every step should be standard in normal condition. \r\n\r\nFurthermore, can you explain further what kind of  \"non-standard operation\"  it is exactly which could cause this failure?\r\n\r\n* 14.03.18-mail Henk:Today I check the broken gear box with Dooya engineer ,they think the components strength is good ,because they have the good torque test (40N.m) result. They think it caused by non-standard operation by new employee . they will have a training for the new operator and find the others factors which is possible.\r\n* 28.02.18-Andreas:still running (by telco) \r\n* 12.02.18 - Andreas : still running  :-)\r\n* 05.02.18 - Mail Martin: still now, I don´t found another broken gearbox. There are four more HE4015 in test active.\r\n* 05.02.18 - Mail Henk: Dear Martin: Have you found the another gearbox broken for new test samples ? Could you return the broken gearbox to us ? Dooya factory want to check it ,then do the life cycle test for HE4015, otherwise ,they will not do it .please advise .\r\n* 30.01.18 - Mail Henk: Dear Martin, Dooya factory will take 2pcs HE4015 motors do the life cycle test ,will advise the result to you.\r\n* 30.01.18 - Mail Sally: Well noted, please immediately set up another 2pcs HE4015 from same batch in the life cycle test stand, meanwhile, we will have Dooya check into this batch info asap. We will be waiting for the further info from you.\r\n* 30.01.18 - Mail Martin: Unfortunately, one of the first motors from the new delivery in the life-cycle-test has already failed. After only 614 cycles, the gearbox is broken! This conditions are absolutly not aceptable. First, please note this claim.  We will discuss further precautions internally.\r\n', 1517297311, NULL, 0, 'red', 2, 6, 5, 7, 0, 1, 0, 2, 1522802563, '', 0, 0, 0, 2, 1517297311, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(112, 'LBW order #28 - order no.: 4500035100', '\r\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\r\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\r\n* 02.02.18 - Shinya has sent the PI - ETD cw23/2018', 1517402863, NULL, 0, 'yellow', 1, 3, 1, 2, 0, 1, 0, 2, 1517572817, '', 0, 0, 0, 1, 1517402863, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(113, 'LBW order #29 - order no.: 4500035101', '\r\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\r\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\r\n* 02.02.18 - Shinya has sent the PI - ETD cw27/2018\r\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\r\n* 09.03.18 - Mail Ben: I honestly think this shouldn’t be a problem. But please wait till I’m back in the factory on Monday and I can check. \r\n* 21.03.18 - Mail Ben: This won’t be a problem. Can you please resend us the order?', 1517402930, NULL, 0, 'yellow', 1, 3, 1, 3, 0, 1, 0, 2, 1521616833, '', 0, 0, 0, 1, 1517402930, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(114, '17.300 pcs. Minebea bearing for sale Type 609ZZM5MTLY121 ', '\r\n* 06.02.18 - Mail Maik: Dear Sally,We have 17.300 pcs. NMB deep groove ball bearing left which we now would like to sell. Besides a few they are all still in original packing. Please see pictures in attachment.  \r\n* 06.02.18 - Mail Sally: Could you please send some product picture, what is the original application in RDD? Do you have a drawing?\r\n* 13.02.18 - Mail Maik: Finally I got the information: (1 euro pallet) 120 x 80 x 60 mm, Weigth: 310 Kg\r\n* 13.02.18 - Mail Sally: Thanks! This is so far all what we need, we will work on this after 27th Feb, because forwarders and our staffs are on holiday already.\r\n* 27.02.18 - Mail Sally: The best deal I can get for this batch is max. 2500 euro, including the freight from Rhede to Shanghai. I understand this is completely a undersell, I hope this wouldn\'t be too hurt.\r\n* 28.02.18 - Mail Leona: Attached are the quote about sea and air.\r\nTotal charge of air: EUR613.50+RMB1291.00/Shipment (without duty）\r\nTotal charge of sea:EUR281.50+USD30+RMB2640/Shipment (without duty）\r\nimport duty in China: 8%\r\n* 28.03.18 - Mail Lisa: Hello Sally, the goods got picked up today. ETA Shanghai is ( plan right now) May 17th.\r\n\r\n\r\n', 1517902797, NULL, 0, 'yellow', 2, 7, 2, 7, 0, 1, 0, 2, 1522251603, '', 0, 0, 0, 2, 1517902797, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(115, 'LBW order #30 - order no.: 4500035305', '\r\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we’ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us “maybe“ 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \r\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB’s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I’m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\r\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\r\n* 07.03.18 - Mail Jens: you’ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there’re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \r\n* 13.03.18 - Shinya has sent the PI with ETD cw36/2018', 1518168300, NULL, 0, 'yellow', 1, 3, 1, 4, 0, 1, 0, 2, 1520933619, '', 0, 0, 0, 1, 1518168300, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(116, 'RoHS Sun Sensor', '06.03.18 - RoHS Requirements for the UBW and LBW Sun Sensor.', 1520336626, 1520498152, 0, 'yellow', 4, 14, 0, 3, 0, 0, 0, 1, 1520498152, '', 0, 0, 0, 4, 1520336626, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(117, 'HP2 order #18 (black colour box) - 4500035339 ', '\r\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you’ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there’re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \r\nETA 27.09.18 (ETD 23.08.18)\r\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw30/2018 and 2nd batch cw35/2018', 1520426460, NULL, 0, 'yellow', 1, 3, 1, 12, 0, 1, 0, 2, 1520934328, '', 0, 0, 0, 1, 1520426460, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(118, 'HP2 order #19 (white colour box) - 4500035601', '\r\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you’ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there’re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\r\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw29/2018 and 2nd batch cw32/2018', 1520426810, NULL, 0, 'yellow', 1, 3, 1, 13, 0, 1, 0, 2, 1520935877, '', 0, 0, 0, 1, 1520426810, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(119, 'LBW PCB Software Update', '\r\n* 08.03.18 - New Software will be send on Monday (12.03.18). We will do a trial run with 500 pcs first then do full production after verification.\r\n* 12.03.18 - SW has been sent to Ben vai email\r\n* 14.03.18 - Software has been received. As mentioned by email we have already got our PCB\'s for Order #27, so we will look at doing a trial of this software update for Order #28.', 1520496428, NULL, 1523232000, 'blue', 4, 16, 1, 1, 0, 1, 0, 1, 1520983879, '', 0, 0, 0, 4, 1520511050, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(120, 'Sun Sensor Testing Device', '08.03.18 - All 4 testers for the new sun sensor are already in RDD since last year, RDD will get the software updated. We need to be sure we are ready to know when we go into mass production by the end of year. We also need to have done a Pilot run before this to make sure the changes have been successful.\r\n08.03.18 - Jörg to arrange SW update of all testers and send them back to RDCN\r\n', 1520496821, NULL, 0, 'blue', 4, 16, 10, 2, 0, 1, 0, 1, 1520511214, '', 0, 0, 0, 4, 1520511052, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(121, 'Payment Terms', '* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\r\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\r\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\r\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI/PO.\r\n* 16.03.18 - I have updated the payments terms based on the discussion:\r\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\r\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\r\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\r\n* 19.03.18 - topic currently \"on hold\" . Telco 26.04.18\r\n* 26.03.18 - This has been agreed after the conference call between Ralf, Manfred, Daniel, Gustav and Ben.', 1520934444, NULL, 0, 'red', 1, 4, 2, 1, 0, 1, 0, 1, 1522050219, '', 0, 0, 0, 1, 1522050219, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(122, 'eMMC Stock Tracking (7,000)', 'I will update this regularly so we can keep track of our eMMC stock. The HP3 must be ready before we run out or we need to upgrade to the new eMMC!\r\n* 13.03.18 - We currently have Order #16, #17, #18 & #19. From these three orders we have already used 3,000 units of our stock. So after taking away the outstanding orders from our stock we have 7,000 Units of eMMC in stock.\r\n* 15.03.18 - Payment deductions of 29.90RMB will happen from Order #20.', 1520935289, NULL, 0, 'grey', 1, 2, 1, 2, 0, 1, 0, 1, 1521100882, '', 0, 0, 0, 1, 1520935289, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(123, 'Sintered Gear Supplier', '* 27.03.18 - I have been searching for a new Sintered Gear supplier for a very long time and finally come up with a company that seems like it could be a viable alternative. They are based in Ningbo and are a Small to Mid Sized Japanese/German Venture. Their prices are 0.40RMB cheaper then NBJX for the full set and their MOQ and Payment terms are better. We can discuss this on Thursday and if you\'d like to proceed I can.', 1522129203, NULL, 0, 'yellow', 1, 3, 1, 18, 0, 1, 0, 1, 1522129203, '', 0, 0, 0, 1, 1522129203, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL),
(124, 'UBW grease specification', 'please specifie the grease we are using in the gearboxes for the LBW. I guess we\'ll use the same grease for the build of the UBW gearboxes.\r\nNeed exact specification for the UBW specification sheet.', 1522996008, NULL, 0, 'purple', 4, 16, 1, 5, 0, 1, 0, 11, 1522996008, '', 0, 0, 0, 4, 1522996008, 0, 0, 0, 0, 0, NULL, NULL, 0, NULL, NULL);

-- --------------------------------------------------------

--
-- Table structure for table `task_has_external_links`
--

CREATE TABLE `task_has_external_links` (
  `id` int(11) NOT NULL,
  `link_type` varchar(100) NOT NULL,
  `dependency` varchar(100) NOT NULL,
  `title` varchar(255) NOT NULL,
  `url` varchar(255) NOT NULL,
  `date_creation` int(11) NOT NULL,
  `date_modification` int(11) NOT NULL,
  `task_id` int(11) NOT NULL,
  `creator_id` int(11) DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `task_has_files`
--

CREATE TABLE `task_has_files` (
  `id` int(11) NOT NULL,
  `name` varchar(255) NOT NULL,
  `path` varchar(255) DEFAULT NULL,
  `is_image` tinyint(1) DEFAULT '0',
  `task_id` int(11) NOT NULL,
  `date` bigint(20) DEFAULT NULL,
  `user_id` int(11) NOT NULL DEFAULT '0',
  `size` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `task_has_files`
--

INSERT INTO `task_has_files` (`id`, `name`, `path`, `is_image`, `task_id`, `date`, `user_id`, `size`) VALUES
(1, 'image002.jpg', 'tasks/1/34d2f2642d987281ddea186a3e849b20adf21402', 1, 1, 1499067830, 1, 31345),
(2, 'Micrometer Postage Slip.jpeg', 'tasks/1/99e7a51387716de038fb30d19667f3a7c37af796', 1, 1, 1499072815, 1, 138927),
(3, 'M7238R-2-1(X) for sun sensor.pdf', 'tasks/2/12a64fb99dbed495646ac59301108bad7c04c1bd', 0, 2, 1499753684, 1, 140939),
(4, 'M7239R-2-AB-0(2) for power supply.pdf', 'tasks/2/6e565dd0b102918e9c287521f164379f2b6c4fe4', 0, 2, 1499753685, 1, 168281),
(5, 'Stock Analysis (Iss 1.0).pdf', 'tasks/2/e1262c4f2028b401df0c725ccc300c3a4cea71d0', 0, 2, 1499753686, 1, 297751),
(6, 'Logo-Adresse-WmD.PDF', 'tasks/27/050224ca929f1795d942618f515625e6e6f30729', 0, 27, 1499758094, 1, 532221),
(7, '17-07-10 Sonnensensoren RD 35 & 45.jpg', 'tasks/27/6211111b1d150fcedfc1de98f6b64f65a1919295', 1, 27, 1499758102, 1, 161188),
(8, 'DSCN3250.jpg', 'tasks/27/41cd3f565f182d00c760a2347c2aab75fdbdac09', 1, 27, 1499760630, 1, 4239155),
(9, '314-F-00-029e (Iss 1.0).pdf', 'tasks/1/ec83a08a6dd8084ca03989cb1ac748adac7f7abb', 0, 1, 1500427578, 1, 271835),
(10, '314-Z-02-022j (Iss 1.0).pdf', 'tasks/1/50a8d0748a9c2fe87c6d4b4c20791c3c351f9672', 0, 1, 1500427579, 1, 226143),
(11, '375-F-00-004a (Iss 1.0).pdf', 'tasks/1/9291d5e631bd758a9df54af55ed547ad7524a687', 0, 1, 1500427579, 1, 275071),
(12, '375-Z-00-007 (Iss 1.0).pdf', 'tasks/1/ff8d9c65a17fe0dc8e29dfbc563298948d43e252', 0, 1, 1500427580, 1, 215277),
(13, 'WechatIMG19.jpeg', 'tasks/27/377c117b2f9b80c8f5822a0c1788b71d07926aea', 1, 27, 1500521646, 1, 98389),
(14, 'WechatIMG18.jpeg', 'tasks/27/997b4711864700e2eaad301fb7f167c74ff61812', 1, 27, 1500521646, 1, 84261),
(15, 'RD45.ai', 'tasks/28/29d461791079c384262a5259d8706ac09abe005d', 0, 28, 1500610814, 1, 1105117),
(16, '566-077.pdf', 'tasks/28/24d5222c802cc6f1e11030a136a7ca348353e4df', 0, 28, 1500610822, 1, 58703),
(18, 'SSSHHA7070088.pdf', 'tasks/5/7ef3ad7bcf3ffc0a5720dd940b019b71ef8c9207', 0, 5, 1500965379, 1, 174785),
(19, 'RD45 Model Number Label Change.docx', 'tasks/28/a254301e93ec35ebdd7bb373837082419fb5b05e', 0, 28, 1501145380, 1, 150670),
(20, 'LBW RD35.45 Sun Sensor Change.docx', 'tasks/27/7f004c9189e544c070d8a88f8b75fda1e924676c', 0, 27, 1501146746, 1, 311210),
(21, 'Gear Packaging.pdf', 'tasks/1/6e1c6c4d433198c20360280aef83e6c3b0de9377', 0, 1, 1504078660, 1, 869528),
(22, 'Screenshot aufgenommen 06/09/2017 15:19.png', 'tasks/33/fabf7ad33a5360155605799db0fdf3ea2c3df3ee', 1, 33, 1504703975, 2, 1549263),
(23, 'Screenshot aufgenommen 06/09/2017 15:20.png', 'tasks/33/019a3c025104c0f503a3697536b62aa6951dd401', 1, 33, 1504704011, 2, 1746478),
(24, '150123_534_gears.xlsx', 'tasks/1/2714295f36ef9cfbb553b30520a521e4376dd266', 0, 1, 1505275301, 1, 11172),
(25, '566-013-开模报告-20170929-1.ppt', 'tasks/41/4487c9004a7ca4af2e24f72460e36f9ff490674d', 0, 41, 1508540740, 1, 1071104),
(26, '566-063-开模报告-20170929-1.ppt', 'tasks/41/095f388aa2d0ca22bfe2227887b07d0422629819', 0, 41, 1508540750, 1, 1333248),
(27, 'RD35 Tool.xlsx', 'tasks/41/82b48182ca5d6996dce0a638fa8f96e1a15984a6', 0, 41, 1508540778, 1, 109292),
(28, 'UBW Gearbox Quote (Iss 2.0).pdf', 'tasks/39/8219d50f69c1627c19adc5409a2712275075967b', 0, 39, 1509507923, 1, 25712),
(29, 'QR_200001386_Housing_GGK 586-01-1_00.pdf', 'tasks/58/4fffb59c187ce2c873bf8a843e67ab480179eb97', 0, 58, 1509622669, 2, 168719),
(30, 'QR_200001327_TM09_HE3015_00.pdf', 'tasks/59/a02ac7acd0dafc6c12ae632cde9c3eb5a0470693', 0, 59, 1509953006, 2, 2085928),
(32, 'CAR-20171103-GGK586-01-1& GGK586-01-2-earth terminal damage.pdf', 'tasks/58/015ee3f54c5496a43f887205c11fa4e4f736811c', 0, 58, 1510125329, 2, 97015),
(33, '566-013d-开模报告-20171028.pptx', 'tasks/41/73f8f2db17362365050d8c0b082d6be398680bb7', 0, 41, 1510126405, 1, 950827),
(34, '566-063C-开模报告-20171028.pptx', 'tasks/41/d167865aa95f924936bebd5cd0fbff8effb583a5', 0, 41, 1510126409, 1, 1035413),
(35, 'DZ361-01(A-00).pdf', 'tasks/51/6af57d639c0df48e14c4185cd6726d845469793b', 0, 51, 1510128921, 2, 402038),
(36, 'DZ233(A-00).pdf', 'tasks/51/4efdfcabfc94e71addb82688f42074b7072efbaf', 0, 51, 1510128922, 2, 312428),
(37, 'DZ233-01(A-01).pdf', 'tasks/51/50a7747209ce030409afa394121f79196817952b', 0, 51, 1510128922, 2, 356590),
(38, 'shipment packing picture.jpg', 'tasks/58/ae8b34fcfb8f9ec6a8d6d0e4ea41b39699b2b17d', 1, 58, 1510132126, 2, 199455),
(39, 'old packing mechod.jpg', 'tasks/58/3fefee29b893525636a98ac4cc52a665af36388b', 1, 58, 1510132126, 2, 73746),
(40, 'Schematic Prints_Wind_DC116.pdf', 'tasks/55/5468ca07d9fa294dda53747ec661dafc8d7a6995', 0, 55, 1510133064, 2, 45035),
(41, 'DOE-17AU0836VTSPB-3.pdf', 'tasks/55/f44676ef52dcd6117de42d9d7b5ff27699c678b2', 0, 55, 1510133064, 2, 326844),
(42, 'DOE-17AU0836VTSPB-1.pdf', 'tasks/55/b9eebed159eda0dc9cca252ca9c781b7b21a395a', 0, 55, 1510133064, 2, 1208394),
(43, 'DOE-17AU0836VTSPB-2.pdf', 'tasks/55/2384aa532fcc9b1d0e52ec7b562a70725f50c529', 0, 55, 1510133065, 2, 1157680),
(44, 'DC116 CE-lVD.PDF', 'tasks/55/d0064da92f3e495e4a5e9eaf4b73df528f7c10e6', 0, 55, 1510133065, 2, 185024),
(45, 'eDC118太阳能风光感应器说明书内页A-04.pdf', 'tasks/55/578d9036c9b4edb8e7ab28ccdfaa0a875ca15ae5', 0, 55, 1510133065, 2, 1050659),
(46, 'eDC118太阳能风光感应器说明书A-04.pdf', 'tasks/55/4ebf140ac9b38b972a5702cd1d2cb5b7471b44e3', 0, 55, 1510133065, 2, 814199),
(47, 'Rademacher_Simple_Sun_Wind_Sensor_DuoFern_V0.2.pdf', 'tasks/55/a969ee44b1406f93567ad4a60a135ee0db5e411d', 0, 55, 1510133065, 2, 496079),
(48, 'DC116W_User_Guide.pdf', 'tasks/55/0c5991a1c22fba253c024ed040ac245d30581ad2', 0, 55, 1510133066, 2, 1189892),
(51, '534-122.pdf', 'tasks/60/2401031dd2ee16fda65881524f5e78d2c345e132', 0, 60, 1510146283, 2, 314048),
(52, '534-123.pdf', 'tasks/60/cc6d56e6d694bc71d7534e481e66ec2f278cb50b', 0, 60, 1510146283, 2, 322377),
(53, '566-013d-开模报告-20171028_Knl.pptx', 'tasks/41/62d6589315280f146b6dd763288ab94a219b4f3c', 0, 41, 1510171211, 2, 1015146),
(54, '566-063C-开模报告-20171028_Knl.pptx', 'tasks/41/00c8c153b3091bad809029c3d63648fc0b762390', 0, 41, 1510171211, 2, 1092746),
(56, 'Attached 1st gear planet test result _124&45-3-50F-06D.pdf', 'tasks/57/d68e6e6cae431b33e1cebb45f761f514906de3c8', 0, 57, 1510219701, 2, 50660),
(57, '#9 salt spray test record.jpg', 'tasks/53/0d0ff1248e1ffdaf169163cc7aa0796c8d94a570', 1, 53, 1510222960, 3, 2566724),
(58, 'FM124客诉8D.xls', 'tasks/53/9896b32e22cf072b825a54b9f3c9fe98f38a9cf8', 0, 53, 1510222961, 3, 35328),
(59, 'FM124客诉8D-E.xls', 'tasks/53/4aaee0b8081a54b40514a66aff5572d652849356', 0, 53, 1510222961, 3, 47104),
(60, 'IP_533_HE1015_04.docx', 'tasks/53/89530be356c58bf0b9b3ec9cad330accf8e190f6', 0, 53, 1510222961, 3, 83849),
(61, 'P1220121.JPG', 'tasks/53/6cbc9333cfc401d0092eb8418c7e374ebf8095e6', 1, 53, 1510222967, 3, 3758697),
(62, 'P1220122.JPG', 'tasks/53/166d6d87a9f12fdc2d8a5d065c4c7d6a77f3ce7c', 1, 53, 1510222970, 3, 2725833),
(63, 'P1220123.JPG', 'tasks/53/a056075a71b4909b7579088196bb359a456fcb95', 1, 53, 1510222974, 3, 3689144),
(64, 'P1220124.JPG', 'tasks/53/7d02d619a3c2c3b57ed3d016b11d56105b6ba33d', 1, 53, 1510222977, 3, 2653074),
(65, 'P1220125.JPG', 'tasks/53/283238981e71d9bb81c4c4f42ddc68bd9b63c4b9', 1, 53, 1510222979, 3, 1969450),
(66, 'P1220126.JPG', 'tasks/53/dabf68e5c4436992f351b39abc7b3829d935a020', 1, 53, 1510222981, 3, 1893862),
(67, 'P1220127.JPG', 'tasks/53/8242e363ea892ff4a7a2bc7e28f57f86990d762f', 1, 53, 1510222983, 3, 1758081),
(68, 'P1220128.JPG', 'tasks/53/1c77e1ee19f8f7b451a8d5036ddd741a0f6a05c5', 1, 53, 1510222987, 3, 3269569),
(69, 'P1220129.JPG', 'tasks/53/77069bd52e70531871d4f8f4f22db70c4d16e94c', 1, 53, 1510222990, 3, 3307330),
(70, 'QR_200001309_TM09_HE1015_00.pdf', 'tasks/53/76f5ef258f7169f29cdba7babc37ef3fc66ccdb0', 0, 53, 1510222990, 3, 103134),
(71, 'Rejection Report.PDF', 'tasks/53/f81d40c690bbbd0dc7b9aa6fb04469949a2de1b4', 0, 53, 1510222990, 3, 25609),
(72, '17-10-23_debit note_sample return delivery_order #5 u. #7_5000040411(1).pdf', 'tasks/53/586b048baf64d72d9764bf8763e47ae14cdc3e95', 0, 53, 1510223116, 3, 12167),
(73, '17-10-23_debit note_sample return delivery_order #5 u. #7_5000040411(2).pdf', 'tasks/53/e4d93deaebe59446ce908f68f0e5a8ec86c2bc58', 0, 53, 1510223116, 3, 9471),
(74, '170823_Belastung_E2017_39.pdf', 'tasks/53/9b32266ad1ba22b1d069541057e6d3c50f6ab79d', 0, 53, 1510223116, 3, 87409),
(75, 'FM124-销退扣款-242-171025001-USD213 59.xlsx', 'tasks/53/725ff73a3cc6332d75d5f55de581925dbdb94656', 0, 53, 1510223117, 3, 27464),
(76, 'QR_200001326_TM09_HE0628_00.pdf', 'tasks/53/e6239dc671d1f3a2a59682e2abb66e613da74ee2', 0, 53, 1510223117, 3, 93175),
(77, 'QR_200001327_TM09_HE1015_00.pdf', 'tasks/53/d73547fa0a4f58dbf73b0c9754dac389ce690b8c', 0, 53, 1510223117, 3, 103451),
(78, 'QR_200001327_TM09_HE1015_01 final 1143pcs.pdf', 'tasks/53/c7c4848f92bd2b336a07dbecee531833509dd2f4', 0, 53, 1510223118, 3, 1021630),
(79, 'Rejection Report (1).PDF', 'tasks/53/ded93d258d2259cf4e8ce09c6fe451f8f8e6556d', 0, 53, 1510223118, 3, 25795),
(80, 'Rejection Report.PDF', 'tasks/53/a6b785338b9525306672380fd8ae5a22264845ff', 0, 53, 1510223119, 3, 25665),
(81, 'Production Schedule (Iss 2.0).pdf', 'tasks/17/847a961bac969b8926c4c24cd4a9321f88ae2a2e', 0, 17, 1510317496, 2, 563794),
(83, 'Production Schedule (Iss 2.0).pdf', 'tasks/40/edb31aaf0e3b1352a65d8725a7aa625ee7bd1d2b', 0, 40, 1510317529, 2, 563794),
(84, 'Production Schedule (Iss 2.0).pdf', 'tasks/64/70768019f4694b774f13871cffa17b7aa1ed700a', 0, 64, 1510317560, 2, 563794),
(85, '671-Z-00-100 a.pdf', 'tasks/52/45138f84af153404d4b6c77228023a2b5545456f', 0, 52, 1510492140, 2, 72765),
(86, '671-Z-00-101 a.pdf', 'tasks/52/0429ab39075f68f247f4f1e13ded1e6ff4ccfb98', 0, 52, 1510492140, 2, 81579),
(87, '671-Z-00-102 a.pdf', 'tasks/52/ca1f70f2fc64aafc293d21236e02c9b2d9055ca0', 0, 52, 1510492140, 2, 81122),
(88, 'RD452.mp4', 'tasks/11/42dda01e757244970b8f4dd72eb0aa3d460f7fb4', 0, 11, 1510552401, 1, 846033),
(89, 'RD451.mp4', 'tasks/11/60ab6f319345e10e4e33a291dc7a0f8c3cb2689b', 0, 11, 1510552402, 1, 846033),
(90, 'FL40RBL80-325V-3075A-20171109(if brushless, 170~200RMB each, approx.100KRMB tooling).pdf', 'tasks/62/4cf6214fd9c0dd9191fdc9c42d12d07baee3e334', 0, 62, 1510564330, 3, 749021),
(91, '566-013-1110.stp', 'tasks/41/abb28a5444fd1551c73ca2d93c8bc80c8d27db57', 0, 41, 1510587794, 2, 147159),
(92, '566-013d-开模报告-20171110.pptx', 'tasks/41/b98c3eb8429052f7ecf1f9b06aa0eef7faa90d28', 0, 41, 1510587795, 2, 825629),
(93, '566-063C-开模报告-20171110.pptx', 'tasks/41/42f6cb5efef666ca1190e4f5f63351f12d51c395', 0, 41, 1510587795, 2, 1050611),
(94, '566-063C-开模报告-20171113.pptx', 'tasks/41/1c66c8d294f1de3bef385440e16e172818fb3fc3', 0, 41, 1510587963, 2, 1081613),
(95, '566-013e.pdf', 'tasks/41/24c7660ae193670a44279be9668b278d2e00de78', 0, 41, 1510587963, 2, 67768),
(96, '566-002e.pdf', 'tasks/13/bff1f65adfb99ee85ef9648ff7d51f1e3b286754', 0, 13, 1510588086, 2, 35566),
(97, 'QR_200001386_Housing_GGK 586-01-1_01.pdf', 'tasks/58/b0bc44351071d18e5c6533cfb17659f64c5c3afe', 0, 58, 1510588386, 2, 550799),
(98, 'AW_PCAS_RD35.45 Cover Printing_00.pdf', 'tasks/28/5fafb3b93b1e40962475d71a5c86b76a1690c7ed', 0, 28, 1510590201, 2, 158274),
(99, 'WSSD40.jpg', 'tasks/49/7afaf8c5e9bdcf0976002cce76d4c650155f60fd', 1, 49, 1510591095, 2, 115957),
(100, 'UBW testing information.msg', 'tasks/39/bebfcd37cf73d70a04e02d37669ef6f9b4a216d2', 0, 39, 1510676132, 2, 4001792),
(101, 'P1220128.JPG', 'tasks/59/ccacdcf25dfbcebf9a5c97e394fa7340f84a776f', 1, 59, 1510677774, 2, 1776924),
(102, 'tubular motor surface contaminate analysis.docx', 'tasks/59/35a4b2c76eb2434d56b4f5aa5737b096d0d5cda8', 0, 59, 1510677775, 2, 4366910),
(103, 'SX5DF transformer.jpg', 'tasks/84/9bb725f6e8b9f02abf292a786aa442318c7bb1d1', 1, 84, 1510727011, 3, 128604),
(104, 'Dooya_TechnicalAnnex_TM20_Ver171110.docx', 'tasks/52/998deba0d93e2c357ef31956849a039f41e63eb4', 0, 52, 1510743575, 2, 2645143),
(105, 'drawing-671-Z-00-104a.pdf', 'tasks/52/597a99d3fa50aa5d29d71eb17ecc9d7931d204e9', 0, 52, 1510743618, 2, 28040),
(106, 'AW_PCAS_SX5DF baseplate_00.pdf', 'tasks/85/986eb7be91b297e90440f031c465ac8dd6cdb079', 0, 85, 1510808286, 3, 107073),
(107, 'WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index(02).docx', 'tasks/86/ad713c593b28fa86fc9200e71b967c90619e4976', 0, 86, 1510808447, 3, 146308),
(108, 'Foscam Quotation 20161025_Rademacher.pdf', 'tasks/87/280fadcacd2b9d301f253764288d843051fd7cdc', 0, 87, 1510808589, 3, 126775),
(109, 'Foscam Quotation 20171116_Rademacher.pdf', 'tasks/87/577897592abaffce53342402c682337c6504036a', 0, 87, 1510808590, 3, 148298),
(110, 'WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index(02).docx', 'tasks/87/32150e27089cb7d409214277eb9d3d51cd0cc579', 0, 87, 1510808652, 3, 48365),
(111, 'image002.png', 'tasks/30/56051f7077f21cefa3ea5e4140d10cb322da9e28', 1, 30, 1510809513, 1, 54832),
(112, 'image002.png', 'tasks/31/505e93dd2d1262fcbae510dc58f3f453c9d05006', 1, 31, 1510809531, 1, 54832),
(113, 'QR_200001327_TM09_HE3015_01.pdf', 'tasks/59/a1bb80558c88eba384bcab847062d5f2e1011791', 0, 59, 1510812866, 3, 132670),
(114, 'QR_200001397_TM10_HM2015_01.pdf', 'tasks/59/2c509ebdd310d485ef2d21d25991a684e845f51e', 0, 59, 1510812867, 3, 98765),
(115, 'QR_200001398_TM09_HE1017_01.pdf', 'tasks/59/fd90fb250e7b146ca5d084c1fee9778cd03c655c', 0, 59, 1510812867, 3, 122549),
(116, 'FC2501P-Specification-2017.11.16.pdf', 'tasks/87/c3b6d6ed48e772171f2253a00c520cb517cc237a', 0, 87, 1510822780, 3, 204639),
(117, 'doc03643020171115160211.pdf', 'tasks/88/ba78388ec888aaa31e643444830dd2edb18101f5', 0, 88, 1510826231, 2, 1256804),
(118, 'Wire Placement OK.JPG', 'tasks/52/b3dbd871245cae758867d03abeb24b55496ee1e9', 1, 52, 1510826567, 2, 501031),
(119, 'Wire Placement wrong.jpg', 'tasks/52/dfae1ce32bc796909b5de7bfef7a36c68a089a37', 1, 52, 1510826567, 2, 707126),
(120, 'Semi-finished products Motor moisture removal and Hall test.xlsx', 'tasks/52/66d8a965d8b79efb7fc66102b4f6593598cb1f9f', 0, 52, 1510826671, 2, 1296489),
(124, 'product change_approval application(1st stage gear 30N40N50N).xlsx', 'tasks/57/bbc1751d3b5cb004b6ccd39f3af814c2bb7c351b', 0, 57, 1510840649, 2, 377409),
(125, '45-3-50F-06A(A-02).pdf', 'tasks/57/eb47c7e43f1a52f0d2401b0517cd98be815e3001', 0, 57, 1510840739, 2, 28118),
(126, 'New drawing of the 50Nm 1st stage Gear.pdf', 'tasks/57/7c1660dd212648cfd3de2d707087dc177c013c1b', 0, 57, 1510840739, 2, 105229),
(127, '45-3-50F-06D(A-00).pdf', 'tasks/57/6e3e8fd7882d41e54ae64b5adcf31334ac5cdb01', 0, 57, 1510840888, 2, 1499280),
(128, 'product change_approval application(1st stage gear 30N40N50N)_update.xlsx', 'tasks/57/d7aede3e9e7187b5823877681ef668ad695bc7ca', 0, 57, 1510840889, 2, 377393),
(129, '1st stage gear  Common normal.jpg', 'tasks/57/6a1b89ef16d2047d9cada391ae7a67292b20b889', 1, 57, 1510840936, 2, 235715),
(130, '1st stage gear tooth width.jpg', 'tasks/57/9ddc025db70a6d4e610a2c4508bf824feb94c59d', 1, 57, 1510840936, 2, 239613),
(131, '45-3-50F-06A life cycle test report Dooya_20170811_finish.xlsx', 'tasks/57/0d452af44da25ee33c7b33697790fa7fd7bfe15f', 0, 57, 1510841177, 2, 12787),
(132, '124# 50Nm 1st stage planet optimised gear comparison.xlsx', 'tasks/57/8e29c3ae3b22769a13fd68f67e61ca60a76569af', 0, 57, 1510841177, 2, 10676),
(133, '500p AG2RAR4107.pdf', 'tasks/57/a67d1f709b8ffc5c81263902ac76dc81c8256b61', 0, 57, 1510841701, 2, 21312),
(134, 'AGBQDTU103 AGBQDTU105.pdf', 'tasks/57/6193eae06a0ca25dde33f496b718557ad302051c', 0, 57, 1510841702, 2, 60680),
(135, 'tubular motor surface mark.jpg', 'tasks/57/fd527882b5da7fdcd811eafde0fee712fa86685f', 1, 57, 1510841703, 2, 350035),
(136, '173010.JPG', 'tasks/57/0bb4c638d2fefa94c352814f8033d26ff96561da', 1, 57, 1510841796, 2, 36020),
(139, '171109_test_record_1_stage_gear_fullfil_requirement.JPG', 'tasks/57/3ab94e5e94b634f129c61f5203eafd6b0f9b7486', 1, 57, 1510842365, 2, 158347),
(140, '170913_price_sinter-gears.JPG', 'tasks/1/f7db8419a4166d1865553dfc831a69aa1950ae24', 1, 1, 1510848445, 2, 57154),
(141, 'Gear Packaging (Iss 2.0).pdf', 'tasks/1/5eeea27a084f1f27868bfd680e3180a65cf5977a', 0, 1, 1510848735, 2, 872312),
(142, '566-002e Modification Sample Report.pdf', 'tasks/13/54ade88884923a67e1cb7ca2f566c288b76e9e61', 0, 13, 1510893936, 1, 10247291),
(143, 'QIR-20171117-sample-Seitenteil -566 F 002 e.docx', 'tasks/13/8c8ef68565ad2b88142f0c342a433e622f98974f', 0, 13, 1510903955, 2, 1483219),
(144, 'product change approval application(SX5DF transformer 2017-11-17).docx', 'tasks/84/62323fed18dfc984595dd157e9a046d391ca7fe9', 0, 84, 1510905341, 3, 372741),
(145, 'QR_20001399_Unterteil HomeTimer_GGK 593-2-1_00.pdf', 'tasks/89/2b8de33212bf1e26fbf5ba2be5bb854328afdabe', 0, 89, 1510919881, 2, 126473),
(146, 'QR_200001327_TM09_HE3015_02.pdf', 'tasks/59/c095f650e55f5980ecf3c01ee5e388be64d0de18', 0, 59, 1511011042, 3, 132945),
(147, 'QR_200001397_TM10_HM2015_02.pdf', 'tasks/59/baa077161b2cb794f9156a15a8019bf804eded2f', 0, 59, 1511011043, 3, 99025),
(148, 'QR_200001398_TM09_HE1017_02.pdf', 'tasks/59/d27a8bc590c0966649b106d1e4294d44becb5b3f', 0, 59, 1511011043, 3, 124735),
(149, 'Production Schedule (Iss 3.0).pdf', 'tasks/17/4cdb851d58591bb3d6f453fa41c7ae7b5ba2441d', 0, 17, 1511141138, 1, 553543),
(150, '124&45-3-50F-06D 30Nm 40Nm 50Nm 1st stage planet optimised gear comparison.xlsx', 'tasks/57/f534dc48d4aa516ae5ac97fb55f0b9561145c129', 0, 57, 1511236020, 3, 15344),
(151, '171121_comparison_1_stage_old_new_12445-3-50F-06D.pdf', 'tasks/57/1e2831e1bf4b543080085e699735e43a44f9c86c', 0, 57, 1511248867, 2, 51475),
(152, '171121_GSM3_sample_Ben.pdf', 'tasks/38/7348e7c0e205459f0d839cc10fa6b4416ddcd834', 0, 38, 1511264799, 2, 167873),
(153, 'IMG_0131.JPG', 'tasks/19/620831208d6e5f70735c048bc35fe93ad569c5c7', 1, 19, 1511345415, 2, 185156),
(154, 'Dooya_TechnicalAnnex_TM20_Ver171122.docx', 'tasks/52/66913448076dc080802771c3e0102b4471a49656', 0, 52, 1511357186, 2, 2644290),
(155, 'neues_Firmenlogo_ab 15.01.18.pptx', 'tasks/90/e3227d5484a9e308aced7533fcda95074aac48fd', 0, 90, 1511360556, 2, 179952),
(156, 'HP2 TP-001C.PDF', 'tasks/90/36201ed391caa1e0dfb875d5125791f55bfbd1db', 0, 90, 1511360556, 2, 617305),
(157, 'QR_200001403_Blende 6-fach Taster_GGK 663-1_00.pdf', 'tasks/91/9d02c680bdeb56552ddd9537e24d2b8079468c2c', 0, 91, 1511409589, 3, 5830209),
(159, '5512曲线图20171105.pdf', 'tasks/38/ab7c5c86ee591b4638a2fb248c4f589b1cb1a138', 0, 38, 1511517297, 2, 833192),
(160, '257462733834049025.jpg', 'tasks/45/093faf519da339c1a0d576bc441eab9fc65b678a', 1, 45, 1511518114, 2, 34291),
(161, '274342696789098558.jpg', 'tasks/45/0b5495690a22dad0bf4808747749b5cdd7f46adf', 1, 45, 1511518114, 2, 43559),
(162, '334171288943119100.jpg', 'tasks/45/70ae817c54f06daae36e873131283afd120862c5', 1, 45, 1511518114, 2, 34422),
(163, '473353424943209006.jpg', 'tasks/45/2a8078bb25a3f2f43ed1fbc892f009ce4a575ada', 1, 45, 1511518114, 2, 32988),
(164, '789481802402228384.jpg', 'tasks/45/1bc960f583eee83d616106f4ee1cd5ea60e2b95c', 1, 45, 1511518115, 2, 34799),
(165, '671-Z-00-101 b.pdf', 'tasks/52/d3b2afb101a345d558d69bd640f41d22fa9894a0', 0, 52, 1511767500, 2, 82304),
(166, 'E-JS-9-1#客户DM35、45G半成品电机排潮及霍尔测试.pdf', 'tasks/52/c684362a70e4b4eacbdbbbc7ce9b21a111ae4f74', 0, 52, 1511767717, 2, 326594),
(167, 'Internal Packaging.jpeg', 'tasks/39/12efc3819b07f8c7bb742b4dfbfb4b0cd5a76bb9', 1, 39, 1511920170, 1, 182462),
(168, 'ReqSpec_LowCost Beltwinder_Ver12_111017.pdf', 'tasks/33/85137b8a414a4c470ccb5da22199305ac17a5ede', 0, 33, 1511939384, 2, 1899309),
(169, 'Quotation 2017-11-24.xlsx', 'tasks/47/58dd1116379fc5b79aa5dc45d3e3f8a9ec48d3f0', 0, 47, 1511969726, 2, 14017),
(170, 'Dooya_TechnicalAnnex_TM20_Ver171123.docx', 'tasks/52/ca2c2fad9af98701def6eb1d753d0b5f5b8f0be6', 0, 52, 1511969856, 2, 2649863),
(171, 'TM20.pdf', 'tasks/52/7f9a3f8622f8cf42e5de462866cf3342bcb42bea', 0, 52, 1511970165, 2, 8962887),
(172, 'IMG_0394.JPG', 'tasks/59/1c98b59c2c3ad6ede4b1be4fbbdb093375ef4ac4', 1, 59, 1511973625, 2, 856343),
(173, 'tube surface.JPG', 'tasks/59/bdd8bbafcd3b7b8a36616a36b7c319c232919d59', 1, 59, 1511973626, 2, 755251),
(174, 'fitting with motor head.docx', 'tasks/92/b6351c4ee29691652fb030f7173643cd718e2f9b', 0, 92, 1512210703, 3, 2398115),
(175, 'RE Inspection records of the parts GGK 539-096  GGK 539-07 from Carry ... (62.4 KB).msg', 'tasks/92/721c3764f617d027fa69eb67e0e96709600f40b4', 0, 92, 1512210704, 3, 63488),
(176, 'spring dimension 43.5 follow drawing ,shaking and noise.MOV', 'tasks/92/d423c061a4a7ee53e0e42e47d88d04150b38a504', 0, 92, 1512210989, 3, 48468652),
(177, 'spring dimension is 42.1mm~42.9mm, noshaking and noise.MOV', 'tasks/92/91853162c8fabb134313c6eb34b5c3c31993046c', 0, 92, 1512211038, 3, 11949996),
(178, 'proposal pos3 of 539-096d.pdf', 'tasks/92/6eecf7df3a26d417cbc26923b68a35d636e9d10d', 0, 92, 1512211205, 3, 995500),
(179, 'QR_200001403_Blende 6-fach Taster_GGK 663-1_01.pdf', 'tasks/91/73251bc276a07b71dd817468a188a5fd0b56bc0b', 0, 91, 1512483419, 2, 94748),
(181, 'drawing-672-F-00-001b.pdf', 'tasks/45/435d1a4ba48bdd35f7c1a25b1d64a38424ba819a', 0, 45, 1512629785, 3, 84795),
(182, 'drawing-672-F-00-002b.pdf', 'tasks/45/f2fc245088da361fee0808e9d7bb6482b402e90b', 0, 45, 1512629785, 3, 97714),
(183, 'FSIR for 672-F-00-001 b.xlsx', 'tasks/45/629873039ed14fdb4b9d32e47018d41592b883b7', 0, 45, 1512629786, 3, 21735),
(184, 'FSIR for 672-F-00-002 b.xlsx', 'tasks/45/b9a32f6e5843376bbba08c94cffac95452d6dd76', 0, 45, 1512629786, 3, 24507),
(185, 'Material properities  sheet -Sabic PC 945 NC.pdf', 'tasks/45/70b6958d8a9c26d8543b30e70bd32d866386ef8b', 0, 45, 1512629798, 3, 16341),
(186, '20171206_163914_resized_1.jpg', 'tasks/93/932f585527f75237d60fc09afe1c2dab4bea7cc3', 1, 93, 1512634764, 2, 368088),
(187, '20171206_163920_resized_1.jpg', 'tasks/93/be5a2720d6436fc5c6a1470f72552837ab8a4db3', 1, 93, 1512634764, 2, 285148),
(188, '20171206_163930_resized_1.jpg', 'tasks/93/5590b3382e4c6671187060c418d26f92038617d0', 1, 93, 1512634764, 2, 389565),
(189, 'QR_200001416_TM09_HE1015_00.pdf', 'tasks/94/d424a61aaa4d0c15921505c76294b1cf2f3120a4', 0, 94, 1512643315, 2, 296303),
(190, '微信图片_20171207181247.png', 'tasks/94/fa487e8cb28d69f83d3e77b11e039c52b638d805', 1, 94, 1512643316, 2, 222497),
(191, '微信图片_20171207181015.png', 'tasks/94/c4f6411106f9a5c9aacca131f565e91fce4479a5', 1, 94, 1512643316, 2, 20753),
(192, 'CAR-20171208- GGK 633-1-color not conform to RAL9003.docx', 'tasks/91/688e746f6605458dc1784e9e88dd284060f584bd', 0, 91, 1512644634, 2, 1769120),
(193, 'WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index(02)_update.docx', 'tasks/86/b5491d95be92a7d72d08c875446ae5fbb95ae471', 0, 86, 1512727785, 3, 146239),
(194, '124 TM20 HAL&NTC test document_V4.docx', 'tasks/52/45d2c9269ecbafa28232c4cdd43023b8184f84bf', 0, 52, 1512736827, 2, 377324),
(195, 'New_SPECIFICATIONS_20170802.pdf', 'tasks/95/c172c6e0bfa0c1ae51c602104594fa07dd39b0d4', 0, 95, 1513074708, 3, 806294),
(196, 'Old-specifications_SMD_V2.0.pdf', 'tasks/95/dca27da9d2f2d91618ba813aac5979ba33f1838b', 0, 95, 1513074710, 3, 585117),
(197, 'WR-01-VO-00X_Vorlage AW_PCAS_Materialnumber_designation_index_Camera WIFI module_20171207.docx', 'tasks/95/0440f1ec2c39ca2bcd9c67b1986ce915f4bb8ab2', 0, 95, 1513074710, 3, 57332),
(198, '533-123k.pdf', 'tasks/96/4758a6ba6c54fd4d6f17fb3605d3fcd336293015', 0, 96, 1513075085, 3, 93963),
(200, 'AW_PCAS_ LFI 534-3 Power Supply.pdf', 'tasks/86/3296830771d336d29af1447870437341701f06b9', 0, 86, 1513079740, 3, 78393),
(203, 'replacement 663-1 compare with RAL9003 color card.JPG', 'tasks/91/01b784e6d2eb5e56b1fb71119613dbdb63774fa7', 1, 91, 1513230161, 3, 711728),
(204, 'IR-GGK663-1(replacement).xlsx', 'tasks/91/85d371ce5f7a1a188541d3d864c07077db8a113b', 0, 91, 1513230205, 3, 483175),
(205, 'NEW WIFI module RED certs.rar', 'tasks/95/277b5e2d8bf87f08eeda62420ae90f186f806968', 0, 95, 1513231462, 3, 7071383),
(206, 'Overview.jpg', 'tasks/93/a06068542dd5e317bf7616d417dc30c9fb484b9f', 1, 93, 1513235787, 1, 526931),
(207, 'Edge Tearing.jpg', 'tasks/93/1887ae0617da5843de58a861c5c8f0614b13c63a', 1, 93, 1513235791, 1, 58079),
(208, 'Corner Problem 2.jpg', 'tasks/93/b80d782b77fe52c8ce822da20670479ed4a5a337', 1, 93, 1513235796, 1, 75685),
(209, 'Corner Problem.jpg', 'tasks/93/06b4c5ff9b53b59c03b1b0e853f64fff081ea79c', 1, 93, 1513235800, 1, 60766),
(210, 'TM20.pdf', 'tasks/52/b5dd26ed0603d165390ddabdadca6f80092266bf', 0, 52, 1513268259, 2, 9048918),
(211, 'FC2501P full device with new WIFI module thermal shock test report_CN.pdf', 'tasks/95/9db4bc3764dc2252df43e419bf5b4a92ed372538', 0, 95, 1513315085, 3, 481314),
(212, 'MPE(固定式).pdf', 'tasks/95/820d0a19e4e52a2b8a8d84eecddddb5e72c58229', 0, 95, 1513315086, 3, 86753),
(213, 'QR_200001416_TM09_HE1015_01.pdf', 'tasks/94/66b7c97582f9b01555f68da21348126af2eee1dc', 0, 94, 1513320081, 3, 71569),
(214, 'Stckliste SAPSt-PLS 534-1-2_cost (Iss 1.0).xlsx', 'tasks/60/dd811e9889456d8ed2820de13e1f425e5f498c16', 0, 60, 1513320585, 1, 15275),
(215, '(substitution for 653 105 131 822 von Würth)A127C-340xx03S-x01.pdf', 'tasks/60/331b7214909210dbef55a1168afb6256108a598c', 0, 60, 1513320605, 1, 256088),
(217, '(substitution)PX-220UF-35V-8X11.5.pdf', 'tasks/60/fcd1242beb9815251de550c777cce655c933d266', 0, 60, 1513323749, 1, 598840),
(218, '(New proposal 2018)emmc_4gb_8gb_ps8225_v50_wt.pdf', 'tasks/97/b4de8e5f1afd21c599324c5fa319df0e7e66009d', 0, 97, 1513340500, 2, 428515),
(219, '(current)emmc_ps8210_v451_80s_153b_wt.pdf', 'tasks/97/59fd883d9041b881dd9421215d25b02f2a9949fa', 0, 97, 1513340500, 2, 510770),
(220, 'foil too tight and too many layer of foil.jpg', 'tasks/98/1a18b17b3973f87937207885e8dd5c07f94feb84', 1, 98, 1513340943, 2, 122008),
(221, 'no damage on S2 carton.jpg', 'tasks/98/486b33a8b794004e5e8aef5ce8e010b22085a93e', 1, 98, 1513340943, 2, 153531),
(222, 'S2 carton shape is better.jpg', 'tasks/98/2cb24c67e98d9821c38fd71ff5c71303a2ecce7e', 1, 98, 1513340943, 2, 105233),
(223, 'some SX5 carton deformation.jpg', 'tasks/98/c9b323eb45d96cbfa8ff99d0ace6d80f86d6dd23', 1, 98, 1513340943, 2, 95137),
(224, 'some SX5 carton deformation2.jpg', 'tasks/98/94e7680fd7f352443bec0d9b11e82c43a6eda903', 1, 98, 1513340944, 2, 96107),
(225, 'some SX5 carton deformation3.jpg', 'tasks/98/9a9ab9c324438aa501000fa95808795ee3c64e4e', 1, 98, 1513340944, 2, 147065),
(226, '(substitution)YXJ-330UF-35V-10X12.5.pdf', 'tasks/60/781b8a37f5659e30ba0417c5fd3c5e59ec48cc87', 0, 60, 1513571247, 3, 268517),
(229, '768190152001950604.jpg', 'tasks/98/2c7b9db8e892ad869004e76739e965516ea2e06b', 1, 98, 1513582852, 2, 2472041),
(230, '774787735801221762.jpg', 'tasks/98/13122d4ed7305f71b149b388770c645fe5e79355', 1, 98, 1513582853, 2, 2483635),
(231, '314-143.pdf', 'tasks/88/04c525e76f7fd6c0a25e0ac73cf7bb9973075b9f', 0, 88, 1513667692, 2, 260260),
(232, '387-065a.pdf', 'tasks/88/36212542e78a7cbbc785b9f0e20deef4cf4e25cd', 0, 88, 1513667692, 2, 83183),
(233, 'doc03643020171115160211.pdf', 'tasks/88/6f67d2b5889fcbc54614dd1df009801a2305af4d', 0, 88, 1513667692, 2, 1256804),
(234, 'YNK_2M0-1_TTL-Network.pdf', 'tasks/88/744faacc09bee63fc2f8510afb6aab5b400e0505', 0, 88, 1513667692, 2, 390593),
(235, 'FC2501P full device reliability test report with new WIFI module_add EN.pdf', 'tasks/95/e0d7ca6c58a4c0d0360034d46e537323b64d9994', 0, 95, 1513673093, 3, 1163905),
(236, 'CCISE170400101 EN 301489-1,17.pdf', 'tasks/95/4b669691674c744dbc6e39db2357b7ce20f5dad8', 0, 95, 1513673548, 2, 2305616),
(237, 'CCISE170400102 EN 300328(RED) 2.4GWIFI.pdf', 'tasks/95/94772fe2fb9ad0bf758bd6a9a4b2d2f96fc178ad', 0, 95, 1513673549, 2, 2999378),
(238, 'CCISE170400103 EN 62311.pdf', 'tasks/95/6594bb6c4c8885d56c399cfa359043594528f55e', 0, 95, 1513673549, 2, 380785),
(239, 'FC2501P full device reliability test report with new WIFI module_add EN.pdf', 'tasks/95/d4c2ead96f0f397fe10802af557ab26b62fd7b54', 0, 95, 1513673549, 2, 1163905),
(240, 'FC2501P full device with new WIFI module thermal shock test report_CN.pdf', 'tasks/95/ffb0f32f6d50f4270ca0a7acab8d4d224eef39a0', 0, 95, 1513673549, 2, 481314),
(241, 'MPE(固定式).pdf', 'tasks/95/5ef6c9881cd5b4414dd87ace631f8f292c2d0f11', 0, 95, 1513673550, 2, 86753),
(242, '171219_BOM_UBW_SX-MHI.XLSX', 'tasks/60/d2fd1cb3495550d9e519f30e531ac4f7985db788', 0, 60, 1513697761, 2, 37879),
(246, 'IMG_3086.jpg', 'tasks/96/61c80cb331d5c96a668aca76b0bf7a194d87d165', 1, 96, 1513756348, 3, 1948034),
(247, 'MaterialData_14526 ZAMAK 5(old).pdf', 'tasks/96/b08befedc2233bcc68d4ac9815ca862d7bbb896f', 0, 96, 1514366992, 3, 342444),
(248, 'MaterialData_14528 ZAMAK 2(new).pdf', 'tasks/96/5874e1feaa060a8cf35083883beb8d709d681024', 0, 96, 1514366992, 3, 317035),
(249, 'ZAMAK 2(new).jpg', 'tasks/96/92bb037e3773d874508983893b81f4b7481ae3b4', 1, 96, 1514366993, 3, 142193),
(250, 'ZAMAK 5(old,now using).jpg', 'tasks/96/b17fc7fb1ae49233185115067277e6046b7227ef', 1, 96, 1514366993, 3, 159195),
(252, 'product change_approval application(PCB WIFI removal 2017-10-16)_signed.jpg', 'tasks/48/6261d76c5743fa2ec43676aac618d9eeef3d0057', 1, 48, 1514863971, 3, 1130909),
(253, 'Screenshot taken 02/01/2018 07:20.png', 'tasks/100/2b966ee404fb669a55ba318416c846372995be8a', 1, 100, 1514877653, 1, 1350263),
(254, 'Screenshot taken 02/01/2018 07:21.png', 'tasks/100/a21a8498014e37f2c4bd13ec4a32ed027aaaec67', 1, 100, 1514877684, 1, 1249087),
(255, 'springimension iO_ mounting iO.MOV', 'tasks/92/4a8882bca13eb30402bcb6d674fe24c2c3be0820', 0, 92, 1514892446, 5, 56588411),
(256, 'springdimension niO_ mounting niO.MOV', 'tasks/92/4d51273dd687da8b635f8acdfe302aa395a5cf07', 0, 92, 1514892533, 5, 34010119),
(257, '20171215_084252.mp4', 'tasks/94/2bd7875801253582bca97619ec5c79c2b61fce0d', 0, 94, 1514906554, 5, 41159022),
(258, '20171215_084537.mp4', 'tasks/94/5390832d0943f337cefba1a6dd5d223608fde980', 0, 94, 1514906560, 5, 18532564),
(259, 'Drawing 539-096d-spring washer.jpg', 'tasks/92/02456e5d347c6136c7818c24a861351d5255a147', 1, 92, 1514947199, 6, 756294),
(260, 'AW_PCAS_659_660_Camera WIFI module_20180103_signed.pdf', 'tasks/95/043a0d4e9f4a94571a73b9f7a555f11c3d155f59', 0, 95, 1514979237, 3, 725298),
(261, 'Testübersicht RD45 2017.JPG', 'tasks/33/310091fd56b03024a3679af7fff515e26f6cc4e3', 1, 33, 1514989076, 5, 131552),
(262, 'IP_533_GGK 533-16_02.docx', 'tasks/102/9dfa85f03c442a4490ee0ef5ba2c672a095d9220', 0, 102, 1515137293, 2, 113039),
(263, '533-011g.pdf', 'tasks/44/63719273f27c969d1201cce72b04a3e298e5f729', 0, 44, 1515157738, 2, 162639),
(264, 'QH_20171017_Platinenhalter 533 zu groß.pdf', 'tasks/44/cd2592ee4fabfbace7e48a63c59626b793b8aa38', 0, 44, 1515157756, 2, 116648),
(265, 'IR-GGK 533-1.xlsx', 'tasks/44/ab82cdd51a1701dba0c777dcdf1b81c3d68683eb', 0, 44, 1515157757, 2, 525048),
(266, '534-124.pdf', 'tasks/39/7b5001a098810df12fc1bd47df6f0d54e820b4f5', 0, 39, 1515396854, 2, 55543),
(269, 'FSR for 672-F-00-001 b_Eller_080117.xlsx', 'tasks/45/954ba26bc401eb41a5d605250f7027319b8fef42', 0, 45, 1515417236, 2, 22292),
(271, 'DSCN3550.JPG', 'tasks/45/a0c4e9cc8e7931c6785f62180d3e633da0359309', 1, 45, 1515417237, 2, 1923747),
(272, 'DSCN3549.JPG', 'tasks/45/985aea376bd2dc8b321e329d377ea4c9ad0aa1d1', 1, 45, 1515417238, 2, 1881958),
(273, 'FSR for 672-F-00-002 b_Eller_080118.xlsx', 'tasks/45/031290b1d0b1d8500bc74c862b3193d22584e551', 0, 45, 1515417300, 2, 23194),
(274, '模具修模方案.ppt', 'tasks/41/fa52b3129d9c6a06a02ac0f3772076f31faef311', 0, 41, 1515477725, 1, 1480192),
(275, '18-01-08_order_4500034742_MHI(HP2 order #17).pdf', 'tasks/103/2a0e3ef47f2f88ebfc6a305d95a4de3e7c941ee1', 0, 103, 1515507199, 2, 14435),
(276, '17-11-09_order_4500033946_MHI(HP2 order #16)_update1.pdf', 'tasks/64/628c596e9bdaae873a33e91ffc2821cc0ab32792', 0, 64, 1515507218, 2, 14321),
(277, '17-10-18_order_4500033639_MHI(HP2 order #15)_update1.pdf', 'tasks/40/4f873052a48536a18023766a4ec6a81708626582', 0, 40, 1515507243, 2, 14490),
(278, '180110_HP2_white_lower_packaging.JPG', 'tasks/93/ef3b02d0ecf2238311b89d1191f673d3adb373ce', 1, 93, 1515594937, 2, 100645),
(279, 'bildmarkekreis_sw_pos.eps', 'tasks/90/715733817bdf25021cb1b4a5c5fab2d1846c13db', 0, 90, 1515748410, 2, 2916338),
(280, 'HomePilot_Verpackung_2018_ctpX4.pdf', 'tasks/90/640e748f3b7629bf030a40b23dd9c4648dc533ea', 0, 90, 1515748411, 2, 446603),
(281, 'HomePilot_Verpackung_2018_illustrator_CC.AI', 'tasks/90/f52d9a2778c1a69fed0d396d2d7f5a40e7001e15', 0, 90, 1515748411, 2, 135181),
(282, 'Logo HomePilot.jpg', 'tasks/90/35842e3f78b6d0508ea4f21f8e439905ca30c474', 1, 90, 1515748411, 2, 472628),
(283, 'Logo schwarz  Druck s_w 1.eps', 'tasks/90/a1ae55ec59755e5307505fb335479441819a3c2d', 0, 90, 1515748412, 2, 1972106),
(285, '30N(1).jpg', 'tasks/57/9ed403ec4cf3a3024dd631d54d12729e00621469', 1, 57, 1515994515, 6, 33465),
(286, '30N(2).jpg', 'tasks/57/3533a413bddbc66fab721d28d5113199f151baf5', 1, 57, 1515994525, 6, 33962),
(287, '30N(3).jpg', 'tasks/57/7057e6d2d4cc9972364c27101b0d3069c721ab57', 1, 57, 1515994535, 6, 28321),
(288, '40N(1).jpg', 'tasks/57/37b27fc358719d225afa8708a6888a1a6e5ad39c', 1, 57, 1515994553, 6, 30803),
(289, '40N(2).jpg', 'tasks/57/a1660f82c65a17e1eb569906cf51f783c31b210f', 1, 57, 1515994563, 6, 35128),
(290, 'GGK533-16 packing pictures (1).JPG', 'tasks/102/977a867206892f4eb5e4d9f65320e0eb652b52f7', 1, 102, 1516064118, 6, 731559),
(291, 'GGK533-16 packing pictures (2).JPG', 'tasks/102/88ed2eeb485c51a7e09cb85ca30eaa617ca9a7e3', 1, 102, 1516064130, 6, 772743),
(292, 'GGK533-16 packing pictures (3).JPG', 'tasks/102/fdcf62c564ae29044f076e4cdaa3edb102abf018', 1, 102, 1516064142, 6, 823161),
(293, 'GGK533-16 packing pictures (4).JPG', 'tasks/102/3a18f20163a5c1e5f61d70b99b923e0cc0cb7f3a', 1, 102, 1516064850, 6, 762449),
(294, '#shpt-18-004  DHL Rhede.xlsx', 'tasks/93/49dabc40493bbac6259ac41b4e918d00f1878d8e', 0, 93, 1516086659, 2, 23674),
(295, 'PI-RD18402.pdf', 'tasks/93/ea6f472e03e75257e16bf87ea3ba02ade89101b9', 0, 93, 1516086659, 2, 169371),
(296, '微信图片_20180116.jpg', 'tasks/93/31a60c06286697de796d15325926d766fcf96a6c', 1, 93, 1516086660, 2, 613267),
(297, 'QIR-20180116-sample-Case Bottom Part.doc', 'tasks/12/56bd9d2c4576482f7219290e1854b59413f371d0', 0, 12, 1516087267, 6, 8096768),
(298, 'QIR-20180116-sample-upper Bottom Part.doc', 'tasks/12/eb4ac90d819af7f23537b3c31bcb807cff5f3829', 0, 12, 1516087300, 6, 4813824),
(299, 'Packaging Folding Process.mp4', 'tasks/93/3d813dbbdf7854d7261929b2a2b4b26a266a4ecf', 0, 93, 1516091294, 1, 15052153),
(300, 'IR-GGK533-51-2.xlsx', 'tasks/96/a12eae6894cf00952fc93189935fbb90f1682bf4', 0, 96, 1516345962, 2, 506646),
(301, '223-443 d.pdf', 'tasks/92/44f301abd05a00ec2089f89c7f1302e3dcb77fc8', 0, 92, 1516583991, 6, 82493),
(302, '40N (3).jpg', 'tasks/57/19ba43cbaf931070feded634dbc85432bc1fd14d', 1, 57, 1516608319, 6, 35109),
(303, '1st stage gear life cycly test record  for 30Nm and 40 Nm 2018.1.22.xlsx', 'tasks/57/94c101f794215b355a37a8aba1e500f4ae008b7d', 0, 57, 1516608333, 6, 19247),
(304, 'P1230408.JPG', 'tasks/108/752d24f204e40dda4801385dff7ca8154afc5691', 1, 108, 1516700869, 2, 3646058),
(305, 'VDE wire.pdf', 'tasks/88/2024185dcc2838a485da1895c10408ae07ada3c2', 0, 88, 1516796469, 2, 1475587),
(306, 'specification sheet (plug + wire + end plug)_EN.pdf', 'tasks/88/11d524c30369a0c8b17e61a8429e6f87717b688d', 0, 88, 1516796469, 2, 506310),
(307, 'VDE-D01(plug).pdf', 'tasks/88/5ff643a4455ca61f48c6a47d8f592edcabebca62', 0, 88, 1516796470, 2, 719455),
(308, 'specification sheet (plug + wire)_EN.pdf', 'tasks/88/3060aa4ff92cee57d2e39fdc35a154579a0f453f', 0, 88, 1516796470, 2, 501283),
(309, 'VDE-QT8(end plug).PDF', 'tasks/88/e269fbc31d9c88c015da0683062ac36c011c5a33', 0, 88, 1516796470, 2, 915536),
(310, 'QR_200001452_RolloPort SX5_45059061_00.pdf', 'tasks/110/380bd798b0c3a757f3b9c3881b9e4372ddf920b6', 0, 110, 1517228074, 2, 913774),
(311, 'PB_DT_Q_HE4015_4500033204_S2P8_PROTOCOL.XLS', 'tasks/111/78fffc9fd48a445376f95fd85bdf5dbd423c93ba', 0, 111, 1517297356, 2, 246487),
(312, 'change the OD for white gear.JPG', 'tasks/108/af9e7fda7b58a7259ffd256929d33d6beaab1096', 1, 108, 1517315697, 2, 797018),
(313, 'little grease will make runing little roughly.JPG', 'tasks/108/dd4dfd70717cc0414f214b33c56f78c426038c56', 1, 108, 1517315698, 2, 722790),
(314, 'more greae will make it runing smooth.JPG', 'tasks/108/c323ee8fdbc53ae803e540378dc84e6ab50761df', 1, 108, 1517315698, 2, 791750),
(315, 'FOR  RADEMACH.pdf', 'tasks/108/fc63e9ba554349156358815879d3ef408069c35a', 0, 108, 1517383376, 2, 282135),
(316, 'unkonw.jpg', 'tasks/108/e483ffb6e85e373879bdc2042fb2b4080d87b615', 1, 108, 1517383376, 2, 479979),
(317, '5pcs spring washer dimension -2018.2.1.xlsx', 'tasks/92/40e9eab80ba0bb1f9eb5bb69784723bab7c7d754', 0, 92, 1517470355, 2, 13947),
(318, 'spring sample 223-F-00-443 d _20180201.jpg', 'tasks/92/1a604103b54ea0760daf0766d7bdd565d37f92ea', 1, 92, 1517470356, 2, 954469),
(319, 'AW_PCAS_Carton box SX5DF_01.pdf', 'tasks/98/b97c0228b17e0845a3b0303f220580569762ab53', 0, 98, 1517481383, 2, 3359457),
(320, 'Stand Overview 1.jpg', 'tasks/101/eb6c77b5151800f52d5ce8141b01cee5b47aef19', 1, 101, 1517554320, 1, 2085745),
(321, 'New Bracket Design.jpg', 'tasks/101/0ceabd1bf2734fe5a7bd6e41607e0bd47538069d', 1, 101, 1517554325, 1, 2048123),
(322, 'Old Bracket Design.jpg', 'tasks/101/760d27457bf6eef8fed9e003a6144511e8d80041', 1, 101, 1517554330, 1, 2057996),
(323, 'Stand Overview 2.jpg', 'tasks/101/6101b83e95b63dcde58c973aa43e78fd22dd396a', 1, 101, 1517554340, 1, 2290625),
(324, 'IMG_1286.JPG', 'tasks/94/04bc0358e138febe84af6550e4d91609eabf97e6', 1, 94, 1517572182, 2, 876527),
(325, 'Nm calculation method.jpg', 'tasks/94/6c319bfc1af23eccb5e9be23ad88320012b99d53', 1, 94, 1517572182, 2, 117299),
(326, 'technical annex.png', 'tasks/94/0422202e1669862a69b7f7ec39a8af32d94d9ce2', 1, 94, 1517572182, 2, 222497),
(327, '43133.6454503009_IMG_4099.jpg', 'tasks/88/2941fac662d628a29c2cf6ded0176d56fb1893db', 1, 88, 1517576670, 2, 67660),
(328, '43133.6454700116_IMG_4100.jpg', 'tasks/88/5652b116c1187dec0783bfb3364322a7dade23d9', 1, 88, 1517576670, 2, 62072),
(329, '43133.6455103356_IMG_4102.jpg', 'tasks/88/de79770ae07c18b6d3b5fe57881df8290c03bf38', 1, 88, 1517576671, 2, 42293),
(330, 'A4ED3EE3262D74B855CE864AF6A9A932.png', 'tasks/88/27dbf5eda7e46fbaff0b194928cc5f3e54281bde', 1, 88, 1517576671, 2, 108048),
(331, 'BBC88E2E51A1250955CDA0B9BDBE3610.png', 'tasks/88/eaa40bb73cf81e93ff29c1de9af3183319d5dd2b', 1, 88, 1517576671, 2, 123522),
(332, 'steel rope OD=4mm.JPG', 'tasks/94/0d788a251fb3243025bfab9b9bfd67dcf9485e5a', 1, 94, 1517578069, 2, 778730),
(333, 'test video.mp4', 'tasks/94/ebc90d2aa1f2fd7056a4c82c61de09d858dce5a9', 0, 94, 1517578076, 2, 14444204),
(334, 'Tube OD=74mm.JPG', 'tasks/94/ce9c761243c03194308f3a108132025540d087f5', 1, 94, 1517578077, 2, 787890),
(335, 'weight=30.49kgs.jpg', 'tasks/94/f6d6cdde2c68c8e3016309b3bb24243a1fd906e5', 1, 94, 1517578077, 2, 90322),
(336, 'FOR  RADEMACH.jpg', 'tasks/108/0e72eb66ca02ec8411a26f1a30af9273daba7677', 1, 108, 1517793615, 6, 435331),
(337, 'mass production color  (2).JPG', 'tasks/88/5916551d5757cf6fb52d22548605a71cb85e00b9', 1, 88, 1517900735, 2, 1007522),
(338, 'mass production color  (1).JPG', 'tasks/88/ec9a7a4112895202a7dd8b9acf389bdcd51eb6ce', 1, 88, 1517900736, 2, 914231),
(341, 'P1040831.jpg', 'tasks/114/359dc74195a023be1f814c47287650eb284d292b', 1, 114, 1517902851, 2, 4718394),
(342, 'P1040832.jpg', 'tasks/114/44eebf9bf7d94c060172db0042c300fa286da4d2', 1, 114, 1517902853, 2, 4714938),
(343, 'P1040833.jpg', 'tasks/114/3636c2ab590b82c3363ff9c9b15af58f1a5d8804', 1, 114, 1517902854, 2, 4565054),
(344, 'QR_200001432_Sonnensensor inkl. Stecker_475 534-1.5_01.pdf', 'tasks/99/c34910e0531dba17ab8ea941fa04e367e1778948', 0, 99, 1518014415, 2, 358458),
(345, '18-02-08_order_4500035251_MHI(eMMC Flash Memory).pdf', 'tasks/97/4fef10704f1a64644f57cb2fe71eb384c3404fac', 0, 97, 1518163664, 2, 13348),
(346, '20180220_152221_resized.jpg', 'tasks/39/0b54167698f4fe913bdd5045562c98fdbcb0af80', 1, 39, 1519310770, 2, 1084466),
(347, '20180220_152233_resized.jpg', 'tasks/39/e143fd6075cc04d2b4c1809662abfbd48fe49b27', 1, 39, 1519310770, 2, 1282441),
(348, '52-A17-067 REV.00.pdf', 'tasks/39/ce68e273ec4c57be2d6a6a0f1d66594d99a0c6c0', 0, 39, 1519310770, 2, 61574),
(349, 'PACK FOR MC-3665-3051-01_REV00.pdf', 'tasks/39/47fdea2917c9d6b0c62c2d3bd35ece48b4560a2b', 0, 39, 1519310771, 2, 156731),
(351, '180215_return_delivery_Dooya_final overview_update.xls', 'tasks/104/7090df299d34699af08fbd64da6c304b02c77139', 0, 104, 1519311648, 2, 51200),
(352, '171114_quotation_SX-MHI_GGK 586-01-1_GGK 586-01-2.JPG', 'tasks/58/86da910b945f424be0d3b3edd7768f410b2c5a0b', 1, 58, 1519734581, 2, 80907),
(353, '180124_SX5 carton layout(same shape as S2) _ 20180124.pdf', 'tasks/110/6ece84de85a44f522e7ef2f37fdc36f593312e79', 0, 110, 1519738822, 2, 74235516),
(354, '18-02-27_Auswertung_Invoice_Dooya return delivery.xlsx', 'tasks/104/e4156c89420ac80367cbcf04cbf92edadd6e72ca', 0, 104, 1519889156, 2, 53608),
(355, '18-02-27_Auswertung_packaging list_Dooya return delivery.xlsx', 'tasks/104/5c665f7e82ce747141de566bde791b89da75c7b9', 0, 104, 1519889156, 2, 52727),
(356, '18-02-27_Auswertung_Rücklieferung Dooya_Warenwert(2).xlsx', 'tasks/104/76613c7ceddbe209bb23d0d2e8f765b8ded0f1f9', 0, 104, 1519889156, 2, 17358),
(357, '18-02-27_Commercial Invoice_Dooya return delivery(2).pdf', 'tasks/104/7fc96d5f9ed42a3cc24f5ab34b480935709ae879', 0, 104, 1519892934, 2, 236612),
(358, '18-02-27_packaging list_Dooya return delivery(2).pdf', 'tasks/104/e47b29f8747a3d66919dce5fae59b7167dabafb4', 0, 104, 1519892935, 2, 287567),
(359, '18-03-01_debit note_return delivery_GGK 663-1_5000042830.pdf', 'tasks/91/92c6192b873eb9fef9bbd464a825077fb72e899c', 0, 91, 1519893010, 2, 7856),
(360, 'QR_200001482_Netzkabel_YNK 1m5_00.pdf', 'tasks/88/821d09197f04f01c477683c9fe56804fd0761199', 0, 88, 1520257337, 2, 1521088),
(361, 'product change_approval application(1).xlsx', 'tasks/57/fd333931b7feefbc0f85fdaa36a58e3f496a8eff', 0, 57, 1520424694, 2, 377028),
(362, 'PCAA_FuE_S1S2SX5TA60_PCB_SW_Versions_2018_03_07.pdf', 'tasks/48/bd46e05209f381f40a1455ac38283cee32947079', 0, 48, 1520486858, 3, 390786),
(363, 'cable broken.JPG', 'tasks/88/97b79d241e6344847104d897a65ce66675dc7251', 1, 88, 1520494683, 2, 665852),
(364, 'copper  sheet broken.JPG', 'tasks/88/647f1bac35f9abf2a5f7669760d437bdaa531aff', 1, 88, 1520494683, 2, 668059),
(365, 'copper line exposed.JPG', 'tasks/88/85dda803a2f86011b6e99ebef11be55c21879a8c', 1, 88, 1520494684, 2, 686428),
(366, 'copper sheet touch the plastic sheel.JPG', 'tasks/88/ddaa7fec0fbb6d86b6a29143642a096d85e52c22', 1, 88, 1520494684, 2, 600848),
(367, 'dirty.JPG', 'tasks/88/f4cfec796ffb4603d50be840e8cc511ed5e1de02', 1, 88, 1520494684, 2, 660869),
(368, 'empty cable lug.JPG', 'tasks/88/68ba605243b110473f78030108bc68399ae70ddb', 1, 88, 1520494685, 2, 553762),
(369, 'IP_314_YNK 1M5_02.docx', 'tasks/88/fec9f06889ea8b599e8ce48b41727fcd24818fd1', 0, 88, 1520494685, 2, 249010),
(370, 'standard sample from Rademacher \'s warehouse.JPG', 'tasks/88/89c83abb087742fffe15dbc1d54475c96a50aafe', 1, 88, 1520494686, 2, 693570),
(371, '微信图片_20180308154449.jpg', 'tasks/45/0b29073dac50115f792c0234913fb2c6f2e10527', 1, 45, 1520512436, 2, 414428),
(372, 'VO-01-900_AW_PCAS_Materialnumber_designation_index(03).dotx', 'tasks/90/1c91bfc639611091cd88e10cb48f759d8affc555', 0, 90, 1520522006, 2, 550331),
(373, '180308_Req_and_Acceptance_for_cable_and_wire_harness_assemblies-IPC_WHMA-A-620B.pdf', 'tasks/88/6ab13d1b3ef46b7cd41fc53c90aab9be7fb3fcbd', 0, 88, 1520527570, 2, 8328629),
(374, 'Box Change Request (Iss 1.0).docx', 'tasks/90/58c75f9e57c736bdf20029b30df00b1d5230075f', 0, 90, 1520931654, 1, 1404737),
(375, 'UBW Master_Carton_Analysis.pdf', 'tasks/39/efb693e454df190b891d32edae52294f04c59e5a', 0, 39, 1520931710, 1, 51589),
(376, 'UBW Pallet_Analysis.pdf', 'tasks/39/a8cd058abe1008d951ee2675858e5073d3da7396', 0, 39, 1520931710, 1, 63250),
(380, '171-005h.pdf', 'tasks/107/e731ccef1b60e2a2fe5fe4c3cb3494022339373d', 0, 107, 1521189053, 2, 43758),
(381, '171-006a.PDF', 'tasks/107/6b11f28b561093742cd8c82a794d82e5659ddb0d', 0, 107, 1521189053, 2, 51178),
(383, '580-054f.pdf', 'tasks/107/3380584fe0ee8570977c48f7eb3689d7e4f8d648', 0, 107, 1521189053, 2, 53493),
(387, '180207_Datenblatt_Leoni_OLW_3700_84A001HOS999_EN_20180316083336.270_X.pdf', 'tasks/107/b2a4bbc816eb1837f451827fe68ea4208038e3d8', 0, 107, 1521189248, 2, 72416),
(388, 'sun-sensor.JPG', 'tasks/107/6bdeec2d51271429a62fb7af69c5e2762ae4f4ea', 1, 107, 1521189442, 2, 11673),
(389, '2018_03_07 Transfer Hofmann-SX-MHI.XLSX', 'tasks/107/cd0ed7270e897b8981c28ba1505ce859defdaff3', 0, 107, 1521189526, 2, 21252),
(390, '171-001 c.pdf', 'tasks/106/e982efd8f31211cf7237e4c4c4884cbcd2c078d8', 0, 106, 1521189711, 2, 52658),
(391, '171-002a.PDF', 'tasks/106/287af2a87c8d6cb4267025d9c1445e09506370b4', 0, 106, 1521189711, 2, 37352),
(392, '171-003d.pdf', 'tasks/106/06fbd2c9eea1f922e6bcc0b06b72ad7a178c285c', 0, 106, 1521189711, 2, 34998),
(393, '171-019.pdf', 'tasks/106/ee598af2cee38cc418f68c6a4a69ba1ef19a1e80', 0, 106, 1521189711, 2, 36080),
(394, '2018_03_07 Transfer Hofmann-SX-MHI.XLSX', 'tasks/106/b5a10962389871832be72157321af72d8feec1ba', 0, 106, 1521189711, 2, 21252),
(395, 'AMBIENT_LIGHT_SENSOR.pdf', 'tasks/106/e3b14ea6149cabd7e4c7a2ffcfcd1d70b0067ad4', 0, 106, 1521189712, 2, 27062),
(396, 'NJL7302L-F3_NJL7302L-F5_E.PDF', 'tasks/106/c3b664db52aea2b9e6e65b7e04013908f9eeb4c5', 0, 106, 1521189712, 2, 514373),
(397, 'light_sensor.JPG', 'tasks/106/32697c448e429ed38ab7e5098a2a379c481de2b8', 1, 106, 1521189911, 2, 13173),
(398, '18-03-15_Auswertung_Forecast motor-gearbox-unit_10A 534-1(2).xlsx', 'tasks/39/915622f58a4995528e80bacc012643cf57d80f31', 0, 39, 1521190793, 2, 130786),
(399, '新建 Microsoft Office Word 文档.docx', 'tasks/111/781b87246661118ce35e7042898ce797486b2c37', 0, 111, 1521449429, 6, 729465),
(400, '180322_PCAS_HP2 Rating Label - change company logo.pdf', 'tasks/90/211aa3d6e6cb5deb28e4950ca1fe3fea3da1e066', 0, 90, 1521718276, 2, 437969),
(401, '180313_PCAS_HP2_Box Change Request _company logo (Iss 1.0)_signed.pdf', 'tasks/90/80a68a12a79ce70bb69735e0e2d99fff017a821c', 0, 90, 1521718276, 2, 448833),
(402, 'drawing 533-011f.jpg', 'tasks/44/5e495023b0a373901db21b9708c17991941929ca', 1, 44, 1522117401, 6, 3620962),
(403, 'Screenshot taken 27/03/2018 05:40.png', 'tasks/123/5f4d5c0c01f4a5d52600c5ec6940795b4b26c299', 1, 123, 1522129245, 1, 23201),
(404, '8D report for HE4015 gear box broken.xls', 'tasks/111/62a6385e0a364f42685061016926b90a966afab0', 0, 111, 1522802584, 6, 5215232);

-- --------------------------------------------------------

--
-- Table structure for table `task_has_links`
--

CREATE TABLE `task_has_links` (
  `id` int(11) NOT NULL,
  `link_id` int(11) NOT NULL,
  `task_id` int(11) NOT NULL,
  `opposite_task_id` int(11) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `task_has_links`
--

INSERT INTO `task_has_links` (`id`, `link_id`, `task_id`, `opposite_task_id`) VALUES
(6, 1, 53, 59),
(5, 1, 59, 53);

-- --------------------------------------------------------

--
-- Table structure for table `task_has_metadata`
--

CREATE TABLE `task_has_metadata` (
  `task_id` int(11) NOT NULL,
  `name` varchar(50) NOT NULL,
  `value` varchar(255) DEFAULT '',
  `changed_by` int(11) NOT NULL DEFAULT '0',
  `changed_on` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

-- --------------------------------------------------------

--
-- Table structure for table `task_has_tags`
--

CREATE TABLE `task_has_tags` (
  `task_id` int(11) NOT NULL,
  `tag_id` int(11) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `task_has_tags`
--

INSERT INTO `task_has_tags` (`task_id`, `tag_id`) VALUES
(2, 1),
(5, 1),
(6, 1),
(7, 1),
(8, 1),
(9, 1),
(10, 1),
(11, 1),
(12, 1),
(13, 1),
(22, 1),
(25, 1),
(27, 1),
(28, 1),
(29, 1),
(30, 1),
(31, 1),
(32, 1),
(33, 1),
(34, 1),
(41, 1),
(109, 1),
(112, 1),
(113, 1),
(115, 1),
(123, 1),
(14, 2),
(15, 2),
(16, 2),
(17, 2),
(18, 2),
(19, 2),
(20, 2),
(24, 2),
(26, 2),
(40, 2),
(42, 2),
(64, 2),
(90, 2),
(93, 2),
(97, 2),
(103, 2),
(117, 2),
(118, 2),
(122, 2),
(45, 11),
(46, 12),
(47, 13),
(48, 13),
(84, 13),
(85, 13),
(98, 13),
(110, 13),
(49, 14),
(50, 15),
(51, 15),
(52, 15),
(53, 15),
(54, 15),
(55, 15),
(56, 15),
(57, 15),
(59, 15),
(61, 15),
(94, 15),
(104, 15),
(105, 15),
(108, 15),
(111, 15),
(52, 16),
(58, 17),
(44, 18),
(102, 18),
(86, 28),
(87, 29),
(95, 29),
(89, 30),
(91, 31),
(92, 32),
(62, 33),
(60, 34),
(99, 35),
(100, 36),
(101, 36),
(102, 37),
(39, 38),
(123, 38);

-- --------------------------------------------------------

--
-- Table structure for table `transitions`
--

CREATE TABLE `transitions` (
  `id` int(11) NOT NULL,
  `user_id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL,
  `task_id` int(11) NOT NULL,
  `src_column_id` int(11) NOT NULL,
  `dst_column_id` int(11) NOT NULL,
  `date` bigint(20) DEFAULT NULL,
  `time_spent` int(11) DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `transitions`
--

INSERT INTO `transitions` (`id`, `user_id`, `project_id`, `task_id`, `src_column_id`, `dst_column_id`, `date`, `time_spent`) VALUES
(7, 2, 1, 7, 9, 4, 1499150300, 160467),
(8, 2, 1, 6, 9, 4, 1499150322, 160599),
(9, 2, 1, 21, 3, 2, 1499156466, 95495),
(10, 1, 1, 5, 3, 9, 1500524601, 1535058),
(11, 1, 1, 9, 3, 9, 1500874395, 1884372),
(12, 2, 1, 5, 9, 4, 1501138949, 614348),
(13, 1, 1, 5, 4, 9, 1501139755, 806),
(14, 1, 1, 25, 3, 4, 1501564388, 2434858),
(15, 2, 1, 24, 3, 4, 1501701945, 2635921),
(16, 2, 1, 25, 4, 3, 1501702491, 138103),
(17, 1, 1, 25, 3, 2, 1501743026, 40535),
(18, 1, 1, 27, 3, 2, 1501743192, 1985161),
(19, 1, 1, 27, 2, 3, 1501743254, 62),
(20, 1, 1, 27, 3, 4, 1502153437, 410183),
(21, 1, 1, 15, 3, 9, 1502762354, 3701747),
(22, 1, 1, 10, 3, 9, 1503296180, 4306060),
(23, 1, 1, 29, 3, 9, 1503296226, 2156551),
(24, 1, 1, 8, 9, 4, 1503297969, 4308015),
(25, 1, 1, 14, 9, 4, 1503300208, 4239713),
(26, 2, 1, 21, 2, 4, 1503501956, 4345490),
(27, 2, 1, 5, 9, 4, 1504112500, 2972745),
(28, 2, 1, 9, 9, 4, 1504112534, 3238139),
(31, 2, 1, 15, 9, 4, 1507562092, 4799738),
(32, 2, 1, 10, 9, 4, 1507562109, 4265930),
(33, 2, 1, 29, 9, 4, 1507562126, 4265900),
(34, 1, 1, 1, 3, 2, 1507886034, 8897299),
(35, 1, 1, 13, 3, 4, 1508196947, 9136559),
(36, 2, 1, 20, 3, 4, 1508340374, 9279473),
(37, 1, 1, 2, 3, 4, 1508828913, 9839642),
(38, 1, 1, 34, 3, 9, 1509508201, 3611383),
(39, 3, 2, 57, 7, 6, 1510213794, 692023),
(40, 3, 2, 54, 7, 6, 1510213807, 692500),
(41, 3, 2, 56, 7, 6, 1510213809, 692250),
(42, 3, 2, 44, 7, 6, 1510213812, 693550),
(43, 3, 2, 58, 7, 6, 1510213814, 591278),
(44, 3, 2, 46, 7, 8, 1510215626, 695086),
(45, 3, 2, 53, 6, 8, 1510215759, 694494),
(46, 1, 1, 28, 3, 4, 1510532112, 10683367),
(47, 1, 1, 13, 4, 3, 1510577041, 2380094),
(48, 2, 2, 58, 6, 7, 1510588403, 374589),
(49, 3, 2, 61, 7, 8, 1510808880, 595404),
(50, 1, 1, 19, 3, 4, 1510818017, 11757181),
(51, 1, 1, 19, 4, 3, 1510818124, 107),
(52, 2, 2, 86, 7, 6, 1511518537, 710119),
(53, 2, 2, 86, 6, 7, 1511518541, 5),
(54, 2, 2, 87, 7, 6, 1511518543, 710008),
(55, 2, 1, 19, 3, 4, 1511973437, 1155313),
(56, 1, 1, 1, 2, 4, 1512353195, 4467161),
(57, 1, 1, 11, 3, 9, 1512545237, 13484995),
(58, 1, 1, 16, 3, 4, 1512545254, 13484576),
(59, 1, 1, 17, 3, 9, 1512545300, 13484581),
(60, 3, 2, 62, 7, 8, 1512629085, 2407448),
(61, 3, 2, 48, 7, 8, 1512629151, 3108375),
(62, 3, 2, 58, 7, 6, 1512629192, 2040789),
(63, 3, 2, 54, 6, 8, 1512727089, 2513282),
(64, 3, 2, 89, 6, 8, 1512727092, 1807244),
(65, 3, 2, 86, 7, 8, 1513079501, 1560960),
(66, 3, 2, 56, 6, 8, 1513572033, 3358224),
(67, 3, 2, 95, 7, 8, 1514979252, 1904575),
(68, 1, 1, 13, 3, 2, 1515034260, 4457219),
(69, 1, 1, 60, 3, 2, 1516232922, 6094931),
(70, 6, 2, 57, 6, 8, 1516699279, 6485485),
(71, 6, 2, 59, 6, 8, 1516699303, 6761615),
(72, 2, 2, 45, 7, 8, 1516700551, 7180159),
(73, 2, 1, 93, 3, 9, 1516797092, 4162437),
(74, 2, 1, 11, 9, 4, 1516797196, 4251959),
(75, 2, 1, 17, 9, 4, 1516797211, 4251911),
(76, 2, 1, 34, 9, 4, 1516797218, 7289017),
(77, 2, 1, 30, 3, 9, 1517428300, 15684335),
(78, 2, 1, 93, 9, 4, 1517470138, 673046),
(79, 2, 2, 98, 7, 8, 1517481409, 4140801),
(80, 6, 2, 102, 6, 8, 1518490974, 3430715),
(81, 2, 2, 44, 6, 7, 1519888583, 9674772),
(82, 2, 2, 91, 6, 7, 1519888734, 8479237),
(83, 2, 2, 99, 6, 7, 1519888846, 5938316),
(84, 2, 2, 110, 6, 7, 1519888877, 2660924),
(85, 2, 2, 91, 7, 8, 1519895766, 7032),
(86, 1, 1, 30, 9, 4, 1520329581, 2901281),
(87, 1, 1, 40, 3, 9, 1520329804, 11989268),
(88, 3, 2, 110, 7, 8, 1520415684, 526807),
(89, 3, 2, 52, 7, 8, 1520416461, 10895395),
(90, 2, 2, 57, 8, 7, 1520424612, 3725333),
(91, 2, 2, 49, 7, 6, 1520437663, 10916784),
(92, 2, 2, 50, 7, 6, 1520437667, 10916708),
(93, 2, 2, 55, 7, 6, 1520437681, 10916274),
(94, 2, 2, 51, 7, 6, 1520437688, 10916686),
(97, 2, 4, 43, 14, 16, 1520511181, 10991048),
(98, 2, 4, 96, 14, 16, 1520511185, 7436214),
(99, 2, 2, 45, 8, 7, 1520512447, 3811896),
(100, 3, 2, 57, 7, 8, 1520826862, 402250),
(101, 2, 2, 57, 8, 7, 1520861495, 34633),
(102, 2, 2, 57, 7, 8, 1520861607, 112),
(103, 1, 1, 18, 3, 4, 1520934533, 14893070),
(104, 1, 1, 26, 3, 4, 1520934537, 14893071),
(105, 1, 1, 42, 3, 4, 1520934875, 11488472),
(106, 1, 1, 97, 3, 4, 1520935127, 7594801),
(107, 2, 1, 32, 3, 9, 1521624986, 18172202),
(108, 2, 1, 26, 4, 3, 1521625260, 690723),
(109, 2, 2, 45, 7, 8, 1521644121, 1131674),
(110, 2, 1, 90, 3, 4, 1521718292, 10357901),
(111, 1, 1, 90, 4, 3, 1522043549, 325257),
(112, 1, 1, 121, 3, 4, 1522050219, 1115775),
(113, 1, 1, 31, 3, 9, 1523243106, 19790377),
(114, 1, 1, 64, 3, 9, 1523243130, 12995118);

-- --------------------------------------------------------

--
-- Table structure for table `users`
--

CREATE TABLE `users` (
  `id` int(11) NOT NULL,
  `username` varchar(50) NOT NULL,
  `password` varchar(255) DEFAULT NULL,
  `is_ldap_user` tinyint(1) DEFAULT '0',
  `name` varchar(255) DEFAULT NULL,
  `email` varchar(255) DEFAULT NULL,
  `google_id` varchar(30) DEFAULT NULL,
  `github_id` varchar(30) DEFAULT NULL,
  `notifications_enabled` tinyint(1) DEFAULT '0',
  `timezone` varchar(50) DEFAULT NULL,
  `language` varchar(5) DEFAULT NULL,
  `disable_login_form` tinyint(1) DEFAULT '0',
  `twofactor_activated` tinyint(1) DEFAULT '0',
  `twofactor_secret` char(16) DEFAULT NULL,
  `token` varchar(255) DEFAULT '',
  `notifications_filter` int(11) DEFAULT '4',
  `nb_failed_login` int(11) DEFAULT '0',
  `lock_expiration_date` bigint(20) DEFAULT NULL,
  `gitlab_id` int(11) DEFAULT NULL,
  `role` varchar(25) NOT NULL DEFAULT 'app-user',
  `is_active` tinyint(1) DEFAULT '1',
  `avatar_path` varchar(255) DEFAULT NULL,
  `api_access_token` varchar(255) DEFAULT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `users`
--

INSERT INTO `users` (`id`, `username`, `password`, `is_ldap_user`, `name`, `email`, `google_id`, `github_id`, `notifications_enabled`, `timezone`, `language`, `disable_login_form`, `twofactor_activated`, `twofactor_secret`, `token`, `notifications_filter`, `nb_failed_login`, `lock_expiration_date`, `gitlab_id`, `role`, `is_active`, `avatar_path`, `api_access_token`) VALUES
(1, 'Ben Hulme', '$2y$10$IYwqOEq.a9TJHH.qqP/Vf.2L8F0cx2t5GSmmP3N/sUCZcLLoJ6VNK', 0, NULL, NULL, NULL, NULL, 1, NULL, NULL, 0, 0, NULL, '', 1, 0, 0, NULL, 'app-admin', 1, NULL, NULL),
(2, 'Manfred Kohlruss ', '$2y$10$toWz2ET/B8rSnM1g6XxG4.rqBnYSngHyYjotgUaDEgwAFo3Jt7QpW', 0, 'Manfred Kohlruss', 'Manfred.Kohlruss@rademacher.de', NULL, NULL, 0, 'Europe/Berlin', 'de_DE', 0, 0, NULL, '99b23fff387cfa8fdb3f762c2dcbd658c3adeae330a0a6454a45f889b219', 4, 0, 0, NULL, 'app-manager', 1, NULL, NULL),
(3, 'Sally Zhang', '$2y$10$vaMYdWKukPepdMsZlJ/RruOAT0O12wr/TIz/jbFhxWZ2PsVEQlLuS', 0, 'Sally Zhang', 'sally.zhang@rademacherchina.com', NULL, NULL, 0, 'Asia/Shanghai', 'zh_CN', 0, 0, NULL, '', 4, 0, 0, NULL, 'app-manager', 1, NULL, NULL),
(4, 'Jens Kremer', '$2y$10$PGH7L7BeZzo37oEIPgN2B.4BFRdp/LvYbbbZNXyVv7Al6Rdhkss8a', 0, 'Jens Kremer', 'jens.kremer@rademacher.de', NULL, NULL, 0, 'Europe/Berlin', 'de_DE', 0, 0, NULL, '', 4, 0, 0, NULL, 'app-manager', 1, NULL, NULL),
(5, 'Andreas Schulte', '$2y$10$cOXYFmQz1fGgAVHDVIV.hOrvSj./gbNb0Zy5Ki0QRUMZfnGlXh.9.', 0, 'Andreas Schulte', 'Andreas.Schulte@rademacher.de', NULL, NULL, 0, 'Europe/Berlin', 'de_DE', 0, 0, NULL, '', 4, 0, 0, NULL, 'app-manager', 1, NULL, NULL),
(6, 'Henk Huang', '$2y$10$VLhyNv/Xx6uSMUrYTchK9.j01n/9hFRj1p3.PFhIYIwKLfWn6Ap0u', 0, 'Henk Huang', 'henk@rademacherchina.com', NULL, NULL, 0, 'Asia/Shanghai', 'zh_CN', 0, 0, NULL, '', 4, 0, 0, NULL, 'app-manager', 1, NULL, NULL),
(7, 'Gustav Astrom', '$2y$10$RSQ5cbvUas33VAIMgLukCOr9f9KSmeiVbvlX8DcC4bTVZbbsflccO', 0, 'Gustav Astrom', 'gustav.astrom@sxmhi.com', NULL, NULL, 0, 'Asia/Shanghai', 'en_US', 0, 0, NULL, '', 4, 0, NULL, NULL, 'app-manager', 1, NULL, NULL),
(8, 'Ralf Kern', '$2y$10$qoicvNpEbnEgwc9IhpduBeeIWNf1fPMAIi1M.i16iX6MPjx0cS.OS', 0, 'Ralf Kern', 'ralf.kern@rademacher.de', NULL, NULL, 0, 'Europe/Berlin', 'de_DE', 0, 0, NULL, '', 4, 0, 0, NULL, 'app-manager', 1, NULL, NULL),
(9, 'Peter Schliwa', '$2y$10$RSTesWpH1TEdoxZKjfD6B.vi0YyEIH7HDqPzLZj9TYBxQViJ4.ArS', 0, 'Peter Schliwa', 'Peter.Schliwa@rademacher.de', NULL, NULL, 0, 'Europe/Berlin', 'de_DE', 0, 0, NULL, '', 4, 0, 0, NULL, 'app-admin', 1, NULL, NULL),
(10, 'Jörg HIrschfeld', '$2y$10$k9i8FPAR9Su0HM/Zm0wO9eM305IW6f4g.p5U7gE8nwSxSssQnIxsy', 0, 'Jörg Hirschfeld', 'joerg.hirschfeld@rademacher.de', NULL, NULL, 0, '', '', 0, 0, NULL, '', 4, 0, NULL, NULL, 'app-manager', 1, NULL, NULL),
(11, 'Berthold Eller', '$2y$10$fJbIkuxHvKsoj.5V4Gx5Xu.hUOE5sMEwBi1skWW/wBKdfZlOKp.Si', 0, 'Berthold Eller', 'berthold.eller@rademacher.de', NULL, NULL, 0, '', '', 0, 0, NULL, '', 4, 0, 0, NULL, 'app-manager', 1, NULL, NULL);

-- --------------------------------------------------------

--
-- Table structure for table `user_has_metadata`
--

CREATE TABLE `user_has_metadata` (
  `user_id` int(11) NOT NULL,
  `name` varchar(50) NOT NULL,
  `value` varchar(255) DEFAULT '',
  `changed_by` int(11) NOT NULL DEFAULT '0',
  `changed_on` int(11) NOT NULL DEFAULT '0'
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `user_has_metadata`
--

INSERT INTO `user_has_metadata` (`user_id`, `name`, `value`, `changed_by`, `changed_on`) VALUES
(1, 'board.collapsed.1', '0', 1, 1499129854),
(3, 'board.collapsed.2', '0', 3, 1509521982);

-- --------------------------------------------------------

--
-- Table structure for table `user_has_notifications`
--

CREATE TABLE `user_has_notifications` (
  `user_id` int(11) NOT NULL,
  `project_id` int(11) NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `user_has_notifications`
--

INSERT INTO `user_has_notifications` (`user_id`, `project_id`) VALUES
(1, 1);

-- --------------------------------------------------------

--
-- Table structure for table `user_has_notification_types`
--

CREATE TABLE `user_has_notification_types` (
  `id` int(11) NOT NULL,
  `user_id` int(11) NOT NULL,
  `notification_type` varchar(50) DEFAULT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `user_has_notification_types`
--

INSERT INTO `user_has_notification_types` (`id`, `user_id`, `notification_type`) VALUES
(1, 1, 'email'),
(2, 1, 'web');

-- --------------------------------------------------------

--
-- Table structure for table `user_has_unread_notifications`
--

CREATE TABLE `user_has_unread_notifications` (
  `id` int(11) NOT NULL,
  `user_id` int(11) NOT NULL,
  `date_creation` bigint(20) NOT NULL,
  `event_name` varchar(50) NOT NULL,
  `event_data` text NOT NULL
) ENGINE=InnoDB DEFAULT CHARSET=utf8;

--
-- Dumping data for table `user_has_unread_notifications`
--

INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(1, 1, 1499070051, 'subtask.update', '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(2, 1, 1499070052, 'subtask.update', '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(3, 1, 1499070054, 'subtask.update', '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(4, 1, 1499070056, 'subtask.update', '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(5, 1, 1499070057, 'subtask.update', '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(6, 1, 1499070060, 'subtask.update', '{\"subtask\":{\"id\":\"2\",\"title\":\"Test Micrometer After Calibration\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1498988796\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(7, 1, 1499070085, 'task.update', '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499070085\",\"reference\":\"\",\"date_started\":\"1499070085\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"date_started\":1499070085}}'),
(8, 1, 1499070121, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n\\r\\nlallalaal\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499070121\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n\\r\\nlallalaal\"}}'),
(9, 1, 1499150300, 'task.move.column', '{\"task_id\":\"7\",\"task\":{\"id\":\"7\",\"title\":\"Security Stock\",\"description\":\"* 01.03.17 - Jens has sent a new order for security stock 1400 pcs\\r\\n* 02.03.17 - Mail Ben: Regarding this delivery, the date is rather tight, we are currently looking into shipping this with Order #21, however this is still quite tight. Please give us till next week before we can confirm 100% on this. We don\\u2019t have stock of a lot of key components to handle the normal orders we and this one as well.\\r\\n* 16.03.17 - Mail Shinya: Just confirm and send to order with supplier one by one, they will catch up our time in this end of March or beginning of April, We will delivery 1400pcs together with LBW#21. Means ETA Rhede CW21\\/2017 (22.05.17)\\r\\n* 10.04.17 - Mail Jens: as mentioned last week in our Telco, I double checked the necessity of the each ordered 2oo pcs. safety stock of the international RD35\\/RD45. After internal double checking we do not need the security stocks of the international variants, due to this you\\u2019ll find appended our updated PO 4500030433 without the two positions of RD35\\/RD45int. The each 2 time of 200 pcs. I add to the national variants, so RD35 increased to 600pcs. and RD45 increased to 800pcs. Please send us your corresponding order comfirmation (PI)!\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - security stock - 1400 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to 29.06.17\",\"date_creation\":\"1498989833\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499150300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499150300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989833\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989833\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(10, 1, 1499150322, 'task.move.column', '{\"task_id\":\"6\",\"task\":{\"id\":\"6\",\"title\":\"LBW Order #21\",\"description\":\"* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 22.05.17 - delay of max. 1-2 weeks  \\r\\n* 10.04.17 - Mail Ben: I had a call with Ralf this morning and because of the current production numbers and situation we have decided to do the following. 1080 Units RD45 will leave by vessel on the 20th and we will send out 360 units Air Freight (We Pay) at the end of the month to make up for this delay in sea freight. As for the further schedule I will let you know later this week.\\r\\n* 18.04.17 - 1600 x RD45 will leave with ETD 20.04.17 \\r\\n* 25.04.17 - we received the information that the ETD changed to 23.04.17\\r\\n* 03.05.17 - Air freight has left we are working on the next batch which is looking like it will hit the previous timeline.\\r\\n* 16.05.17 - Mail Ben: We managed to take care of most of the 60 User Guides, however sadly we are sending 1 box (20 Units) without User Guides. We will send you these 20 user guides with the next delivery as discussed. The box and the pallet have been clearly marked.\\r\\n* 17.05.17 - Goods sent out according to plan, you should also have all the shipping documents. Vessel leaves on the 20th as discussed.\\r\\n* 23.05.17 - remaining quantity 3120 pcs are on the way - ETD 20.05.17 - approx. ETA 26.06.17\\r\\n* 26.06.17 - delay to ETA 29.06.17\",\"date_creation\":\"1498989723\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499150322\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499150322\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989723\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1498989723\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(11, 1, 1499150360, 'subtask.update', '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(12, 1, 1499150361, 'subtask.update', '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(13, 1, 1499150362, 'subtask.update', '{\"subtask\":{\"id\":\"21\",\"title\":\"Relays Arrive In Factory\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"2\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499129530\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(14, 1, 1499154688, 'comment.create', '{\"comment\":{\"id\":\"2\",\"task_id\":\"13\",\"user_id\":\"2\",\"date_creation\":\"1499154688\",\"date_modification\":\"1499154688\",\"comment\":\"68i68oi7o7o\",\"reference\":\"\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"email\":\"Manfred.Kohlruss@rademacher.de\",\"avatar_path\":null},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(15, 1, 1499154707, 'comment.delete', '{\"comment\":{\"id\":\"2\",\"task_id\":\"13\",\"user_id\":\"2\",\"date_creation\":\"1499154688\",\"date_modification\":\"1499154688\",\"comment\":\"68i68oi7o7o\",\"reference\":\"\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"email\":\"Manfred.Kohlruss@rademacher.de\",\"avatar_path\":null},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499060388\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(16, 1, 1499154948, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499154948\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\"}}'),
(17, 1, 1499155009, 'subtask.create', '{\"subtask\":{\"id\":\"22\",\"title\":\"RD-CN needs 35K plugs from RD-D\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"2\",\"user_id\":\"4\",\"position\":\"6\",\"username\":\"Jens Kremer\",\"name\":\"Jens Kremer\",\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499154948\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(18, 1, 1499155130, 'task.update', '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155130\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\"}}'),
(19, 1, 1499155203, 'task.update', '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155203\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(20, 1, 1499155243, 'task.update', '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155243\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(21, 1, 1499155267, 'task.update', '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155267\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n\\r\\n*29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(22, 1, 1499155286, 'task.update', '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155286\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(23, 1, 1499155320, 'task.update', '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\\r\\n\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155320\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\\r\\n\"}}'),
(24, 1, 1499155347, 'task.update', '{\"task_id\":\"8\",\"task\":{\"id\":\"8\",\"title\":\"LBW Order #22\",\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\",\"date_creation\":\"1498989954\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155347\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989954\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"description\":\"* 07.02.17 - Mail Manfred: Dear Ben, as already mentioned in a previous mail - we have received a new order #22 from Schellenberg. Schellenberg ordered the following quantities: 1500 x RD35, 2900 x RD45, 800 x RD45 international (in total 5200 pcs) Delivery date to Schellenberg is 03.07.17. That means for us ETA Rhede end of cw25 (23.06.17) at the latest or ETD end of cw20 (19.05.17). \\r\\n* 08.02.17 - Mail Manfred:start production right after #21 (21.04.17) - ETD end of cw21, ETA Rhede end of cw26, delivery to Schellenberg end of cw27 (07.07.17) => means delay of 1 week to the original delivery date to Schellenberg (28.06.17)\\r\\n* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #22. ETA Rhede 15.06.17. Please send us your order confirmation! \\r\\n* 16.02.17 - confirmed delivery date to Schellenberg - Input from Ralf\'s meeting with Schellenberg original delivery date ETA Schellenberg 03.07.17 - delay of max. 1-2 weeks\\r\\n* 03.05.17 - We are looking at the 20.07.17 at the moment, but I think we can catch up and hit around the 15.07.17 for this shipment.  \\r\\n* 31.05.17 - current status: ETD 17.06.17 (5200 pcs) means ETA 24.07.17 (4 days behind Gantt chart)\\r\\n* 02.06.17 - we need the confirmation for the following booking: Revised CMA skj as below Etd: Jun 18, v\\/v: COSCO ENGLAND 019W, Eta RTM: Jul 16, Ens cut off: Jun 14, Cy closing: Jun 16\\r\\n* 29.06.17 - ETD was planned with 18.06.17 - delay by forwarder - new ETD 25.06.17 - means ETA cw30\\/31\"}}'),
(25, 1, 1499155574, 'task.update', '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499129530\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\"}}'),
(26, 1, 1499155680, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155680\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\"}}'),
(27, 1, 1499155989, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* \",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499155989\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* \"}}'),
(28, 1, 1499156064, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156064\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\"}}'),
(29, 1, 1499156329, 'task.update', '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156329\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(30, 1, 1499156338, 'task.update', '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156338\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\"}}'),
(31, 1, 1499156466, 'task.move.column', '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156466\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1499060971\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"2\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"2\",\"date_moved\":\"1499060971\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(32, 1, 1499156515, 'task.update', '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input manfred: \\\"on hold\\\"\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156515\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input manfred: \\\"on hold\\\"\"}}'),
(33, 1, 1499156529, 'task.update', '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499156529\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\"}}'),
(34, 1, 1499323252, 'task.update', '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499323252\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989543\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\"}}'),
(35, 1, 1499688758, 'task.update', '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499688758\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n\"}}'),
(36, 1, 1499693165, 'task.update', '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499693164\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060791\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \"}}'),
(37, 1, 1499775320, 'task.update', '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499775320\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)\"}}'),
(38, 1, 1499775369, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499775369\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\"}}'),
(39, 1, 1499775915, 'task.update', '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499775915\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990023\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\"}}'),
(40, 1, 1499888371, 'task.update', '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888370\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(41, 1, 1499888498, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888498\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \",\"color_id\":\"red\"}}'),
(42, 1, 1499888638, 'task.update', '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888638\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(43, 1, 1499888659, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888659\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(44, 1, 1499888812, 'task.update', '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888812\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(45, 1, 1499888915, 'task.update', '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888915\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(46, 1, 1499888934, 'task.update', '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888934\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(47, 1, 1499888966, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499888966\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(48, 1, 1499928102, 'task.update', '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499928102\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(49, 1, 1499930240, 'task.update', '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499930240\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \"}}'),
(50, 1, 1499942031, 'task.update', '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. Ben will forward the information to the supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499942031\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. Ben will forward the information to the supplier.\"}}'),
(51, 1, 1499942052, 'task.update', '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1499942052\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\"}}'),
(52, 1, 1500013401, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500013401\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\"}}'),
(53, 1, 1500390493, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1500390493\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\"}}'),
(54, 1, 1501082842, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501082842\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\"}}'),
(55, 1, 1501082858, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501082858\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(56, 1, 1501084063, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084063\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \"}}'),
(57, 1, 1501084087, 'task.update', '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"4\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084087\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Jens Kremer\",\"assignee_name\":\"Jens Kremer\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(58, 1, 1501084102, 'task.update', '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084102\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(59, 1, 1501084135, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501084134\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(60, 1, 1501138949, 'task.move.column', '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501138949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501138949\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500524601\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500524601\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(61, 1, 1501701753, 'task.update', '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed chnage request\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701753\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed chnage request\"}}'),
(62, 1, 1501701790, 'task.update', '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701790\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request\"}}'),
(63, 1, 1501701833, 'task.update', '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701833\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\"}}'),
(64, 1, 1501701918, 'task.update', '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - current status of the label (sample \\/ picture) ? Price confirmed for the moment\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701918\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - current status of the label (sample \\/ picture) ? Price confirmed for the moment\"}}'),
(65, 1, 1501701945, 'task.move.column', '{\"task_id\":\"24\",\"task\":{\"id\":\"24\",\"title\":\"HP2 FOB Pricing\",\"description\":\"* 30.06.17 - Send Jens an Email regarding the HP2 FOB Price Reduction (2.64RMB). Jens thought this was rather low.\\r\\n* 03.07.17 - Currently recalculating. The main problem is I don\'t have Tommy\'s original calculations so I am working them out from what we have shipped in the past. However we can\'t work out the HP2 freight in the same way we work out Sally\'s as a percentage of the total cost as the HP2 is significantly more expensive than Sally\'s Plastic Components. Will have an updated before the next NPSR.\\r\\n* 13.07.17 - Email has been sent to Jens saying the price reduction is 3.50RMB per unit. Waiting for Jen\'s Reply\\/Feedback\\r\\n* 24.07.17 - Price of 7.50RMB less for FOB sent to Jens based on the current shipment of 488. Waiting for feedback.\\r\\n* 01.08.17 - Agreed on 7.94RMB. Shinya will send PI Tomorrow.\",\"date_creation\":\"1499066024\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501701945\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501701945\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499066024\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499066024\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(66, 1, 1501702036, 'task.update', '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702036\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\"}}'),
(67, 1, 1501702055, 'task.update', '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702055\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498990120\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\"}}'),
(68, 1, 1501702341, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(69, 1, 1501702389, 'task.update', '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"orange\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702389\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060607\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"orange\"}}'),
(70, 1, 1501702491, 'task.move.column', '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501702491\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1501564388\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1501564388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(71, 1, 1501702504, 'task.move.position', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501229057\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(72, 1, 1501702511, 'task.move.position', '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing (14,000)\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501702491\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1501702491\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(73, 1, 1501702647, 'task.update', '{\"task_id\":\"27\",\"task\":{\"id\":\"27\",\"title\":\"Sun Sensor Labels\",\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\",\"date_creation\":\"1499758031\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1501702647\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499758031\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.07.17 - Received an email from Dieter regarding Labels for the Sun Sensor cap. 21x11mm White with Black and White Printing. I am working on getting the price and timeline from our packaging supplier.\\r\\n* 12.07.17 - Communicated with the supplier. 100 Samples will be received in 1 week. Price 0.25RMB Each (MOQ 1,000). 100RMB One Time Fee for Cutting Board. I will also calculate the additional cost for the Sun Sensor Assembly.\\r\\n* 12.07.17 - Received first drawings from Dieter. Need Vector Format for the drawings so we can make the best quality labels. Will work on IP\'s and Release Documents after Samples are Finished.\\r\\n* 13.07.17 - Received new drawings from Dieter, the text is perfect and correct, however the logo isn\'t present as it hasn\'t been embedded in the AI file. Also it seems the logo is saved as a BMP which is not a Rasterised format. Email has been sent explaining.\\r\\n* 13.07.17 - RD-D has sent the label now complete as ai. For Ben it is OK. He will forward the information to the supplier.\\r\\n* 14.07.17 - Drawings and information have been sent to the Supplier. He will get to work on this and we should hopefully have the samples in 1 week. After which I will test some myself and send some to Germany (Maybe I can combine these with the Stocko Plug Samples if they are finished at around the same time).\\r\\n* 20.07.17 - Packaging supplier brought the labels, however he used the old version of the drawing not the new one. He is going to do the labels again and they should arrive Monday\\/Tuesday next week (CW30). \\r\\n* 27.07.17 - Change Request for the Sun Sensor Label sent to Andreas. Waiting for Reply.\\r\\n* 01.08.17 - Labels Received, Release Given by Andreas. Only waiting for price agreement from Manfred.\\r\\n* 02.08.17 - Manfred: current status of the label (sample \\/ picture) ? Price confirmed for the moment, as you said - let us look at the price again after we have completed #24\"}}'),
(74, 1, 1503501956, 'task.move.column', '{\"task_id\":\"21\",\"task\":{\"id\":\"21\",\"title\":\"Cable Harness Order\",\"description\":\"* \\\"07.11.16 - RD-D will send asap from each type 3 pcs samples\\r\\n* 23.11.16 - RD-D will send out the samples before end of cw47\\r\\n* 28.11.16 - RD-D has sent out the samples - tracking no.: 440035800497\\r\\n* 14.12.16 - We have begun ordering materials for the production of the 50 units of each type and when I come back I will produce the samples.\\r\\n* 11.01.17 - All Samples have arrvied and been checked. Regarding the cable length issue I have received your mail and will double check tomorrow when back at the factory. We are still waiting on the cable to arrive from Nanjing, when it does I will get to work on the samples. We should be able to send after CNY.\\r\\n* 17.01.17 - please make the 5-10 pcs sample from each type. Your samples should be 100% identical to the samples which we have sent to you, that means length of 290 mm is correct. Please tell us when we can receive the samples.\\r\\n* 19.01.17 - as I said during the telco my fault - yes please produce 50 pcs per each type \\r\\n* 08.02.17 - RD-D has sent the updated drawing\\r\\n* 08.03.17 - We will produce these in CW11\\r\\n* 21.04.17 - Ben will send out the 150 pcs cable harness at the end of cw17 at the latest\\r\\n* 25.04.17 - Mail Ben: It seems we have managed to find a solution to this and they should be leaving soon if everything goes well. Shinya will follow up tomorrow and get back to you.\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 28.04.17 - Jens has send the the order for the cable harness samples\\r\\n* 03.05.17 - Samples sent out, now awaiting RD-D\'s Feedback.\\r\\n* 10.05.16 - samples well receive, minor mistakes, now in the assembling (15.05.17), RD-D needs the data sheets of all components\\r\\n* 17.05.17 - Still waiting for the datasheet from the Cable Supplier, both Connectors have been forwarded to you.\\r\\n* 23.05.17 - in progress - hopefully I can send you a response on Wednesday\\\"\\r\\n* 04.07.17 - Input Manfred: \\\"on hold\\\"\\r\\n* 04.07.17 - BEN: Are you guys waiting till you need more stock? If so what is a rough timeline on this as I would like to prepare on our end?\\r\\n* 11.07.17 - I asked Mike about this. There wasn\'t much he could tell me as a lot of it is very confidential so I don\'t know much, but I will hold until more news comes out.\\r\\n* 21.08.17 - After Ralf\'s email regarding Dresden, I think we can close this?\",\"date_creation\":\"1499060971\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503501955\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503501955\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"position\":6,\"src_column_id\":\"2\",\"dst_column_id\":\"4\",\"date_moved\":\"1499156466\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"2\",\"dst_column_id\":\"4\",\"date_moved\":\"1499156466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(75, 1, 1503502019, 'subtask.update', '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503390089\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(76, 1, 1503502020, 'subtask.update', '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503390089\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(77, 1, 1503502021, 'subtask.update', '{\"subtask\":{\"id\":\"3\",\"title\":\"CW28 Work with Martin on IP\'s\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"3\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503390089\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498988735\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(78, 1, 1503502097, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(79, 1, 1503502259, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n23.08.17 - RD-D has payed the deposit\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502259\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n23.08.17 - RD-D has payed the deposit\"}}'),
(80, 1, 1503502292, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502292\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\"}}'),
(81, 1, 1503502318, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1503502318\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(82, 1, 1504112070, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112070\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\"}}'),
(83, 1, 1504112128, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112128\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(84, 1, 1504112236, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112236\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\"}}'),
(85, 1, 1504112259, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112259\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\"}}'),
(86, 1, 1504112353, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27?\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112353\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27?\"}}'),
(87, 1, 1504112500, 'task.move.column', '{\"task_id\":\"5\",\"task\":{\"id\":\"5\",\"title\":\"LBW Order #19 (Rework)\",\"description\":\"* 30.06.16 - I have asked Katja from the sales team whether Schellenberg has an idea for the #19. Feedback OPEN\\r\\n* 08.07.16 - I have also ask Ralf to get in contact with Schellenberg for #19 - Feedback OPEN\\r\\n* 27.07.16 - we are chasing Schellenberg\\r\\n* 10.08.16 - order #19 was placed with ETA in Rhede 24th. of January 2017, ETD approx. cw49\\/50\\r\\n* 03.11.16 - Everything is on track and going well.\\r\\n* 23.11.16 - We have finished Order #19, OQC as well as palleting we are just waiting for the shipping date to come around before we can ship.\\r\\n* 07.12.16 - the plan is to send it together with other parts from Sally in a 40\' container with ETD 16.12.16 - ETA ca. 20.01.17\\r\\n* 11.01.17 - All done and sent out.\\r\\n* 23.01.17 - we have received the goods\\r\\n* 08.02.17 - based on the fault we have costs of > 3K Euro and more than 1300pcs which we must send back to China\\r\\n* 08.02.17 - in total we have now 1604 pcs defectives (1566 x RD45, 38 x RD35)\\r\\n* 15.02.17 - waiting for the rates from your\\/our forward for the return delivery of the 1604 pcs\\r\\n* 22.02.17 - we will send out the goods asap with IFB - currently we prepare the papers\\r\\n* 07.03.17 -  vessel M\\/V \\u201aCOSCO Spain\\u2018 , ETD Hamburg approx. 19.03.17, ETA Shanghai 19.04.17\\r\\n* 26.04.17 - RD-CN will receive the goods in the beginning of May. Plan could be to send them out with #22 approx. end of June\\r\\n* 24.05.17 - Mail Sally: The custom requests that the goods returned for repair need to be re-export within 6 month from the arrival date, which means 18 September (one month earlier to be save).\\r\\n* 07.06.17 - Ben: Could you please let me know if its possible to delay Order #23 by one week so we can deal with this rework?\\r\\n* 08.06.17 - rework has to be done after #23\\r\\n* 03.07.17 - Rework has been completed. Shinya is currently working on the booking for this shipment and will inform you guys as soon as there is an update. Plan ETD 05.07.17 (not confirmed)\\r\\n* 04.07.17 - Shinya has been working on this and its possible, but a slow process. There are lots of documents we need to prepare for the sending back of reworked product. We currently don\'t know the ETD. We will need to get back to you regarding this when Shinya has cleared up the documentation issue.\\r\\n* 06.07.17 - plan is to send them out at the 16.07.17\\r\\n* 11.07.17 - Shinya is still waiting on the document from customs for the time these goods arrived in China. We will continue pushing them about this and update you as soon as this document arrives as we can book the vessel.\\r\\n* 13.07.17 - Rework goods have been sent today. The vessel is booked to set sail on 20.07.17. Once the goods are on the vessel we can move this task to \\\"In Transit\\\"\\r\\n* 20.07.17 - Looks like everything is ok with this, but we won\'t really know until tomorrow whether the goods have got on the vessel.\\r\\n* 20.07.17 - Goods are on the vessel! We will get the documents soon.\\r\\n* 21.07.17 - We have chased them for B\\/L today, however IFB haven\'t received it yet and told us to wait. We will let you know as soon as we receive it.\\r\\n* 21.07.17 - Shinya and Leona have assured me these goods got on the vessel, but because its rework the B\\/L will arrive next week Monday\\/Tuesday.\\r\\n* 24.07.17 - Seems the rework goods got onto the 22\\/07\\/2017 vessel not the 20\\/07\\/2017..... Rather annoyed by this. We are going to talk to the freight forwarder about why we were misinformed.\\r\\n* 25.07.17 - Updated with the stamped B\\/L\\r\\n* 27.07.17 - I will leave this as In-Transit until they arrive in Germany if that\'s ok.\",\"date_creation\":\"1498989543\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112500\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504112500\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1501139755\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1501139755\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(88, 1, 1504112534, 'task.move.column', '{\"task_id\":\"9\",\"task\":{\"id\":\"9\",\"title\":\"LBW Order #23\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find the official purchase order about Loco BW order #23. 780 x RD35, 2920 x RD45, 700 x suns sensor, 1000 x RD45 int. ETA Rhede 15.08.17. Please send us your order confirmation! \\r\\n* 15.03.17 - we have received the order confirmation with ETA Rhede cw33 (14.08.17) - means ETD ~10.07.17\\r\\n* 07.06.17 . acc. to the Gantt chart ETD ~16.07.17 and ETA ~19.08.17 - please note ETA Schellenberg 30.08.17\\r\\n* 03.07.17 - We are looking at a possible delay to the 20.07.17 (ETD) due to the RX Covers being delayed. (See Email to Manfred and Ralf (03.07.17 14:44CST)\\r\\n* 10.07.17 - Mail IFB: Loco Belt winder Qty: 26cbm   1X20GP, cargo wl finish on Jul 16, ETD: Jul 22 v\\/v: YM WIDTH 007W, ETA RTM:  Aug 15\\r\\n* 11.07.17 - Order #23 has been booked on 22.07.2017 ETD Vessel. This is the earliest we can book.\\r\\n* 11.07.17 - RD-D received booking information from IFB. ETD 22.07.17 - ETA RTM 15.08.17 - means ETA Rhede approx.  < 25.08.17 - ETA Schellenberg should be 04.09.17\\r\\n* 17.07.17 - As discussed over the due to a mistake by our packaging supplier we can\'t send the 700 Sun Sensors with this shipment. We will send the Sun Sensors approximately 1 week later.\\r\\n* 18.07.17 - Worked hard over the weekend and till late yesterday. Sun Sensors are ready, we will ship with Order #23 today.\\r\\n* 18.07.17 - Container packed along with Sun Sensors, Colour Testing Device, and 20 Sun Sensor Packages. Should set sail on the 22nd.\\r\\n* 19.07.17 - We weren\'t able to send out the Light Box with this shipment as we couldn\'t fit it in the container. We will send that out with another shipment. Maybe Sally\'s goods or Ours.\\r\\n* 24.07.17 - These goods got on the vessel with no problems.\",\"date_creation\":\"1498990023\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504112534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504112534\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500874395\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1500874395\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(89, 1, 1504702873, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504702873\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\"}}'),
(90, 1, 1504702930, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504702930\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\"}}'),
(91, 1, 1504703340, 'task.update', '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504703340\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\"}}'),
(92, 1, 1504703360, 'task.update', '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504703360\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(93, 1, 1504703765, 'task.create', '{\"task_id\":33,\"task\":{\"id\":\"33\",\"title\":\"LBW\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703765\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(94, 1, 1504703788, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703788\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW - Claim RD45\",\"color_id\":\"green\"}}'),
(95, 1, 1504703819, 'task.assignee_change', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(96, 1, 1504703837, 'task.move.position', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(97, 1, 1504703845, 'task.move.position', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703819\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(98, 1, 1504703975, 'task.file.create', '{\"file\":{\"id\":\"22\",\"name\":\"Screenshot aufgenommen 06\\/09\\/2017 15:19.png\",\"path\":\"tasks\\/33\\/fabf7ad33a5360155605799db0fdf3ea2c3df3ee\",\"is_image\":\"1\",\"task_id\":\"33\",\"date\":\"1504703975\",\"user_id\":\"2\",\"size\":\"1549263\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703899\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(99, 1, 1504704011, 'task.file.create', '{\"file\":{\"id\":\"23\",\"name\":\"Screenshot aufgenommen 06\\/09\\/2017 15:20.png\",\"path\":\"tasks\\/33\\/019a3c025104c0f503a3697536b62aa6951dd401\",\"is_image\":\"1\",\"task_id\":\"33\",\"date\":\"1504704011\",\"user_id\":\"2\",\"size\":\"1746478\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1504703899\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(100, 1, 1504704186, 'task.update', '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504704186\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(101, 1, 1504775991, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the chnage approval sheet to Andreas for release\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504775991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the chnage approval sheet to Andreas for release\"}}'),
(102, 1, 1504776004, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1504776004\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\"}}'),
(103, 1, 1506688210, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506688210\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\"}}'),
(104, 1, 1506689557, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\"}}'),
(105, 1, 1507560678, 'task.update', '{\"task_id\":\"25\",\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507560678\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\"}}'),
(106, 1, 1507561894, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. Asap RD-D will send the requested samples.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561894\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. Asap RD-D will send the requested samples.\"}}'),
(107, 1, 1507561921, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. and will send asap the requested samples.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561921\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings. and will send asap the requested samples.\"}}'),
(108, 1, 1507561928, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send asap the requested samples.\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561928\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send asap the requested samples.\"}}'),
(109, 1, 1507561944, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561944\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\"}}'),
(110, 1, 1507561970, 'task.update', '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507561970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(111, 1, 1507562029, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562029\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n\"}}'),
(112, 1, 1507562092, 'task.move.column', '{\"task_id\":\"15\",\"task\":{\"id\":\"15\",\"title\":\"HP2 Order #12\",\"description\":\"* 09.02.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order with the number 4500030172. Please send us your order confirmation! Quantity 1K, 1st batch 500 pcs with ETA 31.07.17 (ETD KW25) and 2nd batch with ETA 05.09.17 (ETD KW30) \\r\\n* 10.02.17 - Mail Shinya: Thanks for sending me order #12\\uff0cI will check with our suppliers and send you order confirmation  in the next week.\\r\\n* 20.02.17 - Shinya has sent the PI with the confirmation of the above mentioned delivery dates\\r\\n* 29.03.17 - Mail Manfred: First batch of #12 is too late - according to our system you must bring forward this batch to ETD 05.06.17 - ETA 10.07.17\\r\\n* 05.04.17 - Ben: We need to work on this ASAP. As we have nearly shipped out all Order #11 boards because of the problem we were having. We are currently calculating the earliest these can arrived. We have around another 50~ units in stock. Can you calculate your stock projections so we have a date to aim for. \\r\\n* 11.04.17 - Mail Ben: As discussed over the phone just now. In order to meet your earlier target for the HP2 we need to Rush Order some Samsung Capacitors which have a very long lead-time. As mentioned we will set a 3,000RMB cap on the extra costs for this and will get in touch if this goes over by 1000+ RMB. After all the purchasing is complete Shinya will update the PI and send it to you so we can adjust the unit price for Order #12.     \\r\\n* 17.05.17 - On Track to send everything out according to above schedule. Please also confirm the boxes when you receive them.\\r\\n* 31.05.17 - Current plan: 107 pcs (#11 - see above) and 397pcs (#12) with 40\' container ETD 18.07.17 - ETA 23.07.17\\r\\n* 26.06.17 - remaing quantity #12 - 603 pcs (remaining quantity at the side of Ben ~400 pcs caused by other problems). So Ben will internally bring forward #13 to fullfill #12\\r\\n* 03.07.17 - Still currently looking at a 21.07.17 ETD for the Second Batch of Order #12. We will begin production right after LBW Order #23 is finished.\\r\\n* 11.07.17 - Received an update from Manfred regarding the second part of Order #12. Due to Sales they are looking to delay this to an arrival time of 07.09.17 which means we send out\\r\\n* 01.08.17. This is acceptable, however the quality of the colour boxes could degrade due to the heat in Shanghai. This cost will need to be covered by RD-D incase this happens.\\r\\n* 24.07.17 - We have finished 488 HP2\'s as part of Order #12 with matching power supplies. We have more PCB\'s in stock, when we receive the power supply labels we can probably produce 65 more units. Making a total of 553 Units.\\r\\n* 24.07.17 - We are aiming to get this on the vessel leaving on the 31\\/07\\/2017. We will send out the other batch via LCL as soon as its ready.\\r\\n* 24.07.17 - Goods scheduled for a Warehouse Entry tomorrow before 1200.\\r\\n* 25.07.17 - 488 Units have been sent to the warehouse this morning. They will hopefully leave on a 31\\/07\\/17 vessel. We will send the remaining units later.\\r\\n* 26.07.17 - We have completed the remainder of Order #12. Total of 82 Units. 3 From Order #11 with Matching Power Supplies and the rest being Order #12 with Matching Power Supplies.\\r\\n\",\"date_creation\":\"1499060607\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562092\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1502762354\"},\"project_id\":\"1\",\"position\":3,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1502762354\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(113, 1, 1507562109, 'task.move.column', '{\"task_id\":\"10\",\"task\":{\"id\":\"10\",\"title\":\"LBW Order #24\",\"description\":\"* 17.02.17 - Mail Jens: Dear Shinya,attached you\\u2019ll find the next Loco BW purchase order #24 - 4500031223 with 5120 x RD45, 600 x suns sensor - ETA Rhede 15.09.17 - ETD ~11.08.17 Please send us your order confirmation!\\r\\n* 21.04.17 - Mail Shinya: Please find attached PI-RD17409 for order LBW#24. Confirmation for ETA Rhede cw37 (15.09.17)\\r\\n* 29.05.17 - Mail Jens: I received the question from our ladies from sales, whether it\'s possible to change the quantities of RD35 \\/ Rd45 from order #24.New split: 3120 x RD45 and 2000 x RD35. \\r\\n* 31.05.17 - Mail Shinya: It doesn\\u2019t matter change the quantity for order LBW#24. Please send the update the PO for us.\\r\\n* 07.06.17 - Jens has sent the updated order with 3120 x RD45 and 2000 x RD35 plus 600 x sun sensor (German)\\r\\n* 21.07.17 - **1)** Looks like we have a delay of 10 days on Order #24 due to the motors arriving late. I have sent an email to Manfred and Ralf about this. 20\\/08\\/2017 ETD. **2)** We won\'t be able to have the new printing on the RD45 cover for Order #24 so we will be using labels.\\r\\n* 02.08.17 - Manfred: Current status ? Everything on track ? Have you received further batches of the motor ? ETD 20.08.17 is secured ?\\r\\n* 03.08.17 - Everything is currently on track. 20.08.17 is looking good so far.\\r\\n* 15.08.17 - Still looking good. We are planning to send the good to the warehouse tomorrow afternoon with the 100 Sun Sensor Colour Boxes.\\r\\n* 17.08.17 - Goods sent out without any problem. Container also includes Sun Sensor and BoJiang parts. Set to get on the vessel on the 20th.\\r\\n* 21.08.17 - Goods got on the vessel without a problem. Set sail 20.08.17\",\"date_creation\":\"1498990120\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562109\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562109\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296179\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296179\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(114, 1, 1507562126, 'task.move.column', '{\"task_id\":\"29\",\"task\":{\"id\":\"29\",\"title\":\"100 German Sun Sensor Packaging\",\"description\":\"* 27.07.17 - We have some extra in our stock and are double checking the quality. If these are ok we can send these with Sally shipment or if they are very urgent we can air freight them. I can update you in 1 or 2 hours.\\r\\n* 28.07.17 - From the update last night this has been changed to 100 units with an ETD on the PO of 08.09.17 we shouldn\'t have much problem if we send out with Order #24. Will only be 15~ Days late.\\r\\n* 15.08.17 - Everything looking good to leave with Order #24.\\r\\n* 17.08.17 - Sent along with Order #24.\\r\\n* 21.08.17 - Goods left with Order #24. Set Sail 20.08.17.\",\"date_creation\":\"1501139675\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507562126\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507562126\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296226\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1503296226\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(115, 1, 1507562130, 'task.move.position', '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506668614\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(116, 1, 1507615682, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the poer supply stocko plug - sun sensor still OPEN\",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507615682\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the poer supply stocko plug - sun sensor still OPEN\"}}'),
(117, 1, 1507623903, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1507623902\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n\"}}'),
(118, 1, 1508143672, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17-the new samples are accept by Quality .\",\"date_creation\":\"1499060388\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508143672\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060388\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17-the new samples are accept by Quality .\"}}'),
(119, 1, 1508152037, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508152037\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(120, 1, 1508221252, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens will send asap the updated order - new ETA Rhede cw02\\/2018 as DAP delivery. Furthermore the we must pay the 2nd half when we received the goods because of inventory stock reason. Please check.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508221252\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens will send asap the updated order - new ETA Rhede cw02\\/2018 as DAP delivery. Furthermore the we must pay the 2nd half when we received the goods because of inventory stock reason. Please check.\"}}'),
(121, 1, 1508339434, 'task.update', '{\"task_id\":\"1\",\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\"}}'),
(122, 1, 1508339541, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\\r\\n\\r\\n\\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339541\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\\r\\n\\r\\n\\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(123, 1, 1508339566, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339566\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(124, 1, 1508339675, 'task.update', '{\"task_id\":\"2\",\"task\":{\"id\":\"2\",\"title\":\"Stocko Plug (Chinese Source)\",\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\\r\\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   \",\"date_creation\":\"1498989271\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339675\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1498989271\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 27.07.16 - RD-CN has found a much lower cost Stocko plug here in China. Ben will ask for new samples.\\r\\n* 03.11.16 - We are currently packaging the LBW and should hopefully find these power over the next two weeks.\\r\\n* 11.11.16 - Ben will receive new samples from YJ in cw46\\r\\n* 23.11.16 - We are still pushing for this, but the guy is coming back soon and we should be able to get this rolling properly soon.\\r\\n* 03.05.17 - Will get to work on this \\r\\n* 07.06.17 - from my point of view, Dirk has identified the plug as one major issue for the faults, therefore we should we should give this a higher priority. Or not ?\\r\\n* 28.06.17 - Mail Sally: acc. to the recently feedback from our stocko plug supplier YuanShun the lead time for the plug now is 6~7 month. Would be great if we can shift to domestic equivalent model. Sally purchased 100 pcs from each type of the alternative model - Delivery date ?\\r\\n* \\r\\n29.06.17 - RD-CN need asap approx. 35K stocko plugs - Jens will check the delivery situation in Germany - ETA China approx. end of August\\r\\n* 02.07.17 - Arrival Date of New Stocko Plugs unsure. We will check next week.\\r\\n* 05.07.17 - Chinese Stocko Plugs arriving at the office tomorrow. Should have them in the factory by Friday (07.07.17)\\r\\n* 11.07.17 - Chinese Power Supply Stocko plug samples checked and all critical dimensions seem to be in compliance. Report has been sent to Andreas as well as the future process.\\r\\n* 12.07.17 - 20 Samples of SS and LBW Stocko plug have been sent to YJ. Hopefully they won\'t lose them again and this time they will send the samples separately so we don\'t need to search for them this time.\\r\\n* 12.07.17 - Any update on the purchase of the Stocko Plugs from Germany? Things seem to be going well so far with the Chinese Plugs. I hope we can get them approved soon.\\r\\n* 12.07.17 - RD-D: German supplier had a delivery time of 22-25 weeks \\r\\n* 13.07.17 - YJ has received the samples and will make 20 samples of each SS and Power Supply for us.\\r\\n* 14.07.17 - Andreas asked for some further information from the Stocko Plug supplier in China: - Tolerance of the thickness of the printed circuit board - Type of the spring elements of the plug. Sally is working on getting this information and I am working with YJ to get the samples prepared and the testing completed (from each - sun sensor and power supply plug - 5 pcs assembled - 5 pcs only the componend unmounted\\r\\n* 17.07.17 - Sally has sent the updated drawings with the information Andreas has asked for\\r\\n* 20.07.17 - YJ are having a meeting today and will let us know when they can send us the samples of the Power Supplies and Sun Sensor.\\r\\n* 21.07.17 - YJ are currently working on gathering the materials to produce our samples. They have said they will make them late next week (CW30) and they should arrive in the beginning of August (CW31)\\r\\n* 26.07.17 - Question Manfred: How does fit to our stock situation of the current original stocko plug ? We must make a reverse calculation from the point where we are running out of stock\\r\\n* 28.07.27 - YJ have said 07.08.17 We should receive the samples. We will test them using standard IQC then send them to you guys in Germany via DHL.\\r\\n* 09.08.17 - Sadly these are a bit delayed and we are looking to receive them on Friday (11\\/08\\/17)\\r\\n* 14.08.17 - Samples have been sent to Martin in Rhede. We need these approved ASAP as we have now run out of Stocko Plugs.\\r\\n* 16.08.17 - Martin has received the samples. He said he will give me feedback next week (CW34).\\r\\n* 30.08.17 - Still waiting for the release from Germanys side. Will update Germany with prices once the supply chain is secure.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 06.09.17 - RD-CN has sent the change approval sheet to Andreas for release\\r\\n* 20.09.17 - Sun Sensor Samples Received, currently check dimensions before sending to Germany.\\r\\n* 22.09.17 - Andreas has been given 5 samples of the Sun Sensor Stock Plug while in Germany. Waiting for his feedback regarding these and also his release regarding the Power Supply Stocko Plug (See QSR: Open).\\r\\n* 10.10.17 - Waiting for Andreas\'s feedback regarding the release for the Power Supply Stocko plug and the results from the Sun Sensor Stocko Plug samples he took back from China.\\r\\n* 10.10.17 - Andreas has sent the signed change approval sheet for the power supply stocko plug - sun sensor still OPEN\\r\\n* 18.10.17 - Andreas has sent the change approval sheet (PCAS) for the alternativ stocko plug for the sun sensor.   \"}}'),
(125, 1, 1508339911, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the apyment when they receive the goods because of inventory stock reason. @Ben: Please check.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339911\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the apyment when they receive the goods because of inventory stock reason. @Ben: Please check.\"}}'),
(126, 1, 1508340045, 'task.update', '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340045\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\"}}'),
(127, 1, 1508340132, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check.\\r\\n\\r\\nIf you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340132\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check.\\r\\n\\r\\nIf you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(128, 1, 1508340144, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340144\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(129, 1, 1508340169, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n\\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340169\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n\\r\\nETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(130, 1, 1508340188, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n              ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340188\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017. \\r\\n              ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(131, 1, 1508340205, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340205\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock \\uf04c\\r\\n\"}}'),
(132, 1, 1508340222, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340222\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(\\r\\n\"}}'),
(133, 1, 1508340249, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340249\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n\"}}'),
(134, 1, 1508340329, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* * 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340329\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* * 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(135, 1, 1508340342, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340342\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\"}}'),
(136, 1, 1508340374, 'task.move.column', '{\"task_id\":\"20\",\"task\":{\"id\":\"20\",\"title\":\"HP2 Short Quantities\",\"description\":\"* 14.06.17 - Mail Jens: after double checking the deliveries quantities from the beginning of 2016 on I found a little discrepancy which we should clarify. In appendix you\\u2019ll find a excel sheet with the delivery quantities from order #4 (beginning of 2016) on. From order #4 up to the completely delivered order #10 I\\u2019ve a discrepancy of -74pcs. HP2 which we still miss\\r\\n* 16.06.17 - Mail Shinya: I  will double check one by one, give me several days I will reply you later.\\r\\n* 03.07.17 - Manfred and Jens will double check their side to make sure they\'ve taken into account all debit\\/credit notes.\\r\\n* 05.07.17 - Received Mail for Jens saying the 74 short quantity is correct. I will check tomorrow with Shinya and we can clear this up in the NPSR tomorrow.\\r\\n* 13.07.17 - Ben confirmed the short quantity of 74 pcs. So Jens calculation is correct. When we make the next HP2 payment we will send in parallel a debit note for these 74 pcs. \\r\\n* 06.09.17 - Shinya and Jens have common understanding RE the debit note. RD-D will deduct the debite note from the next HP2 payment #14\\r\\n* 10.10.17 - I believe this is done?\",\"date_creation\":\"1499060901\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508340374\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340374\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060901\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1499060901\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(137, 1, 1508340536, 'task.create', '{\"task_id\":40,\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508340536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(138, 1, 1508340574, 'task.assignee_change', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508340574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(139, 1, 1508340592, 'task.move.position', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508340574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(140, 1, 1508481023, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1508481023\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\"}}'),
(141, 1, 1509446403, 'task.create', '{\"task_id\":42,\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509446403\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(142, 1, 1509446459, 'task.assignee_change', '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509446459\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(143, 1, 1509449439, 'task.update', '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509449439\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a chnage approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(144, 1, 1509449471, 'task.update', '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a **change approval sheet** for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509449471\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a **change approval sheet** for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(145, 1, 1509558240, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509558240\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\"}}'),
(146, 1, 1509620981, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509620981\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\"}}'),
(147, 1, 1509700441, 'task.update', '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509700441\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(148, 1, 1509700496, 'task.update', '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - **Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.**\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509700496\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - **Mail Ben: I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.**\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(149, 1, 1509700527, 'task.update', '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1509700527\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n\\r\\n\"}}'),
(150, 1, 1510130045, 'task.update', '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510130045\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499848745\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(151, 1, 1510137991, 'task.create', '{\"task_id\":60,\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(152, 1, 1510137999, 'task.move.position', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(153, 1, 1510138004, 'task.move.position', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(154, 1, 1510138009, 'task.move.position', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510137991\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(155, 1, 1510139314, 'task.update', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\"}}'),
(156, 1, 1510139326, 'task.file.create', '{\"file\":{\"id\":\"49\",\"name\":\"534-122.pdf\",\"path\":\"tasks\\/60\\/55f8d7e982c1b8bc458892a943292558d8bc6abe\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510139326\",\"user_id\":\"2\",\"size\":\"298197\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(157, 1, 1510139327, 'task.file.create', '{\"file\":{\"id\":\"50\",\"name\":\"534-123.pdf\",\"path\":\"tasks\\/60\\/4ce76686716c027554ccc45d03b6152bd1b8bfeb\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510139327\",\"user_id\":\"2\",\"size\":\"310696\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(158, 1, 1510146283, 'task.file.create', '{\"file\":{\"id\":\"51\",\"name\":\"534-122.pdf\",\"path\":\"tasks\\/60\\/2401031dd2ee16fda65881524f5e78d2c345e132\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510146283\",\"user_id\":\"2\",\"size\":\"314048\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(159, 1, 1510146283, 'task.file.create', '{\"file\":{\"id\":\"52\",\"name\":\"534-123.pdf\",\"path\":\"tasks\\/60\\/cc6d56e6d694bc71d7534e481e66ec2f278cb50b\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1510146283\",\"user_id\":\"2\",\"size\":\"322377\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510139314\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(160, 1, 1510171211, 'task.file.create', '{\"file\":{\"id\":\"53\",\"name\":\"566-013d-\\u5f00\\u6a21\\u62a5\\u544a-20171028_Knl.pptx\",\"path\":\"tasks\\/41\\/62d6589315280f146b6dd763288ab94a219b4f3c\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510171211\",\"user_id\":\"2\",\"size\":\"1015146\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(161, 1, 1510171211, 'task.file.create', '{\"file\":{\"id\":\"54\",\"name\":\"566-063C-\\u5f00\\u6a21\\u62a5\\u544a-20171028_Knl.pptx\",\"path\":\"tasks\\/41\\/00c8c153b3091bad809029c3d63648fc0b762390\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510171211\",\"user_id\":\"2\",\"size\":\"1092746\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510126395\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(162, 1, 1510171339, 'task.update', '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510171339\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n\\r\\n\"}}'),
(163, 1, 1510216320, 'subtask.update', '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(164, 1, 1510216322, 'subtask.update', '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(165, 1, 1510216324, 'subtask.update', '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(166, 1, 1510216328, 'subtask.update', '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(167, 1, 1510216329, 'subtask.update', '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(168, 1, 1510216331, 'subtask.update', '{\"subtask\":{\"id\":\"12\",\"title\":\"Start Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"12\",\"user_id\":\"1\",\"position\":\"4\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1506689557\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(169, 1, 1510221717, 'subtask.update', '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(170, 1, 1510221726, 'subtask.update', '{\"subtask\":{\"id\":\"1\",\"title\":\"Send Micrometer to SGS (3.7.17)\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"1\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(171, 1, 1510223282, 'task.update', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype. It is a zip file for which you need a password.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510223282\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype. It is a zip file for which you need a password.\"}}'),
(172, 1, 1510225079, 'task.update', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510225079\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password.\"}}'),
(173, 1, 1510226766, 'task.update', '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510226766\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\"}}'),
(174, 1, 1510247600, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247600\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\"}}'),
(175, 1, 1510247817, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247817\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(176, 1, 1510247828, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. \\r\\nCan we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247828\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. \\r\\nCan we combine this with Order #27 (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(177, 1, 1510247846, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247846\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA aaprox. 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(178, 1, 1510247858, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510247858\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want\"}}'),
(179, 1, 1510248012, 'task.create', '{\"task_id\":64,\"task\":{\"id\":\"64\",\"title\":\"HP\",\"description\":\"\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248012\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(180, 1, 1510248022, 'task.move.position', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP\",\"description\":\"\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248012\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(181, 1, 1510248061, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248061\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 order #16 - 4500033946\",\"owner_id\":\"1\"}}'),
(182, 1, 1510248160, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April, please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248160\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April, please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\",\"color_id\":\"red\"}}'),
(183, 1, 1510248203, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248203\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n\\r\\n\"}}'),
(184, 1, 1510248338, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 09.11.17 - \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248338\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 09.11.17 - \",\"color_id\":\"red\"}}'),
(185, 1, 1510248374, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248374\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Order #14 - 4500032237\"}}'),
(186, 1, 1510248520, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248520\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(187, 1, 1510248534, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(188, 1, 1510248697, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \"}}'),
(189, 1, 1510249626, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510249626\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\"}}'),
(190, 1, 1510314228, 'task.update', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510314228\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \"}}'),
(191, 1, 1510317375, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* \\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510317375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* \\r\\n\\r\\n\"}}'),
(192, 1, 1510317496, 'task.file.create', '{\"file\":{\"id\":\"81\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/17\\/847a961bac969b8926c4c24cd4a9321f88ae2a2e\",\"is_image\":\"0\",\"task_id\":\"17\",\"date\":\"1510317496\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510248534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(193, 1, 1510317515, 'task.file.create', '{\"file\":{\"id\":\"82\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/40\\/f37db70b52cd6f1f7bfbf5c3628164bbfa83bba1\",\"is_image\":\"0\",\"task_id\":\"40\",\"date\":\"1510317515\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(194, 1, 1510317529, 'task.file.create', '{\"file\":{\"id\":\"83\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/40\\/edb31aaf0e3b1352a65d8725a7aa625ee7bd1d2b\",\"is_image\":\"0\",\"task_id\":\"40\",\"date\":\"1510317529\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510248697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(195, 1, 1510317560, 'task.file.create', '{\"file\":{\"id\":\"84\",\"name\":\"Production Schedule (Iss 2.0).pdf\",\"path\":\"tasks\\/64\\/70768019f4694b774f13871cffa17b7aa1ed700a\",\"is_image\":\"0\",\"task_id\":\"64\",\"date\":\"1510317560\",\"user_id\":\"2\",\"size\":\"563794\"},\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* \\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510317375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(196, 1, 1510587769, 'task.update', '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\"}}'),
(197, 1, 1510587794, 'task.file.create', '{\"file\":{\"id\":\"91\",\"name\":\"566-013-1110.stp\",\"path\":\"tasks\\/41\\/abb28a5444fd1551c73ca2d93c8bc80c8d27db57\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587794\",\"user_id\":\"2\",\"size\":\"147159\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(198, 1, 1510587795, 'task.file.create', '{\"file\":{\"id\":\"92\",\"name\":\"566-013d-\\u5f00\\u6a21\\u62a5\\u544a-20171110.pptx\",\"path\":\"tasks\\/41\\/b98c3eb8429052f7ecf1f9b06aa0eef7faa90d28\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587795\",\"user_id\":\"2\",\"size\":\"825629\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(199, 1, 1510587795, 'task.file.create', '{\"file\":{\"id\":\"93\",\"name\":\"566-063C-\\u5f00\\u6a21\\u62a5\\u544a-20171110.pptx\",\"path\":\"tasks\\/41\\/42f6cb5efef666ca1190e4f5f63351f12d51c395\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587795\",\"user_id\":\"2\",\"size\":\"1050611\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587769\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(200, 1, 1510587951, 'task.update', '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\"}}'),
(201, 1, 1510587963, 'task.file.create', '{\"file\":{\"id\":\"94\",\"name\":\"566-063C-\\u5f00\\u6a21\\u62a5\\u544a-20171113.pptx\",\"path\":\"tasks\\/41\\/1c66c8d294f1de3bef385440e16e172818fb3fc3\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587963\",\"user_id\":\"2\",\"size\":\"1081613\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(202, 1, 1510587963, 'task.file.create', '{\"file\":{\"id\":\"95\",\"name\":\"566-013e.pdf\",\"path\":\"tasks\\/41\\/24c7660ae193670a44279be9668b278d2e00de78\",\"is_image\":\"0\",\"task_id\":\"41\",\"date\":\"1510587963\",\"user_id\":\"2\",\"size\":\"67768\"},\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510587951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(203, 1, 1510588070, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510588070\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\"}}'),
(204, 1, 1510588086, 'task.file.create', '{\"file\":{\"id\":\"96\",\"name\":\"566-002e.pdf\",\"path\":\"tasks\\/13\\/bff1f65adfb99ee85ef9648ff7d51f1e3b286754\",\"is_image\":\"0\",\"task_id\":\"13\",\"date\":\"1510588086\",\"user_id\":\"2\",\"size\":\"35566\"},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510588070\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(205, 1, 1510589975, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510589974\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n\\r\\n\"}}'),
(206, 1, 1510590201, 'task.file.create', '{\"file\":{\"id\":\"98\",\"name\":\"AW_PCAS_RD35.45 Cover Printing_00.pdf\",\"path\":\"tasks\\/28\\/5fafb3b93b1e40962475d71a5c86b76a1690c7ed\",\"is_image\":\"0\",\"task_id\":\"28\",\"date\":\"1510590201\",\"user_id\":\"2\",\"size\":\"158274\"},\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510532112\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510532112\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(207, 1, 1510590238, 'task.update', '{\"task_id\":\"28\",\"task\":{\"id\":\"28\",\"title\":\"LBW Model Number on Cover\",\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\\r\\n* 13.11.17 - Andreas has sent back the change approval sheet\",\"date_creation\":\"1499848745\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510590238\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510532112\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"description\":\"* 12.07.17 - Had a call with Manfred and we need to add RD35 and RD45 marks on the front cover on the product through the stamp printing process. Sending a Mail to Manfred and Ralf to update them about the situation: RX Stamp Update, Rework RD35\\/45 Covers for Order #24.\\r\\n* 13.07.17 - Received the drawings Dieter made, however like the Sun Sensor Label they aren\'t Vector format so they can\'t really work with them. Waiting for the Vector Format to be sent then I will send them to RX.\\r\\n* 13.07.17 - Received mail from Dieter. Sadly the files are in Lossy\\/Rasterised format again (PSD\'s). I have replied to the email.\\r\\n* 13.07.17 - Dieter said changing to Vector format is very complicated so we will try with the Rasterised format and see what supplier comes back with.\\r\\n* 14.07.17 - Drawings have been sent to RX. they have said it will take roughly 3-4 Days to make this updated plate. I am not sure of the costs and they are working it out and will get back to me. If this timeline is stuck to we shouldn\'t have any problems with doing the printing like this for Order #24.\\r\\n* 20.07.17 - Dieter is going to make the label design for the RD35\\/45 so we are ready incase we need to use it.\\r\\n* 21.07.17 - Drawings have been received and I have already sent them to our packaging supplier. He will get to work on this and have them ready next week. For Order #24 we will be using the labels on the RD45. For Order #25 we can switch to the printing system that we received before. I will create the change approval requests as soon as I receive the labels.\\r\\n* 26.07.17 - Because RX have over produced on the RD45 cover and already printed most of Order #25 it seems we still need to use labels for Order #25.\\r\\n* 27.07.17 - Change Approval Request for the RD45 Label given to Andreas. Waiting for his reply.\\r\\n* 28.07.17 - Andreas has sent back the signed change request - what is the current status of the labels (samples \\/ picture) ?\\r\\n* 03.08.17 - Release Reports have been received. We will need to stay on this as we are only using labels for 2 orders. We will need to do another release when RX starts to do the printing. I will change the status to Yellow for now as its not a critical topic anymore.\\r\\n* 09.08.17 - Everything is ok for this for the next two orders. We are still pushing RX to get the metal plate complete.\\r\\n* 25.08.17 - RX have said the plate will be complete tomorrow and they will produce samples for verification on Monday\\/Tuesday.\\r\\n* 30.08.17 - RX have said the plate will arrive today and they will make samples tomorrow.\\r\\n* 07.09.17 - RD35 Samples received. Passed by Henk, you can see them when you come to China.\\r\\n* 20.09.17 - Still waiting for the samples of the RD45. We are pressing RX, but its moving slowly.\\r\\n* 21.10.17 - RX are going to produce the further LBW Orders for us going all the way through to #27, when they do this we will get samples of the RD45 cover.\\r\\n* 01.11.17 - This has now been completed and we have received both the RD35 & RD45 Samples which have been approved by Henk. The Change Approval has also been sent to Andreas. Waiting for him to sign and send back.\\r\\n* 13.11.17 - Andreas has sent back the change approval sheet\"}}'),
(208, 1, 1510657337, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657337\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\"}}'),
(209, 1, 1510657353, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657353\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(210, 1, 1510657447, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657447\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\"}}'),
(211, 1, 1510657457, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510657457\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(212, 1, 1510676075, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510676075\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\"}}'),
(213, 1, 1510676132, 'task.file.create', '{\"file\":{\"id\":\"100\",\"name\":\"UBW testing information.msg\",\"path\":\"tasks\\/39\\/bebfcd37cf73d70a04e02d37669ef6f9b4a216d2\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1510676132\",\"user_id\":\"2\",\"size\":\"4001792\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510676075\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(214, 1, 1510734227, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510734227\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\\r\\n\\r\\n\",\"color_id\":\"yellow\"}}'),
(215, 1, 1510734248, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510734248\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n\",\"color_id\":\"yellow\"}}'),
(216, 1, 1510741428, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updates orders \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741428\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updates orders \\r\\n\\r\\n\\r\\n\"}}'),
(217, 1, 1510741447, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741447\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\\r\\n\\r\\n\"}}'),
(218, 1, 1510741472, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741472\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order\\r\\n\"}}'),
(219, 1, 1510741523, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means ETD approx. 10.04.18 (cw15)\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\"}}'),
(220, 1, 1510741534, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510741534\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n\\r\\n\\r\\n\"}}'),
(221, 1, 1510765015, 'task.update', '{\"task_id\":\"16\",\"task\":{\"id\":\"16\",\"title\":\"HP2 Order #13\",\"description\":\"* 20.03.17 - Mail Jens: Dear Shinya, attached you\\u2019ll find a further HP2 purchase order (order #13) with the PO number 4500030828. Please send us your order confirmation!\\r\\n* 28.03.17 - order confirmation received , 500 pcs ETA CW40 (04.10.17) ETD CW35 and next 500 pcs ETA CW46 (15.11.17) ETD KW41, with updated price , price increase 23 RMB\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 27.10.17 (ETD 22.09.17) and 2nd batch ETA Rhede 14.12.17 (ETD 09.11.17)]\\r\\n* 03.08.17 - We are just waiting for the Main PCB\'s for this order. We should have no problem meeting this timeline.\\r\\n* 22.08.17 - Mail received from Manfred ETD China CW36.\\r\\n* 06.09.17 - please send out 500 pcs asap latest with ETD 15.09.17\\r\\n* 07.09.17 - We will send the 50 extra unpackaged units out with the second half of Order #13.\\r\\n* 11.09.17 - Pallets done, sending goods out tomorrow 12\\/09\\/17\\r\\n* 13.09.17 - Update regarding the next deliveries of HP2. Manfred mentioned: \\\"If we receive the order for 400 pcs HP2, we need the second half of #13 with ETA Rhede 15.11.17 and the first half of #14 with ETA Rhede 10.01.18.\\r\\nIf not, then we need the second half of #13 with ETA Rhede 01.12.17 and the first half of #14 with ETA Rhede 30.01.18.\\\" If the sale takes place we will need to send it out two weeks earlier than this because of the National Holiday in China.\\r\\n* 29.09.17 - We have sent out 343 units and will send out the second batch as soon as the Small PCB\'s for the HP2 arrive.\\r\\n* 10.10.17 - Will get back to Manfred tomorrow regarding the 3rd shipment of the remaining HP2\'s from Order #13.\\r\\n* 13.10.17 - Sorry for the late update, we are looking at sending these goods (153pcs) out in CW43 - means ETA approx. 01.12.17\\r\\n* 24.10.17 - I\'m afraid we are looking at a further delay with this till CW44 due to the SMT Supplier being busy at the moment...\\r\\n* 03.11.17 - ETD 05.11.17 - means ETA approx. 10.12.17\",\"date_creation\":\"1499060678\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510765015\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060678\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"yellow\"}}'),
(222, 1, 1510848445, 'task.file.create', '{\"file\":{\"id\":\"140\",\"name\":\"170913_price_sinter-gears.JPG\",\"path\":\"tasks\\/1\\/f7db8419a4166d1865553dfc831a69aa1950ae24\",\"is_image\":\"1\",\"task_id\":\"1\",\"date\":\"1510848445\",\"user_id\":\"2\",\"size\":\"57154\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(223, 1, 1510848735, 'task.file.create', '{\"file\":{\"id\":\"141\",\"name\":\"Gear Packaging (Iss 2.0).pdf\",\"path\":\"tasks\\/1\\/5eeea27a084f1f27868bfd680e3180a65cf5977a\",\"is_image\":\"0\",\"task_id\":\"1\",\"date\":\"1510848735\",\"user_id\":\"2\",\"size\":\"872312\"},\"task\":{\"id\":\"1\",\"title\":\"UBW GB Parts\",\"description\":\"* 20.04.16 - today we have made a decision and send you asap a further order about 1K pieces with complete QC on your side\\r\\n* 10.05.16 - Mail Shinya: the fastest delivery schedule on CW26. ETA Germany on CW31.\\r\\n* 15.06.16 - Due to the good arriving a bit late and not having a comfortable amount of time to do inspection the goods wil be shipped out along with Sally\'s parts in CW27\\r\\n* 23.06.16 - Confusion with the material cleared up, it seems we are going with the same material  that we use for the LBW as discussed. We will arrange reinspection of the parts and switch the DuPont batch we have with a batch from LBW Order #17 and use the DuPont gears for the LBW.\\r\\n* 29.06.16 - Jonny has confirmed the material Asahi KASEI Tenac-C 4520, POM. We will change the drawing 566-045 according to this information.\\r\\n* 24.08.16 - we should receive the goods today\\r\\n* 07.09.16 - IQC with some minor faults, we will start the life cycle test at the beginning of cw37\\r\\n* 07.12.16 - first feedback looks good, I will send you the detailed results in KW50\\r\\n* 24.01.17 - hopefully I can send you the result after our DTC meeting tomorrow\\r\\n* 08.02.17 - we will start the mass production for the first 1K\\r\\n* 28.02.17 - mass production will be in cw10\\r\\n* 08.03.17 - How did the mass production go?\\r\\n* 15.03.17 - Until end of March they plan to produce 800 pcs\\r\\n* 20.04.17 - all the devices were produced without any problems \\r\\n* 25.04.17 - Manfred will discuss the next steps with Ralf in KW19 at the latest\\r\\n* 23.05.17 - Manfred is collection all necessary information for a further order\\r\\n* 20.06.17 - RD-D has sent all information and waiting for Ben\'s response\\r\\n* 02.07.17 - Bought the micrometer required for inspection. Planning to send it off to SGS for Calibration. Should take 1 week.\\r\\n* 03.07.17 - Micrometer sent to SGS (SF: 920945355241). Will confirm how long the testing will take to complete.\\r\\n* 05.07.17 - SGS Confirmed it will take 1 week to complete testing. They received it today so we are looking at Thursday next week for receiving the Micrometer (13\\/07\\/17)\\r\\n* 12.07.17 - SGS have completed the testing of the Micrometer and are finishing all the paper work to go with it. I am hoping we should receive it this week, if not it\'ll be early next week (CW29). I will follow up with the remaining tasks and pricing once this is received.\\r\\n* 13.07.17 - Payment has been made to SGS. Micrometer will be sent soon with documentation. Should hopefully receive the Micrometer Tomorrow or Monday. After this I will recheck out parts and schedule a call with Martin.\\r\\n* 17.07.17 - Micrometer has been received and complete with testing certification. The Micrometer is fully compliant and in tolerance. Will test tomorrow and measure our gears to check the dimensions.\\r\\n* 19.07.17 - Full report has been sent to Germany regarding the gears with my thoughts and opinions. Waiting for the feedback from Germany.\\r\\n* 22.08.17 - Martin has sent additional gears from Germany for us to make sure our previous reports were correct. Waiting for these to arrive, then we can confirm.\\r\\n* 30.08.17 - Reports sent to Martin, they confirm previous results. Waiting for Martins Feedback.\\r\\n* 30.08.17 - Martins feedback received. Waiting for 100% confirmation that mass production orders can begin then we will move forward. Packaging also needs to be discussed.\\r\\n* 01.09.17 - Martin have given full confirmation for the release. Working on approving the packaging with Manfred.\\r\\n* 13.09.17 - Prices have been sent to Manfred. Waiting for a reply regarding Prices and Packaging.\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n\",\"date_creation\":\"1498988735\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"0\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1508339434\",\"reference\":\"\",\"date_started\":\"1499934060\",\"time_spent\":\"1.81\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886034\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(224, 1, 1510902988, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 . Manfred: we need a DDP delivery\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510902988\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 . Manfred: we need a DDP delivery\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(225, 1, 1510903955, 'task.file.create', '{\"file\":{\"id\":\"143\",\"name\":\"QIR-20171117-sample-Seitenteil -566 F 002 e.docx\",\"path\":\"tasks\\/13\\/8c8ef68565ad2b88142f0c342a433e622f98974f\",\"is_image\":\"0\",\"task_id\":\"13\",\"date\":\"1510903955\",\"user_id\":\"2\",\"size\":\"1483219\"},\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1510894077\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(226, 1, 1511086520, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511086520\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\"}}'),
(227, 1, 1511086628, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511086628\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n\"}}'),
(228, 1, 1511264700, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511264700\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n\"}}'),
(229, 1, 1511264799, 'task.file.create', '{\"file\":{\"id\":\"152\",\"name\":\"171121_GSM3_sample_Ben.pdf\",\"path\":\"tasks\\/38\\/7348e7c0e205459f0d839cc10fa6b4416ddcd834\",\"is_image\":\"0\",\"task_id\":\"38\",\"date\":\"1511264799\",\"user_id\":\"2\",\"size\":\"167873\"},\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511264700\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(230, 1, 1511345404, 'task.update', '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .please help to confirm and advise.\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511345404\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .please help to confirm and advise.\\r\\n\"}}'),
(231, 1, 1511345415, 'task.file.create', '{\"file\":{\"id\":\"153\",\"name\":\"IMG_0131.JPG\",\"path\":\"tasks\\/19\\/620831208d6e5f70735c048bc35fe93ad569c5c7\",\"is_image\":\"1\",\"task_id\":\"19\",\"date\":\"1511345415\",\"user_id\":\"2\",\"size\":\"185156\"},\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .please help to confirm and advise.\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511345404\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(232, 1, 1511360391, 'task.create', '{\"task_id\":90,\"task\":{\"id\":\"90\",\"title\":\"HP2\",\"description\":\"\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"21\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360391\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(233, 1, 1511360400, 'task.move.position', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2\",\"description\":\"\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360391\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":13,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(234, 1, 1511360543, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\"}}'),
(235, 1, 1511360556, 'task.file.create', '{\"file\":{\"id\":\"155\",\"name\":\"neues_Firmenlogo_ab 15.01.18.pptx\",\"path\":\"tasks\\/90\\/e3227d5484a9e308aced7533fcda95074aac48fd\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1511360556\",\"user_id\":\"2\",\"size\":\"179952\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(236, 1, 1511360556, 'task.file.create', '{\"file\":{\"id\":\"156\",\"name\":\"HP2 TP-001C.PDF\",\"path\":\"tasks\\/90\\/36201ed391caa1e0dfb875d5125791f55bfbd1db\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1511360556\",\"user_id\":\"2\",\"size\":\"617305\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360543\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(237, 1, 1511360667, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1511360667\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(238, 1, 1511503710, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"pink\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511503710\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\"}}'),
(239, 1, 1511504034, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17-Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511504034\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17-Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\"}}'),
(240, 1, 1511515451, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511515451\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\"}}'),
(241, 1, 1511517297, 'task.file.create', '{\"file\":{\"id\":\"159\",\"name\":\"5512\\u66f2\\u7ebf\\u56fe20171105.pdf\",\"path\":\"tasks\\/38\\/ab7c5c86ee591b4638a2fb248c4f589b1cb1a138\",\"is_image\":\"0\",\"task_id\":\"38\",\"date\":\"1511517297\",\"user_id\":\"2\",\"size\":\"833192\"},\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511511525\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(242, 1, 1511517375, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\"}}'),
(243, 1, 1511517433, 'task.update', '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517433\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n\"}}'),
(244, 1, 1511519504, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* \",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511519504\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n* \"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(245, 1, 1511768623, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511768623\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n\"}}'),
(246, 1, 1511768631, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511768631\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"green\"}}'),
(247, 1, 1511790742, 'task.update', '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511790742\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n\\r\\n\"}}'),
(248, 1, 1511855708, 'subtask.update', '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(249, 1, 1511855710, 'subtask.update', '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(250, 1, 1511855712, 'subtask.update', '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511517375\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(251, 1, 1511939384, 'task.file.create', '{\"file\":{\"id\":\"168\",\"name\":\"ReqSpec_LowCost Beltwinder_Ver12_111017.pdf\",\"path\":\"tasks\\/33\\/85137b8a414a4c470ccb5da22199305ac17a5ede\",\"is_image\":\"0\",\"task_id\":\"33\",\"date\":\"1511939384\",\"user_id\":\"2\",\"size\":\"1899309\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(252, 1, 1511939680, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511939680\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(253, 1, 1511942380, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\"}}'),
(254, 1, 1511973428, 'task.update', '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511973428\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n\\r\\n\\r\\n\"}}'),
(255, 1, 1511973437, 'task.move.column', '{\"task_id\":\"19\",\"task\":{\"id\":\"19\",\"title\":\"HP2 Tool Repair\",\"description\":\"* 12.06.17 - Mail Ben: Something that just came through at the end of last week was RuiXuan have done some repairs on our mould to stop many of the: \\u2022 Scratch issues on the front, corners and Sides \\u2022 Gas and Flow marks of the front and sides. The total for this is 6,500RMB and they have done the repair already.\\r\\n* 12.06.17 - Mail Manfred: When will you receive the first mass production parts after this mould repair ? For the future please make sure that we discuss such repairs in advance before RX or someone else will start with the work \\/ repair. The costs are herewith confirmed - please send us the invoice.\\r\\n* 12.06.17 - Mail Ben: We are planning our next batch of HP2 soon so we can verify the changes are successful. I will get back to you with a specific date later.\\r\\n* 22.06.17 - Ben said that we will receive the optimized housings not earlier than #14 (end of the year)\\r\\n* 21.10.17 - We have sent another order for 4,000 units to RX. When they produce this we will send QC to check if the tooling modifications have worked.\\r\\n* 16.11.17 - When we receive the batch of housing from the mass production delivery we will select 3 housing and do a QC Report on them and send them to Germany via DHL for Andreas to verify.\\r\\n* 22.11.17 - Mail Henk: Dear Andreas\\/Manfred: This afternoon we sent 5pcs HP2 cover samples to you ,3pcs are qualified for your reference ,2pcs with little shadow close the logo, we not sure if all can use or only 1pc is available or 2pcs all fail ,because HP2 cover have the high appearance requirement .Please help to confirm and advise.\\r\\n* 23.11.17 - Mail Henk: The DHL tracking Number is : 50 1147 9480\\r\\n* 27.11.17 - Mail Manfred: I have just received the samples from our warehouse. The delivery arrived on Friday. I will forward them to Andreas directly. Maybe he can give you asap a response.\\r\\n* 29.11.17 - Mail Henk: Dear Andreas. Please help to check the little shadow close the logo and confirm can be accept or not ASAP.\\r\\n* 29.11.17 - Mail Andreas: Hello Henk, the small deviations on the surface is acceptable and need not be sorted out. Make sure that they do not get bigger.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499060836\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511973437\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511973437\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1510818124\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1510818124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(256, 1, 1512042865, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512042865\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n\"}}'),
(257, 1, 1512118166, 'subtask.update', '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(258, 1, 1512118166, 'subtask.update', '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(259, 1, 1512118168, 'subtask.update', '{\"subtask\":{\"id\":\"37\",\"title\":\"Receive Testing Info From Andreas\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"39\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511942380\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(260, 1, 1512375539, 'task.update', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512375539\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060242\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n\"}}'),
(261, 1, 1512384679, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"FHP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512384679\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n\"}}'),
(262, 1, 1512397952, 'task.update', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512397952\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n\"}}'),
(263, 1, 1512401694, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512401694\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n\\r\\n\"}}'),
(264, 1, 1512462297, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512462297\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Order #14 - 4500032237\"}}'),
(265, 1, 1512462362, 'task.update', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512462362\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060719\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(266, 1, 1512634655, 'task.create', '{\"task_id\":93,\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634655\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(267, 1, 1512634664, 'task.move.position', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634655\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(268, 1, 1512634739, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\"}}'),
(269, 1, 1512634764, 'task.file.create', '{\"file\":{\"id\":\"186\",\"name\":\"20171206_163914_resized_1.jpg\",\"path\":\"tasks\\/93\\/932f585527f75237d60fc09afe1c2dab4bea7cc3\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1512634764\",\"user_id\":\"2\",\"size\":\"368088\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(270, 1, 1512634764, 'task.file.create', '{\"file\":{\"id\":\"187\",\"name\":\"20171206_163920_resized_1.jpg\",\"path\":\"tasks\\/93\\/be5a2720d6436fc5c6a1470f72552837ab8a4db3\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1512634764\",\"user_id\":\"2\",\"size\":\"285148\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(271, 1, 1512634764, 'task.file.create', '{\"file\":{\"id\":\"188\",\"name\":\"20171206_163930_resized_1.jpg\",\"path\":\"tasks\\/93\\/5590b3382e4c6671187060c418d26f92038617d0\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1512634764\",\"user_id\":\"2\",\"size\":\"389565\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634739\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(272, 1, 1512634786, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512634786\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"color_id\":\"red\"}}'),
(273, 1, 1512643014, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512643014\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n\\r\\n\"}}'),
(274, 1, 1512677863, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 07.12.17 - Mail Manfred: Dear Berthold, do you already have a result regarding the sheetmetall parts (5 pcs) which Henk has sent to us ?\\r\\n\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512677863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 07.12.17 - Mail Manfred: Dear Berthold, do you already have a result regarding the sheetmetall parts (5 pcs) which Henk has sent to us ?\\r\\n\\r\\n\"}}'),
(275, 1, 1512677897, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with **ETD 05.18** - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512677897\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means ETD approx. 06.02.18 (cw6).\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with **ETD 05.18** - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\"}}'),
(276, 1, 1512677914, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512677914\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\"}}'),
(277, 1, 1512678022, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512678022\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n\\r\\n\\r\\n\"}}'),
(278, 1, 1512678047, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want **(ETD approx. 06.02.18 (cw6)**\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512678047\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want **(ETD approx. 06.02.18 (cw6)**\"}}'),
(279, 1, 1512679122, 'task.update', '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512679122\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(280, 1, 1512722140, 'task.update', '{\"task_id\":\"13\",\"task\":{\"id\":\"13\",\"title\":\"Carry 001\\/002 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 27.11.17 - Mail Berthold: Thanks for the info, noted. Do we need to change the drawings to fit the new measures, or do they fix the next parts to fit the drawing?\\r\\n* 27.11.17 - Mail Ben: I would personally leave everything alone for the moment with the drawings and just consider the current situation a \\u201cconcession\\u201d for the moment (based on your and Andreas\\u2019s measurements too). Once we have received 2 more orders from Carry we can see where their measurements stand on a longer timeline then we can considering locking in the drawings to this. Hope thats ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499060388\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512722140\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510577041\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* 30.06.17 - Mail Ben: Carry have produced extra which means for most of Order #24 we are secure, however it\\u2019ll keep us going for a while incase there are any modifications required on the tool. Comment Manfred: Tooling will be ready 19.07.17, then function test etc. Ready for mass production latest at ...... ?\\r\\n* 04.07.17 - Earliest time for this tool to be ready and released for mass production is the end of July (CW39). Carry is very quick in production so we shouldn\'t have any issues with our orders.\\r\\n* 26.07.17 - Current status ? \\r\\n* 27.07.17 - Carry have been busy moving factory recently and have not been able to work because of the high temperatures. The boss is going to get back to us with a updated timeline tomorrow.\\r\\n* 02.08.17 - Manfred: Current status ? Because you said, only for most of #24 you are secure\\r\\n* 03.08.17 - Order #24 is secure and we are good to go. Carry said they will be finished by Middle of the this month.\\r\\n* 09.08.17 - Carry have finished assembling the new tool. They are working on optimising it and will send us samples before the end of the month.\\r\\n* 25.08.17 - Just received an update for Carry. They will work on the two forming tools first which are the worst, this will be done in 20 days. Then after they will replace the other three tools. I will check on Carry in 20 days. We should still be able to meet the timeline for Order #25.\\r\\n* 07.09.17 - Carry have been working hard to get the tooling ready. They have used to old tooling design to create the new tool. Samples will be ready on the 14th\\/15th with a full FSIR Report.\\r\\n* 20.09.17 - WuXi has recently been visited by the government so all factories are closed. They will reopen next week (CW39) and we should receive our samples soon.\\r\\n* 22.09.17 - Carry have said they have produced the samples and we will received them tomorrow or Monday.\\r\\n* 29.09.17 - Dimensions have been checked. There is only a problem with the three protruding points on one of the halves, not a major issue but they are out of tolerance. Henk has provided feedback to the supplier and they are modifying the tool. Should be ready after the holiday and shouldn\'t influence production. We have conducted the final function test and everything is ok.\\r\\n* 10.10.17 - One of our QC Staff are going to FHJ today. They have finished the modification on the tool and our QC will approve when they are there, hopefully we should be able to take care of this. Henk will send a report to Andreas for the sheet metal letting him know our tests and results.\\r\\n* 10.10.17 - the new samples are accept by Quality.\\r\\n* 13.11.17 - Task opened again due to Sheet Metal 002 issues. Updated drawing 566-002e.pdf  have been sent to Carry, Carry will send me a timeline for everything tomorrow. The process will be: *1)* Modify Tool *2)* Produce Samples *3)* Test Samples and release mass production *4)* Mass Produce Order #25\\r\\n* 16.11.17 - Sheet Metal samples are being finished late tonight. They will be sent tomorrow morning and we should receive them on Saturday. I will check the samples on Saturday and see if we can release production.\\r\\n* 17.11.17 - Samples have been received today! We have assembled 4x RD45 and 5x RD35 for final function testing and everything is good. There is no wear or noise anymore on the sheet metal or coming from the unit. I have also attached Carry\'s FSIR Report. I will send out samples to Germany when we receive the mass production batch. I am currently waiting for FanRong\'s feedback regarding the timeline for production.\\r\\n* 17.11.17-the 3nd mould modify samples inspection follow drawing 566-F-00-002 e, the new samples pass the test and we concession to accept the little tolerance out. \\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Parts arriving on Wednesday. As soon as parts arrive we will also send samples to Germany.\\r\\n* 24.11.17 - Production is running smoothly and change appears to of been successful. On Monday we will send 5 samples to Germany for inspection.\\r\\n* 27.11.17 - Mail Henk: Dear Andreas\\/Berthold\\/Peter: The seitenteil sheet metal samples are concession to accept by us ,though have several dimension out of tolerance ,these deviations are not interfere the gear working and testing without noise. This afternoon 5pcs samples will send to you by DHL ,the tracking number is :49 6184 0855. Attached FSR for your reference.\\r\\n* 27.11.17 - Mail Berthold: Thanks for the info, noted. Do we need to change the drawings to fit the new measures, or do they fix the next parts to fit the drawing?\\r\\n* 27.11.17 - Mail Ben: I would personally leave everything alone for the moment with the drawings and just consider the current situation a \\u201cconcession\\u201d for the moment (based on your and Andreas\\u2019s measurements too). Once we have received 2 more orders from Carry we can see where their measurements stand on a longer timeline then we can considering locking in the drawings to this. Hope thats ok.\\r\\n\\r\\n\\r\\n\"}}'),
(281, 1, 1512723148, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1512723148\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n\\r\\n\"}}'),
(282, 1, 1512736713, 'task.update', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512736713\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\"}}'),
(283, 1, 1513340326, 'task.create', '{\"task_id\":97,\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(284, 1, 1513340336, 'task.move.position', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(285, 1, 1513340355, 'task.move.position', '{\"task_id\":\"42\",\"task\":{\"id\":\"42\",\"title\":\"HP2 - RED 2014\\/53\\/EU (Radio Emissions Directive) and the EMC 2014\\/30\\/EU compliance\",\"description\":\"\\r\\n* 13.10.17 - Mail Peter: As you surely noticed we need above mentioned certificates including all reports for the whole product spectrum we source via Shanghai Office from China (radio containing devices). However as HomePilot is a Rademacher product I\\u2019d like to ask you to \\u201cactivate\\u201d Guanguye to provide certificates (most likely start re-certification process) for this product.\\r\\n* 16.10.17 - Mail Ben: **I have spoken to Guangyue regarding this and he has said the cost will be in the range of 15,000RMB to 25,000RMB depending on the work\\/testing we need to do. This wouldn\\u2019t include any redesigns that would be required incase we didn\\u2019t meet the certification at the moment. However he feels this wouldn\\u2019t be required and we should meet the requirements. \\r\\nHe said the rough timeline would be 3 - 4 months, if you need it faster we would need to pay more. Would you like me to get him started on this and getting more accurate timelines and prices calculated?**\\r\\n* 16.10.17 - Mail Peter: Yes, please  let him should start all necessary activities. We will discuss internally timeline improvement \\u201cby money\\u201d knowing more precise numbers\\uf04a.\\r\\n* 16.10.17 - Mail Ben: No problem. I will get Guangyue on this ASAP and as soon as I know more I will inform you.\\r\\n* 23.10.17 - Mail Peter: According to RED there is a need to print complete vendor address on the label.Please provide a picture of the new label as soon as possible as we have to convince the Agency we seriously work on this issue (Frank mentioned the current one was created in Shanghai).\\r\\n* 24.10.17 - Mail Ben: I\\u2019ll update our files an use yours. Any idea on if and when we need to do this? \\r\\n* 24.10.17 - Mail Frank: please send us a change approval sheet for this alteration and scrap the 2K labels in your stock\\r\\n* 25.10.17 - Mail Ben: We have around 2,500 labels in stock which means at 0.60RMB each that works out at 1,500RMB. I will ask Shinya to write a PI for you guys for the payment.\\r\\n* 31.10.17 - Mail Ben: Have you received Shinya\\u2019s PI below? Just as an additional update we have received the Labels with the updated design. The only difference is these labels are more for a matt finish rather than a shiny finish, but I don\\u2019t think its a big problem. Everything else is fine. We will begin using these from Order #14 onwards.\\r\\n* 05.11.17 - Guangyue will be back on the 14.11.17 so he will be able to focus on this more at that point. I will push him when he\'s back.\\r\\n* 15.12.17 - Mail Ben: Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE.\\r\\nAfter this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time.\\r\\nThis timeline is based on no major modifications required to the PCB.\\r\\nThe cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option.\\r\\nIf we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\n\\r\\n\",\"date_creation\":\"1509446403\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513319545\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":11,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1509446403\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(286, 1, 1513340369, 'task.move.position', '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512679122\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(287, 1, 1513340374, 'task.move.position', '{\"task_id\":\"41\",\"task\":{\"id\":\"41\",\"title\":\"RD35 013\\/063 Tooling (RX)\",\"description\":\"* 21.10.17 - RD 35 Tooling information and mould analysis has been sent to Manfred & Andreas. PI has also been sent. Waiting for feedback from Germany.\\r\\n* 03.11.17 - Update from Germany received and information has been passed onto RX and they are working on tool.\\r\\n* 08.11.17 - Updated PPT\'s have been received from RX. I have sent them to Dieter and am waiting for his feedback.\\r\\n* 08.11.17 - Mail Ben: Dear Dieter, Thanks for the quick feedback. I have translated your comments and passed them onto the supplier as well as the request for the 3D files. I will get back to you as soon as I hear back.\\r\\n* 13.11.17 - Mail Ben: Dear Dieter, Please find the update PPT\\u2019s from the supplier. I have translated their comments into English. Also please find the STP file for 013 attached.\\r\\n* 13.11.17 - Mail Dieter: Hello Ben, thanks for data, drawing attached, injection point o.k.\\r\\n* 24.11.17 - The tooling has been 100% confirmed with RX and the contracts signed. They have begun and said it will take 35 to 40 days to finish and produce first samples. **So we are looking at the beginning of next year for this first round of samples.**\\r\\n\\r\\n\",\"date_creation\":\"1508540627\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512679122\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1508540627\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(288, 1, 1513340379, 'task.move.position', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17-Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1511504034\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":8,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(289, 1, 1513340434, 'task.move.position', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512736713\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(290, 1, 1513340437, 'task.move.position', '{\"task_id\":\"22\",\"task\":{\"id\":\"22\",\"title\":\"LBW PCB DTC\",\"description\":\"* 08.02.17 - in further discussion with Ralf Huenting\\r\\n* 15.02.17 - Ralf has sent all necessary information. Now we are waiting for your feedback whether everything is fine for you and whether you and Guangyue feel good and confident with the alterations. Furthermore we need the feedback regarding the procurement of the OMRON relay\\r\\n* 22.02.17 - Telco with Ralf H\\u00fcnting and Johannes - further telco on Thursday\\r\\n* 08.03.17 - Saw Ralf\'s Email will reply tomorrow.\\r\\n* 31.03.17 - Mail Peter: As we have been told  there are problems to source this special twin relay in the Chinese market. Hongfa offers also a single version which is called HFKA \\/0121ZSPT \\u2013 what about availability of this one? From the geometry point of view it looks like a one by two replacement of the twin version means it should fit w\\/o any modification. Have you already took a look at this alternative? Maybe you can find another source of such kind of single relay\\u2026\\r\\n* 01.04.17 - Mail Ben: Thanks for this. We are going to look into this and see if it is easy to get. We currently have LOTS of relays in stock so we are safe for a long time. But we will look into this as well as other options.\\r\\n* 03.04.17 - Mail Ben: We\\u2019ve managed to get 10 samples of these, however they\\u2019ve said the feet placement is different. We\\u2019ll see what they look like when we receive them.\\r\\n* 21.04.17 - Ben will send out 8 ssamples of a single Hongfa relay together with the above mentioned cable harnesses at the end of cw17 at the latest\\r\\n* 26.04.17 - Mail Shinya: the samples are on the way via TNT tracking no.: 966302481\\r\\n* 03.05.17 - Need to push Ralf regarding the 1st stage update on the PCB\'s for the LBW.\\r\\n* 10.05.17 - samples well received - further feedback from Ralf H\\u00fcnting\\r\\n* 28.06.17 - Mail Ben: My apologies for not getting back regarding any of this sooner. As far as I see we basically have two things to push forward with at the moment: (1) Improved design of the PCB without the relay change: Testing in Germany, Pilot Run in China, Mass Production in China once old material is used up. (2) New Design using Single Switch Hongfa relay. Work on this in conjunction with the first step.\\r\\n* 22.09.17 - Mail to Ralf H.: Could you please let me know how it is going with this? Can we first work on the improved PCB then look at the alternative PCB with the two single switch relays?\\r\\n* 10.10.17 - Waiting for Ralf\'s Reply.\\r\\n* 10.10.17 - Mail Ralf H.:Plan is for the improve layout: 1) to order sample in November, 2) do the Test in December, 3) you will have  the data for the new PCB in January\\r\\n* 09.11.17 - Mail Ralf H.: The Version 566f-1-7  is finished  I  will send the data for review in KW46  to Ben. And i startet with version  566S-1-6 already. So actually i will order sample end of November. We are on track.\\r\\n* 17.11.17 - Mail Ralf H.: Hallo Ben. Attached the data including Altium files. Please do a check if everything is clear. If you want you can do the sample from this Version  and send these to me for final check. The other way i will do the sample here in germany.  But i think we can speed up if you will do the sample.\\r\\n* 23.11.17 - Mail Ben: I have checked with Guangyue regarding this board and he says everything looks good. Look forward to hearing your results from the test samples. Please let me know when you would like us to go forward with a pilot run.\\r\\n* 23.11.17 - Mail Ralf H.: We discussed to do sample here in Germany and we decidet to do a pilot run directly. So Ben please do a Pilot RUN with the new data you have. I dont know how many sample you need for your production we normally check this with 5 panel. After the PCBA is ready please send 3 PCBA and 3 device to my hand I will do a final check . After this and everything is okay we can  change the mass production. ( and you can deliver the pilot run also)\\r\\nFor this you will get a approval from us. Is this okay for you ? In my mind you can start with pilot run directly. Perhaps you can give a short schedule for this.\\r\\n* 24.11.17 - Mail Ben: Thanks for your quick reply regarding this. I will get everything prepared for a pilot run and let you guys know the timeline as soon as I hear more.\\r\\n* 04.12.17 - Mail Ralf H.: Attached the data including Altium files.  Surface Version for remember. Please do a check if everything is clear. If everything is okay you can do a sample run also like the Loco 566F-1-7 version and send the sample to me.\\r\\n* 08.12.17 - Mail Ben: Thanks very much for this. I will work with Guangyue and our supplier to get the trial run started and see how this goes. I will let you know a timeline as soon as I have one.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499061048\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512736713\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1499061048\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(291, 1, 1513340453, 'task.move.position', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":10,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(292, 1, 1513340458, 'task.move.position', '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1509937603\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":17,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(293, 1, 1513340459, 'task.move.position', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1512397952\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":18,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(294, 1, 1513340500, 'task.file.create', '{\"file\":{\"id\":\"218\",\"name\":\"(New proposal 2018)emmc_4gb_8gb_ps8225_v50_wt.pdf\",\"path\":\"tasks\\/97\\/b4de8e5f1afd21c599324c5fa319df0e7e66009d\",\"is_image\":\"0\",\"task_id\":\"97\",\"date\":\"1513340500\",\"user_id\":\"2\",\"size\":\"428515\"},\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(295, 1, 1513340500, 'task.file.create', '{\"file\":{\"id\":\"219\",\"name\":\"(current)emmc_ps8210_v451_80s_153b_wt.pdf\",\"path\":\"tasks\\/97\\/59fd883d9041b881dd9421215d25b02f2a9949fa\",\"is_image\":\"0\",\"task_id\":\"97\",\"date\":\"1513340500\",\"user_id\":\"2\",\"size\":\"510770\"},\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340326\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(296, 1, 1513342679, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513342679\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\"}}'),
(297, 1, 1513571247, 'task.file.create', '{\"file\":{\"id\":\"226\",\"name\":\"(substitution)YXJ-330UF-35V-10X12.5.pdf\",\"path\":\"tasks\\/60\\/781b8a37f5659e30ba0417c5fd3c5e59ec48cc87\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513571247\",\"user_id\":\"3\",\"size\":\"268517\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513340402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(298, 1, 1513608514, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513608514\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(299, 1, 1513611310, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513611310\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\"}}'),
(300, 1, 1513667799, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nI will update you regarding the timeline as soon as I know more.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513667799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nI will update you regarding the timeline as soon as I know more.\\r\\n\\r\\n\\r\\n\"}}'),
(301, 1, 1513668095, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January.* \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513668095\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January.* \\r\\n\\r\\n\\r\\n\"}}'),
(302, 1, 1513668104, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513668104\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n\\r\\n\\r\\n\"}}'),
(303, 1, 1513670964, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to\\r\\n-\\tGet Detailed documentation for any change made on bootloader and kernel\\r\\n-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project\\r\\n-\\tmake additional validation in the new sw architecture \\r\\n-\\tinvolve our partners for the old and new architecture (Sigma and emlix)\\r\\n-\\tincrease the number of test devices to at least 20 pcs.\\r\\nAs all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513670964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to\\r\\n-\\tGet Detailed documentation for any change made on bootloader and kernel\\r\\n-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project\\r\\n-\\tmake additional validation in the new sw architecture \\r\\n-\\tinvolve our partners for the old and new architecture (Sigma and emlix)\\r\\n-\\tincrease the number of test devices to at least 20 pcs.\\r\\nAs all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(304, 1, 1513671027, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513671027\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(305, 1, 1513671086, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513671086\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(306, 1, 1513676685, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513676685\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(307, 1, 1513676728, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513676728\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(308, 1, 1513697710, 'task.update', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details.\\r\\n\\r\\nLatest on Thursday we will send you further information regarding the target prices.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513697710\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details.\\r\\n\\r\\nLatest on Thursday we will send you further information regarding the target prices.\\r\\n\"}}'),
(309, 1, 1513697733, 'task.update', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513697733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n\"}}'),
(310, 1, 1513697761, 'task.file.create', '{\"file\":{\"id\":\"242\",\"name\":\"171219_BOM_UBW_SX-MHI.XLSX\",\"path\":\"tasks\\/60\\/d2fd1cb3495550d9e519f30e531ac4f7985db788\",\"is_image\":\"0\",\"task_id\":\"60\",\"date\":\"1513697761\",\"user_id\":\"2\",\"size\":\"37879\"},\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513697733\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510137991\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(311, 1, 1513699678, 'task.file.create', '{\"file\":{\"id\":\"243\",\"name\":\"UBW Gearbox Quote (Iss 2.0).pdf\",\"path\":\"tasks\\/39\\/34d05958830173b30b1f8b019d6c05eda2ae75f8\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1513699678\",\"user_id\":\"2\",\"size\":\"25712\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513611310\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(312, 1, 1513754124, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(313, 1, 1513869300, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1513869300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n\\r\\n\\r\\n\"}}'),
(314, 1, 1513949109, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513949109\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\",\"owner_id\":\"5\"}}'),
(315, 1, 1513950843, 'task.create', '{\"task_id\":100,\"task\":{\"id\":\"100\",\"title\":\"Life cycle test reck\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1513950843\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(316, 1, 1513950909, 'task.update', '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1513950909\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"Life cycle test rack\"}}'),
(317, 1, 1514873304, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":\"1514873304\",\"status_name\":\"In Bearbeitung\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(318, 1, 1514873307, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(319, 1, 1514873308, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(320, 1, 1514883904, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. **\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514883904\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. **\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(321, 1, 1514883929, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514883929\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(322, 1, 1514883970, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it buy increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514883970\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it buy increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(323, 1, 1514893488, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514893488\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(324, 1, 1514895262, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514895261\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\"}}'),
(325, 1, 1514895781, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514895781\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\"}}'),
(326, 1, 1514906309, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514906309\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n\\r\\n\\r\\n\"}}'),
(327, 1, 1514908263, 'task.update', '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514908263\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \"}}'),
(328, 1, 1514987275, 'subtask.update', '{\"subtask\":{\"id\":\"34\",\"title\":\"2 Ok and 2 NOK Samples from DE\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"2\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":\"1514987275\",\"status_name\":\"In Bearbeitung\",\"is_timer_started\":true},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(329, 1, 1514987278, 'subtask.update', '{\"subtask\":{\"id\":\"34\",\"title\":\"2 Ok and 2 NOK Samples from DE\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"2\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Erledigt\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(330, 1, 1514987280, 'subtask.update', '{\"subtask\":{\"id\":\"34\",\"title\":\"2 Ok and 2 NOK Samples from DE\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"2\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"Nicht gestartet\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1510809594\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(331, 1, 1514987683, 'task.update', '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  \\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514987683\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  \\r\\n\"}}'),
(332, 1, 1514987799, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 -Andreas : we do not understand the reason for the change request; Mail from Berthold \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514987799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 -Andreas : we do not understand the reason for the change request; Mail from Berthold \"}}'),
(333, 1, 1514987824, 'task.assignee_change', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 -Andreas : we do not understand the reason for the change request; Mail from Berthold \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514987824\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(334, 1, 1514989032, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989032\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery\",\"owner_id\":\"5\"}}'),
(335, 1, 1514989076, 'task.file.create', '{\"file\":{\"id\":\"261\",\"name\":\"Test\\u00fcbersicht RD45 2017.JPG\",\"path\":\"tasks\\/33\\/310091fd56b03024a3679af7fff515e26f6cc4e3\",\"is_image\":\"1\",\"task_id\":\"33\",\"date\":\"1514989076\",\"user_id\":\"5\",\"size\":\"131552\"},\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989032\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(336, 1, 1514989355, 'task.update', '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514989355\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"Life cycle test rack LBW\"}}'),
(337, 1, 1514989366, 'task.create', '{\"task_id\":101,\"task\":{\"id\":\"101\",\"title\":\"[DUPLIKAT] Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514989366\",\"reference\":\"\",\"date_started\":null,\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"}}'),
(338, 1, 1514989402, 'task.update', '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1514989402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"title\":\"Life cycle test rack turbular motors\",\"date_started\":0}}'),
(339, 1, 1514989523, 'task.update', '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #15\\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514989523\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #15\\r\\n\"}}'),
(340, 1, 1514989581, 'task.update', '{\"task_id\":\"18\",\"task\":{\"id\":\"18\",\"title\":\"HP2 Claims (RD-D Programming)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #14\\r\\n\",\"date_creation\":\"1499060791\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"17\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1514989581\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041463\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 22.09.17 - Last feedback from Andreas was that this has become a much smaller proportion of the rejects. So I don\'t think this is a critical issue anymore.\\r\\n* 03.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve  ; #14\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(341, 1, 1514989643, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\"}}'),
(342, 1, 1515061357, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515061357\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n\\r\\n\\r\\n\"}}'),
(343, 1, 1515118606, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515118606\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\"}}'),
(344, 1, 1515119134, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(345, 1, 1515119135, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(346, 1, 1515119136, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(347, 1, 1515119136, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(348, 1, 1515119137, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(349, 1, 1515119138, 'subtask.update', '{\"subtask\":{\"id\":\"36\",\"title\":\"Measuring Force at RD-D Life Cycle Testing\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"5\",\"position\":\"4\",\"username\":\"Andreas Schulte\",\"name\":\"Andreas Schulte\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1514989643\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(350, 1, 1515139327, 'task.assignee_change', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139327\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"2\"}}'),
(351, 1, 1515139344, 'task.assignee_change', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"3\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139344\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Sally Zhang\",\"assignee_name\":\"Sally Zhang\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"3\"}}'),
(352, 1, 1515139361, 'task.assignee_change', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515139361\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(353, 1, 1515396828, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515396828\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n\"}}'),
(354, 1, 1515396854, 'task.file.create', '{\"file\":{\"id\":\"266\",\"name\":\"534-124.pdf\",\"path\":\"tasks\\/39\\/7b5001a098810df12fc1bd47df6f0d54e820b4f5\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1515396854\",\"user_id\":\"2\",\"size\":\"55543\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515396828\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(355, 1, 1515399575, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515399575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\"}}'),
(356, 1, 1515399636, 'task.file.create', '{\"file\":{\"id\":\"267\",\"name\":\"QIR-20180108-sample-Case Upper Part.doc\",\"path\":\"tasks\\/12\\/81d98bd86e68430195d48f8160b54ff1532ef053\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1515399636\",\"user_id\":\"6\",\"size\":\"5485568\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515399575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(357, 1, 1515399666, 'task.file.create', '{\"file\":{\"id\":\"268\",\"name\":\"QIR-20180108-sample-Case Bottom Part.doc\",\"path\":\"tasks\\/12\\/41e7160b872f41f002b563dd1e217556adbe9d2a\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1515399666\",\"user_id\":\"6\",\"size\":\"8096256\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515399575\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(358, 1, 1515485276, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515485276\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \"}}'),
(359, 1, 1515504221, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have updated the order to: 300 x HP2 black \",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515504221\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.17 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have updated the order to: 300 x HP2 black \"}}'),
(360, 1, 1515504402, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw11\\/18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD cw15\\/18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515504402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw11\\/18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD cw15\\/18)\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(361, 1, 1515506591, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506591\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\"}}'),
(362, 1, 1515506964, 'task.create', '{\"task_id\":103,\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(363, 1, 1515506970, 'task.move.position', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506964\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(364, 1, 1515507008, 'task.update', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments!\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515507007\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments!\\r\\n\"}}'),
(365, 1, 1515507138, 'task.update', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515507138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\"}}'),
(366, 1, 1515507199, 'task.file.create', '{\"file\":{\"id\":\"275\",\"name\":\"18-01-08_order_4500034742_MHI(HP2 order #17).pdf\",\"path\":\"tasks\\/103\\/2a0e3ef47f2f88ebfc6a305d95a4de3e7c941ee1\",\"is_image\":\"0\",\"task_id\":\"103\",\"date\":\"1515507199\",\"user_id\":\"2\",\"size\":\"14435\"},\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515507138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(367, 1, 1515507218, 'task.file.create', '{\"file\":{\"id\":\"276\",\"name\":\"17-11-09_order_4500033946_MHI(HP2 order #16)_update1.pdf\",\"path\":\"tasks\\/64\\/628c596e9bdaae873a33e91ffc2821cc0ab32792\",\"is_image\":\"0\",\"task_id\":\"64\",\"date\":\"1515507218\",\"user_id\":\"2\",\"size\":\"14321\"},\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw11\\/18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD cw15\\/18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515504402\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(368, 1, 1515507243, 'task.file.create', '{\"file\":{\"id\":\"277\",\"name\":\"17-10-18_order_4500033639_MHI(HP2 order #15)_update1.pdf\",\"path\":\"tasks\\/40\\/4f873052a48536a18023766a4ec6a81708626582\",\"is_image\":\"0\",\"task_id\":\"40\",\"date\":\"1515507243\",\"user_id\":\"2\",\"size\":\"14490\"},\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515506591\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(369, 1, 1515574126, 'task.update', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515574126\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\"}}'),
(370, 1, 1515575438, 'task.update', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515575438\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n\"}}'),
(371, 1, 1515594924, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515594924\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n\\r\\n\\r\\n\"}}'),
(372, 1, 1515594937, 'task.file.create', '{\"file\":{\"id\":\"278\",\"name\":\"180110_HP2_white_lower_packaging.JPG\",\"path\":\"tasks\\/93\\/ef3b02d0ecf2238311b89d1191f673d3adb373ce\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1515594937\",\"user_id\":\"2\",\"size\":\"100645\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515594924\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(373, 1, 1515748341, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(374, 1, 1515748410, 'task.file.create', '{\"file\":{\"id\":\"279\",\"name\":\"bildmarkekreis_sw_pos.eps\",\"path\":\"tasks\\/90\\/715733817bdf25021cb1b4a5c5fab2d1846c13db\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748410\",\"user_id\":\"2\",\"size\":\"2916338\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(375, 1, 1515748411, 'task.file.create', '{\"file\":{\"id\":\"280\",\"name\":\"HomePilot_Verpackung_2018_ctpX4.pdf\",\"path\":\"tasks\\/90\\/640e748f3b7629bf030a40b23dd9c4648dc533ea\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748411\",\"user_id\":\"2\",\"size\":\"446603\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(376, 1, 1515748411, 'task.file.create', '{\"file\":{\"id\":\"281\",\"name\":\"HomePilot_Verpackung_2018_illustrator_CC.AI\",\"path\":\"tasks\\/90\\/f52d9a2778c1a69fed0d396d2d7f5a40e7001e15\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748411\",\"user_id\":\"2\",\"size\":\"135181\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(377, 1, 1515748411, 'task.file.create', '{\"file\":{\"id\":\"282\",\"name\":\"Logo HomePilot.jpg\",\"path\":\"tasks\\/90\\/35842e3f78b6d0508ea4f21f8e439905ca30c474\",\"is_image\":\"1\",\"task_id\":\"90\",\"date\":\"1515748411\",\"user_id\":\"2\",\"size\":\"472628\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(378, 1, 1515748412, 'task.file.create', '{\"file\":{\"id\":\"283\",\"name\":\"Logo schwarz  Druck s_w 1.eps\",\"path\":\"tasks\\/90\\/a1ae55ec59755e5307505fb335479441819a3c2d\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1515748412\",\"user_id\":\"2\",\"size\":\"1972106\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748341\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(379, 1, 1515748934, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515748934\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(380, 1, 1515856133, 'subtask.update', '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(381, 1, 1515856136, 'subtask.update', '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(382, 1, 1515856136, 'subtask.update', '{\"subtask\":{\"id\":\"41\",\"title\":\"Testing Parameters \",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"38\",\"user_id\":\"2\",\"position\":\"1\",\"username\":\"Manfred Kohlruss \",\"name\":\"Manfred Kohlruss\",\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop.\\r\\nI think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513754124\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(383, 1, 1515856214, 'subtask.update', '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(384, 1, 1515856216, 'subtask.update', '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u6b63\\u5728\\u8fdb\\u884c\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(385, 1, 1515856216, 'subtask.update', '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"2\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(386, 1, 1515856218, 'subtask.update', '{\"subtask\":{\"id\":\"20\",\"title\":\"Purchase Relays\",\"status\":\"0\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"25\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"\\u5f85\\u5b8c\\u6210\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"25\",\"title\":\"LBW Relay Purchasing\",\"description\":\"\\r\\n* 28.06.17 - Mail Manfred: I have heard nothing about the Hongfa relay for a long time. Which could be a good sign or not. What is the current status ? How many pieces do you have in stock or already secure ordered ? From my point of view all current orders, including the new order #25, are secured. Please confirm.\\r\\n* 29.06.17 - Mail Ben: I\\u2019ve just checked the stock. We are secure till Order #26. Order #27 we don\\u2019t have stock, but as mentioned we are beginning to look.    \\r\\n* 04.07.17 - Ada and Shinya have found 14,000 more relays HongFa Relays on the market. We are currently secure up to Order #26, but I always want to try and keep at least 1 years worth of relays in stock. We are going to purchase these and store them in the factory.\\r\\n* 10.07.17 - The relays have been purchased and are going to be in the factory in around the next two weeks. Should arrive in CW30.\\r\\n* 01.08.17 - Relays Arrived (14,000)\\r\\n* 22.09.17 - We are going to look into this again in Order #26 (ETD cw 05\\/18) and purchase another 10k to 15k worth of relays in order to keep us secure.\\r\\n* 08.12.17 - I will check the stocks and update the task on Monday next week (CW50).\\r\\n* 11.12.17 - We have around 18,000 relays in stock which is enough for 26, 27 and 28.\\r\\n* 12.12.17 - Sorry for the mistake above. We have already sent Order #26 and #27 to the SMT Company. We still have 10,587 units in stock.\",\"date_creation\":\"1499129530\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"grey\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1513064887\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743026\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"1\"}}'),
(387, 1, 1515856809, 'task.update', '{\"task_id\":\"38\",\"task\":{\"id\":\"38\",\"title\":\"GSM3 Motor\",\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1506042124\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515856809\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506042124\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 22.09.17 - I have contacted 3 suppliers who can make this motor. 1 Supplier has said its no problem. However I have told them to wait until I get all the drawings from Germany. Pending Manfred sending the drawings through.\\r\\n* 05.10.17 - RD-D has sent all the drawings and will send the requested samples asap\\r\\n* 10.10.17 - I have asked Actuator to send 100 units of the worm to us so I can send these to the suppliers I have found so they can assemble the worm when they make the samples of the motor.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - High level belt winders and GSM2 samples have been received. Waiting for the first round of samples from suppliers.\\r\\n* 21.11.17 - Mail Ben: As requested please find the photos from one of the potential GSM3 Suppliers I found. The motor is a little shorter and narrower than the current GSM2 and fit perfectly into your housing. I will assemble the worm and hall sensor as soon as I am clear on the testing requirements for this motor.\\r\\n* 23.11.17 - Mail Ralf: looks promising. Do you have a data sheet and the characteristic curves for this motor? What is ball park for the price per piece?\\r\\n* 23.11.17 - Mail Ben: Sure I have attached the curves for this motor. I am waiting for the testing information and method then I can test this motor. The price so far is $4.86, but we don\\u2019t know if modifications need to be made.\\r\\n* 24.11.17 - Email sent to chase Andreas about this, hopefully will get a reply.\\r\\n* 29.11.17 - I\'m not sure the information given by Andreas is 100% correct. Waiting for confirmation.\\r\\n* 20.12.17 - Mail Ben: Hi Peter, I have assembled on of the GSM3 Motors we have sourced into the higher level belt winder, however I am having a little trouble with it where it will turn and stop. I think its a problem with the hall sensor but I\\u2019m not sure as the hall sensor is turning.\\r\\nWould it be possible for me to have a chat with Berthold sometime when he has time to see what he thinks about this?\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(388, 1, 1515924883, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515924883\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n\"}}'),
(389, 1, 1515925106, 'task.update', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1515925106\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n\"}}'),
(390, 1, 1516086625, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(391, 1, 1516086659, 'task.file.create', '{\"file\":{\"id\":\"294\",\"name\":\"#shpt-18-004  DHL Rhede.xlsx\",\"path\":\"tasks\\/93\\/49dabc40493bbac6259ac41b4e918d00f1878d8e\",\"is_image\":\"0\",\"task_id\":\"93\",\"date\":\"1516086659\",\"user_id\":\"2\",\"size\":\"23674\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(392, 1, 1516086659, 'task.file.create', '{\"file\":{\"id\":\"295\",\"name\":\"PI-RD18402.pdf\",\"path\":\"tasks\\/93\\/ea6f472e03e75257e16bf87ea3ba02ade89101b9\",\"is_image\":\"0\",\"task_id\":\"93\",\"date\":\"1516086659\",\"user_id\":\"2\",\"size\":\"169371\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(393, 1, 1516086660, 'task.file.create', '{\"file\":{\"id\":\"296\",\"name\":\"\\u5fae\\u4fe1\\u56fe\\u7247_20180116.jpg\",\"path\":\"tasks\\/93\\/31a60c06286697de796d15325926d766fcf96a6c\",\"is_image\":\"1\",\"task_id\":\"93\",\"date\":\"1516086660\",\"user_id\":\"2\",\"size\":\"613267\"},\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(394, 1, 1516086822, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516086822\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\"}}'),
(395, 1, 1516087191, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\"}}'),
(396, 1, 1516087242, 'task.update', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087242\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(397, 1, 1516087267, 'task.file.create', '{\"file\":{\"id\":\"297\",\"name\":\"QIR-20180116-sample-Case Bottom Part.doc\",\"path\":\"tasks\\/12\\/56bd9d2c4576482f7219290e1854b59413f371d0\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1516087267\",\"user_id\":\"6\",\"size\":\"8096768\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(398, 1, 1516087300, 'task.file.create', '{\"file\":{\"id\":\"298\",\"name\":\"QIR-20180116-sample-upper Bottom Part.doc\",\"path\":\"tasks\\/12\\/eb4ac90d819af7f23537b3c31bcb807cff5f3829\",\"is_image\":\"0\",\"task_id\":\"12\",\"date\":\"1516087300\",\"user_id\":\"6\",\"size\":\"4813824\"},\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087191\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(399, 1, 1516087357, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* * 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087356\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* * 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\"}}'),
(400, 1, 1516087368, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087368\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\"}}'),
(401, 1, 1516087441, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516087441\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n\"}}'),
(402, 1, 1516093806, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516093806\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n\\r\\n\\r\\n\"}}'),
(403, 1, 1516192006, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: Taat means me have to wait until end of January with our decision.\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516192006\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: Taat means me have to wait until end of January with our decision.\\r\\n\"}}'),
(404, 1, 1516192022, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. **Comment Manfred: That means me have to wait until end of January with our decision.**\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516192022\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. **Comment Manfred: That means me have to wait until end of January with our decision.**\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(405, 1, 1516274686, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516274686\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(406, 1, 1516275333, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516275333\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(407, 1, 1516700491, 'task.update', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516700491\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\"}}'),
(408, 1, 1516710973, 'task.create', '{\"task_id\":109,\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"21\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(409, 1, 1516710982, 'task.move.position', '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":13,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(410, 1, 1516710990, 'task.move.position', '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"7\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":7,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(411, 1, 1516711002, 'task.move.position', '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg\\r\\n                 in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516710973\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(412, 1, 1516723947, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516723947\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\"}}'),
(413, 1, 1516723990, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516723990\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.178 which means approx. ETD 28.02.18 at your side. Please check and confirm.\\r\\n\"}}'),
(414, 1, 1516724060, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516724060\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(415, 1, 1516784150, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516784150\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\\r\\n\"}}'),
(416, 1, 1516796871, 'task.update', '{\"task_id\":\"60\",\"task\":{\"id\":\"60\",\"title\":\"UBW\",\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n\",\"date_creation\":\"1510137991\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516796871\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516232922\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 18.09.17 - Discussion during meeting in Shanghai: Transfer production to RD-CN -> DTC, RX problem solved, more turn over with SX-MHI, general price increase packaging can be avoided, lower tax on Nichibo motor\\/power supply - Options should be checked until end of October\\r\\n* 24.10.17 - Mail Manfred: with this mail I just want to inform you that this topic is in progress. Based on our IT problem we are a little behind our schedules. Currently we are collecting all necessary information and figures. I hope that we can inform you about our next steps in cw45.\\r\\n* 08.11.17 - Mail Manfred: we have already collected some information RE the plastic parts. Ralf Huenting currently collects the information RE the two PCB\'s of the UBW. Based on this information you should be able to start a first inquiry.\\r\\n* 09.11.17 - Mail Manfred: I have sent you the necessary information for the two PCB\\u2019s of the UBW via Skype (PLA 534-1-2 and PLA 534-2-9). It is a zip file for which you need a password. Annual quantity >30K pcs. \\r\\n* 16.11.17 - Waiting for a reply on the possibility of changing PCB components. Also waiting for the other assembly parts with tooling information and drawings.\\r\\n* 15.12.17 - PCB Pricing Sent. Now waiting for the other components information so they can be quoted too.\\r\\n* 19.12.17 - Mail Manfred: Dear Ben, please find attached the necessary information of the UBW. (1) the drawings (2) the PDF\\u2019s of the user manuals (3) the PDF\\u2019s of the packaging (4) Excel sheet with BOM of SR10060, JV 1018415 and JV 1018414\\r\\nFor a better understanding, please have a look at the assembly drawings 534-122.pdf and 534-123.pdf at first. Please check the information. In our weekly telco on Thursday we can discuss further details. Latest on Thursday we will send you further information regarding the target prices.\\r\\n* 02.01.18 - Need tooling information regarding the UBW Plastic Parts 1) Tooling Size 2) Tooling Drawing 3) Injection Parameters \\r\\n* 02.01.18 - Also need the photos of the labels for the UBW so we can work up the cost and design.\\r\\n* 09.01.18 - Mould drawings received. However missing 3 parts: 534-F-00-083g, 534-F-00-096b, 387-F-00-024d.\\r\\n* 24.01.18 - Mail Manfred: please find attached the tooling data you have asked for. Please note that we do not have any tooling data for the screw caps.\\r\\n\"}}'),
(417, 1, 1516796940, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - manfred has sent the target price with some further information of the comparison which he has sent\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516796940\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - manfred has sent the target price with some further information of the comparison which he has sent\"}}'),
(418, 1, 1516796960, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - Manfred has sent the target price with some further information of the comparison which he has sent\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516796960\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to send the testing information for the UBW\\r\\n* 29.11.17 - Nichibo Motors have been received. We will assemble next week and begin testing after the confirmation from Andreas.\\r\\n* 29.11.17 - Mail Ralf: Noted \\u2013 as far as I remember the original date was 23.12. for the Nichibo motor and we are ahead of schedule, correct? Please keep us in the loop. BTW \\u2013 how is the planning for these tests? How many will be tested at your end, how many motor-gearbox combination will you send to Germany and when?\\r\\n* 29.11.17 - Mail Ben: Yes we are nicely ahead of schedule. We are going to setup some rough stands for testing and get these final function tested and then start life cycle testing. Once the Life Cycle tests have been going for a week or so without problems we will send 20 samples to you guys in Germany (We have 48 units from Nichibo). We\\u2019re looking at CW49\\/CW50 for sending the 20 units to you guys in Germany.\\r\\n* 04.12.17 - We are going to being producing the gearboxes today and will test them using 12kg for the Final Function test and then start several on a life cycle test to see how they do.\\r\\n* 08.12.17 - We have finished testing using 12.5kg and everything functioned exactly the same as the units from Germany. We will package the units and can send 20 units to you guys in Germany. Shall we use DHL for this?\\r\\n* 08.12.17 - As confirmed with Manfred in the NPSR call today we will send these units out with Sallys shipment Tuesday\\/Wednesday next week (CW50).\\r\\n* 14.12.17 - Shipment has been delayed by one day and will leave today. DHL have been called and goods will be sent.\\r\\n* 15.12.17 - tracking number - WAYBILL 4721007336\\r\\n* 18.12.17 - we have received the 20 units and forwarded them to Andreas (QC)\\r\\n* 22.12.17 - 5 units are running in life cycle test\\r\\n* 02.01.18 - The worms for the 4000 unit Order are ready. The other components shouldn\'t be a problem, so all we need to do is wait for the \\\"Go\\\" from RDD.\\r\\n* 02.01.18 - Need to get an update to the Worm Drawing to change it for the Nichibo Motor. Need to update the tolerances and change the Drawing Number -> inquiry to Peter\\r\\n* 03.01.18 - Andreas : we do not understand the reason for the change request; Mail from Berthold \\r\\n* 08.01.18 - Mail Berthold: I made a new drawing with the project number 534-F-00-124. Hope that this will help .... Please make sure not to mix-up.\\r\\n* 10.01.18 - We unfortunately have a price increase which effects this product (NBJX & WT). Increase by 1.38RMB.\\r\\n* 23.01.18 - Waiting for Target prices from Manfred.\\r\\n* 24.01.18 - Manfred has sent the target price with some further information of the comparison which he has sent\"}}'),
(419, 1, 1516797000, 'task.update', '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516797000\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\"}}'),
(420, 1, 1516797092, 'task.move.column', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"2\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516797092\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1512634655\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1512634655\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(421, 1, 1516797196, 'task.move.column', '{\"task_id\":\"11\",\"task\":{\"id\":\"11\",\"title\":\"LBW Order #25\",\"description\":\"* 14.06.17 - Mail Jens: attached you\\u2019ll find the next Loco BW purchase order #25. ETA should be in the second week of December (11.12.17), at the latest! Please send us your order confirmation\\/PI! 1500 x RD35, 3240 x RD45, 300 x sun sensor, 180 x RD35 int., 240 x RD45 int.\\r\\n* 16.06.17 - Shinya has sent PI with confirmation for ETA cw49\\/2017 (means ETD end of October)\\r\\n* 25.07.17 - RX has over produced on the RD45 covers which means we will be using labels until Order #25. After Order #25 we will move onto the new printing.\\r\\n* 28.07.17 - Received Jen\'s updated order regarding the Sun Sensors from 300 to 600. We have contacted YJ and this shouldn\'t be a problem. Shinya will update the PI.\\r\\n* 14.08.17 - We have a problem where we have run out of Stock Plugs. We need to get the Stocko Plugs from China approved ASAP.\\r\\n* 01.09.17 - RD-D has sent the release for the alternative HRB stocko plugs which can be used for the power supplies and for the motors. For the suns sensor RD-D prefered the same version as in the past, that means the plug without a bar in the middle. Sally will asked the supplier for new samples (without bar)\\r\\n* 29.09.17 - Everything on track. Only risk is the sheet metal, but looks like we should be able to keep it under control.\\r\\n* 10.10.17 - Once Carry is approved we should get the sheet metal within a few days and be able to start full production. Lead-Time and everything is ok.\\r\\n* 17.10.17 - Carry tooling has been approved.\\r\\n* 17.10.17 - Manfred mentioned over Wechat that Order #25 can be delayed. Can I please have an updated timeline for the ETA for this?\\r\\n* 17.10.17 - Jens has sent the updated order - new ETA Rhede cw02\\/2018 as DAP delivery or DDP. Furthermore RD-D will delay the 2nd half payment. They will make the payment when they receive the goods because of inventory stock reason. @Ben: Please check.\\r\\n* 21.10.17 - New date and payment terms are acceptable. We will work according to the new timeline for Order #25.\\r\\n* 13.11.17 - We have a problem with the RD35\'s as detailed in the email from 12\\/11\\/17. We are currently working on this and getting the lead-time for the adjustment of the sheet metal tool from Carry and the timeline for new goods. This is linked to Task #13\\r\\n* 17.11.17 - Manfred stated in the NPSR Call that a delay to CW03 2018 would be acceptable. We will work towards this. I will update more when I hear back from Carry.\\r\\n* 17.11.17 - As mentioned in the email sent out. We are looking at the following timeline: **1)** Carry Parts Arriving on Tuesday\\/Wednesday. **2)** Production till CW49 when the goods will be sent to **3)** Germany Arrival in Germany CW03 2018.\\r\\n* 20.11.17 - Carry parts will be leaving tomorrow and arrive on Wednesday which means we should be ok to hit the CW50 ETD and the CW03 ETA.\\r\\n* 24.11.17 - Everything is running smoothly and we should have no problem hitting the timeline mentioned above.\\r\\n* 04.12.17 - Goods are all finished including the 900 Sun Sensors. We will load the container tomorrow.\\r\\n* 04.12.17 - Mail Ben: Dear Andreas, Just for your information we have used 20 RD35 Covers with the new printing for the International version. We have marked the box with the text \\u201cNew Cover\\u201d so you know. See attached photo.\\r\\n* 06.12.17 - Goods sent this morning. ETD of Vessel is 09.12.17.\\r\\n\",\"date_creation\":\"1499060242\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516797196\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797196\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545237\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545237\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(422, 1, 1516797211, 'task.move.column', '{\"task_id\":\"17\",\"task\":{\"id\":\"17\",\"title\":\"HP2 Order #14 - 4500032237\",\"description\":\"* 28.06.17 - Mail Jens: attached you\\u2019ll find our official PO to HP2 purchase order #14 - 4500032237. As discussed with Ben, currently with DDP price, but please update, or send your PI with the new FOB price!  500 x ETA 15.01.18 (ETD 08.12.16) - 500 x 09.02.18 (ETD 29.12.17).\\r\\n* 10.07.17 - Mail Manfred: we have updated our planning in SAP new delivery date for 1st batch ETA Rhede 30.01.18 (ETD 21.12.17) and 2nd batch ETA Rhede 14.03.18\\r\\n* 15.08.17 - Could you please pay the deposit for Order #14 as this will help with our cash flow.\\r\\n* 23.08.17 - RD-D has payed the deposit\\r\\n* 09.10.17 - Please Note: Guangyue will be busy until 20.11.17 so unless you inform us soon we will only be able to deliver the HP2\'s for the first batch of Order #14 according to the schedule on the PO.\\r\\n* 17.10.17 - Mail Manfred: the best would be if we can receive the first batch of #14 in the beginning of January 2018. Also here we have our topic \\u201einventory stock\\u201c for end of 2017.        ETA for first batch #14 \\u2013 09.01.18 \\u2013 means ETD cw48. That means, we would prefer a delivery with incoterm DAP or a DDP. Furthermore the payment off the 2nd half should be in the beginning of 2018. Please check. If you send the batch with a DAP delivery, the ETA Rotterdam must be later as 01.01.2018. Otherwise it is our inventory stock :-(. Please double check the schedule and confirm the delivery date, incoterm and payment of 1st batch #14.\\r\\n* 09.11.17 - Manfred: we need 500 pcs ETA 09.01.18 and 500 pcs ETA beginning of February\\r\\n* 16.11.17 - Manfred mentioned a planning ETD of 28.11.17 for an ETA of 03.01.17.\\r\\n* 16.11.17 - Manfred mentioned a planning **1st Batch** ETD of 28.11.17 for an ETA of 03.01.17. **2nd Batch** ETD of 15.12.17 for an ETA 19.01.17.\\r\\n* 17.11.17 - BEN Question: For the first batch with an ETA of 03.01.17 and with the intercoms of DAP, doesn\'t this mean that the goods arrive at the port before 2018 so they will enter your books and stock list too early?\\r\\n* 17.11.17 - Manfred: we need a DDP delivery\\r\\n* 17.11.17 - I will inform Shinya and change the terms DDP.\\r\\n* 20.11.17 - Updated Gantt Chart Attached for the HP2 Orders.\\r\\n* 22.11.17 - As discussed yesterday, we have a problem with the ESD Chip for the HDMI on the HP2. We pretty much have 100% reject. However late last night we found a good batch in Order #15\'s goods and have made 158 units which will be shipped to the factory for assembly. We are waiting on further testing and a replacement batch of goods from another supplier which should arrive next week. So the plan currently is send the 158 Units out on the 03\\/12\\/2017 to keep you guys going for a week or so until we can rework the other units, produce and then send them out roughly in CW49\\/CW50.\\r\\n* 22.11.17 - Currently looking at the following timelines. 158~ Units to be sent out on 03\\/12\\/17. Replacement chips will arrive tomorrow. Shenou will do rework on Friday and Saturday then Guangyue can start testing on Monday. After which we can start production in CW48\\/49 and send the remaining goods out ETD 08\\/12\\/17.\\r\\n* 24.11.17 - 157 Units will be sent out by Sea and with the second lot Manfred will inform regarding the AF. The chips have arrived and Shenou and they will start rework soon. So hopefully we can receive units on Wednesday or Friday.\\r\\n* 25.11.17 - Components have arrived everything is ok. Cuigao tested 10 boards and everything was good. Shenou will begin the rework and testing will begin on Monday.\\r\\n* 04.12.17 - We have produced an additional 860 units on top of the 157 we sent out before this makes a total of 1017 for Order #14 which also makes up for the short delivery in Order #13. All of these will be sent with the LBW and loaded in the container tomorrow. We haven\'t heard back regarding AF so we presume all will be sent via FCL.\\r\\n* 04.12.17 - Mail Shinya: Hi Manfred, Tomorrow ,We will send the 96 pcs\\uff088ctns\\uff09to you by DHL. and will let you know more details. Remaining quantity via sea 860-96 = 764 pcs\\r\\n* 05.12.17 - Mail Shinya: we have call the DHL, 8 ctns will leaving this afternoon from china time.\\r\\nAttached documents, the tracking number: 45 3075 2413 .\\r\\n* 06.12.17 - Total of 1017 HP2\'s have been sent as part of Order #14. Container was loaded this morning. Vessel leaves 09.12.17\\r\\n\\r\\n\",\"date_creation\":\"1499060719\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516797211\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797211\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545300\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1512545300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(423, 1, 1516797218, 'task.move.column', '{\"task_id\":\"34\",\"task\":{\"id\":\"34\",\"title\":\"LBW Packaging\",\"description\":\"* 20.09.17 - We received the information from Jens regarding the packaging they need in Germany: \\\"300 pcs of VKA 566-3, Loco BW RD35\\/RD45 sun sensor packaging\\r\\n200 pcs of VKA 566-22638, Loco BW RD45INT packaging\\\" We will arrange for this to be sent around 20th October 2017.\\r\\n* 17.10.17 - These goods will be sent with Sallys goods at the end of the month.\\r\\n* 01.11.17 - This has all been sent with Sally\'s goods Vessel Departure: 27.10.17.\",\"date_creation\":\"1505896818\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"6\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516797218\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516797218\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1509508201\"},\"project_id\":\"1\",\"position\":6,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1509508201\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(424, 1, 1516871268, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1516871267\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n\\r\\n\"}}'),
(425, 1, 1517383097, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517383097\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(426, 1, 1517389699, 'task.assignee_change', '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 22.12.2017 - Andreas : Who is the stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ? \\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"5\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1517389699\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"owner_id\":\"5\"}}'),
(427, 1, 1517391127, 'task.update', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n* 31.01.18 - Mail Ben: Thanks, then we will send them directly after CNY with the second batch of Order #15 - HP2\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517391127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n* 31.01.18 - Mail Ben: Thanks, then we will send them directly after CNY with the second batch of Order #15 - HP2\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(428, 1, 1517402863, 'task.create', '{\"task_id\":112,\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"21\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(429, 1, 1517402876, 'task.move.position', '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":13,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(430, 1, 1517402883, 'task.move.position', '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":8,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(431, 1, 1517402889, 'task.move.position', '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28\",\"description\":\"\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402863\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":4,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(432, 1, 1517402930, 'task.create', '{\"task_id\":113,\"task\":{\"id\":\"113\",\"title\":\"LBW order #2 9 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402930\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(433, 1, 1517402949, 'task.update', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #29 - order no.: \"}}'),
(434, 1, 1517402959, 'task.move.position', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":15,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(435, 1, 1517402965, 'task.move.position', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":9,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(436, 1, 1517402975, 'task.move.position', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: \",\"description\":\"\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517402949\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(437, 1, 1517410306, 'task.update', '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - Mail Jens: \",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517410306\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - Mail Jens: \"}}'),
(438, 1, 1517410536, 'task.update', '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517410536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\"}}'),
(439, 1, 1517410675, 'task.update', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517410675\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\"}}'),
(440, 1, 1517428300, 'task.move.column', '{\"task_id\":\"30\",\"task\":{\"id\":\"30\",\"title\":\"LBW Order #26\",\"description\":\"* 03.08.17 - Manfred has said the arrival date for LBW Order #26 is CW16 which is extremely late. If I don\'t hear back from Ralf by the middle of CW32 I will email him to chase him up about this.\\r\\n* 08.08.17 - Email sent to Ralf regarding this. Waiting for his reply.\\r\\n* 18.08.17 - RD-D has sent the order 1000 x RD35, 3750 x RD45, 750 x RD45 int. (in total 5500 pcs) ETA Rhede 13.03.18 - means **ETD approx. 06.02.18 (cw6).**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. We would also like to send this order out in CW5 because of Spring Festival. This means it will arrive in Germany 1 or 2 weeks early.\\r\\n* 09.11.17 - we have received the PI with ETD 05.18 - it is OK for us\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking: order #26: VK 6-22735 - 600 pcs, VK 6-22745 -  3.400 pcs, VK 6-22637 - 400 pcs, VK 6-22638 - 900 pcs, total 5.300 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: However I am afraid to say bringing LBW Order #26 forward so early is impossible. We think we can manage CW05 to ship out and this is what we are going to try for. I will keep you updated.\\r\\n* 23.01.18 - Unfortunately due to the increased traffic before spring festival we can\'t send the gods out until 31.01.18 which means the vessel set sail date is 04.02.18. This vessel has been booked.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1501743965\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1517428300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517428300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1501743965\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1501743965\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(441, 1, 1517470138, 'task.move.column', '{\"task_id\":\"93\",\"task\":{\"id\":\"93\",\"title\":\"HP2 - white lower packaging for HP2 starter kit\",\"description\":\"\\r\\n* 07.12.17 - Mail Manfred: attached some picture of the packaging from the HP2 starter kit.\\r\\nAt these pictures we have assembled the HP2 with foam directly into the starter kit packaging. In the future we want to assemble directly the lower packaging with the HP2\\r\\nto make it easier. That means we will directly use the packaging which we receive from your side.For this we need a simple cheap white lower packaging. The height of the white box must be including the foam at the top of the HP2. \\r\\nCan you please asap provide a quotation\\/price for such a complete HP2 instead of the current complete HP2 price with the black packaging ?\\r\\nHow fast can you send us some sample or final dimensions of the box because we must finalize the packaging of the starter kit ?\\r\\n* 07.12.17 - Mail Ben: I have contacted our packaging supplier and they will come to our factory tomorrow afternoon. So hopefully I\\u2019ll be able to give you the quotation tomorrow or latest Monday next week!\\r\\n* 08.12.17 - Mail Ben: As discussed in the NPSR today the price for the White lower box is **3.1RMB** and the price for the foam is 4.30RMB which makes 7.40RMB which is a reduction of **6.60RMB from the current packaging **which is 14RMB. The supplier is currently working on samples and will have them done Wednesday\\/Thursday next week once we receive them and if everything is ok we will send them via DHL directly.\\r\\n* 14.12.17 - First sample has been received, however there are problems. I have sent feedback to the supplier and am looking for a new sample next week.\\r\\n* 02.01.18 - Mail Ben: I\\u2019ve gone through a couple of samples while you\\u2019ve been away and not been too happy with them so far. The supplier is making another one as we speak and I should have it in my hands tomorrow. I have a better feeling about this one (Fingers Crossed). I\\u2019ll let you know more tomorrow!\\r\\n* 04.01.18 - Waybill 4244581154\\r\\n* 10.01.18 - Hows this going? Is it still stuck? We really need the release on this ASAP.\\r\\n* 10.01.18 - Manfred: we have received the sample, everything looks very good. Very good job. Please carry on with the further production of this white lower packaging as discussed this morning.\\r\\n* 15.01.18 - Mail Jens: in appendix you\\u2019ll find a separate purchase order 4500034849 of 150 pcs white carton box for HP2 (starter kit package).\\r\\n* 16.01.18 - Mail Shinya: Please find attached PI-RD18402 for carton box white HP2. \\r\\nAlso attached invoice of #shpt-18-004 for DHL, please check the documents,\\r\\nWe have already finish package (see picture on attached), if the document is OK, we will call the DHL this afternoon. Waiting for your short reply.\\r\\n* 16.01.18 - Packages have been sent via DHL. I have also attached a video which shows the folding process.\\r\\n* 16.01.18 - Mail Shinya: The carton box  have take out by DHL, attached document for your reference, the tracking No.54 2153 8883\\r\\n* 18.01.18 - RD-D has received the 155 pcs of the packaging\\r\\n* 23.01.18 - When the goods have been send out for Order #15 we will put this task in \\\"In Transit\\\" so after the goods arrive we can confirm this if everything is ok.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1512634655\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"2\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517470138\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517470138\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1516797092\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"9\",\"dst_column_id\":\"4\",\"date_moved\":\"1516797092\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(442, 1, 1517572583, 'task.update', '{\"task_id\":\"109\",\"task\":{\"id\":\"109\",\"title\":\" LBW - security stock - 4500034925\",\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\",\"date_creation\":\"1516710973\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572583\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516710973\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n\\r\\n* 19.01.18 - Mail Jens: in appendix you\\u2019ll find a small PO to fill up our security stock of RD45. Maybe you can check with which order you can send together these 150 pcs RD45? 150 pcs RD45 (VK 6-22745 - ETA 15.05.18)\\r\\n* 23.01.18 - Mail Ben: Hi Jens, We\\u2019re having a little trouble knowing when we can send this order out. Our main problem is the RD45 cover. We don\\u2019t have any stock as we\\u2019ve Ordered for Order #26 and #27 and because Order #28 hasn\\u2019t been placed yet we can\\u2019t put this on the                  back of that order. Sadly as I am sure you know, RX won\\u2019t produce 150 units so I\\u2019m afraid we\\u2019re going to need to wait until we receive Order #28 from you guys.\\r\\n* 23.01.18 - Mail Jens: OK I understand, should be not a problem for the moment, these 150 pcs are only for filling up the security stock, so let\\u2019s wait until order #28, hopefully we\\u2019ll get the information from Schellenberg about order #28 asap, our ladie from the sales had contact Schellenberg in the end of last week again and remind Schellenberg that the lead time is about approx. 6 month, hopefully it helps a bit to speed up the ordering process on Schellenbergs side (Fingers crossed \\uf04a) !\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\"}}'),
(443, 1, 1517572817, 'task.update', '{\"task_id\":\"112\",\"task\":{\"id\":\"112\",\"title\":\"LBW order #28 - order no.: 4500035100\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\",\"date_creation\":\"1517402863\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572817\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402863\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 250 x RD35 int., 700 x RD45 int., 1100 x RD35, 3300 x RD45 (in total 5360 pcs), 400 x sun sensor , ETA Rhede 05.07.18 - means **ETD approx. 25.05.18 (cw21)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw23\\/2018\"}}'),
(444, 1, 1517572837, 'task.update', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517572837\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\"}}'),
(445, 1, 1517579554, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517579554\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(446, 1, 1517901554, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1517901554\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(447, 1, 1518073601, 'task.update', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\",\"date_creation\":\"1499734621\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518073600\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1506041466\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\"}}'),
(448, 1, 1518081624, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518081624\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(449, 1, 1518081630, 'task.assignee_change', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"8\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518081630\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"5\"}}'),
(450, 1, 1518101217, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - new ETD 30.03.18\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518101217\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - new ETD 30.03.18\\r\\n\\r\\n\"}}'),
(451, 1, 1518102027, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - new ETD 30.03.18\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518102027\",\"reference\":\"\",\"date_started\":\"1518102027\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"date_started\":1518102027}}'),
(452, 1, 1518160828, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518160828\",\"reference\":\"\",\"date_started\":\"1518102000\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n\\r\\n\\r\\n\",\"date_started\":1518102000}}'),
(453, 1, 1518163574, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518163574\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(454, 1, 1518163633, 'task.update', '{\"task_id\":\"97\",\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518163633\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(455, 1, 1518163664, 'task.file.create', '{\"file\":{\"id\":\"345\",\"name\":\"18-02-08_order_4500035251_MHI(eMMC Flash Memory).pdf\",\"path\":\"tasks\\/97\\/4fef10704f1a64644f57cb2fe71eb384c3404fac\",\"is_image\":\"0\",\"task_id\":\"97\",\"date\":\"1518163664\",\"user_id\":\"2\",\"size\":\"13348\"},\"task\":{\"id\":\"97\",\"title\":\"HP2 - new eMMC\",\"description\":\"* 15.12.17 - Mail Ben: Currently for the HP2 the eMMC we are currently using is going End of Life so we might as well also do the CE with the new eMMC (Datasheet Attached). The details are as follows: (1) Before the testing Guangyue will prepare several test boards with the new eMMC for us. These will be used so he can update software if required on his end as well as send it to the people for CE. (2) After this they will arrange the test within around 1 to 2 weeks after the boards are prepared. The Digital Test Document will be provided in month after this. The formal document will need more time. This timeline is based on no major modifications required to the PCB. (3)The cost for doing one model HP2 is 21,000RMB (6% VAT Included). The cost for doing two models (Current and New eMMC) is 23,500RMB (6% Included. I strongly suggest we go for the two model option. (4) If we need to further modify the certification there will be an extra charge of around 3,000RMB, but Guangyue is going to try and make sure its done in one go.\\r\\nWe will get the new eMMC samples ordered ASAP and get working on producing the samples.\\r\\n* 18.12.17 - Mail Peter: As eMMC is one of the most critical parts of the whole system we kindly ask you to provide us with 15 boards (better finished HP2s) for testing before approval. We plan to install 10 pcs in our lab for continuous test and 5 to distribute to participants of the field trial.\\r\\nObviously we are going to change not only a type of eMMC but the manufacture too. This shot must be a hit w\\/o any side effect.  Are you aware  of a need for any FW adaptations (bootloader, BSP)? What is the time frame for the trasition?\\r\\n* 19.12.17 - Mail Ben: Totally agree. So just recap. We will put the CE on hold for the moment until we get the eMMC sorted and confirm everything is working correctly and there are no problems. After this we will begin the process of the CE. For the eMMC we have currently ordered 50 samples and are checking the lead-time. For the modifications Guangyue said he will need to make some changes to the Bootloader and Kernel which will take 2-3 days. \\r\\nWe should have the eMMC chips in 2 weeks. Then we can assemble, edit the software then send to you guys in Germany. You should hopefully receive them around the middle of January. \\r\\n* 19.12.17 - Mail Peter: After your confirmation on bootloader and kernel changes - this is surely the worst case \\u2013 we see a lot of effort needed to ensure proper market introduction.\\r\\nWe have to (1) Get Detailed documentation for any change made on bootloader and kernel (2)-\\tsetup a new project \\u2013 unplanned release for the current sw architecture (we are already in transition for a new one) \\uf0e8 this blocks resources planned on another project (3) make additional validation in the new sw architecture  (4) involve our partners for the old and new architecture (Sigma and emlix) (5) increase the number of test devices to at least 20 pcs. As all these measures take a lot of effort and money we\\u2019d prefer to postpone this topic by one year! Please try any possible source to get something around 10k of the current eMMC in stock.\\r\\n@Manfred \\u2013 please support Ben as far as possible\\r\\n* 19.12.17 - Mail Ben: Hi Peter, Ok no problem. I will make the arrangements with Manfred. But this won\\u2019t be cheap as the eMMC has been slowly increasing for a while.\\r\\n* 19.12.17 - Sally has sent the data sheet, for #15 and #16 the eMMC (4GB version) is secured \\r\\n* 21.12.17 - Mail Manfred: this afternoon in a meeting with Ralf and Peter we decided that we will follow Peter\\u2019s below mentioned proposal. **Please source asap 10K of the current eMMC for stock. ** With these 10K we must have enough for this year and also enough for January to April 2019 if we calculate with 1K per month (so 4K for 2019).\\r\\n* 27.12.17 - Mail Sally: We\'ve purchased another 850pcs old eMMC from our current supplier @53RMB (same price as we paid for #14 15 16) for interim period as the lead time from factory source seems very long (right now 30 weeks we will try to see if they can shorten it by increase the qty to 10K). This is the cheapest we can find so far so we immediately placed order, another of our regular main chip supplier has quoted approx. 80RMB each and will go higher next year.\\r\\nThe rest of the qty, we are still waiting for the feedback from RTS.\\r\\n* 09.01.18 - Mail Sally: Beside below 850pcs which secured #17. **RTS will deliver 2000pcs next week @43RMB which we\'ve purchased on 24th Nov, which secure #18 and #19. The rest 7~8K, RTS will have to source from market, **as factory is not willing to produce anymore, so the best price so far he quote is @50RMB, though better than our current price @53RMB, but from the conversation I will feel there could be another 1~2RMB room for negotiation. Please confirm, for this 7~8K, whether we should place the order or not, RTS\'s sub-supplier will try to reserve the stock and current quotation for us for 10days. If yes, we need deposit from RDD 100% value of these eMMC.\\r\\n* 02.02.18 - Mail Ray (RTS): Finally, I can confirm 45RMB including VAT here. But as you know, there is no margin for us to support 30 days payment. The payment should be made 100% before delivery. Can you place the order today? \\r\\n* 02.02.18 - Mail Sally: Thanks Ray for your effort. Yes, we can issue order today. By the way, since the order qty is quite large for us, do you have suggestion that how we can verify the goods to make sure they are original? This is just our standard process for massive qty purchasing.\\r\\n* 09.02.18 - Mail Jens: in appendix you\\u2019ll find the PO for the eMMC Flash Memory, please send us your corresponding PI! \\r\\n* 09.02.18 - Mail Sally: Shinya will send you the PI next week. The payment term is 100% against PI. Later you can deduct the amount of 1000pcs from the deposit payment start from HP2 #20.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513340326\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518163633\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513340326\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(456, 1, 1518168300, 'task.create', '{\"task_id\":115,\"task\":{\"id\":\"115\",\"title\":\"LBW\",\"description\":\"\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168300\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(457, 1, 1518168486, 'task.update', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168486\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\"}}'),
(458, 1, 1518168493, 'task.move.position', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168486\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(459, 1, 1518168500, 'task.move.position', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"0\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168486\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":null,\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(460, 1, 1518168517, 'task.update', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 45000\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518168517\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #30 - order no.: 45000\",\"owner_id\":\"1\"}}'),
(461, 1, 1518412952, 'task.update', '{\"task_id\":\"100\",\"task\":{\"id\":\"100\",\"title\":\"Life cycle test rack LBW\",\"description\":\"* 12.02.18 - Andreas : How much does it cost? And doe you inform Ralf about the costs?\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 22.12.2017 - Andreas : Who is the stand ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1513950843\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1518412952\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1513950843\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"description\":\"* 12.02.18 - Andreas : How much does it cost? And doe you inform Ralf about the costs?\\r\\n* 02.02.18 - After talking with Andreas over the phone and confirming I am going to ask accounting to bill these.\\r\\n* 04.01.18 - I spoke to you a while ago about it on Wechat but got no reply. We had to do it as the old stands have fallen apart and we must build the new ones.\\r\\n* 02.01.18 - Andreas: Oh, I miss an information about doing this investination! You have talk to Ralf about theses! What about the old stand ?\\r\\n* 02.01.18 - We have built the final function testing stand for the LBW. We had no choice. This cost 10,000RMB and we are working on the Life Cycle Testing Stand this is going to cost 20,000RMB. We had no choice but to start them. Can we discuss the costs at a convenient time please?\\r\\n* 22.12.2017 - Andreas : Who is the stand ?\\r\\n\\r\\n\\r\\n\\r\\n\",\"owner_id\":\"1\"}}'),
(462, 1, 1518413320, 'subtask.update', '{\"subtask\":{\"id\":\"33\",\"title\":\"Actuators IQC Reports \",\"status\":\"1\",\"time_estimated\":\"0\",\"time_spent\":\"0\",\"task_id\":\"33\",\"user_id\":\"1\",\"position\":\"1\",\"username\":\"Ben Hulme\",\"name\":null,\"timer_start_date\":0,\"status_name\":\"In Bearbeitung\",\"is_timer_started\":false},\"changes\":[],\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1515924883\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(463, 1, 1518413473, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1518413473\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(464, 1, 1518451085, 'task.update', '{\"task_id\":\"12\",\"task\":{\"id\":\"12\",\"title\":\"FHJ 036\\/037 Tooling\",\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n* 12.02.18 - Mail Ben: Hi Andreas, The goods are on their way:**WAYBILL 79 6690 9882**\\r\\n\\r\\n\",\"date_creation\":\"1499060336\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"5\",\"position\":\"9\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1518451085\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1499060336\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Andreas Schulte\",\"assignee_name\":\"Andreas Schulte\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 09.06.17 - Mail Ben: we need new tooling for the metal housing and the gearbox housing. Total invest \\r\\n* 14.06.17 - Mail Manfred: Please give Carry and FHJ asap the order for the new tooling. Afterwards please send us a Gantt chart where we can see all actions. Specially which effect all actions have for the current orders (#23 and #24) or for orders in the future #25 (ETA Rhede approx. beginning of January 2018). It must be 100% sure that these two new tooling have no negative effect on the existing orders. Please involve our QC in this process where necessary.\\r\\n* Mail Ben: FHJ are currently still using the old tooling for the moment so we are aren\\u2019t too worried about this. Order #23 is secure and we have received all Carry and FHJ Stock for these orders. Order #24 also shouldn\\u2019t be a problem. Comment Manfred: Tooling will be ready at 02.10.17, then function test etc - Ready for mass production latest at ...... ? How does this work in relation to #25 with ETD end of October ?\\r\\n* 03.07.17 - FHJ is currently working on the new tool in accordance with the 3D Files and the Drawings. They will continue to use the very old tool in the mean time to make sure we don\'t run our of stock.\\r\\n* 27.07.17 - FHJ have said the mould will be finish around 19\\/08\\/2017.\\r\\n* 24.08.17 - Tooling has been finished and FHJ are doing the first round of samples tomorrow.\\r\\n* 30.08.17 - FHJ are having big problems with the Industrial Power being shut down in their area. They are going to make the samples for us as soon as they can.\\r\\n* 07.09.17 - FHJ have been sent samples of our Gears so he can test assembly. We are looking at receiving them next week (CW37)\\r\\n* 20.09.17 - We have received the first samples, but a lot of dimensions are out of tolerance so we need to ask FHJ to adjust the tool. We have already received the stock for Order #25 so we are secure for the moment and FHJ can still use the old tool.\\r\\n* 25.09.17 - Samples have been received. Henk is checking. If Dimensions are ok we will do the final function test to check.\\r\\n* 29.09.17 - Henk has provided feedback to the FHJ and they will provide us the second round of samples 10.10.17. FHJ must add item no. and cavitiy no. - drawings must be updated\\r\\n* 13.10.17 - Henk ,inspection the 2nd samples for mould modify ,still have some dimension out of tolerance ,ask supplier going on modify mold and will do the inspection for the 3nd samples .\\r\\n* 04.01.18-Henk,will do the 3rd mould test on this Saturday(Jan.6th) .\\r\\n* 08.01.18-Henk,the third samples are better than last time ,several dimensions out of tolerance ,but can concession to accept.but have 3 place need to supplier to modify mould .\\r\\n* 09.01.18-Henk,the forth samples will be received almost one week later \\r\\n* 16.01.18-Henk mail:Dear Ben:Please see attached inspection report for the fourth samples of the gearbox .Several out dimensions can be concession to accept.  Three defectives which are in the third samples are corrected in new samples .2pcs samples are pass the testing after assembly with the components .\\r\\n* 08.02.18 - Mail Ben: Hi Andreas, On Monday we are going to send you 10 assembled samples of the new Gearbox Samples from the new tool from our supplier (x5 RD35 & x5 RD45). Could you please put these on life cycle test and see if these fail as well. Also we are sending you 5 samples (not assembled) with an FSIR report for you guys to check.\\r\\n* 12.02.18 - Mail Ben: Hi Andreas, The goods are on their way:**WAYBILL 79 6690 9882**\\r\\n\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(465, 1, 1519310719, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \"}}'),
(466, 1, 1519310770, 'task.file.create', '{\"file\":{\"id\":\"346\",\"name\":\"20180220_152221_resized.jpg\",\"path\":\"tasks\\/39\\/0b54167698f4fe913bdd5045562c98fdbcb0af80\",\"is_image\":\"1\",\"task_id\":\"39\",\"date\":\"1519310770\",\"user_id\":\"2\",\"size\":\"1084466\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(467, 1, 1519310770, 'task.file.create', '{\"file\":{\"id\":\"347\",\"name\":\"20180220_152233_resized.jpg\",\"path\":\"tasks\\/39\\/e143fd6075cc04d2b4c1809662abfbd48fe49b27\",\"is_image\":\"1\",\"task_id\":\"39\",\"date\":\"1519310770\",\"user_id\":\"2\",\"size\":\"1282441\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(468, 1, 1519310770, 'task.file.create', '{\"file\":{\"id\":\"348\",\"name\":\"52-A17-067 REV.00.pdf\",\"path\":\"tasks\\/39\\/ce68e273ec4c57be2d6a6a0f1d66594d99a0c6c0\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1519310770\",\"user_id\":\"2\",\"size\":\"61574\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(469, 1, 1519310771, 'task.file.create', '{\"file\":{\"id\":\"349\",\"name\":\"PACK FOR MC-3665-3051-01_REV00.pdf\",\"path\":\"tasks\\/39\\/47fdea2917c9d6b0c62c2d3bd35ece48b4560a2b\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1519310771\",\"user_id\":\"2\",\"size\":\"156731\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(470, 1, 1519310825, 'task.file.create', '{\"file\":{\"id\":\"350\",\"name\":\"52-A17-067 REV.00.pdf\",\"path\":\"tasks\\/39\\/6d635ff0a7060ecd3901b6dd3dd71f033408dc7b\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1519310825\",\"user_id\":\"2\",\"size\":\"61574\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310719\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(471, 1, 1519310950, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1519310950\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \"}}'),
(472, 1, 1519311023, 'task.update', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519311023\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"LBW order #30 - order no.: 4500035305\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(473, 1, 1519311073, 'task.update', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519311073\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\"}}'),
(474, 1, 1519311270, 'task.assignee_change', '{\"task_id\":\"101\",\"task\":{\"id\":\"101\",\"title\":\"Life cycle test rack turbular motors\",\"description\":\"* 02.02.18 - I have uploaded some new photos of the testing stand. This has taken a lot of work to get it to this stage and I have the feeling it is nearly there. However I have broken all the motors I had in stock. @Manfred Kohlruss, could you please order some more from Dooya 4 - 5 Pieces of Each of the common types.\\r\\n* 04.01.18 - This is nearly finished, I will keep you guys updated on the progress.\",\"date_creation\":\"1514989366\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"2\",\"owner_id\":\"1\",\"position\":\"3\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"5\",\"date_modification\":\"1519311270\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1514989366\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Pending\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Andreas Schulte\",\"creator_name\":\"Andreas Schulte\",\"category_description\":null,\"column_position\":\"1\"},\"changes\":{\"owner_id\":\"1\"}}'),
(475, 1, 1519725716, 'task.update', '{\"task_id\":\"40\",\"task\":{\"id\":\"40\",\"title\":\"HP2 Order #15 - 4500033639 (4500034384)\",\"description\":\"* 18.10.17 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #15\\/2018. I\\u2019ve ordered the 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the beginning of March,second step with ETA in the beginning of April\\r\\n* 20.10.17 - Shinya has sent the PI with 500 x ETD cw06\\/2018 and 500 x ETD cw10\\/2018 - does this mean that you have to produce the whole quantity (1K) before CNY ?\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 20.02.18 (ETD cw02\\/2018) and 2nd batch ETA 15.03.18 (ETD cw06\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 300 x HP2 (black packaging) + 200 x HP2 (white packaging) - ETA Rhede 20.02.18 (ETD cw02\\/18). 2nd batch: 400 x HP2 (black packaging) + 100 x HP2 (white packaging) - ETA Rhede 14.03.18 (ETD cw06\\/18)\\r\\n* 16.01.18 - RD-D has delayed the delivery. New ETD 02.02.18\\r\\n* 23.01.18 - Mail Manfred: Hi Ben, we have checked the current figures and came to the following decision. Please let us delay the above mentioned 2nd batch of #15 to ETA 04.04.18 which means approx. ETD 28.02.18 at your side. Please check and confirm whether this is possible.\\r\\n* 24.01.18 - Mail Ben: HP2 2nd batch can leave ETD 02.03.18\\r\\n\",\"date_creation\":\"1508340536\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1519725716\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1508340536\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"title\":\"HP2 Order #15 - 4500033639 (4500034384)\"}}'),
(476, 1, 1520426127, 'task.update', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. ETA Rhede 02.10.18 (ETD 28.08.18) - VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426127\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. ETA Rhede 02.10.18 (ETD 28.08.18) - VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \"}}'),
(477, 1, 1520426143, 'task.update', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426143\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \"}}'),
(478, 1, 1520426460, 'task.create', '{\"task_id\":117,\"task\":{\"id\":\"117\",\"title\":\"HP2 order #18 (black colour box) - 4500035339 \",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n\",\"date_creation\":\"1520426460\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"22\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426460\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(479, 1, 1520426480, 'task.move.position', '{\"task_id\":\"117\",\"task\":{\"id\":\"117\",\"title\":\"HP2 order #18 (black colour box) - 4500035339 \",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n\",\"date_creation\":\"1520426460\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426460\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":14,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(480, 1, 1520426810, 'task.create', '{\"task_id\":118,\"task\":{\"id\":\"118\",\"title\":\"HP2 order #19 (white colour box) - 4500035601\",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\",\"date_creation\":\"1520426810\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"23\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426810\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(481, 1, 1520426818, 'task.move.position', '{\"task_id\":\"118\",\"task\":{\"id\":\"118\",\"title\":\"HP2 order #19 (white colour box) - 4500035601\",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\",\"date_creation\":\"1520426810\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520426810\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":15,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(482, 1, 1520427393, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520427393\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* 02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)\"}}'),
(483, 1, 1520438371, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 17.05.18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520438371\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 17.05.18)\\r\\n\"}}'),
(484, 1, 1520438536, 'task.update', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520438536\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n\"}}'),
(485, 1, 1520438778, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520438778\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(486, 1, 1520517246, 'task.update', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520517246\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\"}}'),
(487, 1, 1520522006, 'task.file.create', '{\"file\":{\"id\":\"372\",\"name\":\"VO-01-900_AW_PCAS_Materialnumber_designation_index(03).dotx\",\"path\":\"tasks\\/90\\/1c91bfc639611091cd88e10cb48f759d8affc555\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1520522006\",\"user_id\":\"2\",\"size\":\"550331\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: (1) Type labels (which in labels in detail) (2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1516275333\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(488, 1, 1520522118, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520522118\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n\\r\\n\\r\\n \\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(489, 1, 1520595377, 'task.update', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520595377\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \"}}'),
(490, 1, 1520933619, 'task.update', '{\"task_id\":\"115\",\"task\":{\"id\":\"115\",\"title\":\"LBW order #30 - order no.: 4500035305\",\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \\r\\n* 13.03.18 - Shinya has sent the PI with ETD cw36\\/2018\",\"date_creation\":\"1518168300\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520933619\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1518168300\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 01.02.18 - Mail Jens: I got a info from Ralf that Schellenberg plan a further Container with Loco Beltwinders with ETA CW40 at Schellenberg, that means, ETA in Rhede should be 2 weeks earlier, because this time need the guys here for the QC inspection.                  Unfortunately Schellenberg has currently a completely unknown about the split and the quantities, thus the question is, if we will place an order, without any information about the split with ETA CW38 in Rhede, when would you need the information about the split at the latest, so that we\\u2019ll reach ETA in Rhede in CW38 without any problems? A further thing is, it could be, that Schellenberg give us \\u201cmaybe\\u201c 10 weeks before ETD the information, that they need the Container not in CW40, they need it now in CW44 (ETA Rhede changed from CW38 to CW42) the question would be, how flexible can we shape the delivery date, is there any possibility for your to accept a delay from maybe 4-5 weeks (CW38-CW43), when you get these information of a delay maybe X weeks before the ETD date (so, up to which point we can postpone the delivery date, about how many weeks before ETD?)? \\r\\n* 02.02.18 - Mail Ben: This is a bit of a nightmare. I would say 10 Weeks before ETD might be workable, but that is the absolute minimum. My main worry is the long lead-time item which is the PCB\\u2019s as these are the only ones that are reliant on the mix. The other two items (Gears and Motor) are used in both the RD45 and RD35 so I\\u2019m not worried about these. Would it be possible for them to give us an idea of the total quantity and a range how the mix could be divided so we can at least prepare something?\\r\\n* 06.02.18 - Mail Ben: I need at LEAST 10 weeks for the split and delay. Personally I would prefer 12. My main problem is the PCB as the other components should be ok.\\r\\n* 07.03.18 - Mail Jens: you\\u2019ll find in appendix the next Loco BW purchase order #30! Please check and send us your PI. If there\\u2019re any questions, please let me know. **ETA Rhede 02.10.18 (ETD 28.08.18) **- VK 6-22637 x 320Stk., VK 6-22638 x 700Stk., VK 6-22735 x 1.380Stk., VK 6-22745 x 2.900Stk.  \\r\\n* 13.03.18 - Shinya has sent the PI with ETD cw36\\/2018\"}}'),
(491, 1, 1520934329, 'task.update', '{\"task_id\":\"117\",\"task\":{\"id\":\"117\",\"title\":\"HP2 order #18 (black colour box) - 4500035339 \",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw30\\/2018 and 2nd batch cw35\\/2018\",\"date_creation\":\"1520426460\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"14\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520934328\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426460\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 24.08.18 (ETD 20.07.18) - 2nd batch 504 pcs - \\r\\nETA 27.09.18 (ETD 23.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw30\\/2018 and 2nd batch cw35\\/2018\"}}'),
(492, 1, 1520934396, 'task.update', '{\"task_id\":\"118\",\"task\":{\"id\":\"118\",\"title\":\"HP2 order #19 (white colour box) - 4500035601\",\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw29\\/2018 and 2nd batch cw32\\/2018\",\"date_creation\":\"1520426810\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1520934396\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520426810\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 07.03.18 - Mail Jens: Hi Shinya, after discussion between Ben, Manfred and me, you\\u2019ll find the next HP2 purchase order in appendix. Please check and send us your PI. If there\\u2019re any questions, please let us know! 1st batch 504 pcs - ETA 15.08.18 (ETD 11.07.18) - 2nd batch 504 pcs - ETA 06.09.18 (ETD 02.08.18)\\r\\n* 13.03.18 - Shinya has sent the PI with ETD 1st batch cw29\\/2018 and 2nd batch cw32\\/2018\"}}'),
(493, 1, 1520936504, 'task.update', '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1520936504\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\"}}'),
(494, 1, 1521118907, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521118907\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: **please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.**\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(495, 1, 1521118933, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521118933\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a **rough figure for the costs of such a pulp moulded tray per piece and the tooling costs** ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\"}}'),
(496, 1, 1521118981, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521118981\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\"}}'),
(497, 1, 1521188978, 'task.update', '{\"task_id\":\"107\",\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\"}}'),
(498, 1, 1521189052, 'task.file.create', '{\"file\":{\"id\":\"377\",\"name\":\"171-001 c.pdf\",\"path\":\"tasks\\/107\\/b40f6d3ac075d906b83a17387d9195ac2f1d904a\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189052\",\"user_id\":\"2\",\"size\":\"52658\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(499, 1, 1521189052, 'task.file.create', '{\"file\":{\"id\":\"378\",\"name\":\"171-002a.PDF\",\"path\":\"tasks\\/107\\/12df44d032ce39de92c2df3304b69d5b8005e4b0\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189052\",\"user_id\":\"2\",\"size\":\"37352\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(500, 1, 1521189053, 'task.file.create', '{\"file\":{\"id\":\"379\",\"name\":\"171-003d.pdf\",\"path\":\"tasks\\/107\\/147f96d21310689f841ae0326ee4306a4913cbcc\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"34998\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(501, 1, 1521189053, 'task.file.create', '{\"file\":{\"id\":\"380\",\"name\":\"171-005h.pdf\",\"path\":\"tasks\\/107\\/e731ccef1b60e2a2fe5fe4c3cb3494022339373d\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"43758\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(502, 1, 1521189053, 'task.file.create', '{\"file\":{\"id\":\"381\",\"name\":\"171-006a.PDF\",\"path\":\"tasks\\/107\\/6b11f28b561093742cd8c82a794d82e5659ddb0d\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"51178\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(503, 1, 1521189053, 'task.file.create', '{\"file\":{\"id\":\"382\",\"name\":\"171-019.pdf\",\"path\":\"tasks\\/107\\/886e45ac19bbad916313009f60a1362571a88fcd\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"36080\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(504, 1, 1521189053, 'task.file.create', '{\"file\":{\"id\":\"383\",\"name\":\"580-054f.pdf\",\"path\":\"tasks\\/107\\/3380584fe0ee8570977c48f7eb3689d7e4f8d648\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"53493\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(505, 1, 1521189053, 'task.file.create', '{\"file\":{\"id\":\"384\",\"name\":\"2018_03_07 Transfer Hofmann-SX-MHI.XLSX\",\"path\":\"tasks\\/107\\/0a027b1ce0a6f47f738a4333bcdb764de702c48d\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"21252\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(506, 1, 1521189053, 'task.file.create', '{\"file\":{\"id\":\"385\",\"name\":\"AMBIENT_LIGHT_SENSOR.pdf\",\"path\":\"tasks\\/107\\/f2dc0584c7eabfd5a3b9fbb137ec20451aec5669\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189053\",\"user_id\":\"2\",\"size\":\"27062\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(507, 1, 1521189054, 'task.file.create', '{\"file\":{\"id\":\"386\",\"name\":\"NJL7302L-F3_NJL7302L-F5_E.PDF\",\"path\":\"tasks\\/107\\/086bbb820c2427f6ae8b9cfa26c2611025e5d4dc\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189054\",\"user_id\":\"2\",\"size\":\"514373\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(508, 1, 1521189248, 'task.file.create', '{\"file\":{\"id\":\"387\",\"name\":\"180207_Datenblatt_Leoni_OLW_3700_84A001HOS999_EN_20180316083336.270_X.pdf\",\"path\":\"tasks\\/107\\/b2a4bbc816eb1837f451827fe68ea4208038e3d8\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189248\",\"user_id\":\"2\",\"size\":\"72416\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(509, 1, 1521189442, 'task.file.create', '{\"file\":{\"id\":\"388\",\"name\":\"sun-sensor.JPG\",\"path\":\"tasks\\/107\\/6bdeec2d51271429a62fb7af69c5e2762ae4f4ea\",\"is_image\":\"1\",\"task_id\":\"107\",\"date\":\"1521189442\",\"user_id\":\"2\",\"size\":\"11673\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(510, 1, 1521189526, 'task.file.create', '{\"file\":{\"id\":\"389\",\"name\":\"2018_03_07 Transfer Hofmann-SX-MHI.XLSX\",\"path\":\"tasks\\/107\\/cd0ed7270e897b8981c28ba1505ce859defdaff3\",\"is_image\":\"0\",\"task_id\":\"107\",\"date\":\"1521189526\",\"user_id\":\"2\",\"size\":\"21252\"},\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. \\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521188978\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(511, 1, 1521189635, 'task.update', '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189635\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(512, 1, 1521189647, 'task.update', '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189647\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(513, 1, 1521189660, 'task.update', '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189660\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\nsensor \\u2013 SAP item no.: TRA 655-1\\r\\nDescription: NJL7302L-F5-TE1#ZZZB\\r\\nIn pastic bags \\u2013 500 pcs\\r\\nSupplier: NJRC\\r\\nData sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(514, 1, 1521189697, 'task.update', '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(515, 1, 1521189711, 'task.file.create', '{\"file\":{\"id\":\"390\",\"name\":\"171-001 c.pdf\",\"path\":\"tasks\\/106\\/e982efd8f31211cf7237e4c4c4884cbcd2c078d8\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"52658\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(516, 1, 1521189711, 'task.file.create', '{\"file\":{\"id\":\"391\",\"name\":\"171-002a.PDF\",\"path\":\"tasks\\/106\\/287af2a87c8d6cb4267025d9c1445e09506370b4\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"37352\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(517, 1, 1521189711, 'task.file.create', '{\"file\":{\"id\":\"392\",\"name\":\"171-003d.pdf\",\"path\":\"tasks\\/106\\/06fbd2c9eea1f922e6bcc0b06b72ad7a178c285c\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"34998\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(518, 1, 1521189711, 'task.file.create', '{\"file\":{\"id\":\"393\",\"name\":\"171-019.pdf\",\"path\":\"tasks\\/106\\/ee598af2cee38cc418f68c6a4a69ba1ef19a1e80\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"36080\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(519, 1, 1521189711, 'task.file.create', '{\"file\":{\"id\":\"394\",\"name\":\"2018_03_07 Transfer Hofmann-SX-MHI.XLSX\",\"path\":\"tasks\\/106\\/b5a10962389871832be72157321af72d8feec1ba\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189711\",\"user_id\":\"2\",\"size\":\"21252\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(520, 1, 1521189712, 'task.file.create', '{\"file\":{\"id\":\"395\",\"name\":\"AMBIENT_LIGHT_SENSOR.pdf\",\"path\":\"tasks\\/106\\/e3b14ea6149cabd7e4c7a2ffcfcd1d70b0067ad4\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189712\",\"user_id\":\"2\",\"size\":\"27062\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(521, 1, 1521189712, 'task.file.create', '{\"file\":{\"id\":\"396\",\"name\":\"NJL7302L-F3_NJL7302L-F5_E.PDF\",\"path\":\"tasks\\/106\\/c3b664db52aea2b9e6e65b7e04013908f9eeb4c5\",\"is_image\":\"0\",\"task_id\":\"106\",\"date\":\"1521189712\",\"user_id\":\"2\",\"size\":\"514373\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n\\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189697\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(522, 1, 1521189774, 'task.update', '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189774\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\"}}'),
(523, 1, 1521189809, 'task.update', '{\"task_id\":\"107\",\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. We will send you asap 50 pcs samples of the single components\\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189809\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. We will send you asap 50 pcs samples of the single components\\r\\n\\r\\n\"}}'),
(524, 1, 1521189911, 'task.file.create', '{\"file\":{\"id\":\"397\",\"name\":\"light_sensor.JPG\",\"path\":\"tasks\\/106\\/32697c448e429ed38ab7e5098a2a379c481de2b8\",\"is_image\":\"1\",\"task_id\":\"106\",\"date\":\"1521189911\",\"user_id\":\"2\",\"size\":\"13173\"},\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189774\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(525, 1, 1521189974, 'task.assignee_change', '{\"task_id\":\"106\",\"task\":{\"id\":\"106\",\"title\":\"Light Sensor\",\"description\":\"* 23.01.18 - Manfred discussed this last week in the NPSR. The project is for a black Light Sensor with a annual quantity of 70k to 100k per year. I am waiting on target prices and information on this product from Manfred.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. I have given you approx. 50 sets of the single components of the item no.: XSB 655-1. \\r\\n* sensor \\u2013 SAP item no.: TRA 655-1, description: NJL7302L-F5-TE1#ZZZB, in pastic bags \\u2013 500 pcs, supplier: NJRC, Data sheet: NJL7302L-F3_NJL7302L-F5_E.pdf\\r\\n\",\"date_creation\":\"1516669136\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"18\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189974\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669136\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(526, 1, 1521189987, 'task.assignee_change', '{\"task_id\":\"107\",\"task\":{\"id\":\"107\",\"title\":\"Sun Sensor (GSM2)\",\"description\":\"* 23.01.18 - Another project discussed in the NPSR was the Sun Sensor for the Higher Level Belt Winders that use the GSM2 motor. The Quantity is 150k per year. We have found a few suppliers for the Fibre Optic Cable, but am waiting for Target Pricing from Manfred so I can make sure what they quote us is competitive.\\r\\n* 13.03.18 - Mail Manfred: Dear Ben, attached the further data (drawings) for this project.\\r\\nPlease find the annual quantities and the MOQ in the attached Excel sheet. Samples I have already given to you of the green market positions in the Excel sheet. We will send you asap 50 pcs samples of the single components\\r\\n\\r\\n\",\"date_creation\":\"1516669216\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"19\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521189987\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1516669216\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(527, 1, 1521190728, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521190728\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n*15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\"}}'),
(528, 1, 1521190763, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521190763\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\"}}'),
(529, 1, 1521190793, 'task.file.create', '{\"file\":{\"id\":\"398\",\"name\":\"18-03-15_Auswertung_Forecast motor-gearbox-unit_10A 534-1(2).xlsx\",\"path\":\"tasks\\/39\\/915622f58a4995528e80bacc012643cf57d80f31\",\"is_image\":\"0\",\"task_id\":\"39\",\"date\":\"1521190793\",\"user_id\":\"2\",\"size\":\"130786\"},\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521190763\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"}}'),
(530, 1, 1521205490, 'task.update', '{\"task_id\":\"39\",\"task\":{\"id\":\"39\",\"title\":\"UBW Gearbox Production\",\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n* 16.03.18 - Mail Ben: Thanks for this everything is much clearer now. We are going to place the orders for the entire year based on your forecast. Please can you confirm that we can do this, once the orders are placed we can play around with the dates a little but not by much. I don\\u2019t need you guys to send the orders through yet for the whole year.\\r\\n\\r\\n\",\"date_creation\":\"1507886160\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521205490\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1507886160\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.09.17 - Waiting for Manfred to return to Germany to discuss the possibility of RD-CN Manufacturing the entire Gearbox and Motor for the UBW then shipping them to Germany as a Sub-Assembly.\\r\\n* 11.10.17 - feedback from RD-D - good idea :-) - carry on. the design of the LBW-worm and the \\r\\n* design of the UBW-worm is the same. The only difference is tolerance of the inner diameter and the length of the press fit. 1) please send us asap 20 samples of the complete motor gearbox unit \\u2013 with LBW gearbox + worm and with Nichibo motor for life cycle tests\\r\\n2) please send us an official quotation for the assembled gearbox with the Nichibo motor. Please mention each component in the quotation, separate the labor costs and the price of the Nichibo motor. BTW: Please double check with Sally the correct HS code for the gearbox motor unit.\\r\\n* 11.10.17 - Mail Ben: I would request that you give me a little more time before I send you the first 20 samples for life cycle testing. I would like to do the lifecycle testing here first to make sure what I send you is good. \\r\\n* \\r\\n* 13.10.17 - We are waiting to receive the motors from Nichibo, the package from Germany and the information from Andreas. After we will assemble and test.\\r\\n* 13.10.17 - Mail Jens: the parcel is on the way via TNT. The tracking number is: GD237720862WW\\r\\n* 24.10.17 - Sadly didn\'t receive any UBW\'s in Jen\'s package. We are waiting for samples for Nichibo and are getting some more worms produced for this as well. Once we receive the Nichibo motors I can work on the samples.\\r\\n* 26.10.17 - Mail Jens: Tracking number for the UBW samples is GD237720880ww\\r\\n* 01.11.17 - We are still waiting on the samples from Nichibo. This will take a little while but are in progress. The first version of the quotation has also been sent to Manfred and Jens.\\r\\n* 05.11.17 - Currently we are looking at the following timeline for the UBW Motor Samples to be complete: **1)** 21\\/11\\/2017 Worm Samples will be received at our end. **2)** Worm Samples will be sent to Nichibo. **3)** After Nichibo receive the worms, the lead-time is 4 weeks so we should receive the samples by around the 23\\/12\\/2017. After this we will begin life cycle testing at our end and also send 20 samples to Germany for Life Cycle testing at their end.\\r\\n* 14.11.17 - Andreas has sent the testing information\\r\\n* 16.11.17 - Andreas has sent testing information for the LBW, not the UBW. I have asked again, lets see what comes back.\\r\\n* 21.11.17 - Worms have been received from Spintec and been forward to Nichibo. Everything is on track. I will double check with Nichibo to see the lead-time.\\r\\n* 22.11.17 - Worms have been sent out today, they should arrive at Nichibo latest Friday. Nichibo have informed us that it will take one week to make the motors after receiving the worm gears. So we are looking at a much faster timeline than originally thought.\\r\\n* 24.17.17 - REMINDER for Andreas to\\r\\n* 06.02.18 - Revised quotation has been sent to Manfred. Waiting to hear back after meeting with Ralf.\\r\\n* 15.02.18 - Mial Manfred: please finalize at first the future payments terms with Nichibo before you forward fiurther orders to Nichibo.\\r\\n* 21.02.18 - Mail Manfred: we have set up a project team for the project \\u201eUBW motor gearbox unit\\u201c. The aim of the team is to set up a clear specification for the motor gearbox unit including the packaging specification, testing etc. \\u2026. In our meeting today my colleague Peter asked whether you also can deliver the units in a pulp moulded tray.\\r\\nCan you please give us a rough figure for the costs of such a pulp moulded tray per piece and the tooling costs ?\\r\\n* 22.02.18 - Manfred has sent the proposal for the ramp up and ramp down secenario of the UBW motor gearbox unit. According to this SX-MHI must deliver the first batch with ETA end of July 2018. \\r\\n* **02.03.18 - Jens has sent the first order 4500035533 - quantity 3072 pcs - ETA Rhede 27.07.18  (ETD 22.06.18)**\\r\\n* 08.03.18 - Meetings points from Berthold and Peter Meeting: 1) Need to decide how many are tested in life cycle testing from each order. 2) Build an Acoustic box for the UBW Motor + GB Testing (Test 50 Units to come up with average) 3) Product Label on the UBW Motor + Gearbox with the Part Number and Serial Number (10A534-1). Berthold will come up with a label design and drawings 4) Ben needs to make a proposal for the printing on the outside of the cardboard box.\\r\\n* 08.03.18 - For the packaging for the UBW we use the sizes detailed in Peter\'s report and we send the first shipment in two pallets with 3 layers each. We also use slightly thicker boxes for the master carton so there is less risk of the units breaking, and we pack the Motor + Gearbox units loose.\\r\\n* 13.03.18 - I have attached and mailed the new packaging specification for the UBW Gearbox Project. Please let me know what you guys think.\\r\\n* 15.03.18 - Packaging has been confirmed by Peter.\\r\\n* 15.03.18 - Nichibo have said both orders will ship out 25.05.2018. We need to give Nichibo orders for the whole year so they can make sure to slot our orders in properly. Nichibo have also informed us their lead-time is 3.5 months now.\\r\\n* 15.03.18 - Manfred will send through updated forecast so we can place orders according to this.\\r\\n* 16.03.18 - Mail Jens: my sent Forecast is of course a rough forecast, these does only shows that we have a requirement in this month and we must also place an order in this month, to meet the requirement, not more! In appendix I\\u2019ve refined the infos about the purchase orders, maybe now it\\u2019s a bit clearer!\\r\\n* 16.03.18 - Mail Ben: Thanks for this everything is much clearer now. We are going to place the orders for the entire year based on your forecast. Please can you confirm that we can do this, once the orders are placed we can play around with the dates a little but not by much. I don\\u2019t need you guys to send the orders through yet for the whole year.\\r\\n\\r\\n\"}}'),
(531, 1, 1521616833, 'task.update', '{\"task_id\":\"113\",\"task\":{\"id\":\"113\",\"title\":\"LBW order #29 - order no.: 4500035101\",\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \\r\\n* 21.03.18 - Mail Ben: This won\\u2019t be a problem. Can you please resend us the order?\",\"date_creation\":\"1517402930\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"4\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521616833\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1517402930\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 31.01.18 - RD-D has sent the order 300 x RD35 int., 550 x RD45 int., 1240 x RD35, 3120 x RD45 (in total 5210 pcs), 400 x sun sensor , ETA Rhede 05.08.18 - means **ETD approx. 29.06.18 (cw26)**\\r\\n* 01.02.18 - Thanks for this, however haven\'t received the PO yet.\\r\\n* 02.02.18 - Shinya has sent the PI - ETD cw27\\/2018\\r\\n* 08.03.18 - Jens has found a difference between our order to SX-MHI and the order which we received  from Schellenberg. Schellenberg has ordered 640 pcs of RD45 int., but we have forwarded only 550 pcs. Can we increase the quantity to 640 pcs. ?\\r\\n* 09.03.18 - Mail Ben: I honestly think this shouldn\\u2019t be a problem. But please wait till I\\u2019m back in the factory on Monday and I can check. \\r\\n* 21.03.18 - Mail Ben: This won\\u2019t be a problem. Can you please resend us the order?\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(532, 1, 1521624986, 'task.move.column', '{\"task_id\":\"32\",\"task\":{\"id\":\"32\",\"title\":\"Sun Sensor (800 DE)\",\"description\":\"\\r\\n* 22.08.17 - RD-D has send the order 800 pcs VK 6-22746 - ETA Rhede 09.05.18 - means ETD 04.04.18 cw14\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon. I was also wondering seeing as the dates are so close. Can we combine this with Order #27\\r\\n (ETD cw21\\/18 - ETA 22.05.18) ?\\r\\n* 09.11.17 - Manfred: it is a little tight because date of customer order is 28.05.17- you can deliver these with order #26 if you want (ETD approx. 06.02.18 (cw6)\\r\\n* 31.01.18 - Mail Ben: We have sent out LBW Order #26 today and loaded the container.\\r\\nHowever unfortunately we couldn\\u2019t fit the 800 Sun Sensors in the container. I believe the best course of action is to send the Sun Sensors out with the HP2 Shipments after Chinese New Year.\\r\\n* 31.01.18 - Mail Jens: from my view and the figures in our system it should be no problem if you send the 800 pcs right after CNY!\\r\\n* 31.01.18 - Mail Ben: Thanks, then we will send them directly after CNY with the second batch of Order #15 - HP2\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452784\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"9\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521624986\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521624986\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"In Transit\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"3\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1503452784\"},\"project_id\":\"1\",\"position\":2,\"column_id\":\"9\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"9\",\"date_moved\":\"1503452784\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(533, 1, 1521625035, 'task.assignee_change', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521625035\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"owner_id\":\"1\"}}'),
(534, 1, 1521625154, 'task.update', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521625153\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\"}}'),
(535, 1, 1521625241, 'task.open', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625241\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934537\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"4\"}}'),
(536, 1, 1521625260, 'task.move.column', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"5\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1520934537\"},\"project_id\":\"1\",\"position\":5,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"4\",\"dst_column_id\":\"3\",\"date_moved\":\"1520934537\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(537, 1, 1521625264, 'task.move.position', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":12,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(538, 1, 1521625269, 'task.move.position', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625260\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"3\"},\"project_id\":\"1\",\"position\":16,\"column_id\":\"3\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"3\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(539, 1, 1521625361, 'task.update', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521625361\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n\\r\\n\\r\\n\"}}'),
(540, 1, 1521643315, 'task.update', '{\"task_id\":\"121\",\"task\":{\"id\":\"121\",\"title\":\"Payment Terms\",\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\\r\\n* 19.03.18 - topic currently \\\"on hold\\\" . Telco 26.04.18\",\"date_creation\":\"1520934444\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"2\",\"position\":\"20\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521643315\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1520934444\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Manfred Kohlruss \",\"assignee_name\":\"Manfred Kohlruss\",\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 13.03.18 - As discussed the payment terms for the LBW, HP2 and UBW Gearbox are as follows:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 30 days after PI\\/PO.\\r\\n* 16.03.18 - I have updated the payments terms based on the discussion:\\r\\n   * LBW: 80% - 20%. The 80% can be paid 4 months before the arrival date in Germany (ETA).\\r\\n   * HP2: 70% - 30%. The 70% can be paid 4 and a half months before the arrival date in Germany (ETA).\\r\\n   * UBW: 80% - 20%. The 80% can be paid 2 and a half months before the ETA in Germany.\\r\\n* 19.03.18 - topic currently \\\"on hold\\\" . Telco 26.04.18\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(541, 1, 1521713799, 'task.update', '{\"task_id\":\"26\",\"task\":{\"id\":\"26\",\"title\":\"HP2 Claims (General)\",\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n* 22.03.18 - Mail Shinya: Here are attached invoice of transport cost for return HP2 11pcs, CNY5,757.00 belong to MHI. CNY608.00 belong to the RDD.\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1499734621\",\"date_completed\":\"0\",\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"16\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1521713799\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521625260\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 11.04.17 - Mail Ben: A while ago we received 49 units of HP2 with various defects across orders #5, #6 and #7. Many of the standard problems we can accept as defective such as: LED, USB etc. However there is a part in there were it says: D$HP2$05\\u00df15352004756 error in programm process The issue with this is we test the HP2\\u2019s before they get sent to your end and there appears to be no problem at all and most of them work successfully at your end. However it seems when you guys put the software onto the HP2 it causes the device to die. Because when we get these units back in China we can\\u2019t seem to use them either. Also because Guangyue doesn\\u2019t know exactly what you are doing at your end we can\\u2019t really analyse the problem. Could you please let me know some more details on this so we can look into this further?\\r\\n* 20.04.17 - problem is under investigation - we have still two units with the same problem. \\r\\n* 03.07.17 - Ben has asked for an update of the current claims - what is the situation, what are the the findings in Germany - response OPEN\\r\\n* 10.07.17 - Andreas has sent an overview with 39 pcs faulty devices \\r\\n* 11.07.17 - The main issue at the moment that needs to be dealt with first is the LED Issues. We currently have 5,000 Units of which 39 have problems and 19 of those are LED Defects. I am working with Andreas now to see if we can deal with this. Firstly find the root cause and as a secondary measure possibly develop some automated equipment to detect this at the Final Function Test.\\r\\n* 13.07.17 - Around 80% clear on most of the issues, however I followed up with another email for additional clarification. Waiting for Andreas\'s Reply.\\r\\n* 20.09.17 - Waiting for Germany to send back the samples. I will double check the samples when we get them.\\r\\n* 16.11.17 - Manfred is currently planning the return delivery. With the delivery I will need a full report of all the defects on the HP2\'s one by one with the Serial Number and the defect explained next to the serial number.\\r\\n* 04.12.17 - Mail Ben: Dear Jens, Thanks for this. I have looked over your list and am quite unhappy to see that 14 of these units are from Orders #7 and #8. Going by the second shipment date on the order: Order #7: 15\\/07\\/2016, Order #8: 01\\/08\\/2016\\r\\nBoth of these have exceeded one year and have been in your warehouse for a long time. Also in addition I have updated the list and found 5 units which have problems we don\\u2019t test for and aren\\u2019t able to test on our end. I have attached the updated list with my comments. You can send these units back including the Order #7 and #8, but I need to discuss on my end internally whether we can accept the claim and reimburse the money.\\r\\n* 14.01.18 : Andreas - I think we can close these point ; we will give you a quick feedback if the next delievery arrieve ; #14 ; Simelar as point 18\\r\\n* 08.02.18 - Mail Shinya: The returned HP2(24pcs) have arrived at shanghai harbor, we are processing customs clearance, Hopefully we will receive the goods before our spring festival(14th February). If we get the goods I will let you know.\\r\\n* 13.03.18 - This has been confirmed in Germany where RD-CN take responsibility for 13 units and 52% of the shipping costs of the HP2\'s (Not include Sally\'s Goods).\\r\\n* 21.03.18 - Mail Jens: Regarding the transport costs, if I\\u2019m right, MHI have paid the transport from Germany to Shanghai (via IFB, Incoterm: EXW Rhede), so maybe Shinya can send us a debit note for the transport costs of the 11 pcs HP2 which were not confirmed from your side? \\r\\nMaybe you can double check the debit note and let us know, from which payment we can deduct the amount?\\r\\n* 21.03.18 - Mail Ben: You can deduct this from your next HP2 Payment which will be HP2 Order #16 Part 1 leaving on the 1st April 2018. Shinya will send you an invoice for the shipping tomorrow.\\r\\n* 22.03.18 - Mail Shinya: Here are attached invoice of transport cost for return HP2 11pcs, CNY5,757.00 belong to MHI. CNY608.00 belong to the RDD.\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(542, 1, 1521718276, 'task.file.create', '{\"file\":{\"id\":\"400\",\"name\":\"180322_PCAS_HP2 Rating Label - change company logo.pdf\",\"path\":\"tasks\\/90\\/211aa3d6e6cb5deb28e4950ca1fe3fea3da1e066\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1521718276\",\"user_id\":\"2\",\"size\":\"437969\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521718264\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(543, 1, 1521718276, 'task.file.create', '{\"file\":{\"id\":\"401\",\"name\":\"180313_PCAS_HP2_Box Change Request _company logo (Iss 1.0)_signed.pdf\",\"path\":\"tasks\\/90\\/80a68a12a79ce70bb69735e0e2d99fff017a821c\",\"is_image\":\"0\",\"task_id\":\"90\",\"date\":\"1521718276\",\"user_id\":\"2\",\"size\":\"448833\"},\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"15\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521718264\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"}}'),
(544, 1, 1521718292, 'task.move.column', '{\"task_id\":\"90\",\"task\":{\"id\":\"90\",\"title\":\"HP2 -  change company logo\",\"description\":\"\\r\\n* 22.11.17 - Mail Manfred: with this mail I would like to inform you in advance that we have a new company logo starting from Q1\\/2018. Please have a look at the attachment. It is not absolutely different to the old one ;-)  We decided that we will make a flowing transition instead of a hard cut where we have to scrap a lot of things. On your side I would see the following actions: **(1) Type labels (which in labels in detail) **(2) Packaging homepilot (3) Homepilot upper part (interchangeable insert) \\u2013 please have a look at the attached drawing. Maybe you can check whether I have forgotten something. It would be very helpfull if you can give us an information about your stock of this things, so that we roughly know when we will have the change to the new logo or whether we must decide to scrap some things. Could you please check with RX asap whether a change of the insert (point 3) is possible ? Please ask for a quotation with a leadtime. Also here: how many pieces (upper part) have you already in stock ?\\r\\n* 22.11.17 - Mail Ben: This will involve quite a considerable amount of work and negotiation. \\r\\nRegarding the parts for the HomePilot we have the following: (1) HP2 Housing. RX have produced 4000 units, so basically we need to wait until Order #18 before you guys are going to see the change with current stock levels. (2) Packaging isn\\u2019t a problem, we have a lot of stock but I think after Order #15 at the latest we can make this change. I will need updated artwork from your side as the HP2 Packaging Design was done by you guys in Germany (AI Files\\/Vector Format) (3) Labels we only have stock that covers order #14 for the labels, so this again should be a problem. Again please send through vector\\/AI formats of the logo.\\r\\nAs far as I know and have seen the logo isn\\u2019t actually an insert in the tool, its actually part of the main core mould. I will double check this tomorrow and get back to you, but this could be a difficult exercise. I will have more information for you later this week.\\r\\n* 24.11.17 - I need vector formats of the logo for the packaging and HP2 Rating Label and Power Supply label change. I will also talk to RX next week regarding the modification of the logo in the mould. I will get a timeline and cost for this.\\r\\n* 21.12.17 - Mail Manfred: this afternoon we decided together with Ralf that we will not change the company logo at the current HP2 housing. All other necessary information for the change of the packaging and type labels I will send you at the beginning of January.\\r\\n* 12.01.18 - Mail Manfred: attached the information you have asked for. Please send us pictures or samples for the further release and give us an information about the timing of the possible change\\r\\n* 17.01.18 - Mail Manfred: I had  a short chat with Andrea from our marketing department.\\r\\nShe told me that verything is the same like in the past, she had only deleted the \\u201e2\\u201c as you have already mentioned. In the attachend she has again marked what is glossiy and silver.\\r\\n* 18.01.18 - Mail Manfred: I have spoke with with Andrea from the marketing department.\\r\\nIt is correct what you said, you can delete the left and the right side of the printing because this is inside of the carton ;-). She told me that according to our new CI \\u2013 we have the letter \\u201ehomepilot\\u201c plus the new company logo together. Please have a look at the jpg file in the attachment . Therefore she \\/ we definitely want this in silver. That means \\u201ehomepilot\\u201c + logo + smart home. So everything what you can see in the jpg file.\\r\\n* 18.01.18 - Mail Ben: All very clear I will get right on it. Please give me 2 weeks to get this arranged as the supplier is currently finishing some packaging for the LBW Order and is working on his other customers goods as well before Spring Festival. I will keep you updated.\\r\\n* 08.03.18 - Hi Ben, as discussed please find attached the new PCAS document.\\r\\nPlease use this document in future and send us the PCAS for the packaging of the homepilot. \\r\\n* 13.03.18 - Change sheet for the HP2 Box Change has been sent. The labels should arrive next week and we will also send this change request through.\\r\\n* 20.03.18 - Manfred has sent the signed PCAS for the homepilot packaging with new company logo\\r\\n* 22.03.18 - Packaging Change request received, however there is no signature. Ben has also sent through the change request for the Rating Label on the HP2 Housing.\",\"date_creation\":\"1511360391\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"4\",\"owner_id\":\"1\",\"position\":\"1\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521718292\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1521718292\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Done\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"4\"},\"changes\":{\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1511360391\"},\"project_id\":\"1\",\"position\":1,\"column_id\":\"4\",\"swimlane_id\":\"1\",\"src_column_id\":\"3\",\"dst_column_id\":\"4\",\"date_moved\":\"1511360391\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\"}'),
(545, 1, 1521800951, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521800951\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n\"}}'),
(546, 1, 1521808059, 'task.update', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521808059\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n\"}}'),
(547, 1, 1521808099, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"11\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1521808099\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). 2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n\"}}'),
(548, 1, 1522058706, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522058706\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\"}}');
INSERT INTO `user_has_unread_notifications` (`id`, `user_id`, `date_creation`, `event_name`, `event_data`) VALUES
(549, 1, 1522058734, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522058734\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\"}}'),
(550, 1, 1522060471, 'task.update', '{\"task_id\":\"103\",\"task\":{\"id\":\"103\",\"title\":\"HP2 order #17 - 4500034742\",\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n* 24.03.18 - Mail Ben: No problem I will get this worked out and with the first batch of Order #17 we will make a plan to ship out some single HP2 units to you guys!\\r\\n\",\"date_creation\":\"1515506964\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"13\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522060471\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1515506964\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 10.01.18 - Shinya has sent the PI - 750 pcs ETD cw19\\/2018 and 750 pcs ETD cw23\\/2018\\r\\n* 10.01.18 - Mail Ben: The pricing is as follows: Standard HP2 Package: 595.34RMB, White Packaging: 588.74RMB. The reduction is 6.60RMB.\\r\\n* 09.01.18 - Mail Jens: in appendix you\\u2019ll find the next order for the home pilot, it\\u2019s purchase order #17\\/2018. With this order I ordered each 500 pcs with black and 250 pcs with white colour box per delivery. Please check the delivery dates and send us your comments! 1st batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 07.06.18 (ETD cw18\\/18). 2nd batch: 500 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 09.07.18 (ETD cw22\\/18)\\r\\n* 06.03.18 - together with Ben we have updated the delivery dates - 1st batch ETA 14.06.18 (ETD 10.05.18) and 2nd batch ETA 25.07.18 (ETD 20.06.18)\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. \\r\\n* 24.03.18 - Mail Ben: No problem I will get this worked out and with the first batch of Order #17 we will make a plan to ship out some single HP2 units to you guys!\\r\\n\"}}'),
(551, 1, 1522064802, 'task.update', '{\"task_id\":\"33\",\"task\":{\"id\":\"33\",\"title\":\"LBW - Claim RD45\",\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\\r\\n* 26.03.18 - Mail Andreas: Okay ! Thank you very much for the information! We will send you the information you want at the end of next week, because Martin and I are on holiday in the moment.\\r\\n\",\"date_creation\":\"1504703765\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"green\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"10\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522064802\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"700.45\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1504703765\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"* 14.01.17 - Andreas : We calculate the radius accordingly and additionally measure the weight on the belt so it should be the same weight on the belt\\r\\n* 08.01.17 - Ben: We are using the same weights 7.5kg (73.55N) however we really need to look at the radius of the belts so we can calculate the Nm of force. As we discussed in China, you mentioned you use a double pulley system which is closer to the real life use by the customer however we simply attach the weight directly to the LBW\'s Belt wheel. I think this is the key difference.\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25\\r\\n* 03.01.18 - Andreas: see the overview of or test with max 7,5 Nm at the belt webbing in the test;  Why we have the problems and your test will be okay; We don\\u00b4t know the differenzens; We\\u00b4ll test 5 pices of the next delivery  #25 \\r\\n* 16.11.17 - Received information from Andreas however sadly haven\'t heard more regarding the failures or more details about the testing system yet.\\r\\n* 22.09.17 - Please see the Sub-Tasks for update regarding pending work.\\r\\n* 07.09.17 - Our devices have been checked and there are no problems with the units from Order #24. I am still waiting for Actuators reply, but they have already told me they have never changed any materials or parts and wouldn\'t do without asking us first.\\r\\n* 04.09.17 - Mail Martin: we have a new issue with the RD45. From the three last deliveries, we have still three defective devices from three with minor cycles. We found brush marks at the inside of the chassis (Pic.1) and the plastic gear-wheel is damaged (Pic.2). Do you have also still any RD45 in your life-cycle-test? What\\u00b4s your experiences with these devices? I will open and analyze another device tomorrow.\\r\\n* 13.03.18 - I will visit Actuator at the beginning of April to start to find out about this and see what\'s going on.\\r\\n* 26.03.18 - I have sent 4 samples of failed units that I brought back from Germany to Actuator they have conducted the first round of analysis and can\'t find any major problems with the motors. They have contacted their Oil Bearing supplier again to see whats going on, but so far the supplier has said they haven\'t changed anything. They will continue to push.\\r\\nActuator have also said they have all the motors form our previous orders so they want to start testing them to see if they can recreate the problem. I have asked them to send the motors to us so we can assemble them for them. @Andreas\\/Martin: Could you or Martin please send me a detailed list of all the orders you have done Life Cycle testing for on the LBW and indicated how many you\\u2019ve tested and how many have failed so I know when this problem started to occur.\\r\\n* 26.03.18 - Mail Andreas: Okay ! Thank you very much for the information! We will send you the information you want at the end of next week, because Martin and I are on holiday in the moment.\\r\\n\"}}'),
(552, 1, 1522316314, 'task.update', '{\"task_id\":\"31\",\"task\":{\"id\":\"31\",\"title\":\"LBW Order #27\",\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\\r\\n\\r\\n\\r\\n\",\"date_creation\":\"1503452729\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"yellow\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"2\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"1\",\"date_modification\":\"1522316314\",\"reference\":\"\",\"date_started\":\"1518102000\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1503452729\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Ben Hulme\",\"creator_name\":null,\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 22.08.17 - RD-D has sent the order 660 x RD45 int., 1500 x RD35, 3200 x RD45 (in total 5360 pcs) ETA Rhede 22.05.18 - means **ETD approx. 10.04.18 (cw15)**\\r\\n* 23.08.17 - Order Received. Shinya will double check and get back to Jens soon.\\r\\n* 14.11.17 - Mail Jens: Dear Shiny, we got a info from our sales team that Schellenberg asked about a change of Loco order #26 and order #7, our sales team got the following\\r\\nupdated figures from them for double checking order #27: VK 6-22735 - 1.200 pcs, VK 6-22745 - 3.000 pcs, VK 6-22637 - 300 pcs, VK 6-22638 - 860 pcs, total 5.360 pcs. Is it possible that you double check whether it\\u2019s possible to change to the above mentioned updated quantities?\\r\\n* 15.11.17 - Mail Ben: Hi Jens, No problem, we can change these quantities to the ones you\\u2019ve requested. Shinya will send the update orders to you Tuesday next week.\\r\\n* 15.11.17 - Jens has sent the updated order - waiting for the updated PI\\r\\n* 16.11.17 - PI Will be sent on Tuesday by Shinya\\r\\n* 15.01.18 - RD-D asked whether it is possible to bring forward this delivery  (question from Schellenberg)\\r\\n* 16.01.18 - Mail Ben: Regarding Order #27 this shouldn\\u2019t be a problem. However we are still short on 3 components (PCB, Motor and Bearing). As soon as these arrive we\\u2019ll have no problems.\\r\\n* 16.01.18 - Mail Jens: when can you give us a final feedback regarding the timing ?\\r\\n* 17.01.18 - Mail Ben: Regarding the 3 components. (1) Actuator Motor: We are expecting Order #27\\u2019s goods to arrive on the 31st January. (2) Bearing: These should be arriving before the end of the month. I am honestly not too worried about this part because this supplier is quite quick when it comes to producing our orders. (3) PCB\\u2019s: The PCB\\u2019s are arriving on January 23rd\\/24th.\\r\\nI really don\\u2019t see any problems, but as you know until the goods are in our factory I prefer to stay safe and not commit 100%. Comment Manfred: That means me have to wait until end of January with our decision.\\r\\n* 25.01.18 - Mail Ben: As discussed over the call. Our bearing bushes have been lost sadly. They are reproducing them and will ship them out in February. It should arrive at the end of February. Shouldn\\u2019t be a big problem. So I think you can confirm with Schellenberg that the earlier delivery time should be ok.\\r\\n* 06.02.18 - The bearing bushes have arrived earlier than expected due to our suppliers effort to fix this situation so we shouldn\'t have any problems now. Motors, PCB\'s and the bearing bush have arrived and are in stock.\\r\\n* 08.02.18 - **new ETD 30.03.18**\\r\\n* 09.02.18 - Mail Ben: I don\\u2019t think this will be a problem! We should be able to manage CW14\\/CW15 ETD for Order #27.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\\r\\n\\r\\n\\r\\n\"}}'),
(553, 1, 1522316618, 'task.update', '{\"task_id\":\"64\",\"task\":{\"id\":\"64\",\"title\":\"HP2 order #16 - 4500033946\",\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\",\"date_creation\":\"1510248012\",\"date_completed\":null,\"date_due\":\"0\",\"color_id\":\"red\",\"project_id\":\"1\",\"column_id\":\"3\",\"owner_id\":\"1\",\"position\":\"12\",\"score\":\"0\",\"is_active\":\"1\",\"category_id\":\"0\",\"creator_id\":\"2\",\"date_modification\":\"1522316618\",\"reference\":\"\",\"date_started\":\"0\",\"time_spent\":\"0\",\"time_estimated\":\"0\",\"swimlane_id\":\"1\",\"date_moved\":\"1510248012\",\"recurrence_status\":\"0\",\"recurrence_trigger\":\"0\",\"recurrence_factor\":\"0\",\"recurrence_timeframe\":\"0\",\"recurrence_basedate\":\"0\",\"recurrence_parent\":null,\"recurrence_child\":null,\"priority\":\"0\",\"external_provider\":null,\"external_uri\":null,\"category_name\":null,\"swimlane_name\":\"Default swimlane\",\"project_name\":\"Manufacturing (NPSR)\",\"column_title\":\"Work in progress\",\"assignee_username\":\"Ben Hulme\",\"assignee_name\":null,\"creator_username\":\"Manfred Kohlruss \",\"creator_name\":\"Manfred Kohlruss\",\"category_description\":null,\"column_position\":\"2\"},\"changes\":{\"description\":\"\\r\\n* 09.11.17 - Mail Jens: in appendix you\\u2019ll find the next order #16\\/2018. I order 1.000 pcs as usual in 2 steps with 500 pcs., first step with ETA in the middle of April (ETD cw10\\/18), please don\\u2019t wonder that the delivery date of order #16 stepp1 is nearly similar to the second step of order #15 (that\'s because we still have to bring forward the delivery schedule of the second step of order #15!).\\r\\nI think we can discuss it tomorrow morning during the weekly Telco! The second step of order #16 I\\u2019ve placed with ETA in Rhede at the middle of May! Please double check the delivery dates and send us a corresponding PI!\\r\\n* 10.11.17 - Mail Ben:  Everything seems like it should be ok up to Order #16, however the USB 1.5A Power Switch has a very long lead-time so we can\\u2019t currently make the delivery date you\\u2019ve requested for Order #16 Pt. 1.\\r\\n* 13.11.17 - Mail Shinya: Dear Jens, Please see attached PI-RD17429 for HP2 order #16.if you have any questions let me know. 500 pcs with ETD cw11\\/18 (ETA cw16) and 500 pcs with ETD cw16\\/18 (ETA cw21)\\r\\n* 19.11.17 - Manfred: according to the current figures: 1st batch ETA 18.04.18 (ETD cw11\\/2018) and 2nd batch ETA 17.05.18 (ETD cw15\\/2018)\\r\\n* 09.01.18 - Manfred: we have sent you an update of the order. 1st batch: 350 x HP2 (black packaging) + 150 x HP2 (white packaging) - ETA Rhede 18.04.18 (ETD cw13.03.18). **2nd batch: 250 x HP2 (black packaging) + 250 x HP2 (white packaging) - ETA Rhede 17.05.18 (ETD 12.04.18)**\\r\\n* 13.03.18 - Unfortunately we have a delay with the HP2 first batch. The first batch will set sail on 30.03.18. The white boxes will leave via air on the 16.03.18.\\r\\n* 23.03.18 - Mail Jens: we need still 100 pcs HP2 without packaging and accessories, the same as  we already get from you in the past. Is it possible that you send these 100 pcs with order #16 2nd batch ?\\r\\n* 23.03.18 - Mail Ben: I\\u2019m afraid HP2 16 Part 2 isn\\u2019t possible as we have already pretty much finished producing it and it is ready to go out. Also the other problem is we have ordered all the accessories and parts for producing a full batch. We can do this in Order #17 sorry.\\r\\n* 29.03.18 - shipment booking IFB: Comm:Plastic parts; power supply; display panel; loco belt winder; bracket, Q\\u2019ty:11200KGS\\/44CBM by 40GP, Cargo ready date:Apr-4, V\\/v:OOCL INDONESIA\\/002w, ETD:Apr-10, ETA RTM:May-11\\r\\n\"}}');

--
-- Indexes for dumped tables
--

--
-- Indexes for table `actions`
--
ALTER TABLE `actions`
  ADD PRIMARY KEY (`id`),
  ADD KEY `project_id` (`project_id`);

--
-- Indexes for table `action_has_params`
--
ALTER TABLE `action_has_params`
  ADD PRIMARY KEY (`id`),
  ADD KEY `action_id` (`action_id`);

--
-- Indexes for table `columns`
--
ALTER TABLE `columns`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `idx_title_project` (`title`,`project_id`),
  ADD KEY `columns_project_idx` (`project_id`);

--
-- Indexes for table `column_has_move_restrictions`
--
ALTER TABLE `column_has_move_restrictions`
  ADD PRIMARY KEY (`restriction_id`),
  ADD UNIQUE KEY `role_id` (`role_id`,`src_column_id`,`dst_column_id`),
  ADD KEY `project_id` (`project_id`),
  ADD KEY `src_column_id` (`src_column_id`),
  ADD KEY `dst_column_id` (`dst_column_id`);

--
-- Indexes for table `column_has_restrictions`
--
ALTER TABLE `column_has_restrictions`
  ADD PRIMARY KEY (`restriction_id`),
  ADD UNIQUE KEY `role_id` (`role_id`,`column_id`,`rule`),
  ADD KEY `project_id` (`project_id`),
  ADD KEY `column_id` (`column_id`);

--
-- Indexes for table `comments`
--
ALTER TABLE `comments`
  ADD PRIMARY KEY (`id`),
  ADD KEY `user_id` (`user_id`),
  ADD KEY `comments_reference_idx` (`reference`),
  ADD KEY `comments_task_idx` (`task_id`);

--
-- Indexes for table `currencies`
--
ALTER TABLE `currencies`
  ADD UNIQUE KEY `currency` (`currency`);

--
-- Indexes for table `custom_filters`
--
ALTER TABLE `custom_filters`
  ADD PRIMARY KEY (`id`),
  ADD KEY `project_id` (`project_id`),
  ADD KEY `user_id` (`user_id`);

--
-- Indexes for table `groups`
--
ALTER TABLE `groups`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `name` (`name`);

--
-- Indexes for table `group_has_users`
--
ALTER TABLE `group_has_users`
  ADD UNIQUE KEY `group_id` (`group_id`,`user_id`),
  ADD KEY `user_id` (`user_id`);

--
-- Indexes for table `invites`
--
ALTER TABLE `invites`
  ADD PRIMARY KEY (`email`,`token`);

--
-- Indexes for table `last_logins`
--
ALTER TABLE `last_logins`
  ADD PRIMARY KEY (`id`),
  ADD KEY `user_id` (`user_id`);

--
-- Indexes for table `links`
--
ALTER TABLE `links`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `label` (`label`);

--
-- Indexes for table `password_reset`
--
ALTER TABLE `password_reset`
  ADD PRIMARY KEY (`token`),
  ADD KEY `user_id` (`user_id`);

--
-- Indexes for table `plugin_schema_versions`
--
ALTER TABLE `plugin_schema_versions`
  ADD PRIMARY KEY (`plugin`);

--
-- Indexes for table `projects`
--
ALTER TABLE `projects`
  ADD PRIMARY KEY (`id`);

--
-- Indexes for table `project_activities`
--
ALTER TABLE `project_activities`
  ADD PRIMARY KEY (`id`),
  ADD KEY `creator_id` (`creator_id`),
  ADD KEY `project_id` (`project_id`),
  ADD KEY `task_id` (`task_id`);

--
-- Indexes for table `project_daily_column_stats`
--
ALTER TABLE `project_daily_column_stats`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `project_daily_column_stats_idx` (`day`,`project_id`,`column_id`),
  ADD KEY `column_id` (`column_id`),
  ADD KEY `project_id` (`project_id`);

--
-- Indexes for table `project_daily_stats`
--
ALTER TABLE `project_daily_stats`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `project_daily_stats_idx` (`day`,`project_id`),
  ADD KEY `project_id` (`project_id`);

--
-- Indexes for table `project_has_categories`
--
ALTER TABLE `project_has_categories`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `idx_project_category` (`project_id`,`name`),
  ADD KEY `categories_project_idx` (`project_id`);

--
-- Indexes for table `project_has_files`
--
ALTER TABLE `project_has_files`
  ADD PRIMARY KEY (`id`),
  ADD KEY `project_id` (`project_id`);

--
-- Indexes for table `project_has_groups`
--
ALTER TABLE `project_has_groups`
  ADD UNIQUE KEY `group_id` (`group_id`,`project_id`),
  ADD KEY `project_id` (`project_id`);

--
-- Indexes for table `project_has_metadata`
--
ALTER TABLE `project_has_metadata`
  ADD UNIQUE KEY `project_id` (`project_id`,`name`);

--
-- Indexes for table `project_has_notification_types`
--
ALTER TABLE `project_has_notification_types`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `project_id` (`project_id`,`notification_type`);

--
-- Indexes for table `project_has_roles`
--
ALTER TABLE `project_has_roles`
  ADD PRIMARY KEY (`role_id`),
  ADD UNIQUE KEY `project_id` (`project_id`,`role`);

--
-- Indexes for table `project_has_users`
--
ALTER TABLE `project_has_users`
  ADD UNIQUE KEY `idx_project_user` (`project_id`,`user_id`),
  ADD KEY `user_id` (`user_id`);

--
-- Indexes for table `project_role_has_restrictions`
--
ALTER TABLE `project_role_has_restrictions`
  ADD PRIMARY KEY (`restriction_id`),
  ADD UNIQUE KEY `role_id` (`role_id`,`rule`),
  ADD KEY `project_id` (`project_id`);

--
-- Indexes for table `remember_me`
--
ALTER TABLE `remember_me`
  ADD PRIMARY KEY (`id`),
  ADD KEY `user_id` (`user_id`);

--
-- Indexes for table `settings`
--
ALTER TABLE `settings`
  ADD PRIMARY KEY (`option`);

--
-- Indexes for table `subtasks`
--
ALTER TABLE `subtasks`
  ADD PRIMARY KEY (`id`),
  ADD KEY `subtasks_task_idx` (`task_id`);

--
-- Indexes for table `subtask_time_tracking`
--
ALTER TABLE `subtask_time_tracking`
  ADD PRIMARY KEY (`id`),
  ADD KEY `user_id` (`user_id`),
  ADD KEY `subtask_id` (`subtask_id`);

--
-- Indexes for table `swimlanes`
--
ALTER TABLE `swimlanes`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `name` (`name`,`project_id`),
  ADD KEY `swimlanes_project_idx` (`project_id`);

--
-- Indexes for table `tags`
--
ALTER TABLE `tags`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `project_id` (`project_id`,`name`);

--
-- Indexes for table `tasks`
--
ALTER TABLE `tasks`
  ADD PRIMARY KEY (`id`),
  ADD KEY `idx_task_active` (`is_active`),
  ADD KEY `column_id` (`column_id`),
  ADD KEY `tasks_reference_idx` (`reference`),
  ADD KEY `tasks_project_idx` (`project_id`),
  ADD KEY `tasks_swimlane_ibfk_1` (`swimlane_id`);

--
-- Indexes for table `task_has_external_links`
--
ALTER TABLE `task_has_external_links`
  ADD PRIMARY KEY (`id`),
  ADD KEY `task_id` (`task_id`);

--
-- Indexes for table `task_has_files`
--
ALTER TABLE `task_has_files`
  ADD PRIMARY KEY (`id`),
  ADD KEY `files_task_idx` (`task_id`);

--
-- Indexes for table `task_has_links`
--
ALTER TABLE `task_has_links`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `task_has_links_unique` (`link_id`,`task_id`,`opposite_task_id`),
  ADD KEY `opposite_task_id` (`opposite_task_id`),
  ADD KEY `task_has_links_task_index` (`task_id`);

--
-- Indexes for table `task_has_metadata`
--
ALTER TABLE `task_has_metadata`
  ADD UNIQUE KEY `task_id` (`task_id`,`name`);

--
-- Indexes for table `task_has_tags`
--
ALTER TABLE `task_has_tags`
  ADD UNIQUE KEY `tag_id` (`tag_id`,`task_id`),
  ADD KEY `task_id` (`task_id`);

--
-- Indexes for table `transitions`
--
ALTER TABLE `transitions`
  ADD PRIMARY KEY (`id`),
  ADD KEY `src_column_id` (`src_column_id`),
  ADD KEY `dst_column_id` (`dst_column_id`),
  ADD KEY `transitions_task_index` (`task_id`),
  ADD KEY `transitions_project_index` (`project_id`),
  ADD KEY `transitions_user_index` (`user_id`);

--
-- Indexes for table `users`
--
ALTER TABLE `users`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `users_username_idx` (`username`);

--
-- Indexes for table `user_has_metadata`
--
ALTER TABLE `user_has_metadata`
  ADD UNIQUE KEY `user_id` (`user_id`,`name`);

--
-- Indexes for table `user_has_notifications`
--
ALTER TABLE `user_has_notifications`
  ADD UNIQUE KEY `user_has_notifications_unique_idx` (`user_id`,`project_id`),
  ADD KEY `user_has_notifications_ibfk_2` (`project_id`);

--
-- Indexes for table `user_has_notification_types`
--
ALTER TABLE `user_has_notification_types`
  ADD PRIMARY KEY (`id`),
  ADD UNIQUE KEY `user_has_notification_types_user_idx` (`user_id`,`notification_type`);

--
-- Indexes for table `user_has_unread_notifications`
--
ALTER TABLE `user_has_unread_notifications`
  ADD PRIMARY KEY (`id`),
  ADD KEY `user_id` (`user_id`);

--
-- AUTO_INCREMENT for dumped tables
--

--
-- AUTO_INCREMENT for table `actions`
--
ALTER TABLE `actions`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `action_has_params`
--
ALTER TABLE `action_has_params`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `columns`
--
ALTER TABLE `columns`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=18;

--
-- AUTO_INCREMENT for table `column_has_move_restrictions`
--
ALTER TABLE `column_has_move_restrictions`
  MODIFY `restriction_id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `column_has_restrictions`
--
ALTER TABLE `column_has_restrictions`
  MODIFY `restriction_id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `comments`
--
ALTER TABLE `comments`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=3;

--
-- AUTO_INCREMENT for table `custom_filters`
--
ALTER TABLE `custom_filters`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `groups`
--
ALTER TABLE `groups`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `last_logins`
--
ALTER TABLE `last_logins`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=1058;

--
-- AUTO_INCREMENT for table `links`
--
ALTER TABLE `links`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=12;

--
-- AUTO_INCREMENT for table `projects`
--
ALTER TABLE `projects`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=5;

--
-- AUTO_INCREMENT for table `project_activities`
--
ALTER TABLE `project_activities`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=2200;

--
-- AUTO_INCREMENT for table `project_daily_column_stats`
--
ALTER TABLE `project_daily_column_stats`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=4714;

--
-- AUTO_INCREMENT for table `project_daily_stats`
--
ALTER TABLE `project_daily_stats`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=1420;

--
-- AUTO_INCREMENT for table `project_has_categories`
--
ALTER TABLE `project_has_categories`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `project_has_files`
--
ALTER TABLE `project_has_files`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `project_has_notification_types`
--
ALTER TABLE `project_has_notification_types`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `project_has_roles`
--
ALTER TABLE `project_has_roles`
  MODIFY `role_id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `project_role_has_restrictions`
--
ALTER TABLE `project_role_has_restrictions`
  MODIFY `restriction_id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `remember_me`
--
ALTER TABLE `remember_me`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=323;

--
-- AUTO_INCREMENT for table `subtasks`
--
ALTER TABLE `subtasks`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=52;

--
-- AUTO_INCREMENT for table `subtask_time_tracking`
--
ALTER TABLE `subtask_time_tracking`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=57;

--
-- AUTO_INCREMENT for table `swimlanes`
--
ALTER TABLE `swimlanes`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=5;

--
-- AUTO_INCREMENT for table `tags`
--
ALTER TABLE `tags`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=39;

--
-- AUTO_INCREMENT for table `tasks`
--
ALTER TABLE `tasks`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=125;

--
-- AUTO_INCREMENT for table `task_has_external_links`
--
ALTER TABLE `task_has_external_links`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT;

--
-- AUTO_INCREMENT for table `task_has_files`
--
ALTER TABLE `task_has_files`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=405;

--
-- AUTO_INCREMENT for table `task_has_links`
--
ALTER TABLE `task_has_links`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=7;

--
-- AUTO_INCREMENT for table `transitions`
--
ALTER TABLE `transitions`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=115;

--
-- AUTO_INCREMENT for table `users`
--
ALTER TABLE `users`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=12;

--
-- AUTO_INCREMENT for table `user_has_notification_types`
--
ALTER TABLE `user_has_notification_types`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=3;

--
-- AUTO_INCREMENT for table `user_has_unread_notifications`
--
ALTER TABLE `user_has_unread_notifications`
  MODIFY `id` int(11) NOT NULL AUTO_INCREMENT, AUTO_INCREMENT=554;

--
-- Constraints for dumped tables
--

--
-- Constraints for table `actions`
--
ALTER TABLE `actions`
  ADD CONSTRAINT `actions_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `action_has_params`
--
ALTER TABLE `action_has_params`
  ADD CONSTRAINT `action_has_params_ibfk_1` FOREIGN KEY (`action_id`) REFERENCES `actions` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `columns`
--
ALTER TABLE `columns`
  ADD CONSTRAINT `columns_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `column_has_move_restrictions`
--
ALTER TABLE `column_has_move_restrictions`
  ADD CONSTRAINT `column_has_move_restrictions_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `column_has_move_restrictions_ibfk_2` FOREIGN KEY (`role_id`) REFERENCES `project_has_roles` (`role_id`) ON DELETE CASCADE,
  ADD CONSTRAINT `column_has_move_restrictions_ibfk_3` FOREIGN KEY (`src_column_id`) REFERENCES `columns` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `column_has_move_restrictions_ibfk_4` FOREIGN KEY (`dst_column_id`) REFERENCES `columns` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `column_has_restrictions`
--
ALTER TABLE `column_has_restrictions`
  ADD CONSTRAINT `column_has_restrictions_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `column_has_restrictions_ibfk_2` FOREIGN KEY (`role_id`) REFERENCES `project_has_roles` (`role_id`) ON DELETE CASCADE,
  ADD CONSTRAINT `column_has_restrictions_ibfk_3` FOREIGN KEY (`column_id`) REFERENCES `columns` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `comments`
--
ALTER TABLE `comments`
  ADD CONSTRAINT `comments_ibfk_1` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `custom_filters`
--
ALTER TABLE `custom_filters`
  ADD CONSTRAINT `custom_filters_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `custom_filters_ibfk_2` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `group_has_users`
--
ALTER TABLE `group_has_users`
  ADD CONSTRAINT `group_has_users_ibfk_1` FOREIGN KEY (`group_id`) REFERENCES `groups` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `group_has_users_ibfk_2` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `last_logins`
--
ALTER TABLE `last_logins`
  ADD CONSTRAINT `last_logins_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `password_reset`
--
ALTER TABLE `password_reset`
  ADD CONSTRAINT `password_reset_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_activities`
--
ALTER TABLE `project_activities`
  ADD CONSTRAINT `project_activities_ibfk_1` FOREIGN KEY (`creator_id`) REFERENCES `users` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `project_activities_ibfk_2` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `project_activities_ibfk_3` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_daily_column_stats`
--
ALTER TABLE `project_daily_column_stats`
  ADD CONSTRAINT `project_daily_column_stats_ibfk_1` FOREIGN KEY (`column_id`) REFERENCES `columns` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `project_daily_column_stats_ibfk_2` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_daily_stats`
--
ALTER TABLE `project_daily_stats`
  ADD CONSTRAINT `project_daily_stats_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_has_categories`
--
ALTER TABLE `project_has_categories`
  ADD CONSTRAINT `project_has_categories_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_has_files`
--
ALTER TABLE `project_has_files`
  ADD CONSTRAINT `project_has_files_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_has_groups`
--
ALTER TABLE `project_has_groups`
  ADD CONSTRAINT `project_has_groups_ibfk_1` FOREIGN KEY (`group_id`) REFERENCES `groups` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `project_has_groups_ibfk_2` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_has_metadata`
--
ALTER TABLE `project_has_metadata`
  ADD CONSTRAINT `project_has_metadata_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_has_notification_types`
--
ALTER TABLE `project_has_notification_types`
  ADD CONSTRAINT `project_has_notification_types_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_has_roles`
--
ALTER TABLE `project_has_roles`
  ADD CONSTRAINT `project_has_roles_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_has_users`
--
ALTER TABLE `project_has_users`
  ADD CONSTRAINT `project_has_users_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `project_has_users_ibfk_2` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `project_role_has_restrictions`
--
ALTER TABLE `project_role_has_restrictions`
  ADD CONSTRAINT `project_role_has_restrictions_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `project_role_has_restrictions_ibfk_2` FOREIGN KEY (`role_id`) REFERENCES `project_has_roles` (`role_id`) ON DELETE CASCADE;

--
-- Constraints for table `remember_me`
--
ALTER TABLE `remember_me`
  ADD CONSTRAINT `remember_me_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `subtasks`
--
ALTER TABLE `subtasks`
  ADD CONSTRAINT `subtasks_ibfk_1` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `subtask_time_tracking`
--
ALTER TABLE `subtask_time_tracking`
  ADD CONSTRAINT `subtask_time_tracking_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `subtask_time_tracking_ibfk_2` FOREIGN KEY (`subtask_id`) REFERENCES `subtasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `swimlanes`
--
ALTER TABLE `swimlanes`
  ADD CONSTRAINT `swimlanes_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `tasks`
--
ALTER TABLE `tasks`
  ADD CONSTRAINT `tasks_ibfk_1` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `tasks_ibfk_2` FOREIGN KEY (`column_id`) REFERENCES `columns` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `tasks_swimlane_ibfk_1` FOREIGN KEY (`swimlane_id`) REFERENCES `swimlanes` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `task_has_external_links`
--
ALTER TABLE `task_has_external_links`
  ADD CONSTRAINT `task_has_external_links_ibfk_1` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `task_has_files`
--
ALTER TABLE `task_has_files`
  ADD CONSTRAINT `task_has_files_ibfk_1` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `task_has_links`
--
ALTER TABLE `task_has_links`
  ADD CONSTRAINT `task_has_links_ibfk_1` FOREIGN KEY (`link_id`) REFERENCES `links` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `task_has_links_ibfk_2` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `task_has_links_ibfk_3` FOREIGN KEY (`opposite_task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `task_has_metadata`
--
ALTER TABLE `task_has_metadata`
  ADD CONSTRAINT `task_has_metadata_ibfk_1` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `task_has_tags`
--
ALTER TABLE `task_has_tags`
  ADD CONSTRAINT `task_has_tags_ibfk_1` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `task_has_tags_ibfk_2` FOREIGN KEY (`tag_id`) REFERENCES `tags` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `transitions`
--
ALTER TABLE `transitions`
  ADD CONSTRAINT `transitions_ibfk_1` FOREIGN KEY (`src_column_id`) REFERENCES `columns` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `transitions_ibfk_2` FOREIGN KEY (`dst_column_id`) REFERENCES `columns` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `transitions_ibfk_3` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `transitions_ibfk_4` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `transitions_ibfk_5` FOREIGN KEY (`task_id`) REFERENCES `tasks` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `user_has_metadata`
--
ALTER TABLE `user_has_metadata`
  ADD CONSTRAINT `user_has_metadata_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `user_has_notifications`
--
ALTER TABLE `user_has_notifications`
  ADD CONSTRAINT `user_has_notifications_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE,
  ADD CONSTRAINT `user_has_notifications_ibfk_2` FOREIGN KEY (`project_id`) REFERENCES `projects` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `user_has_notification_types`
--
ALTER TABLE `user_has_notification_types`
  ADD CONSTRAINT `user_has_notification_types_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;

--
-- Constraints for table `user_has_unread_notifications`
--
ALTER TABLE `user_has_unread_notifications`
  ADD CONSTRAINT `user_has_unread_notifications_ibfk_1` FOREIGN KEY (`user_id`) REFERENCES `users` (`id`) ON DELETE CASCADE;
COMMIT;

/*!40101 SET CHARACTER_SET_CLIENT=@OLD_CHARACTER_SET_CLIENT */;
/*!40101 SET CHARACTER_SET_RESULTS=@OLD_CHARACTER_SET_RESULTS */;
/*!40101 SET COLLATION_CONNECTION=@OLD_COLLATION_CONNECTION */;
